Loading...
HomeMy WebLinkAboutItem 05a - 2027-2031 CIP1 City of Lakeville Memorandum To: Planning Commission From: Justin Miller, City Administrator Julie Stahl, Finance Director Paul Oehme, Public Works Director Zach Johnson, City Engineer Joe Masiarchin, Parks & Recreation Director Date: September 17, 2026 Subject: 2027-2031 Capital Improvement Plan (CIP) Attached is a draft of the proposed 2027-2031 Capital Improvement Plan (CIP). The CIP is comprised of the following components: Transportation, Utility, Environmental Resources, Parks and Recreation, Facilities, Equipment and Technology. Included with this plan are the project descriptions, locations, revenues and expenditures. The 2027-2031 CIP includes public improvement projects due in large part to increased growth, economic conditions, and the resulting increase in revenue from City permits and connection charges to finance infrastructure improvements. The following are the more significant improvement projects included in the 2027-2031 CIP: Transportation  CP XX-01: Annual Pavement Management/Maintenance (2027-2031 construction)  CP XX-02: Annual Street Rehabilitation/Reconstruction (2027-2031 construction)  CP XX-03: Annual Collector Roadway Rehabilitation/Reconstruction (2027-2031 construction)  CP 22-16: Freight Rail Car Storage Facility (2027 construction)  CP 24-05: 179th St/Future CSAH 9 Bridge (2030 construction)  CP 25-04: 185th St/CSAH 60 Expansion (Kenwood Tr - Ipava Ave) (2025 construction; 2026-2028 payment to Dakota County)  CP 25-05: Holyoke Ave/Highview Ave Reconstruction (2031-2032 construction)  CP 26-04: Dodd Blvd/CSAH 9 Modernization (210th St – 202nd St/Kenwood Tr) (2027 construction)  CP 26-05: Interstate 35/CSAH 50 Interchange (2029 construction)  CP 26-15: Lake Marion Greenway (2026 construction; additional XX-15 segments in 2027-2030)  CP 27-11: CSAH 9 and Glacier Way Trail Traffic Signal (2027 construction)  CP 28-04: Dodd Blvd/CSAH 9 Modernization (215th St - 210th St) (2028 construction)  CP 28-05: CSAH 60 and Orchard Trail Traffic Signal (2028 construction)  CP 28-16: Kenrick Ave Extension (181st St-176th St) (2028 construction)  CP 29-04: CSAH 9 Improvements at 194th St and 190th St (2029 construction)  CP 31-07: CSAH 50 Expansion (CSAH 23 – Flagstaff Ave) (2030 construction) 2 Utilities  Watermain maintenance/replacement and sanitary sewer rehabilitation - in conjunction with annual street rehabilitation/reconstruction projects (2027-2031 construction)  Fairfield Water Tower Repainting (2030 construction)  Wells 24 and 25 (2028 construction) Parks  East Community Park (2026-2027 construction)  Voyageur Park (2027 construction)  Bunker Hill Athletic Decks (2028 construction)  Ritter Meadows Park (2028 construction)  Klamath Trail Retaining Wall (2028 construction)  Keokuk Ave/172nd St Park (2030 construction)  Skatepark (2030 construction)  Southwest corner of 210th St & I-35 Park (2031 construction)  Various trail and trail lighting projects (2027-2031 construction) Facilities  Central Maintenance Facility (CMF) Expansion (2027 construction)  Water Treatment Plant (WTP) Satellite Plant (2027 construction)  Fire Station #2 Construction (2026-2027 construction)  Fire Station #3 Rebuild (2027 construction)  Fire Station #1 Renovations (2028 construction)  Police Station Workout Room Expansion (2029 construction) The CIP was presented to the City Council at their September 8 meeting. The final 2027-2031 CIP will be considered for approval at the October 5, 2026 City Council meeting. Minnesota State Statute 462.356 provides that capital improvements are reviewed by the Planning Commission for consistency with the Comprehensive Plan and the Planning Commission report their findings in writing to the City Council. The Planning Commission is not responsible for reviewing the fiscal implications of the CIP. Staff reviewed the CIP and finds it consistent with the Comprehensive Plan. Therefore, staff recommends a motion finding that the capital improvements identified in the 2027-2031 CIP are in compliance with the Comprehensive Plan. CAPITAL IMPROVEMENT PLAN 2027-2031 CITY OF LAKEVILLE DRA F T Capital Improvement Plan 2027-2031 Lakeville, MN Administrative Summary Table of Contents Administrative Summary • Introduction- Page 3 • Categories- Page 3 • Debt Analysis & Tax Impact- Page 4-5 • Additional Considerations- Page 5 Cost Type Summary- Page 6 Funding Source Summary- Page 7 Projects & Funding Sources by Cost Type- Page 9 Project Details- Page 14-121 Street Reconstruction Plan- Page 122 CIP Planning Flowchart- Page 123 CIP Map- Page 124 Produced Using Plan-It CIP Software Page 2 Introduction The Capital Improvement Plan provides a long-range framework to meet the infrastructure needs and development objectives of our community. It provides policy makers and the community with a strategic (documented) approach to implementation and administration of improvement projects and equipment acquisitions. The Plan identifies the allocation of the City’s financial resources and maximizes the use of non-tax revenues to finance the improvements. Municipal State Aid Street Funds (MSA), connection charges, special assessments and other revenue sources are vital elements to financing City improvements. The use of these revenue sources reduces the reliance on property taxes to finance these improvements. The City intends to pursue the financing strategy as presented, but future events may require changes in both costs and revenues. The Capital Improvement Plan represents a significant financial, engineering and development undertaking for the City in the years ahead. The Capital Improvement Plan is consistent with the City’s Comprehensive Plan and takes into consideration projects identified in the Dakota County Capital Improvement Plan. Categories Transportation includes all roads, streets, street lights, bridges and traffic signals within the City with the exception of Interstate I-35 and routine maintenance of County roads. Major funding sources include Municipal State Aid Street funds, special assessments and property taxes. Utility infrastructure includes the construction and major maintenance of all water systems such as wells, towers and the water treatment facility. Utilities also include sanitary sewer and storm sewer systems. The primary source of financing for developing new systems is connection charges collected when property develops or with the issuance of a building permit. Maintenance projects are financed by user fees. The Water Treatment Plant expansion in 2027 is planned to include a combination of bond funding (principal and interest payments to be repaid with user fees), and fund balance/net assets in the Water Trunk Fund and Water Operating Fund, respectively. Environmental Resources system includes lakes, wetlands, streams, prairies and woodlands. Maintenance project are financed with user fees. Parks system includes regional, community and neighborhood parks as well as trails and recreation facilities such as the Arts Center and Heritage Center. Major resources include park dedication fees collected when property develops, and grants. Maintenance projects are financed with property taxes and other revenue sources. A parks bond referendum was approved in the fall of 2021 and related projects have been/are being constructed between 2022-2027. Facilities include the city hall, police station, fire stations, central maintenance facility, arts center, FiRST Center, and other municipal buildings. Primary revenue sources include, but are not limited to, property taxes, General Fund, Water Operating Fund, and planned bond proceeds in several years (for Fire station renovations, CMF expansion, and Water Treatment plant expansion). Equipment includes all major equipment acquisitions and replacement. Primary revenue sources include, but are not limited to, Liquor Fund contributions, General Fund, Utility Funds, sale of assets and property taxes. Technology includes all major technology-related equipment acquisitions and replacement. Primary revenue sources include, but are not limited to, Liquor Fund, General Fund, Utility Funds, and property taxes. Produced Using Plan-It CIP Software Page 3 Debt Analysis and Tax Impact In reviewing the 2027-2031 Capital Improvement Plan, the City Council should consider the level of debt, the commitment of funds to repay that debt, as well as the annual tax impact associated with the scheduled projects. As of 12/31/2026, the City of Lakeville will have $184,455,000 in debt. The following chart reflects the type of debt that comprises the $184.5M. EXISTING CITY DEBT AS OF 12/31/2026 BOND TYPE AMOUNT PURPOSE GO CAPITAL IMPROVEMENT $91,120,000 Various capital projects (Central Maintenance Facility, Police Station, First Center, Fire Station) GO STREET RECONSTRUCTION $16,935,000 Street reconstruction projects GO IMPROVEMENT $44,885,000 Various capital improvement projects; includes special assessment-supported debt GO STATE AID STREET REVENUE $2,815,000 Various street improvement projects GO WATER REVENUE $8,905,000 Holyoke Ave water tower, water treatment facility improvements, wells 21 and 22, 215th St utility improvements HRA LEASE REVENUE- LIQUOR $280,000 Construction of liquor store (2007) TAX ABATEMENT $14,165,000 Arenas projects 2021-2022, Keokuk liquor store construction WATER REVENUE $5,350,000 Watermain replacement (in conjunction with street reconstruction projects) TOTAL REMAINING PRINCIPAL $184,455,000 The 2027-2031 CIP includes projects that will need to be funded by bond proceeds. Bonds are issued for the project costs that the City is funding through tax levies as well as the costs that are specially assessed to property owners. The City anticipates $138,797,000 in bonding for projects in the CIP plan for 2027-2031, including the following- • $33,797,000 for street reconstruction/collector road rehabilitation projects in 2027-2031 • $26,000,000 for the CMF facility expansion in 2027 • $35,000,000 for the bonded portion of a Water Treatment Facility expansion project in 2027 • $20,000,000 in 2027 and $24,000,000 in 2028 for fire station remodel projects. The anticipated bonding amount for 2027 is $88,105,260, which assumes no bonding is needed in 2027 for planned equipment expenditures. The current CIP projections assume no bond funding will be needed for the Municipal State Aid (MSA) projects, which will be dependent on project costs and timing. Major projects scheduled for 2027, which are planned to be funded with bonds are listed below (note that these amounts also include any bonds which will be repaid by special assessments): PLANNED BOND FUNDING IN 2027 PROJECT ESTIMATED BOND AMOUNT 2027 street projects $7,105,260 Central Maintenance Facility expansion 26,000,000 Water treatment satellite plant 35,000,000 Fire station #3 improvements 20,000,000 Total $88,105,260 Major projects that involve a property tax levy component in 2027 are listed below: TAX LEVY FUNDING IN CAPITAL PROJECT FUNDS IN 2027 FUND TAX LEVY IN 2027 Building Fund $1,300,000 Equipment Fund 400,000 Park & Trail Improvement Fund 1,800,000 Pavement Management Fund 2,700,000 Technology Fund 300,000 Total $6,500,000 Project costs in the CIP may be higher than the tax levy amounts above, due to additional funding sources beyond tax levy, such as fund balance, or other sources (as reflected in the CIP). There are sometimes transfers from General Fund balance reserve into Capital Project Funds to reduce the impact on the tax levy, and such transfers are not reflected in the table above. The impact of the 2027-2031 CIP and other anticipated bond payment adjustments on the debt service property tax levy are reflected in the following table: Produced Using Plan-It CIP Software Page 4 PROJECTED CHANGE IN DEBT LEVY 2027 2028 2029 2030 2031 TOTAL 2027-2031 ANNUAL DEBT LEVY $12,297,737 12,897,185 11,984,528 10,397,856 8,547,666 $56,124,973 CHANGE FROM: EXISTING DEBT - 599,448 (912,657) (1,586,672) (1,850,190) (3,750,071) NEW CIP- STREET PROJECTS - 899,000 1,891,000 2,753,000 3,416,000 8,959,000 NEW CIP-FACILITIES - 2,175,663 2,175,663 2,175,663 2,175,663 8,702,650 TOTAL CHANGE - 3,674,111 3,154,006 3,341,990 3,741,473 13,911,579 REVISED DEBT LEVY $12,297,737 $15,971,848 $16,051,191 $15,326,519 $14,139,329 $70,036,552 % CHANGE IN DEBT LEVY 30% 0% (5%) (8%) Each year, certain bond issues mature and the corresponding debt service payments are eliminated. The amount of debt service dropping off each year as payments are made is less than the amount that we are adding for new CIP projects through 2028. This levels out in 2029, and flips the other way in 2030 whereby the amount of debt levy from existing debt falls at a greater rate than what is being proposed to add. This results in a significant increase in the debt service property tax levy in 2028, slight increase in 2029, and decreases in 2030 and 2031. The proposed CIP projects will impact the debt service beginning in 2028. The anticipated bond payments on debt issued in conjunction with these new projects will result in an increased debt service levy of approximately $3,074,000 for 2028, $4,067,000 for 2029, $4,929,000 for 2030, and $5,592,000 for 2031. The $138.8M of bonding for projects in the 2027-2031 CIP will require significant bond payments beginning in 2028 from the following sources: tax levy, special assessments, franchise fees, and the Water Operating Fund/Water Trunk Fund. The estimated annual payments by source are shown in the table and chart below. Funding of New Debt from CIP (Cumulative Payments by Year) Funding source 2028 2029 2030 2031 2032 Tax Levy $3,074,663 $4,066,663 $4,928,663 $5,591,663 $6,260,663 Special Assessments 43,791 205,645 398,642 398,642 398,642 Franchise Fees 1,673,587 3,681,891 3,681,891 3,681,891 3,681,891 Water Funds 3,486,896 3,486,896 3,486,896 3,486,896 3,486,896 Total 8,278,936 11,441,094 12,496,091 13,159,091 13,828,091 Additional Considerations Impact of the Capital Improvement Plan on the Operating Budget The City’s Operating Budget is affected by the Capital Improvement Plan. Capital improvements typically result in ongoing expenses for routine operation, repair and maintenance upon completion or acquisition. Existing City facilities and equipment will eventually require rehabilitation, renovation or upgrades to accommodate new uses or address needed improvements. Older facilities usually involve higher maintenance and repair costs as well. Capital improvements make a positive contribution to the economic vitality, quality of life and fiscal well-being of our community in spite of potential recurring operating costs. Capital projects such as the redevelopment of under-performing or under-used areas of the City, and the infrastructure expansion needed to support new development, help promote the economic development and growth that generates additional operating revenues. These new revenue sources provide the funding needed to maintain, improve and expand the City’s infrastructure. Additional considerations Dakota County staff continue to prepare the Dakota County’s draft 2027-2031 Transportation, Transportation Sales & Use Tax, and Regional Rail Authority Capital Improvement Program. City and County staff continue to coordinate efforts to create CIPs that align with both local and regional transportation needs. Produced Using Plan-It CIP Software Page 5 2027 through 2031 Cost Type Summary Lakeville, MN Cost Type Summary Cost Type 2027 2028 2029 2030 2031 Total Environmental Resources 1,601,500 1,601,500 1,601,500 1,601,500 1,601,500 8,007,500 Equipment 4,116,501 5,417,938 4,469,224 6,016,451 4,503,375 24,523,489 Facilities 87,173,600 26,160,400 8,247,789 6,351,860 1,795,000 129,728,649 Parks 4,041,500 8,117,500 2,729,000 3,827,000 4,099,950 22,814,950 Technology 513,715 730,021 521,998 366,953 148,651 2,281,338 Transportation 36,360,907 23,133,352 16,277,943 14,230,307 19,765,703 109,768,212 Utility 1,932,000 3,635,000 2,105,000 2,775,000 1,945,000 12,392,000 GRAND TOTAL 135,739,723 68,795,711 35,952,454 35,169,071 33,859,179 309,516,138 Produced Using Plan-It CIP Software Page 6 2027 through 2031 Capital Improvement Plan Lakeville, MN Funding Source Summary Source 2027 2028 2029 2030 2031 Total Arenas 1,534 7,599 3,628 3,696 4,384 20,841 Building Fund 938,600 1,105,400 8,027,789 1,195,000 1,705,000 12,971,789 Communications Fund 59,932 79,455 81,751 79,262 99,237 399,637 Dakota County 14,769,824 4,124,000 354,250 2,458,000 10,000 21,716,074 Dakota County- Advance funding of city share -465,454 -2,674,000 -336,000 -3,475,454 Environmental Resources Fund 1,690,872 1,351,974 1,343,878 2,198,744 1,508,194 8,093,662 Equipment Fund 3,294,423 5,047,526 3,863,123 4,694,237 3,494,305 20,393,614 Escrows 362,029 311,046 657,600 1,330,675 General Fund 319,505 196,242 266,212 209,517 236,994 1,228,470 G.O. Improvement Bonds- Franchise Fees (Facilities) 20,000,000 24,000,000 44,000,000 G.O. Improvement Bonds - Sp. Assess. 330,077 1,220,000 1,454,737 3,004,814 G.O. Improvement Bonds- Taxes (Facilities) 26,000,000 26,000,000 G.O. Improvement Bonds - Taxes (Streets) 6,775,183 7,481,056 6,497,047 4,995,932 5,043,203 30,792,421 Improvement Construction Fund 225,000 225,000 Liquor Fund 176,367 299,222 70,366 674,978 102,455 1,323,388 MSA/MSA Bonds - Sp. Assess. 350,000 350,000 Municipal State Aid 2,163,680 7,726,250 3,466,633 2,634,375 7,214,900 23,205,838 Other cost share arrangement- Credit River (Judicial Rd) 127,000 127,000 Other funding- Federal 325,000 325,000 Other funding- State 7,229,958 7,229,958 Park Dedication Fund 2,657,000 4,515,000 1,524,791 2,912,000 3,185,000 14,793,791 Park & Trail Improvement Fund 1,889,500 3,782,500 1,394,000 1,347,000 2,314,950 10,727,950 Pavement Management Fund 2,722,500 2,750,000 2,720,000 2,790,000 2,865,000 13,847,500 Sanitary Sewer Operating Fund 1,309,376 1,303,438 1,361,704 1,240,633 1,889,643 7,104,794 Sanitary Sewer Trunk Fund 75,000 175,000 167,968 75,000 75,000 567,968 Stormwater Infrastructure Fund 585,000 600,000 582,672 205,000 1,240,000 3,212,672 Streetlight Operating Fund 10,000 50,000 60,000 Technology Fund 322,338 525,564 450,356 295,062 120,841 1,714,161 Vermillion River Watershed JPO 10,000 10,000 10,000 10,000 10,000 50,000 Water Operating Fund 10,500,479 2,293,439 2,221,704 3,710,635 1,367,473 20,093,730 Water Revenue Bonds 35,000,000 35,000,000 Produced Using Plan-It CIP Software Page 7 Source 2027 2028 2029 2030 2031 Total Water Trunk Fund -3,635,000 2,565,000 395,845 3,440,000 315,000 3,080,845 GRAND TOTAL 135,769,723 68,795,711 35,922,454 35,169,071 33,859,179 309,516,138 Produced Using Plan-It CIP Software Page 8 2027 through 2031 Projects & Funding Sources by Cost type Lakeville, MN Projects & Funding Sources By Cost Type Cost Type Project # 2027 2028 2029 2030 2031 Total Environmental Resources East Lake Rough Fish Barrier 23-58 35,000 35,000 35,000 35,000 35,000 175,000 Forestry (Ash tree injection/removal, reforestatio ER-05 141,500 141,500 141,500 141,500 141,500 707,500 Lake Management ER-02 110,000 110,000 110,000 110,000 110,000 550,000 Storm Water Conveyance System Expansion ER-04 100,000 100,000 100,000 100,000 100,000 500,000 Stormwater Infrastructure Maintenance ER-03 960,000 960,000 960,000 960,000 960,000 4,800,000 Vegetation Management - City Outlots/ Public land ER-06 170,000 170,000 170,000 170,000 170,000 850,000 Water Quality and Water Conservation ER-01 85,000 85,000 85,000 85,000 85,000 425,000 Environmental Resources Total 1,601,500 1,601,500 1,601,500 1,601,500 1,601,500 8,007,500 Dakota County 10,000 10,000 10,000 10,000 10,000 50,000 Environmental Resources Fund 1,340,000 1,340,000 1,340,000 1,340,000 1,340,000 6,700,000 General Fund 141,500 141,500 141,500 141,500 141,500 707,500 Stormwater Infrastructure Fund 100,000 100,000 100,000 100,000 100,000 500,000 Vermillion River Watershed JPO 10,000 10,000 10,000 10,000 10,000 50,000 Source Grand Total 1,601,500 1,601,500 1,601,500 1,601,500 1,601,500 8,007,500 Equipment Communications PEG-Equipment E-10 54,000 70,000 77,000 75,000 95,000 371,000 Construction Services-Equipment E-07 69,414 30,495 56,000 155,909 Environmental Resources - Equipment E-11 692,835 692,835 Facilities - Equipment E-05 45,021 46,296 91,317 Fire - Equipment E-02 421,542 1,103,344 290,000 1,537,900 99,220 3,452,006 Inspections-Equipment E-06 69,000 72,600 141,600 Liquor-Equipment E-08 34,880 34,880 Park Maintenance-Equipment E-04 551,179 732,095 768,585 604,887 457,858 3,114,604 Police-Equipment E-01 1,073,660 1,630,133 1,343,932 1,086,173 1,479,134 6,613,032 Streets-Equipment E-03 1,847,645 1,590,400 1,475,823 1,639,573 1,647,392 8,200,833 Utilities-Equipment E-12 54,040 245,670 379,509 324,083 652,171 1,655,473 Equipment Total 4,116,501 5,417,938 4,469,224 6,016,451 4,503,375 24,523,489 Communications Fund 54,000 70,000 77,000 75,000 95,000 371,000 Environmental Resources Fund 346,075 855,114 166,405 1,367,594 Equipment Fund 3,294,423 5,047,526 3,863,123 4,694,237 3,494,305 20,393,614 General Fund 138,005 54,742 114,712 68,017 95,494 470,970 Liquor Fund 34,880 34,880 Other funding- State 229,958 229,958 Sanitary Sewer Operating Fund 53,003 122,835 189,755 162,041 652,171 1,179,805 Water Operating Fund 1,037 122,835 189,754 162,042 0 475,668 Source Grand Total 4,116,501 5,417,938 4,469,224 6,016,451 4,503,375 24,523,489 Facilities Arts Center-Maintenance/ Improvements B-05 645,000 180,000 445,000 350,000 1,620,000 City Hall Building Maintenance/ Improvements B-01 185,000 245,000 867,000 70,000 130,000 1,497,000 CMF Building Maintenance/ Improvements B-02 25,670,000 3,147,704 375,000 520,000 29,712,704 Produced Using Plan-It CIP Software Page 9 Cost Type Project # 2027 2028 2029 2030 2031 Total Fine Arts Building-Maintenance/ Improvements B-06 100,000 570,000 670,000 Fire Station #1-Building Maintenance/ Improvements B-07 20,500,000 20,500,000 Fire Station #3-Building Maintenance/ Improvements B-09 20,000,000 3,500,000 23,500,000 Fire Station #4-Building Maintenance/ Improvements B-10 154,700 154,700 FiRST Center Facility Maintenance/ Improvements B-17 100,000 30,000 130,000 Galaxie Liquor Store- Maintenance/ Improv B-15 80,000 331,570 65,000 476,570 Heritage Center-Maintenance/ Improvements B-04 43,000 228,000 745,000 280,000 75,000 1,371,000 Heritage Liquor Store- Maintenance/ Improv B-13 15,000 95,000 200,000 25,000 335,000 Kenrick Liquor Store- Maintenance/ Improv B-14 15,000 30,290 45,290 Keokuk Liquor Store- Maintenance/ Improv B-12 70,000 70,000 Police Station- Building Maintenance/ Improvements B-03 165,600 62,400 2,963,385 25,000 600,000 3,816,385 Water Treatment Facilty-Maintenance/ Improvements B-16 40,235,000 880,000 190,000 4,525,000 45,830,000 Facilities Total 87,173,600 26,160,400 8,247,789 6,351,860 1,795,000 129,728,649 Building Fund 938,600 1,105,400 8,027,789 1,195,000 1,705,000 12,971,789 G.O. Improvement Bonds- Franchise Fees (Facilities) 20,000,000 24,000,000 44,000,000 G.O. Improvement Bonds- Taxes (Facilities) 26,000,000 26,000,000 Liquor Fund 30,000 175,000 631,860 90,000 926,860 Water Operating Fund 9,235,000 880,000 190,000 1,500,000 11,805,000 Water Revenue Bonds 35,000,000 35,000,000 Water Trunk Fund -4,000,000 3,025,000 -975,000 Source Grand Total 87,203,600 26,160,400 8,217,789 6,351,860 1,795,000 129,728,649 Parks Bunker Hill Athletic Decks P-27 70,000 750,000 820,000 East Community Park Phase II 25-20 500,000 500,000 Future Park Land Acquisition P-04 2,000,000 100,000 100,000 100,000 2,300,000 Kensington Park Athletic Deck and Parking Lot P-26 30,000 300,000 330,000 Keokuk Avenue/172nd St. Park P-11 75,000 825,000 900,000 Klamath Trail Retaining Wall 23-13 30,000 1,500,000 1,530,000 Other Projects P-19 67,000 430,000 355,000 325,000 330,000 1,507,000 Park Development - Adminstrative Projects P-02 20,000 20,000 20,000 20,000 20,000 100,000 Park Development - Developer Credits P-03 435,000 435,000 435,000 435,000 435,000 2,175,000 Park Improvements (Various Parks) P-06 394,000 469,000 137,000 162,000 862,000 2,024,000 Park Parking Lot Reconstruction P-09 210,000 113,000 55,000 45,000 90,000 513,000 Parks Major Maintenance - Bldgs/ Shelters/Grounds P-17 8,000 25,000 500 24,850 0 58,350 Parks Major Maintenance - Courts P-20 30,000 22,000 12,000 51,400 60,200 175,600 Parks Major Maintenance - Fields P-16 37,000 39,000 39,000 12,000 14,000 141,000 Parks Major Maintenance - General P-01 18,500 19,500 19,500 19,750 19,750 97,000 Parks Major Maintenance - Open Space P-15 37,000 37,000 37,000 38,000 38,000 187,000 Parks - New Parking Lots & Expansions P-24 530,000 530,000 Playground Replacement P-08 340,000 650,000 384,000 384,000 390,000 2,148,000 Ritter Meadows Park P-13 60,000 870,000 930,000 Skatepark P-12 50,000 600,000 650,000 Produced Using Plan-It CIP Software Page 10 Cost Type Project # 2027 2028 2029 2030 2031 Total S of 185th and E of Future Ixonia Ave Ext- Park P-18 75,000 75,000 S.W. Corner of 210th Street & I-35 P-25 75,000 925,000 1,000,000 Trail Improvements (Various Trails) P-05 535,000 708,000 710,000 710,000 741,000 3,404,000 Voyageur Park P-14 720,000 720,000 Parks Total 4,041,500 8,117,500 2,729,000 3,827,000 4,099,950 22,814,950 Park Dedication Fund 2,402,000 4,335,000 1,335,000 2,480,000 1,985,000 12,537,000 Park & Trail Improvement Fund 1,639,500 3,782,500 1,394,000 1,347,000 2,114,950 10,277,950 Source Grand Total 4,041,500 8,117,500 2,729,000 3,827,000 4,099,950 22,814,950 Technology Technology-Arenas T-04 1,534 7,599 3,628 3,696 4,384 20,841 Technology-Communications T-05 2,440 0 0 823 3,392 6,655 Technology-Environmental Resources T-07 1,946 4,255 823 1,099 8,123 Technology - General Government T-01 40,941 12,792 9,704 39,465 11,210 114,112 Technology-Liquor T-06 120,283 53,598 17,431 6,146 197,458 Technology-Network infrastructure T-10 183,513 496,879 249,660 180,720 44,389 1,155,161 Technology- Parks & recreation T-09 11,827 21,377 15,184 3,552 12,472 64,412 Technology-Public Safety T-02 127,734 120,300 221,883 102,723 46,062 618,702 Technology-Public Works T-03 6,961 5,907 20,094 16,499 18,473 67,934 Technology-Utilities T-08 16,536 7,314 1,845 1,221 1,024 27,940 Technology Total 513,715 730,021 521,998 366,953 148,651 2,281,338 Arenas 1,534 7,599 3,628 3,696 4,384 20,841 Communications Fund 5,932 9,455 4,751 4,262 4,237 28,637 Environmental Resources Fund 4,797 11,974 3,878 3,630 1,789 26,068 Liquor Fund 146,367 124,222 35,486 43,118 12,455 361,648 Sanitary Sewer Operating Fund 16,373 25,603 11,949 8,592 2,472 64,989 Technology Fund 322,338 525,564 450,356 295,062 120,841 1,714,161 Water Operating Fund 16,374 25,604 11,950 8,593 2,473 64,994 Source Grand Total 513,715 730,021 521,998 366,953 148,651 2,281,338 Transportation 195th Street Bridge Replacement 31-08 2,000,000 2,000,000 200th Street (Hamburg to Cedar) 28-05 75,000 1,600,000 1,675,000 Collector Roadway Rehabilitation XX-03 3,322,260 2,371,102 2,301,784 1,015,932 963,203 9,974,281 County Pavement Preservation/City Utility Repairs XX-10 35,000 35,000 CSAH 23 Alignment Study (Griffon Tr - 135th St) 29-05 31,500 31,500 CSAH 23 M&O (CSAH 9 to CSAH 42) 27-09 53,568 53,568 CSAH 31 and CSAH 46 Traffic Signal 27-06 0 0 CSAH 46 and Foliage Avenue Traffic Signal 28-06 52,031 253,125 305,156 CSAH 46 and Galaxie Avenue Traffic Signal 28-07 59,063 253,125 312,188 CSAH 46 and Lac Lavon/Interlachen Traffic Signal 30-05 104,062 534,375 638,437 CSAH 50 and Iberia Avenue Traffic Safety Mgmt 31-05 140,000 67,500 207,500 CSAH 50/CSAH 60 RAB Modifications 26-08 1 1 CSAH 50 Expansion (CSAH 23 - Flagstaff Ave) 31-07 295,000 150,000 1,910,000 2,355,000 CSAH 5 and Kenyon Avenue Traffic Signal 27-05 141,000 141,000 CSAH 60/185th Street (Kenwood Tr- Ipava Ave) 25-04 0 0 0 0 CSAH 60 and Judicial Road Traffic Signal 31-09 50,000 50,000 Produced Using Plan-It CIP Software Page 11 Cost Type Project # 2027 2028 2029 2030 2031 Total CSAH 60 and Orchard Trail Traffic Signal 27-07 80,156 396,000 476,156 CSAH 9 and Glacier Way Traffic Signal 27-11 584,500 584,500 CSAH 9/Dodd Blvd Modernization (215th St-210th St) 28-04 843,750 4,840,000 5,683,750 CSAH 9 Improvements at 194th St & 190th St 29-04 231,000 75,938 1,701,000 2,007,938 CSAH 9 Modernization (210th St - Heritage Dr) 26-04 13,127,529 13,127,529 Freight Rail Car Storage Facility 22-16 7,475,000 7,475,000 Future CSAH 9/CSAH 31 Traffic Signal System 23-08 0 0 Holyoke/Highview Avenue Reconstruction 25-05 8,860,000 8,860,000 Interstate 35/CSAH 50 Interchange Reconstruction 26-05 2,293,549 675,000 1,843,659 4,812,208 Kenrick Ave Extension (181st St-176th St) P28-16 2,500,000 2,500,000 Lake Marion Greenway XX-15 567,500 150,000 405,000 2,880,000 4,002,500 Pavement Management - Maintenance XX-01 2,580,000 2,950,000 2,920,000 2,990,000 3,065,000 14,505,000 Street Reconstruction XX-02 4,840,000 6,670,000 6,925,000 4,710,000 4,810,000 27,955,000 Transportation Total 36,360,907 23,133,352 16,277,943 14,230,307 19,765,703 109,768,212 Dakota County 14,759,824 4,114,000 344,250 2,448,000 21,666,074 Dakota County- Advance funding of city share -465,454 -2,674,000 -336,000 -3,475,454 Escrows 362,029 311,046 657,600 1,330,675 General Fund 40,000 10,000 50,000 G.O. Improvement Bonds - Sp. Assess. 330,077 1,220,000 1,454,737 3,004,814 G.O. Improvement Bonds - Taxes (Streets) 6,775,183 7,481,056 6,497,047 4,995,932 5,043,203 30,792,421 Improvement Construction Fund 225,000 225,000 MSA/MSA Bonds - Sp. Assess. 350,000 350,000 Municipal State Aid 2,163,680 7,726,250 3,466,633 2,634,375 7,214,900 23,205,838 Other cost share arrangement- Credit River (Judicial Rd) 127,000 127,000 Other funding- Federal 325,000 325,000 Other funding- State 7,000,000 7,000,000 Park Dedication Fund 255,000 180,000 189,791 432,000 1,200,000 2,256,791 Park & Trail Improvement Fund 250,000 200,000 450,000 Pavement Management Fund 2,722,500 2,750,000 2,720,000 2,790,000 2,865,000 13,847,500 Sanitary Sewer Operating Fund 385,000 375,000 375,000 375,000 520,000 2,030,000 Sanitary Sewer Trunk Fund 100,000 92,968 192,968 Stormwater Infrastructure Fund 485,000 500,000 482,672 105,000 1,140,000 2,712,672 Streetlight Operating Fund 10,000 50,000 60,000 Water Operating Fund 611,068 700,000 850,000 450,000 525,000 3,136,068 Water Trunk Fund 350,000 130,845 480,845 Source Grand Total 36,360,907 23,133,352 16,277,943 14,230,307 19,765,703 109,768,212 Utility Fiber Optic Cable Connection U-10 62,000 70,000 60,000 80,000 80,000 352,000 Sanitary Sewer Inflow/Infiltration Maintenance U-03 575,000 575,000 575,000 575,000 575,000 2,875,000 Sanitary Sewer Lift Station Rehabilitation U-02 255,000 175,000 180,000 80,000 100,000 790,000 Sanitary Sewer Trunk Improvements U-01 75,000 75,000 75,000 75,000 75,000 375,000 Tower and Reservoir Maintenance U-08 150,000 1,000,000 1,150,000 Water Distribution Features U-06 150,000 150,000 300,000 Watermain Trunk Extensions U-05 265,000 265,000 265,000 265,000 265,000 1,325,000 Water meter replacement U-09 350,000 400,000 425,000 425,000 425,000 2,025,000 Well and Pump Rehabilitation U-07 250,000 125,000 375,000 125,000 375,000 1,250,000 Produced Using Plan-It CIP Software Page 12 Cost Type Project # 2027 2028 2029 2030 2031 Total Well Construction U-04 100,000 1,800,000 50,000 1,950,000 Utility Total 1,932,000 3,635,000 2,105,000 2,775,000 1,945,000 12,392,000 Sanitary Sewer Operating Fund 855,000 780,000 785,000 695,000 715,000 3,830,000 Sanitary Sewer Trunk Fund 75,000 75,000 75,000 75,000 75,000 375,000 Water Operating Fund 637,000 565,000 980,000 1,590,000 840,000 4,612,000 Water Trunk Fund 365,000 2,215,000 265,000 415,000 315,000 3,575,000 Source Grand Total 1,932,000 3,635,000 2,105,000 2,775,000 1,945,000 12,392,000 GRAND TOTAL 135,739,723 68,795,711 35,952,454 35,169,071 33,859,179 309,516,138 Produced Using Plan-It CIP Software Page 13 2027 thru 2031 Project Details Lakeville, MN Project Name East Lake Rough Fish Barrier Project # 23-58 Contact Zach Johnson, City Engineer Cost Type Environmental Resources Department Environmental Resources Funding Description Environmental Resources Fund Expenditures 2027 2028 2029 2030 2031 Total Engineering/Design/Other costs 35,000 35,000 35,000 35,000 35,000 175,000 Total 35,000 35,000 35,000 35,000 35,000 175,000 Funding Sources 2027 2028 2029 2030 2031 Total Environmental Resources Fund 35,000 35,000 35,000 35,000 35,000 175,000 Total 35,000 35,000 35,000 35,000 35,000 175,000 Produced Using Plan-It CIP Software Page 14 2027 thru 2031 Project Details Lakeville, MN Project Name Water Quality and Water Conservation Project # ER-01 Contact Zach Johnson, City Engineer Cost Type Environmental Resources Type Other Department Environmental Resources Funding Description Environmental Resources Fund County Project # N/A SP/SAP # N/A JPA # N/A Description Water Quality Best Management Practices • Partnership projects aligning with Black Dog Watershed Water Management Organization, Dakota County Soil and Water Conservation District and Vermillion River Watershed Joint Powers Organization restoration and protection strategies. Funding intended as City’s cost-share to meet partnership or grant matching requirements. Emphasis on Federal Clean Water Act, Minnesota Pollution Control Agency MS4 permit and Total Maximum Daily Load compliance. Urban Restoration - Public System Initiatives and Improvements • Program designed to restore and manage landscaping at public facilities and public open spaces by replacing hardscape and lawns with native plants/ low-maintenance vegetation. Best management practices include native grasses/plants, prairies, rain gardens and woodlands to provide stormwater rate control/volume reduction or water quality improvements. Water Conservation • Program designed to implement water conservation strategies to reduce water use. Best management practices include water reuse and smart irrigation systems. Expenditures 2027 2028 2029 2030 2031 Total Water Quality BMPs 75,000 75,000 75,000 75,000 75,000 375,000 Urban Restoration- Public System Initiatives 10,000 10,000 10,000 10,000 10,000 50,000 Total 85,000 85,000 85,000 85,000 85,000 425,000 Funding Sources 2027 2028 2029 2030 2031 Total Environmental Resources Fund 85,000 85,000 85,000 85,000 85,000 425,000 Total 85,000 85,000 85,000 85,000 85,000 425,000 Produced Using Plan-It CIP Software Page 15 2027 thru 2031 Project Details Lakeville, MN Project Name Lake Management Project # ER-02 Contact Zach Johnson, City Engineer Cost Type Environmental Resources Type Other Department Environmental Resources Funding Description Environmental Resources Fund County Project # N/A SP/SAP # N/A JPA # N/A Description Annual management program designed to promote and protect public water resources. Annual assessments, including aquatic plant surveys, aquatic invasive species monitoring, fish surveys and water monitoring/sampling, guide best management practices and strategies, and prioritize and schedule treatments. Best management practices and strategies include chemical treatments, education and outreach, and fish management. Expenditures 2027 2028 2029 2030 2031 Total Water Quality Assessment 60,000 60,000 60,000 60,000 60,000 300,000 Water Quality Treatment 50,000 50,000 50,000 50,000 50,000 250,000 Total 110,000 110,000 110,000 110,000 110,000 550,000 Funding Sources 2027 2028 2029 2030 2031 Total Environmental Resources Fund 100,000 100,000 100,000 100,000 100,000 500,000 Dakota County 10,000 10,000 10,000 10,000 10,000 50,000 Total 110,000 110,000 110,000 110,000 110,000 550,000 Produced Using Plan-It CIP Software Page 16 2027 thru 2031 Project Details Lakeville, MN Project Name Stormwater Infrastructure Maintenance Project # ER-03 Contact Zach Johnson, City Engineer Cost Type Environmental Resources Type Maintenance Department Engineering Funding Description Environmental Resources Fund Description Stormwater Basin Rehabilitation • Annual maintenance program designed to extend service life/minimize life-cycle costs of public stormwater management basins. Stormwater management basins improve water quality of stormwater runoff and reduce peak stormwater discharge rates. Public stormwater management basins are inspected regularly to prioritize and schedule maintenance and rehabilitation projects. Best management practices include maintenance at emergency overflow/easement areas, sediment/vegetation removal and slope restoration. Emphasis on Minnesota Pollution Control Agency Municipal Separate Storm Sewer System (MS4) permit compliance. Stormwater Infrastructure Maintenance/Rehabilitation • Annual preventive maintenance program designed to protect the City’s investment in public stormwater infrastructure. Best management practices include flared-end section repairs, sediment removal, storm sewer pipe and manhole repairs, and stormwater conveyance systems improvements. Emphasis on Minnesota Pollution Control Agency Municipal Separate Storm Sewer System (MS4) permit compliance. Flared-End Section (FES) Maintenance • Annual maintenance program designed to improve the overall performance and effectiveness of the City’s stormwater management system. Best management practices include removal of accumulated sediment that is restricting stormwater flow through flared-end sections, stormwater infrastructure designed to convey water to/from stormwater management basins. Stormwater Structure Sump Filling • Annual program designed to improve the overall efficiency and effectiveness in maintaining the performance of the City's stromwater management. Expenditures 2027 2028 2029 2030 2031 Total Stormwater Basin Rehabilitation 450,000 450,000 450,000 450,000 450,000 2,250,000 Stormwater Infrastructure maintenance/rehabilitation 290,000 290,000 290,000 290,000 290,000 1,450,000 Creeks- proactive/preventative maintenance 100,000 100,000 100,000 100,000 100,000 500,000 FES Maintenance- MS4 Pond/ Outfall Insp. 85,000 85,000 85,000 85,000 85,000 425,000 Stormwater structure sump filling 35,000 35,000 35,000 35,000 35,000 175,000 Total 960,000 960,000 960,000 960,000 960,000 4,800,000 Funding Sources 2027 2028 2029 2030 2031 Total Environmental Resources Fund 950,000 950,000 950,000 950,000 950,000 4,750,000 Vermillion River Watershed JPO 10,000 10,000 10,000 10,000 10,000 50,000 Total 960,000 960,000 960,000 960,000 960,000 4,800,000 Produced Using Plan-It CIP Software Page 17 2027 thru 2031 Project Details Lakeville, MN Project Name Storm Water Conveyance System Expansion Project # ER-04 Contact Zach Johnson, City Engineer Cost Type Environmental Resources Expenditures 2027 2028 2029 2030 2031 Total Construction 100,000 100,000 100,000 100,000 100,000 500,000 Total 100,000 100,000 100,000 100,000 100,000 500,000 Funding Sources 2027 2028 2029 2030 2031 Total Stormwater Infrastructure Fund 100,000 100,000 100,000 100,000 100,000 500,000 Total 100,000 100,000 100,000 100,000 100,000 500,000 Produced Using Plan-It CIP Software Page 18 2027 thru 2031 Project Details Lakeville, MN Project Name Forestry (Ash tree injection/removal, reforestatio Project # ER-05 Contact Zach Jorgensen, City Forester Cost Type Environmental Resources Type Maintenance Department Environmental Resources Description Annual maintenance program designed to manage, preserve, and protect public woodland assets. Best management practices include Emerald Ash Borer program (tree injections, tree removal/stump grinding of infected trees and reforestation of public parks/open spaces). Expenditures 2027 2028 2029 2030 2031 Total Ash tree injection 60,000 55,000 55,000 55,000 55,000 280,000 Ash tree removal 53,000 56,000 56,000 56,000 56,000 277,000 Reforestation 28,500 30,500 30,500 30,500 30,500 150,500 Total 141,500 141,500 141,500 141,500 141,500 707,500 Funding Sources 2027 2028 2029 2030 2031 Total General Fund 141,500 141,500 141,500 141,500 141,500 707,500 Total 141,500 141,500 141,500 141,500 141,500 707,500 Produced Using Plan-It CIP Software Page 19 2027 thru 2031 Project Details Lakeville, MN Project Name Vegetation Management - City Outlots/Public land Project # ER-06 Contact Zach Jorgensen, City Forester Cost Type Environmental Resources Type Maintenance Department Environmental Resources Description Annual maintenance program designed to help establish deep-rooted native vegetation that will help prevent erosion and filter out chemicals, and nutrients, like phosphorous, that degrades water quality. Managing invasive and noxious weeds also helps to establish the native vegetation, increase biodiversity, and improve habitat for local wildlife. Expenditures 2027 2028 2029 2030 2031 Total Vegetation maintenance-City outlots/public land 170,000 170,000 170,000 170,000 170,000 850,000 Total 170,000 170,000 170,000 170,000 170,000 850,000 Funding Sources 2027 2028 2029 2030 2031 Total Environmental Resources Fund 170,000 170,000 170,000 170,000 170,000 850,000 Total 170,000 170,000 170,000 170,000 170,000 850,000 Produced Using Plan-It CIP Software Page 20 2027 thru 2031 Project Details Lakeville, MN Project Name Police-Equipment Project # E-01 Contact Bob Mach, Fleet Supervisor Cost Type Equipment Type Equipment Department Police Department Funding Description Equipment Fund Description The CIP includes anticipated replacement/addition of various equipment costs for the Police division. Expenditures 2027 2028 2029 2030 2031 Total Equipment purchase - squad vehicles 610,000 1,030,000 1,282,600 981,000 1,288,000 5,191,600 Equipment purchase - radios 345,000 351,505 9,890 96,823 45,138 848,356 Equipment Purchase - attachments 0 172,000 0 0 0 172,000 Equipment purchase - safety equipment 76,150 57,644 30,742 6,384 0 170,920 Equipment purchase - firearms 42,510 18,984 20,700 1,966 55,841 140,001 Equipment purchase - supplemental equipment 0 0 0 0 90,155 90,155 Total 1,073,660 1,630,133 1,343,932 1,086,173 1,479,134 6,613,032 Funding Sources 2027 2028 2029 2030 2031 Total Equipment Fund 1,050,090 1,621,687 1,328,715 1,074,156 1,456,240 6,530,888 General Fund 23,570 8,446 15,217 12,017 22,894 82,144 Total 1,073,660 1,630,133 1,343,932 1,086,173 1,479,134 6,613,032 Produced Using Plan-It CIP Software Page 21 2027 thru 2031 Project Details Lakeville, MN Project Name Fire - Equipment Project # E-02 Contact Bob Mach, Fleet Supervisor Cost Type Equipment Type Equipment Department Fire Funding Description Equipment Fund Description The CIP includes anticipated replacement/addition of various equipment costs for the Fire division. Expenditures 2027 2028 2029 2030 2031 Total Equipment purchase - multi-year fire equipment 0 800,000 0 1,532,000 0 2,332,000 Equipment purchase - radios 177,644 177,644 0 0 0 355,288 Equipment purchase - supplemental equipment 243,898 34,500 0 0 38,720 317,118 Equipment Purchase - vehicle 0 0 210,000 0 60,500 270,500 Equipment purchase - safety equipment 0 91,200 80,000 0 0 171,200 Equipment Purchase - Trailer 0 0 0 5,900 0 5,900 Total 421,542 1,103,344 290,000 1,537,900 99,220 3,452,006 Funding Sources 2027 2028 2029 2030 2031 Total Equipment Fund 421,542 1,103,344 290,000 1,537,900 99,220 3,452,006 Total 421,542 1,103,344 290,000 1,537,900 99,220 3,452,006 Produced Using Plan-It CIP Software Page 22 2027 thru 2031 Project Details Lakeville, MN Project Name Streets-Equipment Project # E-03 Contact Bob Mach, Fleet Supervisor Cost Type Equipment Type Equipment Department Streets Funding Description Equipment Fund Description The CIP includes anticipated replacement/addition of various equipment costs for the Streets division. Expenditures 2027 2028 2029 2030 2031 Total Equipment Purchase - plow truck 695,580 1,114,400 713,000 731,600 750,200 4,004,780 Equipment purchase - heavy equipment 692,150 459,200 606,498 79,392 440,429 2,277,669 Equipment purchase - sweepers (split 50-50 with Fund 7450) 459,915 0 0 324,558 332,809 1,117,282 Equipment purchase - supplemental equipment 0 16,800 87,325 362,423 123,954 590,502 Equipment Purchase - vehicle 0 0 69,000 141,600 0 210,600 Total 1,847,645 1,590,400 1,475,823 1,639,573 1,647,392 8,200,833 Funding Sources 2027 2028 2029 2030 2031 Total Equipment Fund 1,271,612 1,590,400 1,475,823 1,477,294 1,480,987 7,296,116 Environmental Resources Fund 346,075 0 0 162,279 166,405 674,759 Other funding- State 229,958 0 0 0 0 229,958 Total 1,847,645 1,590,400 1,475,823 1,639,573 1,647,392 8,200,833 Produced Using Plan-It CIP Software Page 23 2027 thru 2031 Project Details Lakeville, MN Project Name Park Maintenance-Equipment Project # E-04 Contact Bob Mach, Fleet Supervisor Cost Type Equipment Type Equipment Department Park Maintenance Funding Description Equipment Fund Description The CIP includes anticipated replacement/addition of various equipment costs for the Park Maintenance division. Expenditures 2027 2028 2029 2030 2031 Total Equipment purchase - heavy equipment 91,898 406,911 256,450 0 151,250 906,509 Equipment Purchase - vehicle 132,488 64,614 110,469 309,687 191,710 808,968 Equipment purchase - mowers 111,289 114,352 251,796 191,802 0 669,239 Equipment purchase - supplemental equipment 0 42,618 53,155 103,398 99,168 298,339 Equipment purchase - load & pack refuse 215,504 0 0 0 0 215,504 Equipment Purchase - Trailer 0 72,800 34,500 0 15,730 123,030 Equipment purchase - seasonal staff equipment 0 30,800 62,215 0 0 93,015 Total 551,179 732,095 768,585 604,887 457,858 3,114,604 Funding Sources 2027 2028 2029 2030 2031 Total Equipment Fund 551,179 732,095 768,585 604,887 457,858 3,114,604 Total 551,179 732,095 768,585 604,887 457,858 3,114,604 Produced Using Plan-It CIP Software Page 24 2027 thru 2031 Project Details Lakeville, MN Project Name Facilities - Equipment Project # E-05 Contact Tom Breeggemann, Facilities Supervisor Cost Type Equipment Type Equipment Department General Government Facilities Funding Description Equipment Fund Description The CIP includes anticipated replacement/addition of various equipment costs for the Facilities division. Expenditures 2027 2028 2029 2030 2031 Total Equipment purchase 45,021 46,296 0 0 0 91,317 Total 45,021 46,296 0 0 0 91,317 Funding Sources 2027 2028 2029 2030 2031 Total General Fund 45,021 46,296 0 0 0 91,317 Total 45,021 46,296 0 0 0 91,317 Produced Using Plan-It CIP Software Page 25 2027 thru 2031 Project Details Lakeville, MN Project Name Inspections-Equipment Project # E-06 Contact Bob Mach, Fleet Supervisor Cost Type Equipment Type Equipment Department Inspections Funding Description Equipment Fund Description The CIP includes anticipated replacement/addition of various equipment costs for the Inspections division. Expenditures 2027 2028 2029 2030 2031 Total Equipment purchase 0 0 69,000 0 72,600 141,600 Total 0 0 69,000 0 72,600 141,600 Funding Sources 2027 2028 2029 2030 2031 Total General Fund 0 0 69,000 0 72,600 141,600 Total 0 0 69,000 0 72,600 141,600 Produced Using Plan-It CIP Software Page 26 2027 thru 2031 Project Details Lakeville, MN Project Name Construction Services-Equipment Project # E-07 Contact Bob Mach, Fleet Supervisor Cost Type Equipment Type Equipment Department Construction Services Funding Description Equipment Fund Description The CIP includes anticipated replacement/addition of various equipment costs for the Construction Services division. Expenditures 2027 2028 2029 2030 2031 Total Equipment purchase 69,414 0 30,495 56,000 0 155,909 Total 69,414 0 30,495 56,000 0 155,909 Funding Sources 2027 2028 2029 2030 2031 Total General Fund 69,414 0 30,495 56,000 0 155,909 Total 69,414 0 30,495 56,000 0 155,909 Produced Using Plan-It CIP Software Page 27 2027 thru 2031 Project Details Lakeville, MN Project Name Liquor-Equipment Project # E-08 Contact Bob Mach, Fleet Supervisor Cost Type Equipment Type Equipment Department Keokuk Liquor Store Funding Description Liquor Fund Description The CIP includes anticipated replacement/addition of various equipment costs for the Liquor stores. Expenditures 2027 2028 2029 2030 2031 Total Equipment purchase 0 0 34,880 0 0 34,880 Total 0 0 34,880 0 0 34,880 Funding Sources 2027 2028 2029 2030 2031 Total Liquor Fund 0 0 34,880 0 0 34,880 Total 0 0 34,880 0 0 34,880 Produced Using Plan-It CIP Software Page 28 2027 thru 2031 Project Details Lakeville, MN Project Name Communications PEG-Equipment Project # E-10 Contact Tierney Helmers, Communications Manager Cost Type Equipment Type Equipment Department Communications Funding Description Equipment Fund Description The CIP includes anticipated replacement/addition of various equipment costs for the Communications division. Expenditures 2027 2028 2029 2030 2031 Total Equipment purchase 54,000 70,000 77,000 75,000 95,000 371,000 Total 54,000 70,000 77,000 75,000 95,000 371,000 Funding Sources 2027 2028 2029 2030 2031 Total Communications Fund 54,000 70,000 77,000 75,000 95,000 371,000 Total 54,000 70,000 77,000 75,000 95,000 371,000 Produced Using Plan-It CIP Software Page 29 2027 thru 2031 Project Details Lakeville, MN Project Name Environmental Resources - Equipment Project # E-11 Contact Bob Mach, Fleet Supervisor Cost Type Equipment Type Equipment Department Environmental Resources Funding Description Environmental Resources Fund Description The CIP includes anticipated replacement/addition of various equipment costs for the Environmental Resources division. Expenditures 2027 2028 2029 2030 2031 Total Equipment purchase 0 0 0 692,835 0 692,835 Total 0 0 0 692,835 0 692,835 Funding Sources 2027 2028 2029 2030 2031 Total Environmental Resources Fund 0 0 0 692,835 0 692,835 Total 0 0 0 692,835 0 692,835 Produced Using Plan-It CIP Software Page 30 2027 thru 2031 Project Details Lakeville, MN Project Name Utilities-Equipment Project # E-12 Contact Shane Quade, Utilities Superintendent Cost Type Equipment Type Equipment Department Utilities Funding Description Water Operating Fund Description The CIP includes anticipated replacement/addition of various equipment costs for the Utilities division. Expenditures 2027 2028 2029 2030 2031 Total Equipment Purchase - vehicle 0 162,262 379,509 324,083 652,171 1,518,025 Equipment purchase - heavy equipment 0 53,000 0 0 0 53,000 Equipment purchase 51,965 0 0 0 0 51,965 Equipment Purchase - Trailer 0 18,995 0 0 0 18,995 Equipment purchase - supplemental equipment 0 11,413 0 0 0 11,413 Equipment Purchase - attachments 2,075 0 0 0 0 2,075 Total 54,040 245,670 379,509 324,083 652,171 1,655,473 Funding Sources 2027 2028 2029 2030 2031 Total Sanitary Sewer Operating Fund 53,003 122,835 189,755 162,041 652,171 1,179,805 Water Operating Fund 1,037 122,835 189,754 162,042 0 475,668 Total 54,040 245,670 379,509 324,083 652,171 1,655,473 Produced Using Plan-It CIP Software Page 31 2027 thru 2031 Project Details Lakeville, MN Project Name City Hall Building Maintenance/ Improvements Project # B-01 Contact Tom Breeggemann, Facilities Supervisor Cost Type Facilities Type Maintenance Department City Hall Description The CIP includes anticipated maintenance/repair/improvement costs at Lakeville's City Hall building at 20195 Holyoke Ave. Expenditures 2027 2028 2029 2030 2031 Total Roof replacement 0 0 850,000 0 0 850,000 West Wing office renovations/ Engineering Conf Room 0 200,000 0 0 0 200,000 Carpet 135,000 0 0 0 0 135,000 Lunchroom 0 0 0 0 100,000 100,000 RTU S3 Replacement 0 0 0 70,000 0 70,000 Solar farm 50,000 0 0 0 0 50,000 Wall coverings 0 45,000 0 0 0 45,000 Admin Bathrooms 0 0 0 0 30,000 30,000 Window film 0 0 17,000 0 0 17,000 Total 185,000 245,000 867,000 70,000 130,000 1,497,000 Funding Sources 2027 2028 2029 2030 2031 Total Building Fund 185,000 245,000 867,000 70,000 130,000 1,497,000 Total 185,000 245,000 867,000 70,000 130,000 1,497,000 Produced Using Plan-It CIP Software Page 32 2027 thru 2031 Project Details Lakeville, MN Project Name CMF Building Maintenance/Improvements Project # B-02 Contact Tom Breeggemann, Facilities Supervisor Cost Type Facilities Type Maintenance/Improvement Department Utilities Funding Description Building Fund Description The CIP includes anticipated maintenance/repair/improvement costs at Lakeville's Central Maintenance Facility building at 7570 179th St. W. It also includes costs to expand the facility in 2027, which will be funded by bonds, to be repaid by tax levy in future years. Expenditures 2027 2028 2029 2030 2031 Total CMF Expansion 25,000,000 0 0 0 0 25,000,000 Roof replacement 0 0 3,000,000 0 0 3,000,000 Generator Replacement 0 0 0 0 425,000 425,000 Fleet storage floor coating 0 0 0 300,000 0 300,000 Boiler plant replacement 300,000 0 0 0 0 300,000 BAS automation 185,000 0 0 0 0 185,000 Building wall system 0 0 100,000 0 0 100,000 Truck Garage paint (interior) 80,000 0 0 0 0 80,000 Infrared tube heater replacement 0 0 0 75,000 0 75,000 Fire Panel (update) 65,000 0 0 0 0 65,000 Water heater replacement 0 0 0 0 55,000 55,000 Building envelope improvements 0 0 47,704 0 0 47,704 Monument sign 40,000 0 0 0 0 40,000 Carpet 0 0 0 0 30,000 30,000 Paint Exterior Doors and Trim 0 0 0 0 10,000 10,000 Total 25,670,000 0 3,147,704 375,000 520,000 29,712,704 Funding Sources 2027 2028 2029 2030 2031 Total G.O. Improvement Bonds- Taxes (Facilities) 26,000,000 0 0 0 0 26,000,000 Building Fund -330,000 0 3,147,704 375,000 520,000 3,712,704 Total 25,670,000 0 3,147,704 375,000 520,000 29,712,704 Produced Using Plan-It CIP Software Page 33 2027 thru 2031 Project Details Lakeville, MN Project Name Police Station- Building Maintenance/Improvements Project # B-03 Contact Tom Breeggemann, Facilities Supervisor Cost Type Facilities Type Maintenance/Improvement Department Police Department Funding Description Building Fund Description Anticipated maintenance/repairs/improvements needed on the Police Station building. Expenditures 2027 2028 2029 2030 2031 Total Workout room expansion 0 0 2,500,000 0 0 2,500,000 Roof replacement 0 0 0 0 600,000 600,000 Generator Replacement 0 0 402,500 0 0 402,500 Front landscaping 80,000 0 0 0 0 80,000 Radiant panels for offices 0 0 60,885 0 0 60,885 Sit stand desks 17,600 22,400 0 0 0 40,000 Evidence fence 30,000 0 0 0 0 30,000 Fencing 30,000 0 0 0 0 30,000 Building needs study 0 30,000 0 0 0 30,000 Paint-interior 0 0 0 25,000 0 25,000 Window film 0 10,000 0 0 0 10,000 Patrol furniture 8,000 0 0 0 0 8,000 Total 165,600 62,400 2,963,385 25,000 600,000 3,816,385 Funding Sources 2027 2028 2029 2030 2031 Total Building Fund 165,600 62,400 2,963,385 25,000 600,000 3,816,385 Total 165,600 62,400 2,963,385 25,000 600,000 3,816,385 Produced Using Plan-It CIP Software Page 34 2027 thru 2031 Project Details Lakeville, MN Project Name Heritage Center- Maintenance/ Improvements Project # B-04 Contact Tom Breeggemann, Facilities Supervisor Cost Type Facilities Type Maintenance/Improvement Department Heritage Center Funding Description Building Fund Description The Lakeville Heritage Center is located at 20110 Holyoke Ave and is home to Lakeville Area Active Adults, Lakeville Area Historical Society and Lakeville Yellow Ribbon. The CIP includes estimated costs for maintenance/repairs/improvements at the Heritage Center building. Expenditures 2027 2028 2029 2030 2031 Total Interior renovation phase 1 0 0 690,000 0 0 690,000 Interior renovation phase 2 0 0 0 280,000 0 280,000 RTU MULTI 0 220,000 0 0 0 220,000 Carpet Replacement 0 0 0 0 75,000 75,000 Building envelope improvements 0 0 55,000 0 0 55,000 Fire Panel (update) 25,000 0 0 0 0 25,000 JHP-amenities 18,000 0 0 0 0 18,000 Mini Split Replacement 0 8,000 0 0 0 8,000 Total 43,000 228,000 745,000 280,000 75,000 1,371,000 Funding Sources 2027 2028 2029 2030 2031 Total Building Fund 43,000 228,000 745,000 280,000 75,000 1,371,000 Total 43,000 228,000 745,000 280,000 75,000 1,371,000 Produced Using Plan-It CIP Software Page 35 2027 thru 2031 Project Details Lakeville, MN Project Name Arts Center-Maintenance/Improvements Project # B-05 Contact Tom Breeggemann, Facilities Supervisor Cost Type Facilities Type Maintenance/Improvement Department LAAC - Performing Arts Building Funding Description Building Fund Description The Lakeville Area Arts Center is located at 20965 Holyoke Ave, in historic downtown Lakeville. The Arts Center hosts theater and other events, community classes, and provides rental opportunities. The CIP includes estimated costs for maintenance/repairs/improvements at the Arts Center building. Expenditures 2027 2028 2029 2030 2031 Total AHU 1 520,000 0 0 0 0 520,000 AHU 2 0 0 0 0 350,000 350,000 Building envelope improvements 0 0 0 320,000 0 320,000 Theater Seating Refurbishment 0 0 150,000 0 0 150,000 AHU Replacements 0 0 0 125,000 0 125,000 Light board replacement 80,000 0 0 0 0 80,000 Bleacher carpet 0 0 30,000 0 0 30,000 Fire Panel (update) 25,000 0 0 0 0 25,000 Bleacher flooring 20,000 0 0 0 0 20,000 Total 645,000 0 180,000 445,000 350,000 1,620,000 Funding Sources 2027 2028 2029 2030 2031 Total Building Fund 645,000 0 180,000 445,000 350,000 1,620,000 Total 645,000 0 180,000 445,000 350,000 1,620,000 Produced Using Plan-It CIP Software Page 36 2027 thru 2031 Project Details Lakeville, MN Project Name Fine Arts Building-Maintenance/Improvements Project # B-06 Contact Tom Breeggemann, Facilities Supervisor Cost Type Facilities Type Maintenance/Improvement Department LAAC - Fine Arts Building Funding Description Building Fund Description The Fine Arts Center is located at 20950 Howland Ave and is a division of the Lakeville Area Arts Center, focused on providing expanded classroom and studio space for fine arts programming. The CIP includes estimated costs for maintenance/repairs/improvements at the Fine Arts Center building. Expenditures 2027 2028 2029 2030 2031 Total Roof replacement 0 570,000 0 0 0 570,000 Boiler plant replacement 100,000 0 0 0 0 100,000 Total 100,000 570,000 0 0 0 670,000 Funding Sources 2027 2028 2029 2030 2031 Total Building Fund 100,000 570,000 0 0 0 670,000 Total 100,000 570,000 0 0 0 670,000 Produced Using Plan-It CIP Software Page 37 2027 thru 2031 Project Details Lakeville, MN Project Name Fire Station #1-Building Maintenance/Improvements Project # B-07 Contact Tom Breeggemann, Facilities Supervisor Cost Type Facilities Type Maintenance/Improvement Department Fire Station #1 Description Station 1 protects the region south of 195th Street to 220th Street, west to Judicial Road (Scott County), and east to the Farmington border. The CIP includes anticipated maintenance/repairs and improvements to the Fire Station #1 building. Expenditures 2027 2028 2029 2030 2031 Total Remodel for full time 0 20,500,000 0 0 0 20,500,000 Total 0 20,500,000 0 0 0 20,500,000 Funding Sources 2027 2028 2029 2030 2031 Total G.O. Improvement Bonds- Franchise Fees (Facilities) 0 20,500,000 0 0 0 20,500,000 Total 0 20,500,000 0 0 0 20,500,000 Produced Using Plan-It CIP Software Page 38 2027 thru 2031 Project Details Lakeville, MN Project Name Fire Station #3-Building Maintenance/Improvements Project # B-09 Contact Tom Breeggemann, Facilities Supervisor Cost Type Facilities Type Maintenance/Improvement Department Fire Station #3 Funding Description Building Fund Description Anticipated maintenance/repairs/improvements needed on the Fire Station #3 building. Expenditures 2027 2028 2029 2030 2031 Total Remodel for full time 20,000,000 3,500,000 0 0 0 23,500,000 Total 20,000,000 3,500,000 0 0 0 23,500,000 Funding Sources 2027 2028 2029 2030 2031 Total G.O. Improvement Bonds- Franchise Fees (Facilities) 20,000,000 3,500,000 0 0 0 23,500,000 Total 20,000,000 3,500,000 0 0 0 23,500,000 Produced Using Plan-It CIP Software Page 39 2027 thru 2031 Project Details Lakeville, MN Project Name Fire Station #4-Building Maintenance/Improvements Project # B-10 Contact Tom Breeggemann, Facilities Supervisor Cost Type Facilities Type Maintenance/Improvement Department Fire Station #4 Funding Description Building Fund Description Built in 2002, Station 4 is currently Lakeville's newest and most centrally located station. The CIP includes anticipated maintenance/repairs/improvements needed on the Fire Station #4 building. Expenditures 2027 2028 2029 2030 2031 Total RTU 1,2,4 replacement 0 0 95,000 0 0 95,000 Carpet 0 0 30,000 0 0 30,000 Building envelope improvements 0 0 29,700 0 0 29,700 Total 0 0 154,700 0 0 154,700 Funding Sources 2027 2028 2029 2030 2031 Total Building Fund 30,000 0 124,700 0 0 154,700 Total 30,000 0 124,700 0 0 154,700 Produced Using Plan-It CIP Software Page 40 2027 thru 2031 Project Details Lakeville, MN Project Name Keokuk Liquor Store- Maintenance/Improv Project # B-12 Contact Tom Breeggemann, Facilities Supervisor Cost Type Facilities Type Maintenance/Improvement Department Keokuk Liquor Store Funding Description Liquor Fund Description The CIP includes anticipated maintenance/repairs/improvement costs at the Keokuk Liquor Store building, which is located at 20880 Keokuk Ave. This facility also includes the Emporium Room, which is a multi-purpose, 3,000 square feet room that can be rented for meetings, celebrations or classes. Expenditures 2027 2028 2029 2030 2031 Total Paint sales floor & office walls 0 0 0 70,000 0 70,000 Total 0 0 0 70,000 0 70,000 Funding Sources 2027 2028 2029 2030 2031 Total Liquor Fund 0 0 0 70,000 0 70,000 Total 0 0 0 70,000 0 70,000 Produced Using Plan-It CIP Software Page 41 2027 thru 2031 Project Details Lakeville, MN Project Name Heritage Liquor Store- Maintenance/Improv Project # B-13 Contact Tom Breeggemann, Facilities Supervisor Cost Type Facilities Type Maintenance/Improvement Department Heritage Liquor Store Funding Description Liquor Fund Description The CIP includes anticipated maintenance/repairs/improvement costs at the Heritage Liquor Store building, which is located at 20164 Heritage Dr. Expenditures 2027 2028 2029 2030 2031 Total Entrance door replacement 0 0 0 200,000 0 200,000 Flooring Replacement 0 65,000 0 0 0 65,000 Cooler mechanicals 0 0 0 0 25,000 25,000 LED Light Installation 0 20,000 0 0 0 20,000 Fire sprinkler system installation 15,000 0 0 0 0 15,000 Paint sales floor & office walls 0 10,000 0 0 0 10,000 Total 15,000 95,000 0 200,000 25,000 335,000 Funding Sources 2027 2028 2029 2030 2031 Total Liquor Fund 15,000 95,000 0 200,000 25,000 335,000 Total 15,000 95,000 0 200,000 25,000 335,000 Produced Using Plan-It CIP Software Page 42 2027 thru 2031 Project Details Lakeville, MN Project Name Kenrick Liquor Store- Maintenance/Improv Project # B-14 Contact Tom Breeggemann, Facilities Supervisor Cost Type Facilities Type Maintenance/Improvement Department Kenrick Liquor Store Funding Description Liquor Fund Description The CIP includes anticipated maintenance/repairs/improvement costs at the Kenrick Liquor Store building, which is located at 16179 Kenrick Ave. Expenditures 2027 2028 2029 2030 2031 Total Building envelope improvements 0 0 0 30,290 0 30,290 Cooler fire suppression maintenance 15,000 0 0 0 0 15,000 Total 15,000 0 0 30,290 0 45,290 Funding Sources 2027 2028 2029 2030 2031 Total Liquor Fund 15,000 0 0 30,290 0 45,290 Total 15,000 0 0 30,290 0 45,290 Produced Using Plan-It CIP Software Page 43 2027 thru 2031 Project Details Lakeville, MN Project Name Galaxie Liquor Store- Maintenance/Improv Project # B-15 Contact Tom Breeggemann, Facilities Supervisor Cost Type Facilities Type Maintenance/Improvement Department Galaxie Liquor Store Funding Description Liquor Fund Description The CIP includes anticipated maintenance/repairs/improvement costs at the Galaxie Liquor Store building, which is located at 16000 Galaxie Ave. Expenditures 2027 2028 2029 2030 2031 Total Roof replacement 0 0 0 275,000 0 275,000 Sales counter renovations 0 80,000 0 0 0 80,000 Flooring Replacement 0 0 0 0 65,000 65,000 Building envelope improvements 0 0 0 56,570 0 56,570 Total 0 80,000 0 331,570 65,000 476,570 Funding Sources 2027 2028 2029 2030 2031 Total Liquor Fund 0 80,000 0 331,570 65,000 476,570 Total 0 80,000 0 331,570 65,000 476,570 Produced Using Plan-It CIP Software Page 44 2027 thru 2031 Project Details Lakeville, MN Project Name Water Treatment Facilty-Maintenance/Improvements Project # B-16 Contact Paul Oehme, Public Works Director Cost Type Facilities Type Maintenance/Improvement Department Utilities Funding Description Water Operating Fund Description Anticipated maintenance/repairs/improvements needed on the existing Water Treatment Facility building. The City’s water demand continues to grow as new development occurs. This project would construct a satellite water treatment plant at the northeast corner of 179th Street and Granby Lane. A water treatment expansion study completed in 2026 identified the need for a satellite treatment facility to meet future water demands. The new plant will improve the redundancy and resiliency of the City’s water system and provide additional capacity to improve water distribution and maintain system pressure during peak-demand periods. Expenditures 2027 2028 2029 2030 2031 Total Satellite Water Treatment Plant construction 40,000,000 0 0 0 0 40,000,000 Fleet garage expansion 0 0 0 3,000,000 0 3,000,000 Roof replacement 0 0 0 1,500,000 0 1,500,000 Electrical split 0 300,000 0 0 0 300,000 Parking lot mill and overlay 0 250,000 0 0 0 250,000 BAS upgrade 185,000 0 0 0 0 185,000 Dehumidifier 0 150,000 0 0 0 150,000 Filter rooms exhaust fan replacement 0 120,000 0 0 0 120,000 AHU Replacements 0 0 115,000 0 0 115,000 Building envelope improvements 0 0 75,000 0 0 75,000 Fleet garage mechanicals 0 60,000 0 0 0 60,000 Wall coverings 30,000 0 0 0 0 30,000 Well #7 roof replacement 0 0 0 25,000 0 25,000 Main bathroom sink and countertops 20,000 0 0 0 0 20,000 Total 40,235,000 880,000 190,000 4,525,000 0 45,830,000 Funding Sources 2027 2028 2029 2030 2031 Total Water Revenue Bonds 35,000,000 0 0 0 0 35,000,000 Water Operating Fund 9,235,000 880,000 190,000 1,500,000 0 11,805,000 Water Trunk Fund -4,000,000 0 0 3,025,000 0 -975,000 Total 40,235,000 880,000 190,000 4,525,000 0 45,830,000 Produced Using Plan-It CIP Software Page 45 2027 thru 2031 Project Details Lakeville, MN Project Name FiRST Center Facility Maintenance/Improvements Project # B-17 Contact Tom Breeggemann, Facilities Supervisor Cost Type Facilities Type Maintenance/Improvement Department FiRST Center Funding Description FiRST Center Operating Fund Description Construction of the FiRST Center began in early 2025 and will be located at the former Public Works site within the Airlake Industrial Park at 7777 214th Street West. It is expected to be completed in 2026. Operational costs to maintain and operate the facility will be provided through membership fees paid by the various agencies that will be using the facility. The CIP estimates maintenance/repair/improvements costs at this facility. Expenditures 2027 2028 2029 2030 2031 Total Facility improvements/ maintenance 100,000 0 0 0 0 100,000 Paint-interior 0 0 0 0 30,000 30,000 Total 100,000 0 0 0 30,000 130,000 Funding Sources 2027 2028 2029 2030 2031 Total Building Fund 100,000 0 0 0 30,000 130,000 Total 100,000 0 0 0 30,000 130,000 Produced Using Plan-It CIP Software Page 46 2027 thru 2031 Project Details Lakeville, MN Project Name Klamath Trail Retaining Wall Project # 23-13 Contact Mark Kruse, Parks Superintendent Cost Type Parks Type Maintenance Department Park Maintenance Funding Description Park & Trail Improvement Fund Description Two existing modular block retaining walls (totaling over 1,200 feet in length) run along the south side of Klamath Trail, west of County State Aid Highway 5. Both were constructed in 1999. After signs of deterioration were noticed, a third party completed a Condition Assessment Report. Based on the walls' anticipated lifespan and the assessment findings — which identified visible staining, cracking along the face of individual blocks, and other forms of deterioration — repair is warranted. Updated cost estimates for four repair options were obtained in 2026, ranging from $3.3 million to $4.3 million. Based on these latest estimates, staff is proposing the evaluation of a new option, that could potentially eliminate the wall and create a new trail corridor instead. Planning and Design work is being budgeted for 2027, with construction anticipated in 2028. Expenditures 2027 2028 2029 2030 2031 Total Retaining Wall Reconstruction 0 1,500,000 0 0 0 1,500,000 Engineering/Design/Other costs 30,000 0 0 0 0 30,000 Total 30,000 1,500,000 0 0 0 1,530,000 Funding Sources 2027 2028 2029 2030 2031 Total Park & Trail Improvement Fund 30,000 1,500,000 0 0 0 1,530,000 Total 30,000 1,500,000 0 0 0 1,530,000 Map Produced Using Plan-It CIP Software Page 47 2027 thru 2031 Project Details Lakeville, MN Project Name East Community Park Phase II Project # 25-20 Contact Joseph Masiarchin, Parks Director Cost Type Parks Type New construction Department Park Bonds Funding Description Park Bonds Fund Description The East Community Park project was approved as part of the 2021 Park Bond Referendum and includes shelter, restrooms (year round), community garden, dog park, water access, and fishing piers. Construction is in progress in 2026 and is anticipated to be completed in 2027. This project also includes the trails/trailhead in East Community Park, which is part of a multi-phased County greenway project designed to provide connectivity City and County trail system. Expenditures 2027 2028 2029 2030 2031 Total East Community Park 500,000 0 0 0 0 500,000 Total 500,000 0 0 0 0 500,000 Funding Sources 2027 2028 2029 2030 2031 Total Park Dedication Fund 500,000 0 0 0 0 500,000 Total 500,000 0 0 0 0 500,000 Map Produced Using Plan-It CIP Software Page 48 2027 thru 2031 Project Details Lakeville, MN Project Name Parks Major Maintenance - General Project # P-01 Contact Mark Kruse, Parks Superintendent Cost Type Parks Type Maintenance Department Park Maintenance Funding Description Park Improvement Fund Description Includes general park amenities like benches, grills, tables and improvements completed through our Eagle Scout Program. Expenditures 2027 2028 2029 2030 2031 Total Park Amenities – Benches, Grills, Tables, etc. 10,000 11,000 11,000 11,000 11,000 54,000 Eagle Scout Project Materials 8,500 8,500 8,500 8,750 8,750 43,000 Total 18,500 19,500 19,500 19,750 19,750 97,000 Funding Sources 2027 2028 2029 2030 2031 Total Park & Trail Improvement Fund 18,500 19,500 19,500 19,750 19,750 97,000 Total 18,500 19,500 19,500 19,750 19,750 97,000 Produced Using Plan-It CIP Software Page 49 2027 thru 2031 Project Details Lakeville, MN Project Name Park Development - Adminstrative Projects Project # P-02 Contact Joseph Masiarchin, Parks Director Cost Type Parks Type New construction Department Park Dedication Funding Description Park Dedication Fund Description The Park Dedication Fund budget provides appropriations for many activities including planning, design and feasibility reports for park projects. On an annual basis those project include engineering and design work for a wide variety of park projects, including rinks, playgrounds and future parks. Expenditures 2027 2028 2029 2030 2031 Total Engineering/Design/Other costs 20,000 20,000 20,000 20,000 20,000 100,000 Total 20,000 20,000 20,000 20,000 20,000 100,000 Funding Sources 2027 2028 2029 2030 2031 Total Park Dedication Fund 20,000 20,000 20,000 20,000 20,000 100,000 Total 20,000 20,000 20,000 20,000 20,000 100,000 Produced Using Plan-It CIP Software Page 50 2027 thru 2031 Project Details Lakeville, MN Project Name Park Development - Developer Credits Project # P-03 Contact Joseph Masiarchin, Parks Director Cost Type Parks Type Other Department Park Dedication Funding Description Park Dedication Fund Description Represents credits associated with new development when the park dedication requirement is fulfilled through a land dedication. Expenditures 2027 2028 2029 2030 2031 Total Developer-Credits 435,000 435,000 435,000 435,000 435,000 2,175,000 Total 435,000 435,000 435,000 435,000 435,000 2,175,000 Funding Sources 2027 2028 2029 2030 2031 Total Park Dedication Fund 435,000 435,000 435,000 435,000 435,000 2,175,000 Total 435,000 435,000 435,000 435,000 435,000 2,175,000 Produced Using Plan-It CIP Software Page 51 2027 thru 2031 Project Details Lakeville, MN Project Name Future Park Land Acquisition Project # P-04 Contact Joseph Masiarchin, Parks Director Cost Type Parks Type Other Department Park Dedication Funding Description Park Dedication Fund Description Represents potential costs of land acquisition where needed to fulfill future plans for parks in the City based on the 2026-2036 Parks System Master Plan. Expenditures 2027 2028 2029 2030 2031 Total Land acquisition for parks/trails use 0 2,000,000 100,000 100,000 100,000 2,300,000 Total 0 2,000,000 100,000 100,000 100,000 2,300,000 Funding Sources 2027 2028 2029 2030 2031 Total Park Dedication Fund 0 2,000,000 100,000 100,000 100,000 2,300,000 Total 0 2,000,000 100,000 100,000 100,000 2,300,000 Produced Using Plan-It CIP Software Page 52 2027 thru 2031 Project Details Lakeville, MN Project Name Trail Improvements (Various Trails) Project # P-05 Contact Mark Kruse, Parks Superintendent Cost Type Parks Type Reconstruction/Maintenance Department Park Maintenance Funding Description Trail Improvement Fund Description Staff complete trail rating every three years to evaluate the condition of all trail segments in our community. Based on the evaluation results staff will refine the current plan for either overlaying or reclaiming City trail segments, along with crack filling and fog sealing of trails. Maintenance of sidewalks and trails along Dakota County roadways is provided in accordance with the current County and City Maintenance Agreement for County Bikeway Trails. In 2021, the Dakota County Board of Commissioners approved the following regarding trails and sidewalks along Dakota County roadways: Multi-Use Trails and Sidewalk Maintenance Dakota County will participate in pavement preservation, overlay, or reconstruction of trails and sidewalks along the County highway system up to 100 percent. The City is responsible for snow and ice removal. To be eligible for County participation in trails and sidewalks, a system-wide maintenance agreement between the County and local agency will be required to identify system-wide trail and sidewalk roles and cost responsibilities. Expenditures 2027 2028 2029 2030 2031 Total Construction- Trail Rehabilitation/ Reconstruction 450,000 500,000 525,000 525,000 525,000 2,525,000 Crack Seal 85,000 85,000 85,000 85,000 90,000 430,000 Construction- New trails 0 100,000 100,000 100,000 100,000 400,000 Trail inspection and rating 0 23,000 0 0 26,000 49,000 Total 535,000 708,000 710,000 710,000 741,000 3,404,000 Funding Sources 2027 2028 2029 2030 2031 Total Park & Trail Improvement Fund 535,000 608,000 610,000 610,000 641,000 3,004,000 Park Dedication Fund 0 100,000 100,000 100,000 100,000 400,000 Total 535,000 708,000 710,000 710,000 741,000 3,404,000 Produced Using Plan-It CIP Software Page 53 2027 thru 2031 Project Details Lakeville, MN Project Name Park Improvements (Various Parks) Project # P-06 Contact Mark Kruse, Parks Superintendent Cost Type Parks Type Maintenance Department Park Maintenance Funding Description Park Improvement Fund Description The Park Improvement Fund provides funding for replacement and upgrades to shelters and buildings, improvements to hockey rinks, basketball, pickleball, tennis courts and other park amenities. Expenditures 2027 2028 2029 2030 2031 Total Aronson Athletic Light Replacement 0 0 0 0 400,000 400,000 Miracle Field surface replacement/ repairs 0 300,000 0 0 0 300,000 East Community- Tennis court reconstruction 0 0 0 0 250,000 250,000 Dodd Trail Pickleball reconstruction 225,000 0 0 0 0 225,000 McGuire-Rink reconstruction 110,000 110,000 0 0 0 220,000 Meadows Rink reconstruction 0 0 0 155,000 0 155,000 Rolling Oaks rink reconstruction 0 0 130,000 0 0 130,000 Parkview Rink reconstruction 0 0 0 0 130,000 130,000 East Community- BB court reconstruction 0 0 0 0 75,000 75,000 Dodd Trail BB Reconstruction- concrete 52,000 0 0 0 0 52,000 Prairie Lake BB reconstruction- concrete 0 52,000 0 0 0 52,000 Ballfield dugout roof support 7,000 7,000 7,000 7,000 7,000 35,000 Total 394,000 469,000 137,000 162,000 862,000 2,024,000 Funding Sources 2027 2028 2029 2030 2031 Total Park & Trail Improvement Fund 394,000 469,000 137,000 162,000 862,000 2,024,000 Total 394,000 469,000 137,000 162,000 862,000 2,024,000 Produced Using Plan-It CIP Software Page 54 2027 thru 2031 Project Details Lakeville, MN Project Name Playground Replacement Project # P-08 Contact Mark Kruse, Parks Superintendent Cost Type Parks Type Reconstruction/Maintenance Department Park Maintenance Funding Description Park Improvement Fund Description The Park Improvement Fund provides funding for replacement and upgrades to playgrounds. The Arts Center playground funding includes a $90,000 donation from QA-1. Expenditures 2027 2028 2029 2030 2031 Total Aronson Park 0 400,000 0 0 0 400,000 Meadows Park 0 0 0 0 130,000 130,000 Chadwick Park 0 0 0 0 130,000 130,000 Orchard Lake Park 0 0 0 0 130,000 130,000 Spyglass Park 0 0 0 128,000 0 128,000 Kenreel Park 0 0 0 128,000 0 128,000 Jaycee Park 0 0 128,000 0 0 128,000 Lakeridge Park 0 0 128,000 0 0 128,000 Rolling Oaks Park 0 0 128,000 0 0 128,000 Bassett Park 0 0 0 128,000 0 128,000 Fairfield Park 0 125,000 0 0 0 125,000 Lynwood Heights Park 0 125,000 0 0 0 125,000 Prairie Lake Park 120,000 0 0 0 0 120,000 Village Creek Park 120,000 0 0 0 0 120,000 Orchard Lake Beach 100,000 0 0 0 0 100,000 Total 340,000 650,000 384,000 384,000 390,000 2,148,000 Funding Sources 2027 2028 2029 2030 2031 Total Park & Trail Improvement Fund 340,000 650,000 384,000 384,000 390,000 2,148,000 Total 340,000 650,000 384,000 384,000 390,000 2,148,000 Produced Using Plan-It CIP Software Page 55 2027 thru 2031 Project Details Lakeville, MN Project Name Park Parking Lot Reconstruction Project # P-09 Contact Mark Kruse, Parks Superintendent Cost Type Parks Type Reconstruction/Maintenance Department Park Maintenance Funding Description Park Improvement Fund Description The Park Improvement Fund provides funding for replacement and rehabilitation of parking lots used to access City parks. Expenditures 2027 2028 2029 2030 2031 Total Orchard Lake Park 210,000 0 0 0 0 210,000 East Community Park 0 0 0 0 90,000 90,000 Greenridge Park 0 68,000 0 0 0 68,000 Prairie Lake Park 0 0 55,000 0 0 55,000 Highview Heights 0 45,000 0 0 0 45,000 Cedar Highlands 0 0 0 45,000 0 45,000 Total 210,000 113,000 55,000 45,000 90,000 513,000 Funding Sources 2027 2028 2029 2030 2031 Total Park & Trail Improvement Fund 210,000 113,000 55,000 45,000 90,000 513,000 Total 210,000 113,000 55,000 45,000 90,000 513,000 Produced Using Plan-It CIP Software Page 56 2027 thru 2031 Project Details Lakeville, MN Project Name Keokuk Avenue/172nd St. Park Project # P-11 Contact Joseph Masiarchin, Parks Director Cost Type Parks Type New construction Department Park Dedication Funding Description Park Dedication Fund Description The Parks, Trails and Open Space Plan calls for a neighborhood park in the area which is proposed to be constructed in 2030. Planning/design costs are included in 2029. Expenditures 2027 2028 2029 2030 2031 Total Construction 0 0 0 800,000 0 800,000 Planning/Design 0 0 75,000 25,000 0 100,000 Total 0 0 75,000 825,000 0 900,000 Funding Sources 2027 2028 2029 2030 2031 Total Park Dedication Fund 0 0 75,000 825,000 0 900,000 Total 0 0 75,000 825,000 0 900,000 Map Produced Using Plan-It CIP Software Page 57 2027 thru 2031 Project Details Lakeville, MN Project Name Skatepark Project # P-12 Contact Mark Kruse, Parks Superintendent Cost Type Parks Type New construction Department Park Dedication Description Planning/design costs are included in 2029 with construction planned for 2030 Expenditures 2027 2028 2029 2030 2031 Total Construction 0 0 0 600,000 0 600,000 Planning/Design 0 0 50,000 0 0 50,000 Total 0 0 50,000 600,000 0 650,000 Funding Sources 2027 2028 2029 2030 2031 Total Park Dedication Fund 0 0 50,000 600,000 0 650,000 Total 0 0 50,000 600,000 0 650,000 Map Produced Using Plan-It CIP Software Page 58 2027 thru 2031 Project Details Lakeville, MN Project Name Ritter Meadows Park Project # P-13 Contact Joseph Masiarchin, Parks Director Cost Type Parks Type New construction Department Park Dedication Funding Description Park Dedication Fund Description The Parks, Trails and Open Space Plan calls for a neighborhood park in the area which is proposed to be constructed in 2029. Expenditures 2027 2028 2029 2030 2031 Total Construction 0 850,000 0 0 0 850,000 Planning/Design 60,000 20,000 0 0 0 80,000 Total 60,000 870,000 0 0 0 930,000 Funding Sources 2027 2028 2029 2030 2031 Total Park Dedication Fund 60,000 870,000 0 0 0 930,000 Total 60,000 870,000 0 0 0 930,000 Map Produced Using Plan-It CIP Software Page 59 2027 thru 2031 Project Details Lakeville, MN Project Name Voyageur Park Project # P-14 Contact Joseph Masiarchin, Parks Director Cost Type Parks Type New construction Department Park Dedication Funding Description Park Dedication Fund Description The Parks, Trails, and Open Space Plan calls for a neighborhood park East of Cedar Avenue and south of 181st Street serving the future development in this area. The park will be approximately 2 acres in size and is proposed to be constructed in 2027. Expenditures 2027 2028 2029 2030 2031 Total Construction 700,000 0 0 0 0 700,000 Planning/Design 20,000 0 0 0 0 20,000 Total 720,000 0 0 0 0 720,000 Funding Sources 2027 2028 2029 2030 2031 Total Park Dedication Fund 720,000 0 0 0 0 720,000 Total 720,000 0 0 0 0 720,000 Map Produced Using Plan-It CIP Software Page 60 2027 thru 2031 Project Details Lakeville, MN Project Name Parks Major Maintenance - Open Space Project # P-15 Contact Mark Kruse, Parks Superintendent Cost Type Parks Type Maintenance Department Park Maintenance Funding Description Park Improvement Fund Description Includes parking lot and trail maintenance work such as crack sealing and paint striping. Funds also include ongoing maintenance and improvements at the West Lake Marion Bike Course. Expenditures 2027 2028 2029 2030 2031 Total Pavement Maintenance Parking Lots & Trails 18,000 18,000 18,000 19,000 19,000 92,000 Fence Repairs 10,000 10,000 10,000 10,000 10,000 50,000 West Lake Marion Mountain Bike Contract Maintenance 9,000 9,000 9,000 9,000 9,000 45,000 Total 37,000 37,000 37,000 38,000 38,000 187,000 Funding Sources 2027 2028 2029 2030 2031 Total Park & Trail Improvement Fund 37,000 37,000 37,000 38,000 38,000 187,000 Total 37,000 37,000 37,000 38,000 38,000 187,000 Produced Using Plan-It CIP Software Page 61 2027 thru 2031 Project Details Lakeville, MN Project Name Parks Major Maintenance - Fields Project # P-16 Contact Mark Kruse, Parks Superintendent Cost Type Parks Type Maintenance Department Park Maintenance Funding Description Park Improvement Fund Description Includes field maintenance and improvements throughout the parks system. Expenditures 2027 2028 2029 2030 2031 Total Field improvements/Maintenance 12,000 12,000 12,000 12,000 14,000 62,000 Aronson – replace backstop field 4 0 27,000 0 0 0 27,000 Aronson – replace backstop field 3 0 0 27,000 0 0 27,000 Aronson – replace backstop field 2 25,000 0 0 0 0 25,000 Total 37,000 39,000 39,000 12,000 14,000 141,000 Funding Sources 2027 2028 2029 2030 2031 Total Park & Trail Improvement Fund 37,000 39,000 39,000 12,000 14,000 141,000 Total 37,000 39,000 39,000 12,000 14,000 141,000 Produced Using Plan-It CIP Software Page 62 2027 thru 2031 Project Details Lakeville, MN Project Name Parks Major Maintenance - Bldgs/Shelters/Grounds Project # P-17 Contact Mark Kruse, Parks Superintendent Cost Type Parks Type Maintenance/Improvement Department Park Maintenance Funding Description Park Improvement Fund Description Includes general maintenance projects, maintenance of buildings, park shelters and grounds (examples- re-shingle park shelters, replace signs, repair fencing, replace rubber floors, etc.). Expenditures 2027 2028 2029 2030 2031 Total Projects TBD - Major Maintenance Bldgs/Shelters/Grounds 0 0 500 24,850 0 25,350 Ritter Farm Park Cistern Restoration 0 25,000 0 0 0 25,000 Steve Michaud – HVAC Replacement and AC 8,000 0 0 0 0 8,000 Total 8,000 25,000 500 24,850 0 58,350 Funding Sources 2027 2028 2029 2030 2031 Total Park & Trail Improvement Fund 8,000 25,000 500 24,850 0 58,350 Total 8,000 25,000 500 24,850 0 58,350 Produced Using Plan-It CIP Software Page 63 2027 thru 2031 Project Details Lakeville, MN Project Name S of 185th and E of Future Ixonia Ave Ext- Park Project # P-18 Contact Mark Kruse, Parks Superintendent Cost Type Parks Type New construction Department Park Dedication Funding Description Park Dedication Fund Description The Parks, Trails and Open Space Plan calls for a neighborhood park in the area which is proposed to be constructed in 2032. Planning/design costs are included in 2031. Expenditures 2027 2028 2029 2030 2031 Total Planning/Design 0 0 0 0 75,000 75,000 Total 0 0 0 0 75,000 75,000 Funding Sources 2027 2028 2029 2030 2031 Total Park Dedication Fund 0 0 0 0 75,000 75,000 Total 0 0 0 0 75,000 75,000 Map Produced Using Plan-It CIP Software Page 64 2027 thru 2031 Project Details Lakeville, MN Project Name Other Projects Project # P-19 Contact Joseph Masiarchin, Parks Director Cost Type Parks Department Park Dedication Funding Description Park Dedication Fund Description This category is intended to include smaller park projects such as adding artwork in the parks, tree planting, security cameras at park facilities, Pickleball courts in the south side of the City based on the 2026-2036 Parks System Master Plan, and the completion of an ADA Transition Plan. Expenditures 2027 2028 2029 2030 2031 Total Other amenities to be determined 0 100,000 300,000 300,000 300,000 1,000,000 ADA Transition Plan 0 275,000 0 0 0 275,000 Security cameras- various park facilities 30,000 30,000 30,000 0 0 90,000 Tree Planting 15,000 15,000 15,000 15,000 20,000 80,000 Art in the Park 10,000 10,000 10,000 10,000 10,000 50,000 Aronson Park – Field 9 improvements 12,000 0 0 0 0 12,000 Total 67,000 430,000 355,000 325,000 330,000 1,507,000 Funding Sources 2027 2028 2029 2030 2031 Total Park Dedication Fund 67,000 430,000 355,000 325,000 330,000 1,507,000 Total 67,000 430,000 355,000 325,000 330,000 1,507,000 Produced Using Plan-It CIP Software Page 65 2027 thru 2031 Project Details Lakeville, MN Project Name Parks Major Maintenance - Courts Project # P-20 Contact Mark Kruse, Parks Superintendent Cost Type Parks Type Maintenance Department Park Maintenance Funding Description Park Improvement Fund Description Includes funding to resurface and restripe basketball, pickleball, and tennis courts. Expenditures 2027 2028 2029 2030 2031 Total Oak Shores Park 0 0 0 0 38,000 38,000 Bunker Hill PB & BB Resurfacing 30,000 0 0 0 0 30,000 Pinnacle Reserve Park 0 0 0 22,200 0 22,200 Knob Hill Park 0 0 0 0 22,200 22,200 Cedar Crossing Park 0 12,000 0 0 0 12,000 Jaycee Park 0 10,000 0 0 0 10,000 Chadwick Park 0 0 0 9,000 0 9,000 Fieldstone Park 0 0 0 9,000 0 9,000 Kensington Park 0 0 0 9,000 0 9,000 North Creek Park 0 0 0 2,200 0 2,200 Bassett Park 0 0 2,000 0 0 2,000 Rolling Oaks Park 0 0 2,000 0 0 2,000 Greenridge Park 0 0 2,000 0 0 2,000 Highview Heights 0 0 2,000 0 0 2,000 Foxborough Park 0 0 2,000 0 0 2,000 Hypointe Crossing Park 0 0 2,000 0 0 2,000 Total 30,000 22,000 12,000 51,400 60,200 175,600 Funding Sources 2027 2028 2029 2030 2031 Total Park & Trail Improvement Fund 30,000 22,000 12,000 51,400 60,200 175,600 Total 30,000 22,000 12,000 51,400 60,200 175,600 Produced Using Plan-It CIP Software Page 66 2027 thru 2031 Project Details Lakeville, MN Project Name Parks - New Parking Lots & Expansions Project # P-24 Contact Joseph Masiarchin, Parks Director Cost Type Parks Type New construction Department Park Dedication Funding Description Park Dedication Fund Description Parking lot expansion at Grand Paririe Park is needed due to current high volume use estimates including Splashpad, Pickelball, Grandstand and the Athletic Decks. Expenditures 2027 2028 2029 2030 2031 Total Grand Prairie Park 530,000 0 0 0 0 530,000 Total 530,000 0 0 0 0 530,000 Funding Sources 2027 2028 2029 2030 2031 Total Park Dedication Fund 530,000 0 0 0 0 530,000 Total 530,000 0 0 0 0 530,000 Map Produced Using Plan-It CIP Software Page 67 2027 thru 2031 Project Details Lakeville, MN Project Name S.W. Corner of 210th Street & I-35 Project # P-25 Contact Joseph Masiarchin, Parks Director Cost Type Parks Type New construction Department Park Dedication Description The existing Parks, Trails and Open Spaces plan calls for a future neighborhood park in the area of 210th street and I-35. Expenditures 2027 2028 2029 2030 2031 Total Construction 0 0 0 0 900,000 900,000 Planning/Design 0 0 0 75,000 25,000 100,000 Total 0 0 0 75,000 925,000 1,000,000 Funding Sources 2027 2028 2029 2030 2031 Total Park Dedication Fund 0 0 0 75,000 925,000 1,000,000 Total 0 0 0 75,000 925,000 1,000,000 Map Produced Using Plan-It CIP Software Page 68 2027 thru 2031 Project Details Lakeville, MN Project Name Kensington Park Athletic Deck and Parking Lot Project # P-26 Contact Mark Kruse, Parks Superintendent Cost Type Parks Type Reconstruction/Maintenance Department Park Dedication Funding Description Park & Trail Improvement Fund Expenditures 2027 2028 2029 2030 2031 Total Parking lot 0 0 200,000 0 0 200,000 Kensington Park Athletic Deck Improvements 0 0 100,000 0 0 100,000 Planning/Design 0 30,000 0 0 0 30,000 Total 0 30,000 300,000 0 0 330,000 Funding Sources 2027 2028 2029 2030 2031 Total Park Dedication Fund 0 0 200,000 0 0 200,000 Park & Trail Improvement Fund 0 30,000 100,000 0 0 130,000 Total 0 30,000 300,000 0 0 330,000 Produced Using Plan-It CIP Software Page 69 2027 thru 2031 Project Details Lakeville, MN Project Name Bunker Hill Athletic Decks Project # P-27 Contact Joseph Masiarchin, Parks Director Cost Type Parks Type Expansion Department Park Dedication Funding Description Park Dedication Fund Description Renovate existing park conditions to create two new athletic decks, a new expansion of the parking lot, and adding irrigation to all athletic fields. Project will also include rennovation of existing baseball field and all fencing. Expenditures 2027 2028 2029 2030 2031 Total Construction 0 750,000 0 0 0 750,000 Planning/Design 70,000 0 0 0 0 70,000 Total 70,000 750,000 0 0 0 820,000 Funding Sources 2027 2028 2029 2030 2031 Total Park Dedication Fund 70,000 480,000 0 0 0 550,000 Park & Trail Improvement Fund 0 270,000 0 0 0 270,000 Total 70,000 750,000 0 0 0 820,000 Produced Using Plan-It CIP Software Page 70 2027 thru 2031 Project Details Lakeville, MN Project Name Technology - General Government Project # T-01 Contact Trevor Stewart, IT Manager Cost Type Technology Type Technology Description The Technology Fund accounts for the accumulation and disbursement of funds for the purchase of technology equipment for the City. Expenditures 2027 2028 2029 2030 2031 Total Technology - computers/hardware acquisitions 40,941 12,792 9,704 39,465 11,210 114,112 Total 40,941 12,792 9,704 39,465 11,210 114,112 Funding Sources 2027 2028 2029 2030 2031 Total Technology Fund 40,941 12,792 9,704 39,465 11,210 114,112 Total 40,941 12,792 9,704 39,465 11,210 114,112 Produced Using Plan-It CIP Software Page 71 2027 thru 2031 Project Details Lakeville, MN Project Name Technology-Public Safety Project # T-02 Contact Trevor Stewart, IT Manager Cost Type Technology Type Technology Description The Technology Fund accounts for the accumulation and disbursement of funds for the purchase of technology equipment for the City. Expenditures 2027 2028 2029 2030 2031 Total Technology - computers/hardware acquisitions 127,734 120,300 221,883 102,723 46,062 618,702 Total 127,734 120,300 221,883 102,723 46,062 618,702 Funding Sources 2027 2028 2029 2030 2031 Total Technology Fund 127,734 120,300 221,883 102,723 46,062 618,702 Total 127,734 120,300 221,883 102,723 46,062 618,702 Produced Using Plan-It CIP Software Page 72 2027 thru 2031 Project Details Lakeville, MN Project Name Technology-Public Works Project # T-03 Contact Trevor Stewart, IT Manager Cost Type Technology Type Technology Description The Technology Fund accounts for the accumulation and disbursement of funds for the purchase of technology equipment for the City. Expenditures 2027 2028 2029 2030 2031 Total Technology - computers/hardware acquisitions 6,961 5,907 20,094 16,499 18,473 67,934 Total 6,961 5,907 20,094 16,499 18,473 67,934 Funding Sources 2027 2028 2029 2030 2031 Total Technology Fund 6,961 5,907 20,094 16,499 18,473 67,934 Total 6,961 5,907 20,094 16,499 18,473 67,934 Produced Using Plan-It CIP Software Page 73 2027 thru 2031 Project Details Lakeville, MN Project Name Technology-Arenas Project # T-04 Contact Trevor Stewart, IT Manager Cost Type Technology Type Technology Description The Technology Fund accounts for the accumulation and disbursement of funds for the purchase of technology equipment for Lakeville Arenas. Expenditures 2027 2028 2029 2030 2031 Total Technology - computers/hardware acquisitions 1,534 7,599 3,628 3,696 4,384 20,841 Total 1,534 7,599 3,628 3,696 4,384 20,841 Funding Sources 2027 2028 2029 2030 2031 Total Arenas 1,534 7,599 3,628 3,696 4,384 20,841 Total 1,534 7,599 3,628 3,696 4,384 20,841 Produced Using Plan-It CIP Software Page 74 2027 thru 2031 Project Details Lakeville, MN Project Name Technology-Communications Project # T-05 Contact Trevor Stewart, IT Manager Cost Type Technology Type Technology Description The Technology Fund accounts for the accumulation and disbursement of funds for the purchase of technology equipment for the City. Expenditures 2027 2028 2029 2030 2031 Total Technology - computers/hardware acquisitions 2,440 0 0 823 3,392 6,655 Total 2,440 0 0 823 3,392 6,655 Funding Sources 2027 2028 2029 2030 2031 Total Communications Fund 2,440 0 0 823 3,392 6,655 Total 2,440 0 0 823 3,392 6,655 Produced Using Plan-It CIP Software Page 75 2027 thru 2031 Project Details Lakeville, MN Project Name Technology-Liquor Project # T-06 Contact Trevor Stewart, IT Manager Cost Type Technology Type Technology Funding Description Liquor Fund Description The Technology Fund accounts for the accumulation and disbursement of funds for the purchase of technology equipment for the City. Expenditures 2027 2028 2029 2030 2031 Total Technology - IT infrastructure 51,500 53,598 0 0 0 105,098 Technology - computers/hardware acquisitions 68,783 0 0 17,431 6,146 92,360 Total 120,283 53,598 0 17,431 6,146 197,458 Funding Sources 2027 2028 2029 2030 2031 Total Liquor Fund 120,283 53,598 0 17,431 6,146 197,458 Total 120,283 53,598 0 17,431 6,146 197,458 Produced Using Plan-It CIP Software Page 76 2027 thru 2031 Project Details Lakeville, MN Project Name Technology-Environmental Resources Project # T-07 Contact Trevor Stewart, IT Manager Cost Type Technology Type Technology Description The Technology Fund accounts for the accumulation and disbursement of funds for the purchase of technology equipment for the City. Expenditures 2027 2028 2029 2030 2031 Total Technology - computers/hardware acquisitions 1,946 4,255 0 823 1,099 8,123 Total 1,946 4,255 0 823 1,099 8,123 Funding Sources 2027 2028 2029 2030 2031 Total Environmental Resources Fund 1,946 4,255 0 823 1,099 8,123 Total 1,946 4,255 0 823 1,099 8,123 Produced Using Plan-It CIP Software Page 77 2027 thru 2031 Project Details Lakeville, MN Project Name Technology-Utilities Project # T-08 Contact Trevor Stewart, IT Manager Cost Type Technology Type Technology Description The Technology Fund accounts for the accumulation and disbursement of funds for the purchase of technology equipment for the City. Expenditures 2027 2028 2029 2030 2031 Total Technology - computers/hardware acquisitions 16,536 7,314 1,845 1,221 1,024 27,940 Total 16,536 7,314 1,845 1,221 1,024 27,940 Funding Sources 2027 2028 2029 2030 2031 Total Water Operating Fund 8,268 3,657 923 611 512 13,971 Sanitary Sewer Operating Fund 8,268 3,657 922 610 512 13,969 Total 16,536 7,314 1,845 1,221 1,024 27,940 Produced Using Plan-It CIP Software Page 78 2027 thru 2031 Project Details Lakeville, MN Project Name Technology- Parks & recreation Project # T-09 Contact Trevor Stewart, IT Manager Cost Type Technology Type Technology Expenditures 2027 2028 2029 2030 2031 Total Technology - computers/hardware acquisitions 11,827 21,377 15,184 3,552 12,472 64,412 Total 11,827 21,377 15,184 3,552 12,472 64,412 Funding Sources 2027 2028 2029 2030 2031 Total Technology Fund 11,827 21,377 15,184 3,552 12,472 64,412 Total 11,827 21,377 15,184 3,552 12,472 64,412 Produced Using Plan-It CIP Software Page 79 2027 thru 2031 Project Details Lakeville, MN Project Name Technology-Network infrastructure Project # T-10 Contact Trevor Stewart, IT Manager Cost Type Technology Type Technology Expenditures 2027 2028 2029 2030 2031 Total Technology - IT infrastructure 183,513 496,879 249,660 180,720 44,389 1,155,161 Total 183,513 496,879 249,660 180,720 44,389 1,155,161 Funding Sources 2027 2028 2029 2030 2031 Total Technology Fund 134,875 365,188 183,491 132,823 32,624 849,001 Liquor Fund 26,084 70,624 35,486 25,687 6,309 164,190 Water Operating Fund 8,106 21,947 11,027 7,982 1,961 51,023 Sanitary Sewer Operating Fund 8,105 21,946 11,027 7,982 1,960 51,020 Communications Fund 3,492 9,455 4,751 3,439 845 21,982 Environmental Resources Fund 2,851 7,719 3,878 2,807 690 17,945 Total 183,513 496,879 249,660 180,720 44,389 1,155,161 Produced Using Plan-It CIP Software Page 80 2027 thru 2031 Project Details Lakeville, MN Project Name Freight Rail Car Storage Facility Project # 22-16 Contact Zach Johnson, City Engineer Cost Type Transportation Type Other Department Engineering Funding Description Improvement Construction Description Programmed for 2027 construction. The City was awarded $750,000 in Federal Funding (Fiscal Year 2023) for engineering design and $7,000,000 in State Funding for construction. Project includes construction of a 90-car storage yard, and a 30-car transload facility within the City’s industrial parks, south of CSAH 70. Expenditures 2027 2028 2029 2030 2031 Total Construction 7,000,000 0 0 0 0 7,000,000 Engineering/Design/Other costs 475,000 0 0 0 0 475,000 Total 7,475,000 0 0 0 0 7,475,000 Funding Sources 2027 2028 2029 2030 2031 Total Other funding- State 7,000,000 0 0 0 0 7,000,000 Other funding- Federal 325,000 0 0 0 0 325,000 Improvement Construction Fund 150,000 0 0 0 0 150,000 Stormwater Infrastructure Fund 0 0 0 0 0 0 Total 7,475,000 0 0 0 0 7,475,000 Map Produced Using Plan-It CIP Software Page 81 Produced Using Plan-It CIP Software Page 82 2027 thru 2031 Project Details Lakeville, MN Project Name Holyoke/Highview Avenue Reconstruction Project # 25-05 Contact Zach Johnson, City Engineer Cost Type Transportation Type Rehabilitation Department Engineering Funding Description Municipal State Aid Description Phase I: Heritage Drive to South of 190th Street Phase II: South of 190th Street to Dodd Boulevard/CSAH 9 Phase I programmed for 2029 construction. Project includes road rehabilitation and modernization, intersection improvements and a pedestrian underpass. Phase II programmed for 2032 construction. Project includes road rehabilitation and modernization and intersection improvements and a pedestrian underpass. Expenditures 2027 2028 2029 2030 2031 Total Construction 0 0 0 0 6,155,000 6,155,000 Construction- New trails 0 0 0 0 1,200,000 1,200,000 Construction- Stormwater infrastructure (new) 0 0 0 0 1,035,000 1,035,000 Trail costs (rehabilitation/ reconstruction) 0 0 0 0 200,000 200,000 Construction- Sanitary Sewer infrastructure (repair/replace) 0 0 0 0 145,000 145,000 Construction- Water infrastructure (repair/replace) 0 0 0 0 75,000 75,000 Streetlight costs 0 0 0 0 50,000 50,000 Total 0 0 0 0 8,860,000 8,860,000 Funding Sources 2027 2028 2029 2030 2031 Total Municipal State Aid 0 0 0 0 5,147,400 5,147,400 Park Dedication Fund 0 0 0 0 1,200,000 1,200,000 Stormwater Infrastructure Fund 0 0 0 0 1,035,000 1,035,000 Escrows 0 0 0 0 657,600 657,600 MSA/MSA Bonds - Sp. Assess. 0 0 0 0 350,000 350,000 Park & Trail Improvement Fund 0 0 0 0 200,000 200,000 Sanitary Sewer Operating Fund 0 0 0 0 145,000 145,000 Water Operating Fund 0 0 0 0 75,000 75,000 Streetlight Operating Fund 0 0 0 0 50,000 50,000 Total 0 0 0 0 8,860,000 8,860,000 Produced Using Plan-It CIP Software Page 83 Map Produced Using Plan-It CIP Software Page 84 2027 thru 2031 Project Details Lakeville, MN Project Name CSAH 9 Modernization (210th St - Heritage Dr) Project # 26-04 Contact Zach Johnson, City Engineer Cost Type Transportation Type Modernization Department Engineering Funding Description Municipal State Aid County Project # 09-065 SP/SAP # 188-020-034; 019-609-029; 019-650-026 JPA # 24020 County Billing Contact John Sass County Billing Email John.Sass@co.dakota.mn.us Description Modernization of CSAH 9 (Dodd Boulevard) between 210th Street and Heritage Drive. Project includes a 2-lane divided highway and trails along both sides, with drainage and safety improvements. Includes CSAH 50 intersection and signal system replacement, with a roundabout. Expenditures 2027 2028 2029 2030 2031 Total Construction 12,500,968 0 0 0 0 12,500,968 Mill and Overlay on CR50 (CSAH9-Holyoke Ave) 350,000 0 0 0 0 350,000 County to repay City ROW costs- Scheffler property 276,561 0 0 0 0 276,561 Total 13,127,529 0 0 0 0 13,127,529 Funding Sources 2027 2028 2029 2030 2031 Total Dakota County 12,243,000 0 0 0 0 12,243,000 Stormwater Infrastructure Fund 380,000 0 0 0 0 380,000 Escrows 292,029 0 0 0 0 292,029 Park Dedication Fund 155,000 0 0 0 0 155,000 General Fund 40,000 0 0 0 0 40,000 Streetlight Operating Fund 10,000 0 0 0 0 10,000 Sanitary Sewer Operating Fund 5,000 0 0 0 0 5,000 Water Operating Fund 2,500 0 0 0 0 2,500 Total 13,127,529 0 0 0 0 13,127,529 Map Produced Using Plan-It CIP Software Page 85 2027 thru 2031 Project Details Lakeville, MN Project Name Interstate 35/CSAH 50 Interchange Reconstruction Project # 26-05 Contact Zach Johnson, City Engineer Cost Type Transportation Type Interchange Reconstruction Department Engineering Funding Description Municipal State Aid County Project # 50-033 SP/SAP # 019-650-021 JPA # 24276; County Billing Contact Susan Wimberly County Billing Email Susan.Wimberly@CO.DAKOTA.MN.US Description Reconstruction of the interchange at I-35 and CSAH 5/50 (Kenwood Trail). The existing interchange is deficient in capacity, sight distance and turn lanes, resulting in delays and safety issues. This project includes replacement of the I-35 bridges over CSAH 5/50 and construction of a northbound auxiliary lane along I-35 between CSAH 5/50 and CSAH 46. This project is not led by the City, so only the City's share of costs is shown, other than repayment of RALF loans recently used to purchase right of way in the project area. Expenditures 2027 2028 2029 2030 2031 Total Construction 0 0 1,803,659 0 0 1,803,659 Repay RALF Loan (County share of repayment of 2017 and 2021/2022 RALF Loans) 1,478,161 0 0 0 0 1,478,161 Right of Way- Acquisition/ Professional fees 0 675,000 0 0 0 675,000 Engineering/Design/Other costs 554,536 0 0 0 0 554,536 Repay RALF Loan (City share of repayment of 2017 and 2021/2022 RALF Loans) 260,852 0 0 0 0 260,852 Fiber conduit (Weather Siren) 0 0 10,000 0 0 10,000 Fiber Conduit (Park Dedication Fund) 0 0 10,000 0 0 10,000 Fiber Conduit (Lift Station) 0 0 10,000 0 0 10,000 Fiber conduit (Well/tower) 0 0 10,000 0 0 10,000 Total 2,293,549 675,000 1,843,659 0 0 4,812,208 Funding Sources 2027 2028 2029 2030 2031 Total Municipal State Aid 815,388 675,000 1,248,133 0 0 2,738,521 Dakota County 1,478,161 0 0 0 0 1,478,161 Stormwater Infrastructure Fund 0 0 232,672 0 0 232,672 Water Trunk Fund 0 0 130,845 0 0 130,845 Park Dedication Fund 0 0 129,041 0 0 129,041 Sanitary Sewer Trunk Fund 0 0 92,968 0 0 92,968 General Fund 0 0 10,000 0 0 10,000 Total 2,293,549 675,000 1,843,659 0 0 4,812,208 Produced Using Plan-It CIP Software Page 86 Map Produced Using Plan-It CIP Software Page 87 2027 thru 2031 Project Details Lakeville, MN Project Name CSAH 50/CSAH 60 RAB Modifications Project # 26-08 Contact Zach Johnson, City Engineer Cost Type Transportation Type Maintenance/Improvement Department Engineering Funding Description Municipal State Aid County Project # 50-038 SP/SAP # TBD JPA # TBD Description County-led safety improvement designed to improve pedestrian, bicyclist and vehicle safety. Project includes pavement markings and sign modifications. Expenditures 2027 2028 2029 2030 2031 Total Construction 1 0 0 0 0 1 Total 1 0 0 0 0 1 Funding Sources 2027 2028 2029 2030 2031 Total Municipal State Aid 1 0 0 0 0 1 Total 1 0 0 0 0 1 Map Produced Using Plan-It CIP Software Page 88 2027 thru 2031 Project Details Lakeville, MN Project Name CSAH 5 and Kenyon Avenue Traffic Signal Project # 27-05 Contact Zach Johnson, City Engineer Cost Type Transportation Type Traffic Signal Department Engineering Funding Description Municipal State Aid County Project # 05-060 SP/SAP # 019-605-037; 1980-100 JPA # 24276 County Billing Contact Susan Wimberly County Billing Email Susan.Wimberly@CO.DAKOTA.MN.US Description New traffic signal designed to alleviate congestion and optimize intersection operations. County-led project includes geometric improvements and pavement markings. City cost-share per Dakota County Highway Cost Share Policy F.4.1 (Dakota County 2040 Transportation Plan), Expenditures 2027 2028 2029 2030 2031 Total Construction 141,000 0 0 0 0 141,000 Total 141,000 0 0 0 0 141,000 Funding Sources 2027 2028 2029 2030 2031 Total Municipal State Aid 141,000 0 0 0 0 141,000 Total 141,000 0 0 0 0 141,000 Map Produced Using Plan-It CIP Software Page 89 2027 thru 2031 Project Details Lakeville, MN Project Name CSAH 31 and CSAH 46 Traffic Signal Project # 27-06 Contact Zach Johnson, City Engineer Cost Type Transportation Type Traffic Signal Department Engineering Funding Description Municipal State Aid County Project # 31-125 SP/SAP # TBD JPA # TBD County Billing Contact Tyler Krage County Billing Email Tyler.Krage@co.dakota.mn.us Description Replacement of existing traffic signal that is approaching the end of its useful life. City cost-share per Dakota County Highway Cost Share Policy F.4.2 (Dakota County 2040 Transportation Plan). Expenditures 2027 2028 2029 2030 2031 Total Construction 0 0 0 0 0 0 Total 0 0 0 0 0 0 Funding Sources 2027 2028 2029 2030 2031 Total Municipal State Aid 0 0 0 0 0 0 Total 0 0 0 0 0 0 Map Produced Using Plan-It CIP Software Page 90 2027 thru 2031 Project Details Lakeville, MN Project Name CSAH 60 and Orchard Trail Traffic Signal Project # 27-07 Contact Zach Johnson, City Engineer Cost Type Transportation Type Traffic Signal Department Engineering Funding Description Municipal State Aid County Project # 60-029 SP/SAP # TBD JPA # TBD County Billing Contact Tyler Krage County Billing Email Tyler.Krage@co.dakota.mn.us Description New traffic signal designed to alleviate congestion and optimize intersection operations. County-led project includes geometric improvements and pavement markings. City cost-share per Dakota County Highway Cost Share Policy F.4.1 (Dakota County 2040 Transportation Plan) Expenditures 2027 2028 2029 2030 2031 Total Construction 0 396,000 0 0 0 396,000 Traffic signal- Design/ROW 80,156 0 0 0 0 80,156 Total 80,156 396,000 0 0 0 476,156 Funding Sources 2027 2028 2029 2030 2031 Total Municipal State Aid 80,156 396,000 0 0 0 476,156 Total 80,156 396,000 0 0 0 476,156 Map Produced Using Plan-It CIP Software Page 91 2027 thru 2031 Project Details Lakeville, MN Project Name CSAH 23 M&O (CSAH 9 to CSAH 42) Project # 27-09 Contact Zach Johnson, City Engineer Cost Type Transportation Type Maintenance Department Engineering Funding Description Pavement Management County Project # 23-088 SP/SAP # 019-623-042 JPA # 23660 County Billing Contact Saeed Kanwar County Billing Email Saeed.Kanwar@co.dakota.mn.us Description Mill and overlay of CSAH 23 (Cedar Avenue) from CSAH 9 (179th Street) to CSAH 42 (150th Street).The project will include pavement preservation and ADA improvements. Expenditures 2027 2028 2029 2030 2031 Total Construction 53,568 0 0 0 0 53,568 Total 53,568 0 0 0 0 53,568 Funding Sources 2027 2028 2029 2030 2031 Total Water Operating Fund 53,568 0 0 0 0 53,568 Total 53,568 0 0 0 0 53,568 Map Produced Using Plan-It CIP Software Page 92 2027 thru 2031 Project Details Lakeville, MN Project Name CSAH 9 and Glacier Way Traffic Signal Project # 27-11 Contact Zach Johnson, City Engineer Cost Type Transportation Type Traffic Signal Department Engineering Funding Description Municipal State Aid County Project # 09-069 SP/SAP # 188-150-002 JPA # TBD County Billing Contact Tyler Krage County Billing Email Tyler.Krage@co.dakota.mn.us Description New traffic signal designed to alleviate congestion and optimize intersection operations. City-led project includes geometric improvements and pavement markings. City cost-share per Dakota County Highway Cost Share Policy F.4.1 (Dakota County 2040 Transportation Plan) Expenditures 2027 2028 2029 2030 2031 Total Construction 570,000 0 0 0 0 570,000 Engineering/Design/Other costs 14,500 0 0 0 0 14,500 Total 584,500 0 0 0 0 584,500 Funding Sources 2027 2028 2029 2030 2031 Total Dakota County 321,475 0 0 0 0 321,475 Municipal State Aid 193,025 0 0 0 0 193,025 Escrows 70,000 0 0 0 0 70,000 Total 584,500 0 0 0 0 584,500 Map Produced Using Plan-It CIP Software Page 93 2027 thru 2031 Project Details Lakeville, MN Project Name CSAH 9/Dodd Blvd Modernization (215th St-210th St) Project # 28-04 Contact Zach Johnson, City Engineer Cost Type Transportation Type Modernization Department Engineering Funding Description Municipal State Aid County Project # 09-067 SP/SAP # TBD County Billing Contact John Sass County Billing Email John.Sass@co.dakota.mn.us Description Modernization of CSAH 9 (Dodd Bouelvard) between CSAH 70 (215th Street) and 210th Street. Project includes a 2-lane divided highway and trails along both sides, with drainage and safety improvements. City cost-share per Dakota County Highway Cost Share Policy F.1 (Dakota County 2040 Transportation Plan). Expenditures 2027 2028 2029 2030 2031 Total Construction 0 4,840,000 0 0 0 4,840,000 Right of Way- Acquisition/ Professional fees 843,750 0 0 0 0 843,750 Total 843,750 4,840,000 0 0 0 5,683,750 Funding Sources 2027 2028 2029 2030 2031 Total Dakota County 717,188 4,114,000 0 0 0 4,831,188 Municipal State Aid 126,562 500,000 0 0 0 626,562 Escrows 0 196,000 0 0 0 196,000 Park Dedication Fund 0 30,000 0 0 0 30,000 Total 843,750 4,840,000 0 0 0 5,683,750 Map Produced Using Plan-It CIP Software Page 94 2027 thru 2031 Project Details Lakeville, MN Project Name 200th Street (Hamburg to Cedar) Project # 28-05 Contact Steve Ferraro, Public Works Coordinator Cost Type Transportation Type Modernization Department Construction Services Funding Description Improvement Construction Expenditures 2027 2028 2029 2030 2031 Total Construction 0 1,600,000 0 0 0 1,600,000 Engineering/Design/Other costs 75,000 0 0 0 0 75,000 Total 75,000 1,600,000 0 0 0 1,675,000 Funding Sources 2027 2028 2029 2030 2031 Total G.O. Improvement Bonds - Taxes (Streets) 0 784,954 0 0 0 784,954 Water Trunk Fund 0 350,000 0 0 0 350,000 Stormwater Infrastructure Fund 0 250,000 0 0 0 250,000 Escrows 0 115,046 0 0 0 115,046 Sanitary Sewer Trunk Fund 0 100,000 0 0 0 100,000 Improvement Construction Fund 75,000 0 0 0 0 75,000 Total 75,000 1,600,000 0 0 0 1,675,000 Map Produced Using Plan-It CIP Software Page 95 2027 thru 2031 Project Details Lakeville, MN Project Name CSAH 46 and Foliage Avenue Traffic Signal Project # 28-06 Contact Zach Johnson, City Engineer Cost Type Transportation Type Traffic Signal Department Engineering Funding Description Municipal State Aid County Project # 46-065 SP/SAP # TBD JPA # TBD County Billing Contact Tyler Krage County Billing Email Tyler.Krage@co.dakota.mn.us Description Replacement of existing traffic signal that is approaching the end of its useful life. City cost-share per Dakota County Highway Cost Share Policy F.4.2 (Dakota County 2040 Transportation Plan). Expenditures 2027 2028 2029 2030 2031 Total Construction 0 253,125 0 0 0 253,125 Traffic signal- Design/ROW 52,031 0 0 0 0 52,031 Total 52,031 253,125 0 0 0 305,156 Funding Sources 2027 2028 2029 2030 2031 Total Municipal State Aid 52,031 253,125 0 0 0 305,156 Total 52,031 253,125 0 0 0 305,156 Map Produced Using Plan-It CIP Software Page 96 2027 thru 2031 Project Details Lakeville, MN Project Name CSAH 46 and Galaxie Avenue Traffic Signal Project # 28-07 Contact Zach Johnson, City Engineer Cost Type Transportation Type Traffic Signal Department Engineering Funding Description Municipal State Aid County Project # 46-064 SP/SAP # TBD JPA # TBD County Billing Contact Tyler Krage County Billing Email Tyler.Krage@co.dakota.mn.us Description Replacement of existing traffic signal that is approaching the end of its useful life. City cost-share per Dakota County Highway Cost Share Policy F.4.2 (Dakota County 2040 Transportation Plan). Expenditures 2027 2028 2029 2030 2031 Total Construction 0 253,125 0 0 0 253,125 Traffic signal- Design/ROW 59,063 0 0 0 0 59,063 Total 59,063 253,125 0 0 0 312,188 Funding Sources 2027 2028 2029 2030 2031 Total Municipal State Aid 59,063 253,125 0 0 0 312,188 Total 59,063 253,125 0 0 0 312,188 Map Produced Using Plan-It CIP Software Page 97 2027 thru 2031 Project Details Lakeville, MN Project Name CSAH 9 Improvements at 194th St & 190th St Project # 29-04 Contact Zach Johnson, City Engineer Cost Type Transportation Type Maintenance/Improvement Department Engineering Funding Description Municipal State Aid County Project # 09-068 SP/SAP # TBD JPA # TBD Description Construction of new intersection control at the CSAH 9 (Dodd Boulevard) and 194th Street/Indiana Avenue intersection. City cost-share per Dakota County Highway Cost Share Policy F.4/F.13 (Dakota County 2040 Transportation Plan). Construction of directional access median at the CSAH 9 (Dodd Boulevard) and 190th Street intersection. City cost-share per Dakota County Highway Cost Share Policy F.15 (Dakota County 2040 Transportation Plan). Expenditures 2027 2028 2029 2030 2031 Total Construction 0 0 1,701,000 0 0 1,701,000 Engineering/Design/Other costs 231,000 0 0 0 0 231,000 Right of Way- Acquisition/ Professional fees 0 75,938 0 0 0 75,938 Total 231,000 75,938 1,701,000 0 0 2,007,938 Funding Sources 2027 2028 2029 2030 2031 Total Municipal State Aid 231,000 75,938 1,701,000 0 0 2,007,938 Total 231,000 75,938 1,701,000 0 0 2,007,938 Map Produced Using Plan-It CIP Software Page 98 2027 thru 2031 Project Details Lakeville, MN Project Name CSAH 23 Alignment Study (Griffon Tr - 135th St) Project # 29-05 Contact Zach Johnson, City Engineer Cost Type Transportation Type Other Department Engineering Funding Description Municipal State Aid County Project # 23-089 SP/SAP # N/A Description Preliminary engineering for CSAH 23 (Cedar Avenue) from Griffon Trail/Upper 164th Street to 135th Street. The corridor study will determine best practices to manage future traffic growth, and recommend pedestrian and corridor safety improvements, and potential grade-separated intersections. Expenditures 2027 2028 2029 2030 2031 Total Engineering/Design/Other costs 0 0 31,500 0 0 31,500 Total 0 0 31,500 0 0 31,500 Funding Sources 2027 2028 2029 2030 2031 Total Municipal State Aid 0 0 31,500 0 0 31,500 Total 0 0 31,500 0 0 31,500 Map Produced Using Plan-It CIP Software Page 99 2027 thru 2031 Project Details Lakeville, MN Project Name CSAH 46 and Lac Lavon/Interlachen Traffic Signal Project # 30-05 Contact Zach Johnson, City Engineer Cost Type Transportation Type Traffic Signal Department Engineering Funding Description Municipal State Aid County Project # 46-066 SP/SAP # TBD JPA # TBD County Billing Contact Tyler Krage County Billing Email Tyler.Krage@co.dakota.mn.us Description Replacement of existing traffic signal that is approaching the end of its useful life. City cost-share per Dakota County Highway Cost Share Policy F.4.2 (Dakota County 2040 Transportation Plan). Expenditures 2027 2028 2029 2030 2031 Total Construction 0 0 0 534,375 0 534,375 Traffic signal- Design/ROW 0 104,062 0 0 0 104,062 Total 0 104,062 0 534,375 0 638,437 Funding Sources 2027 2028 2029 2030 2031 Total Municipal State Aid 0 104,062 0 534,375 0 638,437 Total 0 104,062 0 534,375 0 638,437 Map Produced Using Plan-It CIP Software Page 100 2027 thru 2031 Project Details Lakeville, MN Project Name CSAH 50 and Iberia Avenue Traffic Safety Mgmt Project # 31-05 Contact Zach Johnson, City Engineer Cost Type Transportation Type Maintenance/Improvement Department Engineering Funding Description Municipal State Aid County Project # 50-XXX SP/SAP # TBD JPA # TBD Description Construction of traffic safety management improvements at CSAH 50 (202nd Street) and Iberia Avenue intersection. Expenditures 2027 2028 2029 2030 2031 Total Engineering/Design/Other costs 0 0 0 140,000 0 140,000 Right of Way- Acquisition/ Professional fees 0 0 0 0 67,500 67,500 Total 0 0 0 140,000 67,500 207,500 Funding Sources 2027 2028 2029 2030 2031 Total Municipal State Aid 0 0 0 140,000 67,500 207,500 Total 0 0 0 140,000 67,500 207,500 Map Produced Using Plan-It CIP Software Page 101 2027 thru 2031 Project Details Lakeville, MN Project Name CSAH 50 Expansion (CSAH 23 - Flagstaff Ave) Project # 31-07 Contact Zach Johnson, City Engineer Cost Type Transportation Type Expansion Department Engineering Funding Description Municipal State Aid County Project # 50-039 SP/SAP # TBD JPA # TBD Description Expansion of CSAH 50 between CSAH 23 (Cedar Avenue) and Flagstaff Avenue to improve traffic management safety and provide capacity for increasing traffic volumes. The current cost projections anticipate that the County will lead the project, so only City share of costs is shown. The project includes expansion of a two- lane road to four lanes, as well as two traffic signal replacements.The current City share of the expansion costs is 15.5%. The current City share of the signal system costs is 25%. In Fall 2026, the County board is planning to review the cost share policy that could change the City's expansion cost from a 75%-25% cost split to an 85%-15% cost split, which would lower the City cost. The City of Farmington is also participating in the project. Expenditures 2027 2028 2029 2030 2031 Total Construction 0 0 0 1,910,000 0 1,910,000 Engineering/Design/Other costs 0 295,000 0 0 0 295,000 Right of Way- Acquisition/ Professional fees 0 0 150,000 0 0 150,000 Total 0 295,000 150,000 1,910,000 0 2,355,000 Funding Sources 2027 2028 2029 2030 2031 Total Municipal State Aid 0 295,000 150,000 1,910,000 0 2,355,000 Total 0 295,000 150,000 1,910,000 0 2,355,000 Map Produced Using Plan-It CIP Software Page 102 2027 thru 2031 Project Details Lakeville, MN Project Name 195th Street Bridge Replacement Project # 31-08 Contact Zach Johnson, City Engineer Cost Type Transportation Type Bridge Department Engineering Funding Description Municipal State Aid County Project # N/A SP/SAP # TBD JPA # TBD Description The 195th Street bridge crossing over I-35 (Bridge 19841) will need to be reconstructed to accommodate future traffic as development west of I-35, Kenrick Avenue and Keokuk Avenue occurs. Expenditures 2027 2028 2029 2030 2031 Total Construction 0 0 0 0 2,000,000 2,000,000 Total 0 0 0 0 2,000,000 2,000,000 Funding Sources 2027 2028 2029 2030 2031 Total Municipal State Aid 0 0 0 0 2,000,000 2,000,000 Total 0 0 0 0 2,000,000 2,000,000 Produced Using Plan-It CIP Software Page 103 2027 thru 2031 Project Details Lakeville, MN Project Name CSAH 60 and Judicial Road Traffic Signal Project # 31-09 Contact Zach Johnson, City Engineer Cost Type Transportation Type Traffic Signal Department Engineering Funding Description Municipal State Aid County Project # 60-XXX SP/SAP # TBD JPA # TBD Description • New traffic signal system designed to alleviate congestion and optimize intersection operations. • Includes geometric improvements and pavement markings. • City-led project • Owned/maintained by Dakota County/Scott County Expenditures 2027 2028 2029 2030 2031 Total Traffic signal- Design/ROW 0 0 0 50,000 0 50,000 Total 0 0 0 50,000 0 50,000 Funding Sources 2027 2028 2029 2030 2031 Total Municipal State Aid 0 0 0 50,000 0 50,000 Total 0 0 0 50,000 0 50,000 Map Produced Using Plan-It CIP Software Page 104 2027 thru 2031 Project Details Lakeville, MN Project Name Kenrick Ave Extension (181st St-176th St) Project # P28-16 Contact Zach Johnson, City Engineer Cost Type Transportation Type Extension Department Engineering Funding Description Municipal State Aid Description Kenrick Ave will need to be extended to accomodate future traffic as development occurs. Construction would coincide with development of the parcels, and be primarily funded by the developer. Expenditures 2027 2028 2029 2030 2031 Total Construction 0 2,500,000 0 0 0 2,500,000 Total 0 2,500,000 0 0 0 2,500,000 Funding Sources 2027 2028 2029 2030 2031 Total Municipal State Aid 0 2,500,000 0 0 0 2,500,000 Total 0 2,500,000 0 0 0 2,500,000 Map Produced Using Plan-It CIP Software Page 105 2027 thru 2031 Project Details Lakeville, MN Project Name Pavement Management - Maintenance Project # XX-01 Contact Steve Ferraro, Public Works Coordinator Cost Type Transportation Type Maintenance Department Construction Services Funding Description Pavement Management Description Annual preventive maintenance program designed to protect the City’s investment in public street/road infrastructure assets. Best management practices include crack sealing, seal coating, surface sealing, mill and overlay and roadway patching. Associated maintenance activities such as curb and gutter repair, drain tile repair, pavement marking painting, and stormwater infrastructure repair are included. Maintenance is financed primarily through property taxes. A portion of the City’s annual Municipal State Aid (MSA) allotment is applied toward street/road maintenance, with the remaining MSA balance applied toward MSA-designated projects and debt payments on previously issued bonds supporting these projects. The remaining principal and interest balances due on MSA-supported bonds at the end of 2026 will be $2,815,000. The final principal payment will be made in 2036. Expenditures 2027 2028 2029 2030 2031 Total Patching & Minor Overlays 1,660,000 1,930,000 1,900,000 1,935,000 2,010,000 9,435,000 Surface Sealing 275,000 375,000 375,000 375,000 375,000 1,775,000 Crack Seal 200,000 200,000 200,000 225,000 225,000 1,050,000 Construction- Water infrastructure (repair/replace) 100,000 100,000 100,000 100,000 100,000 500,000 Construction- Sanitary Sewer infrastructure (repair/replace) 100,000 100,000 100,000 100,000 100,000 500,000 Sidewalk ADA 65,000 65,000 65,000 65,000 65,000 325,000 Safety Improvements 50,000 50,000 50,000 50,000 50,000 250,000 Velocity Patching 50,000 50,000 50,000 50,000 50,000 250,000 Concrete Curb & Draintile 30,000 30,000 30,000 40,000 40,000 170,000 County Road Stormwater Infrastructure 30,000 30,000 30,000 30,000 30,000 150,000 Bridge Inspections & Repairs 20,000 20,000 20,000 20,000 20,000 100,000 Total 2,580,000 2,950,000 2,920,000 2,990,000 3,065,000 14,505,000 Funding Sources 2027 2028 2029 2030 2031 Total Pavement Management Fund 2,380,000 2,750,000 2,720,000 2,790,000 2,865,000 13,505,000 Sanitary Sewer Operating Fund 100,000 100,000 100,000 100,000 100,000 500,000 Water Operating Fund 100,000 100,000 100,000 100,000 100,000 500,000 Total 2,580,000 2,950,000 2,920,000 2,990,000 3,065,000 14,505,000 Produced Using Plan-It CIP Software Page 106 2027 thru 2031 Project Details Lakeville, MN Project Name Street Reconstruction Project # XX-02 Contact Steve Ferraro, Public Works Coordinator Cost Type Transportation Type Reconstruction/Maintenance Department Construction Services Funding Description Improvement Construction Description Annual program designed to extend street life, minimize total life cycle costs, and improve local streets when routine maintenance costs exceed the cost-benefit of the investment or streets approach the end of their life cycle. Citywide OCI goal for local streets is 75. Both rehabilitation (surface sealing/mill and overlay) and reconstruction (reclamation) practices are utilized. Expenditures 2027 2028 2029 2030 2031 Total Construction 4,135,000 5,670,000 5,775,000 4,105,000 4,205,000 23,890,000 Construction- Water infrastructure (repair/replace) 350,000 500,000 650,000 250,000 250,000 2,000,000 Construction- Sanitary Sewer infrastructure (repair/replace) 250,000 250,000 250,000 250,000 250,000 1,250,000 Construction- Stormwater infrastructure (new) 105,000 250,000 250,000 105,000 105,000 815,000 Total 4,840,000 6,670,000 6,925,000 4,710,000 4,810,000 27,955,000 Funding Sources 2027 2028 2029 2030 2031 Total G.O. Improvement Bonds - Taxes (Streets) 4,008,000 4,450,000 4,365,000 4,105,000 4,205,000 21,133,000 G.O. Improvement Bonds - Sp. Assess. 0 1,220,000 1,410,000 0 0 2,630,000 Water Operating Fund 350,000 500,000 650,000 250,000 250,000 2,000,000 Sanitary Sewer Operating Fund 250,000 250,000 250,000 250,000 250,000 1,250,000 Stormwater Infrastructure Fund 105,000 250,000 250,000 105,000 105,000 815,000 Other cost share arrangement- Credit River (Judicial Rd) 127,000 0 0 0 0 127,000 Total 4,840,000 6,670,000 6,925,000 4,710,000 4,810,000 27,955,000 Produced Using Plan-It CIP Software Page 107 2027 thru 2031 Project Details Lakeville, MN Project Name Collector Roadway Rehabilitation Project # XX-03 Contact Zach Johnson, City Engineer Cost Type Transportation Type Rehabilitation Department Engineering Funding Description Improvement Construction Description This annual program keeps collector and arterial roads in good driving condition and helps the City avoid the higher cost of letting them fail completely. Streets are treated before minor repairs stop being cost-effective or before a road reaches the end of its useful life, typically through a mill and overlay or, for roads in worse condition, reclamation. The City's goal is to keep the average condition of collector and arterial roads at a rating of 75 out of 100. Expenditures 2027 2028 2029 2030 2031 Total Streets/Storm- Construction/ Engineering/Other 3,097,260 2,246,102 2,176,784 890,932 838,203 9,249,281 Construction- Water infrastructure (repair/replace) 100,000 100,000 100,000 100,000 100,000 500,000 Construction- Sanitary Sewer infrastructure (repair/replace) 25,000 25,000 25,000 25,000 25,000 125,000 Construction- New trails 100,000 0 0 0 0 100,000 Total 3,322,260 2,371,102 2,301,784 1,015,932 963,203 9,974,281 Funding Sources 2027 2028 2029 2030 2031 Total G.O. Improvement Bonds - Taxes (Streets) 2,767,183 2,246,102 2,132,047 890,932 838,203 8,874,467 Water Operating Fund 100,000 100,000 100,000 100,000 100,000 500,000 G.O. Improvement Bonds - Sp. Assess. 330,077 0 44,737 0 0 374,814 Sanitary Sewer Operating Fund 25,000 25,000 25,000 25,000 25,000 125,000 Park Dedication Fund 100,000 0 0 0 0 100,000 Total 3,322,260 2,371,102 2,301,784 1,015,932 963,203 9,974,281 Produced Using Plan-It CIP Software Page 108 2027 thru 2031 Project Details Lakeville, MN Project Name County Pavement Preservation/City Utility Repairs Project # XX-10 Contact Zach Johnson, City Engineer Cost Type Transportation Type Maintenance Department Engineering Funding Description Water Operating Fund County Project # TBD SP/SAP # N/A JPA # TBD Description Storm sewer, sanitary sewer and water repairs completed in conjunctions with annual Dakota County pavement preservation program. Expenditures 2027 2028 2029 2030 2031 Total Construction 25,000 0 0 0 0 25,000 Construction- Water infrastructure (repair/replace) 5,000 0 0 0 0 5,000 Construction- Sanitary Sewer infrastructure (repair/replace) 5,000 0 0 0 0 5,000 Total 35,000 0 0 0 0 35,000 Funding Sources 2027 2028 2029 2030 2031 Total Pavement Management Fund 25,000 0 0 0 0 25,000 Water Operating Fund 5,000 0 0 0 0 5,000 Sanitary Sewer Operating Fund 5,000 0 0 0 0 5,000 Total 35,000 0 0 0 0 35,000 Produced Using Plan-It CIP Software Page 109 2027 thru 2031 Project Details Lakeville, MN Project Name Lake Marion Greenway Project # XX-15 Contact Zach Johnson, City Engineer Cost Type Transportation Type Greenway Department Park Dedication Funding Description Park Dedication Fund County Project # 2000453 SP/SAP # N/A JPA # TBD County Billing Contact Tony Wotzka County Billing Email Tony.Wotzka@CO.DAKOTA.MN.US Description Trail improvements to existing local network in coordination with jurisdictional transfer to Dakota County for Lake Marion Greenway. Expenditures 2027 2028 2029 2030 2031 Total Segment C- Downtown to Cedar Ave 0 0 325,000 1,800,000 0 2,125,000 Segment D- Murphy Hanrehan Park to Ritter Farm Park 0 0 80,000 1,080,000 0 1,160,000 Segment B- Downtown 567,500 0 0 0 0 567,500 Segment E- CSAH 23 to CSAH 31 0 150,000 0 0 0 150,000 Total 567,500 150,000 405,000 2,880,000 0 4,002,500 Funding Sources 2027 2028 2029 2030 2031 Total Dakota County 0 0 344,250 2,448,000 0 2,792,250 Park Dedication Fund 0 150,000 60,750 432,000 0 642,750 Pavement Management Fund 317,500 0 0 0 0 317,500 Park & Trail Improvement Fund 250,000 0 0 0 0 250,000 Total 567,500 150,000 405,000 2,880,000 0 4,002,500 Produced Using Plan-It CIP Software Page 110 2027 thru 2031 Project Details Lakeville, MN Project Name Lake Marion Greenway Project # XX-15 Cost Type Transportation Contact Zach Johnson, City Engineer Produced Using Plan-It CIP Software Page 111 2027 thru 2031 Project Details Lakeville, MN Project Name Sanitary Sewer Trunk Improvements Project # U-01 Contact Shane Quade, Utilities Superintendent Cost Type Utility Type Maintenance/Improvement Department Utilities Funding Description Sewer Fund Description The Sanitary Sewer Plan anticipates the extension of sanitary sewer trunk facilities to serve areas of anticipated/planned growth. Lift Station 26 is under construction in 2025. Timing of sanitary sewer trunk system improvements subject to growth rate and location of planned land development. Expenditures 2027 2028 2029 2030 2031 Total Construction 75,000 75,000 75,000 75,000 75,000 375,000 Total 75,000 75,000 75,000 75,000 75,000 375,000 Funding Sources 2027 2028 2029 2030 2031 Total Sanitary Sewer Trunk Fund 75,000 75,000 75,000 75,000 75,000 375,000 Total 75,000 75,000 75,000 75,000 75,000 375,000 Produced Using Plan-It CIP Software Page 112 2027 thru 2031 Project Details Lakeville, MN Project Name Sanitary Sewer Lift Station Rehabilitation Project # U-02 Contact Shane Quade, Utilities Superintendent Cost Type Utility Type Maintenance Department Utilities Funding Description Equipment Fund Description Lift station service life is 12-15 years. Pumps, motors and equipment are inspected, repaired and replaced to ensure uninterrupted service. Lift stations are inspected/cleaned annually and scheduled for rehabilitation every 12-15 years. Expenditures 2027 2028 2029 2030 2031 Total Lift Station 7 175,000 0 0 0 0 175,000 Lift Station 5 0 0 100,000 0 0 100,000 Lift Station 23 0 0 0 0 100,000 100,000 Lift Station 6 0 100,000 0 0 0 100,000 Lift Station 3 80,000 0 0 0 0 80,000 Lift Station 22 0 75,000 0 0 0 75,000 Lift Station 12 0 0 0 40,000 0 40,000 Lift Station 19 0 0 40,000 0 0 40,000 Lift Station 13 0 0 0 40,000 0 40,000 Lift Station 11 0 0 40,000 0 0 40,000 Total 255,000 175,000 180,000 80,000 100,000 790,000 Funding Sources 2027 2028 2029 2030 2031 Total Sanitary Sewer Operating Fund 255,000 175,000 180,000 80,000 100,000 790,000 Total 255,000 175,000 180,000 80,000 100,000 790,000 Produced Using Plan-It CIP Software Page 113 2027 thru 2031 Project Details Lakeville, MN Project Name Sanitary Sewer Inflow/Infiltration Maintenance Project # U-03 Contact Shane Quade, Utilities Superintendent Cost Type Utility Department Utilities Funding Description Equipment Fund Description Annual program designed to manage peak discharge rates and maintain/extend the overall service life of the sanitary sewer collection system through rehabilitating infrastructure susceptible to inflow and infiltration (groundwater). Public sanitary sewer infrastructure is inspected (televising 250,000 pipe-feet/year) and cleaned (jetting 75 pipe-miles/year) to maintain the integrity and function of the sanitary sewer collection system. Expenditures 2027 2028 2029 2030 2031 Total Construction 575,000 575,000 575,000 575,000 575,000 2,875,000 Total 575,000 575,000 575,000 575,000 575,000 2,875,000 Funding Sources 2027 2028 2029 2030 2031 Total Sanitary Sewer Operating Fund 575,000 575,000 575,000 575,000 575,000 2,875,000 Total 575,000 575,000 575,000 575,000 575,000 2,875,000 Produced Using Plan-It CIP Software Page 114 2027 thru 2031 Project Details Lakeville, MN Project Name Well Construction Project # U-04 Contact Shane Quade, Utilities Superintendent Cost Type Utility Department Utilities Funding Description Equipment Fund Description The Water Plan provides guidance in identifying future water system facilities required to serve areas of planned land development. Well #23 is currently under construction and will be brought online in 2025, and Wells 24 and 25 are programmed for 2028 construction. Construction timing and well location subject to population demand/water needs. The Wellhead and Source Water Protection Plan must be amended prior to receiving a Minnesota Department of Health permit. Expenditures 2027 2028 2029 2030 2031 Total Construction 0 1,800,000 0 0 0 1,800,000 Engineering/Design/Other costs 100,000 0 0 0 50,000 150,000 Total 100,000 1,800,000 0 0 50,000 1,950,000 Funding Sources 2027 2028 2029 2030 2031 Total Water Trunk Fund 100,000 1,800,000 0 0 50,000 1,950,000 Total 100,000 1,800,000 0 0 50,000 1,950,000 Produced Using Plan-It CIP Software Page 115 2027 thru 2031 Project Details Lakeville, MN Project Name Watermain Trunk Extensions Project # U-05 Contact Shane Quade, Utilities Superintendent Cost Type Utility Department Utilities Funding Description Water Trunk Fund Description The Water Plan anticipates the extension of watermain trunk facilities to serve areas of planned land development. Timing of watermain trunk system improvements subject to growth rate and location of planned land development. Expenditures 2027 2028 2029 2030 2031 Total Construction 265,000 265,000 265,000 265,000 265,000 1,325,000 Total 265,000 265,000 265,000 265,000 265,000 1,325,000 Funding Sources 2027 2028 2029 2030 2031 Total Water Trunk Fund 265,000 265,000 265,000 265,000 265,000 1,325,000 Total 265,000 265,000 265,000 265,000 265,000 1,325,000 Produced Using Plan-It CIP Software Page 116 2027 thru 2031 Project Details Lakeville, MN Project Name Water Distribution Features Project # U-06 Contact Shane Quade, Utilities Superintendent Cost Type Utility Department Utilities Funding Description Water Trunk Fund Description The Water Plan provides guidance in identifying future water system features required to serve areas of planned land development, including features to either reduce or boost the water pressure due to the elevation of new development. New pressure reducing valves are programmed for 2026, 2028 and 2030 construction. Construction timing and location subject to growth rate and location of planned land development. Expenditures 2027 2028 2029 2030 2031 Total Construction 0 150,000 0 150,000 0 300,000 Total 0 150,000 0 150,000 0 300,000 Funding Sources 2027 2028 2029 2030 2031 Total Water Trunk Fund 0 150,000 0 150,000 0 300,000 Total 0 150,000 0 150,000 0 300,000 Produced Using Plan-It CIP Software Page 117 2027 thru 2031 Project Details Lakeville, MN Project Name Well and Pump Rehabilitation Project # U-07 Contact Shane Quade, Utilities Superintendent Cost Type Utility Department Utilities Funding Description Equipment Fund Description Pumps, motors and equipment are inspected, repaired and replaced to ensure uninterrupted, efficient service and a water system operating at maximum pumping capacity. City wells provide water for on-demand distribution system (24 hours/day, 7 days/week). Multiple starts/stops place tremendous stress on the motors and pump components and constant water exposure can lead to corrosion. Well and pumps are scheduled for rehabilitation every 8-10 years, based on pump type. Expenditures 2027 2028 2029 2030 2031 Total Well 21 125,000 0 0 0 0 125,000 Well 4 0 0 0 0 125,000 125,000 Well 11 0 0 125,000 0 0 125,000 Well 10 0 125,000 0 0 0 125,000 Well 22 125,000 0 0 0 0 125,000 Well 14 0 0 0 0 125,000 125,000 Well 8 0 0 125,000 0 0 125,000 Well 12 0 0 0 125,000 0 125,000 Well 2 0 0 0 0 125,000 125,000 Well 9 0 0 125,000 0 0 125,000 Total 250,000 125,000 375,000 125,000 375,000 1,250,000 Funding Sources 2027 2028 2029 2030 2031 Total Water Operating Fund 250,000 125,000 375,000 125,000 375,000 1,250,000 Total 250,000 125,000 375,000 125,000 375,000 1,250,000 Produced Using Plan-It CIP Software Page 118 2027 thru 2031 Project Details Lakeville, MN Project Name Tower and Reservoir Maintenance Project # U-08 Contact Shane Quade, Utilities Superintendent Cost Type Utility Type Maintenance Department Utilities Funding Description Water Operating Fund Description Maintenance program designed to manage, preserve and protect investment in water storage tanks (interior and exterior). Maintenance removes buildup, dirt/ dust, and extends the life of the coating system, minimizing total lifecycle costs. Expenditures 2027 2028 2029 2030 2031 Total Fairfield Water Tower 0 0 0 1,000,000 0 1,000,000 Construction 0 0 150,000 0 0 150,000 Total 0 0 150,000 1,000,000 0 1,150,000 Funding Sources 2027 2028 2029 2030 2031 Total Water Operating Fund 0 0 150,000 1,000,000 0 1,150,000 Total 0 0 150,000 1,000,000 0 1,150,000 Produced Using Plan-It CIP Software Page 119 2027 thru 2031 Project Details Lakeville, MN Project Name Water meter replacement Project # U-09 Contact Shane Quade, Utilities Superintendent Cost Type Utility Department Utilities Funding Description Equipment Fund Description Annual program designed to replace residential and commercial water meters approaching the end of their life cycle, to ensure accurate water monitoring use data for Minnesota Department of Natural Resources reporting. Program goal is 1,200 water meter replacements per year (based on meter age) with the intent of meeting/maintaining a 20-year service life. Routine water meter replacement is completed by City Utilities staff. Expenditures 2027 2028 2029 2030 2031 Total Equipment purchase 350,000 400,000 425,000 425,000 425,000 2,025,000 Total 350,000 400,000 425,000 425,000 425,000 2,025,000 Funding Sources 2027 2028 2029 2030 2031 Total Water Operating Fund 350,000 400,000 425,000 425,000 425,000 2,025,000 Total 350,000 400,000 425,000 425,000 425,000 2,025,000 Produced Using Plan-It CIP Software Page 120 2027 thru 2031 Project Details Lakeville, MN Project Name Fiber Optic Cable Connection Project # U-10 Contact Shane Quade, Utilities Superintendent Cost Type Utility Type Other Department Utilities Funding Description Equipment Fund Description Extension of fiber optic cable to remote utility sites (lift stations, wells) for better and more reliable communication. Expenditures 2027 2028 2029 2030 2031 Total Fiber conduit (Well/tower) 37,000 40,000 30,000 40,000 40,000 187,000 Fiber Conduit (Lift Station) 25,000 30,000 30,000 40,000 40,000 165,000 Total 62,000 70,000 60,000 80,000 80,000 352,000 Funding Sources 2027 2028 2029 2030 2031 Total Water Operating Fund 37,000 40,000 30,000 40,000 40,000 187,000 Sanitary Sewer Operating Fund 25,000 30,000 30,000 40,000 40,000 165,000 Total 62,000 70,000 60,000 80,000 80,000 352,000 Produced Using Plan-It CIP Software Page 121 CITY OF LAKEVILLE STREET RECONSTRUCTION PLAN Project # Project description:2027 2028 2029 2030 2031 Total XX-02 Street Reconstruction 6,775,183 7,481,056 6,497,047 4,995,932 5,043,203 30,792,421 XX-03 Collector Rehabilitation 330,077 1,220,000 1,454,737 - - 3,004,814 - - - - - - 7,105,260$ 8,701,056$ 7,951,784$ 4,995,932$ 5,043,203$ 33,797,235$ Page 122 Cap i t a l Im p r o v e m e n t Pl a n & O p e r a t i n g B u d g e t Infrastructure Specific Plans Water System Plan Adopted 2019 Transportation Plan Adopted 2019 Next update 2028 Sanitary Sewer Plan Adopted 2019 Next update 2028 Water and Natural Resources Management Plan Adopted 2019 Parks, Trails and Open Space Plan Last update 2015 Next update 2026 Citywide Planning 20 4 0 Co m p r e h e n s i v e P l a n / L a n d U s e P l a n Ad o p t e d 2 0 2 0 Ne x t U p d a t e 2 0 2 8 En v i s i o n L a k e v i l l e 2 0 4 0 La s t U p d a t e d 2 0 2 3 Studies & Site Specific Plans/REPORTS Sanitary Sewer and Water Rates & Fees Study (Last Update 2017) Water Treatment Facility Expansion Plan (Last Update 2022) CMF Expansion Study (Last Update 2015) Dakota County East-West Corridor Preservation Study (Phase 1: 2003 / Phase 2: 2006) Pedestrian Crossing Study (2024) Park Dedication Fee Study (Last update 2012) Various Park Master Plans (As needed) CSAH 60/64 Alignment Study (2026) Downtown Development Guide (Last Update 2018) Indoor Athletic Facility Study (2017) 2027 Projects Pavement Maintenance Local Street Rehabilitation Arterial/Collector Rehabilitation County Pavement Preservation and City Utility Repairs 215th Street Public Improvements Dodd Boulevard Public Improvements Freight Rail Car & Transload Facility Lake Marion Greenway Water Quality and Water Conservation Lake Management Stormwater Infrastructure Maintenance Forestry Vegetation Management East Community Park Various other park projects NOTES: not all 2027 CIP projects are listed here (only Highlights) City and Dakota County Partnership Projects Are Subject to Adopted Dakota County 2040 Transportation Plan Cost Share Policies. (Revised in 2020) Fire Resource and Space Needs Study (Last Update 2020) School Road Safety Task (2014) Dakota County Principal Arterial Study (2018) Dakota County Pedestrian Crossing Safety Assessment (2022) MnDOT I-35 Roadway Study: Burnsville and Lakeville (2024) Strategic Plan for Economic Development (Last Update 2019) Dakota County School Travel Safety Assessment (2021) Trail Condition Review (OCI) (2022) Cedar Ave Environmental Assessment (2009) ADA Transition Plan Last update 2019 Next update 2028 !H !H !H !H!H!H !H !H !H !H !H !H 162ND ST W KEN W OO DTRL 160TH ST W 210TH ST W DO D D B L V D CE DAR AVE 185TH ST W 215TH ST W 179TH ST W KENW OOD TRL 179TH ST W JUNI P E R W A Y DODD BLVD 185TH ST W PI L O T K N O B R D KE N RI C K A V E 202ND ST W 200TH ST W 28-03 28-03 27-03 27 - 0 3 27-03 29 - 0 3 29-03 30-03 25-05 27-01 27-01 27-02 27-02 27-01 27-02 27-01 28-02 28-02 28-02 28-02 28-02 28-16 26-05 29-02 29-02 29-02 29-02 22-16 27-05 27-11 27-0628-0628-07 27-07 30-05 26-05 29-04 29-04 31-08 30-02 30-02 30-02 30-02 31-02 31-02 31-02 35 5 50 23 9 31 60 46 70 Kingsley Lake Lee Lake Orchard Lake Ea s t L a k e Lake Marion 27-09 26-04 27-10 26-04 28-04 31-07 City of Lakeville 2027 - 2031 CIP P:\Projects\Construction Services\CIP Maps\CIP Maps.aprx 5 20312030 202920282027 Local Street Reconstruction County Pavement Preservation Collector Roadway Rehabilitation County Roadway Expansion/ Modernization