Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
10-19-2026
AGENDA CITY COUNCIL MEETING October 19, 2026 - 6:00 PM City Hall Council Chambers Members of the public can participate in person at Lakeville City Hall, 20195 Holyoke Avenue. The mayor will allow for public comments and questions at the appropriate time. The City Council is provided background information for agenda items in advance by staff and appointed commissions, committees, and boards. Decisions are based on this information, as well as City policy, practices, input from constituents, and a council member’s personal judgment. 1. Call to order, moment of silence and flag pledge 2. Roll Call 3. Citizen Comments 4. Additional agenda information 5. Presentations/Introductions a. Annual Finance Department Review 6. Consent Agenda a. Check Register Summary b. Minutes of the 10/05/2026 City Council Meeting c. Agreement for Purchase of Residential Water Meters d. Purchase Agreement from EMI Audio for Performing Arts Center Audio System Equipment Upgrades and Installation e. U.S. Department of Homeland Security Staffing for Adequate Fire and Emergency Response (SAFER) Grant Acceptance f. Deferment of Special Assessments for Senior Citizens, Disabled and Military g. Professional Services Agreement with RJM Construction h. Resolution to Approve Watermain Improvements for Satellite Water Treatment Plant and Amendment to the Agreement with RJM, City Project No. 27-13 i. Ritter Meadows Private Recreation Building Conditional Use Permit j. 7383 170th Street – Conditional Use Permit k. Spirit of Brandtjen Farm Commercial 8th Addition - Release of Agreements l. Agreement with Pember Companies, Incorporated for King Park Field 6 Site Improvements Page 1 of 300 City Council Meeting Agenda October 19, 2026 Page 2 7. Action Items 8. Unfinished Business 9. New Business New Business items are intended for informal City Council discussion and will not begin before 6:15 p.m. The Council may provide direction to staff but will not take formal action on these matters. a. Discuss Local Affordable Housing Aid (LAHA) b. Streetlight Policy Review c. Proposed 2027 Enterprise Fund Budgets & Utility Rate Projections d. Review 2027 Proposed Fee Schedule 10. Announcements a. Next City Council Meeting November 2, 2026 11. Adjourn Page 2 of 300 Date: 10/19/2026 Check Register Summary Proposed Action Staff recommends adoption of the following motion: Move to approve the Check Register Summaries for 10/6/2026-10/7/2026. Overview Checks 331053 - 331206 $ 1,069,582.56 ACH/EFT 26918 - 27105 $5,279,327.51 Total $ 6,348,910.07 The City Council receives a list of expenditures paid (claims detail), which is available to the public upon request. The City serves as the fiscal agent for Lakeville Arenas and Dakota 911 and processes their accounts payable and payments – these amounts are not included in the total above. Financial Impact: $6,348,910.07 Budgeted: Yes Source: Various Envision Lakeville Community Values: Good Value for Public Services Report Completed by: Julie Stahl, Finance Director Page 3 of 300 CHECK DISBURSEMENT REPORT FOR CITY OF LAKEVILLE Amount 1000 GENERAL FUND 66,957.58 2000 COMMUNICATIONS FUND 116.62 2210 FRANCHISE FEES 2,028.01 2292 FIRST CENTER OPERATING FUND 8,170.08 3116 2014B REFUNDING BONDS 375.00 3318 2014A IMPROVEMENT BONDS 375.00 3319 2015A IMPROVEMENT BONDS 266.25 3324 2020A IMPRV BONDS 375.00 3325 2022C IMPRV BONDS 375.00 3403 2015A STATE AID STREET BONDS 108.75 3538 2018B ST RECON & REF BOND (09A)375.00 3539 2021C STREET RECONSTR BONDS 375.00 4000 BUILDING FUND 117,302.00 4200 PARK DEDICATION FUND 104,337.84 4720 2024A PARK BONDS 380,506.07 5300 PAVEMENT MANAGEMENT FUND 922.02 7450 ENVIRONMENTAL RESOURCES FUND 17,884.29 7575 STREET LIGHTING FUND 16,478.90 7600 WATER FUND 66,191.26 7700 SEWER FUND 2,043.29 7800 LIQUOR FUND 222,968.05 7900 MUNICIPAL RESERVES FUND 46,533.99 8000 ESCROW FUND 13,702.81 9800 PAYROLL CLEARING FUND 814.75 Report Total:1,069,582.56 10/13/2026 01:30 PM Page:1/1 Page 4 of 300 CHECK DISBURSEMENT REPORT FOR CITY OF LAKEVILLE Amount 1000 GENERAL FUND 287,396.20 2000 COMMUNICATIONS FUND 34.54 2292 FIRST CENTER OPERATING FUND 560.22 3122 2022C BONDS (PARK REF)2,500.00 3124 2024A TAX BONDS (PARK REF)2,500.00 3252 2021B KEOKUK LIQUOR STORE 1,500.00 3541 2023A STREET RECON BONDS 2,500.00 4000 BUILDING FUND 314,230.59 4025 NEW FIRE STATION #2 (2026 CONSTRUCTION)1,411,545.35 4100 EQUIPMENT FUND 492.04 4125 TECHNOLOGY FUND 6,314.00 4200 PARK DEDICATION FUND 322,216.49 4500 PARK & TRAIL IMPROVEMENTS 111,296.94 4720 2024A PARK BONDS 347,131.84 5200 STATE AID CONSTRUCTION FUND 78,188.02 5300 PAVEMENT MANAGEMENT FUND 97,296.92 5400 STORMWATER INFRASTRUCTURE FND 2,700.00 5500 WATER TRUNK FUND 923.13 5600 SANITARY SEWER TRUNK FUND 18,113.84 6611 2026 STREET PROJECTS 166,632.36 7450 ENVIRONMENTAL RESOURCES FUND 9,971.38 7575 STREET LIGHTING FUND 82.09 7600 WATER FUND 41,864.33 7700 SEWER FUND 538,207.34 7800 LIQUOR FUND 512,446.31 8000 ESCROW FUND 16.34 8970 LAKEVILLE ARENAS - OPERATIONS 577.48 9800 PAYROLL CLEARING FUND 1,002,089.76 Report Total:5,279,327.51 10/13/2026 01:34 PM Page:1/1 Page 5 of 300 MINUTES CITY COUNCIL MEETING October 5, 2026 - 6:00 PM City Hall Council Chambers 1. Call to order, moment of silence and flag pledge Mayor Hellier called the meeting to order at 6:00 P.M. 2. Roll Call Members Present: Mayor Hellier, Council Members Lee, Volk, Wolter Members Absent: Council Member Bermel Staff Present: Andrea McDowell Poehler, City Attorney; Julie Stahl, Finance Director; Allyn Kuennen, Assistant City Administrator; Taylor Snider, Assistant to the City Administrator; Brad Paulson, Police Chief; Paul Oehme, Public Works Director; Tina Goodroad, Community Development Director; Mike Meyer, Fire Chief; Zach Johnson, City Engineer 3. Citizen Comments 4. Additional agenda information 5. Presentations/Introductions a. Proclamation for Manufacturing Month Community Development Director Tina Goodroad introduced Manufacturing Month in the City of Lakeville. Councilmember Wolter read the Manufacturing Month proclamation. b. Business Spotlight Video — Christian Brothers Automotive Community Development Director Tina Goodroad introduced the Business Spotlight Video, highlighting Christian Brothers Automotive. Owner Ken Titcomb presented the backstory to why Lakeville has been such a great place to raise a family and grow a business. c. Public Works Quarterly Report Public Works Director Paul Oehme presented the Public Works Quarterly Report to Council. 6. Consent Agenda Motion was made by Wolter, seconded by Lee, to approve the Consent Agenda. Voice vote was taken on the motion. Ayes - Hellier, Lee, Volk, Wolter a. Check Register Summary Page 6 of 300 City Council Meeting Minutes October 5, 2026 Page 2 b. Minutes of the 09/21/2026 City Council Meeting c. Resolution Approving Charitable Gambling for Lakeville Hockey Association d. Resolution accepting donations from customers of the Lakeville Municipal Liquor Stores e. Resolution Accepting Grant from MN Department of Public Safety Office of Traffic Safety f. Adopt Public Improvement and Special Assessment Agreement - 6729 175th St W g. Resolution Calling a Public Hearing Relating to the Imposition of a Service Charge for Special Service District No.1 h. 2026-2027 City of Lakeville Hunting Map i. Proposed Changes to the Designated Snowmobile Trail Map j. Resolution Authorizing Temporary Closing of City Streets for the Downtown Lakeville Boo (DLBoo) Event k. Proposal with ECSI for the Upgrade of Liquor Store Security Cameras l. Amend 2026 General, Debt, Capital, Utility, Special Revenue, and Internal Service Fund Budgets m. Sign Variance for Dakota County at 10125 217th Street/Recycling Zone n. Joint Powers Agreement with the City of Farmington and Supplemental Agreements with Barr Engineering and SRF Consulting Group for the East Branch of South Creek Conditional Letter of Map Revision and Preliminary Roadway Design o. Supplemental Agreement with Kimley-Horn for Professional Services for the 2027 Collector Roadway Rehabilitation p. Encroachment Agreement with RM-BFR, LLC for Private Improvements in Public Easements q. Agreement for Fleet Vehicle Software 7. Action Items a. Public Hearing — Resolution Adopting Assessments for Unpaid Special Charges Finance Director Julie Stahl presented to Council regarding the resolution adopting assessments as unpaid special charges. Mayor Hellier opened the public hearing at 6:29 P.M. Motion was made by Lee, seconded by Volk, to close the public hearing. Voice vote was taken on the motion. Ayes - Hellier, Lee, Volk, Wolter Motion was made by Lee, seconded by Wolter, to approve the resolution adopting assessments for unpaid special charges. Roll call was taken on the motion. Ayes - Hellier, Lee, Volk, Wolter b. Public Hearing for the Proposed 2027-2031 Capital Improvement Plan and Street Reconstruction Plan and the Intent to Issue General Obligation Street Reconstruction and General Obligation Capital Improvement Bonds. Page 7 of 300 City Council Meeting Minutes October 5, 2026 Page 3 Finance Director Julie Stahl presented the public hearing for the proposed 2027-2031 Capital Improvement Plan and Street Reconstruction Plan and the Intent to Issue General Obligation Street Reconstruction and General Obligation Capital Improvement Bonds. Mayor Hellier opened the public hearing at 6:31 P.M. Motion was made by Lee, seconded by Wolter, to close the public hearing. Voice vote was taken on the motion. Ayes - Hellier, Lee, Volk, Wolter Motion was made by Lee, seconded by Volk, to approve the resolution adopting the 5- Year Capital Improvement Plan (2027-2031) and approving the issuance of General Obligation Capital Improvement Bonds. Roll call was taken on the motion. Ayes - Hellier, Lee, Volk, Wolter Motion was made by Lee, seconded by Wolter, to approve the resolution adopting a 5- Year Street Reconstruction Plan (2027-2031) and approving the issuance of General Obligation Street Reconstruction Bonds. Roll call was taken on the motion. Ayes - Hellier, Lee, Volk, Wolter Motion was made by Wolter, seconded by Volk, to approve the resolution declaring the official intent of the City of Lakeville to reimburse certain expenditures from bond proceeds. Roll call was taken on the motion. Ayes - Hellier, Lee, Volk, Wolter 8. Unfinished Business 9. New Business a. Existing Regulations and Process Regarding Boulevard Signs Community Development Director Goodroad presented to the City Council regarding boulevard signs and the current regulations. Council discussed possible ways to reduce staff time spent on picking up illegally placed boulevard signs. b. Youth Citizens Academy Taylor Snider, Assistant to the City Administrator, presented an updated Youth Citizens Academy to Council. Council supported the new format and instructed staff to proceed with the new Youth Citizens Academy program. c. Award of FEMA Staffing for Adequate Fire and Emergency Response (SAFER) Grant – Six Career Firefighters Fire Chief Mike Meyer announced to Council that Lakeville was awarded a FEMA Staffing for Adequate Fire and Emergency Response (SAFER) Grant. 10. Council/Committee Updates 11. Announcements 12. Adjourn Motion was made by Volk, seconded by Lee, to adjourn. Voice vote was taken on the motion. All in favor. Mayor Hellier adjourned the meeting at 7:17 P.M. Page 8 of 300 City Council Meeting Minutes October 5, 2026 Page 4 Respectfully Submitted, __________________________________ Taylor Snider, Deputy City Clerk ____________________________ Luke M. Hellier, Mayor Page 9 of 300 Date: 10/19/2026 Agreement for Purchase of Residential Water Meters Proposed Action Staff recommends adoption of the following motion: Move to approve the purchase of water meters from Ferguson Waterworks. Overview Lakeville provides metered water service to residential, commercial, and industrial customers in Lakeville. This order replenishes the residential meter inventory that is used for repairs, replacements, and new construction. The Utilities Division requested a quote from Ferguson Waterworks for compatible meters used with our fixed base meter reading system. Ferguson Waterworks provided a quote for $155,000.00. Ferguson Waterworks is the sole source for Neptune meters that are fully compatible with our fixed base reading system. Staff recommends approval of this purchase. Supporting Information 1. Meter Quote 2. Neptune Sole Source Letter Financial Impact: $155,000.00 Budgeted: Yes Source: Water Fund Envision Lakeville Community Values: Good Value for Public Service Report Completed by: Shane Quade, Utilities Superintendent Page 10 of 300 FERGUSON WATERWORKS #2518 1694 91ST AVE NE BLAINE, MN 55449-4311 Phone: 763-560-5200 Fax: 763-560-1799 Deliver To: From:Brian Rollins brian.rollins@ferguson.com Comments: HOW ARE WE DOING? WE WANT YOUR FEEDBACK! Scan the QR code or use the link below to complete a survey about your bids: https://survey.medallia.com/?bidsorder&fc=2518&on=24675 17:07:39 OCT 01 2026 FERGUSON ENTERPRISES LLC #2518 Price Quotation Phone: 763-560-5200 Fax: 763-560-1799 Bid No:B190720 Bid Date:10/01/26 Quoted By:BRR Cust Phone:952-985-4400 Terms:NET 10TH PROX Customer:CITY OF LAKEVILLE 18400 IPAVA AVE W ATTN: ACCOUNTS PAYABLE 20195 HOLYOKE AVE LAKEVILLE, MN 55044 Ship To:CITY OF LAKEVILLE 18400 IPAVA AVE W ATTN: ACCOUNTS PAYABLE 20195 HOLYOKE AVE LAKEVILLE, MN 55044 Cust PO#:3/4" METERS Job Name:METER ACCOUNT Page 1 of 1 Item Description Quantity Net Price UM Total NED2D11RPDG11 LF 3/4 SL T10 MTR P/C R900I USG 500 310.000 EA 155000.00 Net Total:$155000.00 Tax:$0.00 Freight:$0.00 Total:$155000.00 Quoted prices are based upon receipt of the total quantity for immediate shipment (48 hours). SHIPMENTS BEYOND 48 HOURS SHALL BE AT THE PRICE IN EFFECT AT TIME OF SHIPMENT UNLESS NOTED OTHERWISE. QUOTES FOR PRODUCTS SHIPPED FOR RESALE Due to the uncertain impact of potential tariffs, Ferguson's quotation/proposal has not included any provision or contingency for future tariffs or increase of existing tariffs. Ferguson reserves the right to adjust prices to reflect the impact of any new or increased tariffs that affect our costs at the time of shipment. Ferguson will provide notice of any such adjustments along with documentation supporting the changes. CONTRACTOR CUSTOMERS: IF YOU HAVE DBE/MBE/WBE//VBE/SDVBE/SBE GOOD FAITH EFFORTS DIVERSITY GOALS/ REQUIREMENTS ON A FEDERAL, STATE, LOCAL GOVERNMENT, PRIVATE SECTOR PROJECT, PLEASE CONTACT YOUR BRANCH SALES REPRESENATIVE IMMEDIATELY PRIOR TO RECEIVING A QUOTE/ORDER. ARE NOT FIRM UNLESS NOTED OTHERWISE. https://www.ferguson.com/content/website-info/terms-of-sale LEAD LAW WARNING: It is illegal to install products that are not "lead free" in accordance with US Federal or other applicable law in potable water systems anticipated for human consumption. Products with *NP in the description are NOT lead free and can only be installed in non-potable applications. Buyer is solely responsible for product selection. Seller not responsible for delays, lack of product or increase of pricing due to causes beyond our control, and/or based upon Local, State and Federal laws governing type of products that can be sold or put into commerce. This Quote is offered contingent upon the Buyer's acceptance of Seller's terms and conditions, which are incorporated by reference and found either following this document, or on the web at Govt Buyers: All items are open market unless noted otherwise. Page 11 of 300 January 16, 2026 Shane Quade City of Lakeville 18400 Ipava Ave Lakeville, MN 55044 Ref.: Ferguson Water Works - Sole Authorized Distributor - State of Minnesota Shane: Neptune Technology Group Inc is pleased to affirm that Ferguson Water Works is the sole authorized distributor in the State of Minnesota for Neptune RF meter reading equipment and software, Neptune water meters and Neptune parts. Ferguson Water Works is authorized by Neptune to submit an offer for Neptune water meters and related products. Thank you for your interest in Neptune products. If you have any questions, please contact your local Ferguson Water Works representative, Brian Rollins, at (319) 631-3174, or your local Neptune representative, Ian Coburn at (334) 220-9318 . Sincerely, Ian Coburn Ian Coburn Senior Territory Manager MN, IA, WI, SD, ND, NE Page 12 of 300 Date: 10/19/2026 Purchase Agreement from EMI Audio for Performing Arts Center Audio System Equipment Upgrades and Installation Proposed Action Staff recommends adoption of the following motion: Move to approve the purchase agreement from EMI Audio for Performing Arts Center audio system equipment upgrades and installation. Overview Some existing sound equipment at the Lakeville Area Arts Center’s Performing Arts Building is due for replacement after a decade of use. The 2026-2030 Capital Improvement Plan included theater system upgrades and replacement. EMI Audio provided a quote to replace and install amplifiers for the main speakers, an upgraded digital mixer, a dual-input microphone line, a stage monitor, and additional components. The installation will include re-routing existing cables, relocating the equipment rack, control booth amplifier and backstage amplifiers. The installation will be completed this year, before the busy holiday show season. Supporting Information 1. EMI Audio Proposal Dated October 6, 2026 2. Purchase Agreement from EMI Audio for Performing Arts Center Audio System Equipment Upgrades and Installation Financial Impact: $36,339.48 Budgeted: Yes Source: CIP/Building Fund Envision Lakeville Community Values: Access to a Multitude of Natural Amenities and Recreational Opportunities Report Completed by: Nicki Pretzer, Arts Center Manager Page 13 of 300 4719 42nd AVE N Robbinsdale, MN 55422 Phone 612-789-2496 Fax 612-789-2873 www.EMIAudio.com Quote q15267 Tue 10/ 6/2026 9:00AM JEFF GEISLER On Account Status: Quote #: Terms: Operator: Quoted for: LAKEVILLE AREA ART CENTER Customer #: 14733 Phone 952-985-4640 Job Descr: ATTN ART CENTER 20195 HOLYOKE AVENUE Lakeville, MN 55044 Arts Center Rack Move/Electronics Upgrade Ordered By: JOSEPH MASIARCHIN 952-985-4601 Sales Rep: Jeff Geisler 612-789-2496 Jeff@EMIAudio.com - - This quote will remodel the Arts Center Sound System. Changes to the Stage: The Amplifier equipment rack will move down to the stage. This will require the speaker cables to be re-routed to that location and new Line level feeds routed from the booth to the stage. At that time, we would also replace the amplifiers that feed the main speakers. The existing amps will be 10 years old. The effect and monitor speaker lines will be abandoned in favor of powered monitors being fed from the DX-168s Changes to the Booth: An equipment rack will be installed on the wall to free up counter space. These items will be moved to the equipment rack: Wireless Receivers and antenna distribution, hearing assistance, CD Player, Intercom base station, Paging system control panel. New items that will be in this rack: Control Booth Amp, Lobby/backstage amp The mixer will have a S link card installed so both digital snake lines on the stage are active at the same time. Two DX-168 mix racks will be provided. They can either each be connected to a digital snake line or chained together. We will replace 11 XLR jacks and two Ethernet jacks to update your wiring. Items SoldQty Each Price LOWELL LWR2423 WALL MOUNT RACK $1,491.95$1,491.951 FURMAN CN-1800S 15A SEQUENCER $605.76$605.761 BOSE PSX2404D 4CH POWERSHARE AMP 2400W $10,497.00$3,499.003 BOSE P2600A 2CH POWERSPACE AMPLIFIER $1,349.95$1,349.951 TOA A-9120SM2CU 120 WATT MIXER/AMP $1,575.00$1,575.001 TOA D-001T MIC/LINE DUAL INPUT MODULE $510.00$255.002 RAPCO MT-415FL 4 Channel Snake $157.44$52.483 ALLEN & HEATH S-LINK CARD FOR SQ $299.99$299.991 ALLEN & HEATH DX168 $3,998.00$1,999.002 WEST PENN 227 12-2 PVC $480.00$0.96500 WEST PENN 25291B 22-2 PLENUM $150.00$0.30500 MISC CABLE/CONNECTORS/FASTENERS $500.00$500.001 LABOR EMI AUDIO $10,000.00$10,000.001 Begin at: 9:00:00AMThu 12/ 7/2023 RDL D-XLR3F WHITE SINGLE XLR $289.41$26.3111 Steel Decora Cover Plates $150.00$150.001 D-SERIES ETHERCON JACK WITH IDC TERMINAL $39.98$19.992 EV PXM-12MP STAGE MONITOR $3,796.00$949.004 ZLX-8-G2 PASSIVE 8" 1000W SPEAKER $449.00$449.001 Quote valid for 7 days contract-params.SQL.rpt (4)Printed On Tue 10/ 6/2026 9:55:52AM Software by Point-of-Rental Software www.point-of-rental.com Store Hours: 10am-5pm M-F, 10am-2pm ST Modification #10 Page 14 of 300 Page 2 of 2Quote #: q15267 LAKEVILLE AREA ART CENTER Quote valid for 7 days Quote LAKEVILLE AREA ART CENTER Signature: $36,339.48 Amount Due: Paid: $36,339.48 Total: Subtotal: Sales: $0.00 $36,339.48 $36,339.48 contract-params.SQL.rpt (4)Printed On Tue 10/ 6/2026 9:55:52AM Software by Point-of-Rental Software www.point-of-rental.com Store Hours: 10am-5pm M-F, 10am-2pm ST Modification #10 Page 15 of 300 1 237871v2 NON-BID CONTRACT FOR PURCHASE OF GOODS AND SERVICES AGREEMENT made this 19th day of October, 2026, by and between the CITY OF LAKEVILLE, a Minnesota municipal corporation ("City") and EMI AUDIO, a Minnesota corporation ("Contractor") IN CONSIDERATION OF THEIR MUTUAL COVENANTS, THE PARTIES AGREE AS FOLLOWS: 1. CONTRACT DOCUMENTS. The following documents shall be referred to as the “Contract Documents,” all of which shall be taken together as a whole as the contract between the parties as if they were set verbatim and in full herein: A. This Agreement. B. Contractor’s Quote and attached agreement dated January 8, 2026 In the event of a conflict among the provisions of the Contract Documents, the order in which they are listed above shall control in resolving any such conflicts. Contract Document “A” has the first priority and Contract Document “B” has the last priority. 2. CONTRACTOR OBLIGATIONS. The Contractor shall provide the goods, services and perform the work in accordance with the Contract Documents (“Work”). Contractor shall provide all personnel, supervision, services, materials, tools, equipment and supplies and do all things necessary and ancillary thereto specified in the Contract Documents. 3. CONTRACTOR’S REPRESENTATIONS. A. Contractor has examined and carefully studied the Contract Documents and other related data identified in the Contract Documents. B. Contractor is familiar with and is satisfied as to all federal, state, and local Laws and Regulations that may affect cost, progress, and performance of the Work. C. Contractor has given City written notice of all conflicts, errors, ambiguities, or discrepancies that Contractor has discovered in the Contract Documents, and the written resolution thereof by City is acceptable to Contractor. D. The Contract Documents are generally sufficient to indicate and convey understanding of all terms and conditions for performance and furnishing of the Work. 4. COMPENSATION. Contractor shall be paid by the City for the goods and services described in accordance with the Quote, which is inclusive of reimbursable expenses. The fee shall not be adjusted even if the estimated number of hours to perform a task, or any other estimate, Page 16 of 300 2 237871v2 assumption or matter is wrong or exceeded. Payment shall be made periodically after a service has been completed and within thirty-five (35) days of receipt of an invoice. 5. COMPLETION DATE. The Contractor shall complete the Work within a timeframe that is agreed upon between the Parties prior to the start of the project. 6. WARRANTY. The Contractor shall be held responsible for any and all defects in workmanship and materials and upon notification by the City shall immediately replace or repair the defective workmanship and materials without cost to the City. The Contractor warrants that only new unused materials will be used. The Contractor further warrants to the City that all materials and services furnished under the Contract will be in conformance with Contract Documents and that the goods are of merchantable quality and are fit for the use for which they are sold. These warranties are in addition to any manufacturer's standard warranty, and any warranty provided by law. 7. RIGHTS AND REMEDIES. A. The duties and obligations imposed by the Contract Documents, and the rights and remedies available thereunder shall be in addition to, and not a limitation of, any duties, obligations, rights and remedies otherwise imposed or available by law. B. No action, or failure to act, by the City or the Contractor shall constitute a waiver of any right or duty afforded any of them under the Contract, nor shall any such action or failure to act constitute an approval of, or acquiescence in, any breach there under, except as may be specifically agreed in writing. 8. CHANGES TO WORK. Without invalidating the Contract, the City may, at any time, or from time to time, order additions, deletions or revisions in the work provided under this Agreement; these will be authorized by an amendment to the Contract. Upon approval of an amendment, Contractor shall proceed with the work provided under the amendment. Changes in the Contract Price shall be based upon the prices identified in the Quote provided or negotiated between the parties based on similar work provided in the Proposal. 9. UNAUTHORIZED WORK. Additional work performed without authorization of an amendment of this Contract will not entitle Contractor to an increase in the Compensation or an extension of the Contract. 10. DOCUMENTS. The City shall be the owner of all documents, reports, studies, analysis and the like prepared by the Contractor in conjunction with this contract. 11. COMPLIANCE WITH LAWS AND REGULATIONS. In providing services hereunder, Contractor shall abide by all statutes, ordinances, rules and regulations pertaining to the provisions of goods and services to be provided. 12. STANDARD OF CARE. Contractor shall exercise the same degrees of care, skill, and diligence in the performance of the services as is ordinarily possessed and exercised by a professional Contractor under similar circumstances. No other warranty, expressed or implied, is Page 17 of 300 3 237871v2 included in this Agreement. City shall not be responsible for discovering deficiencies in the accuracy of Contractor’s services. 13. INDEMNIFICATION. To the fullest extent permitted by law, Contractor agrees to defend, indemnify and hold harmless the City, and its employees, officials, and agents from and against all claims, actions, damages, losses and expenses, including reasonable attorney fees, arising out of Contractor’s negligence or its performance or failure to perform its obligations under this Contract. Contractor’s indemnification obligation shall apply to subcontractor(s), or anyone directly or indirectly employed or hired by Contractor, or anyone for whose acts Contractor may be liable. Contractor agrees this indemnity obligation shall survive the completion or termination of this Contract. 14. INSURANCE. Prior to the start of the project, Contractor shall furnish to the City a certificate of insurance showing proof of the required insurance required under this Paragraph. Contractor shall take out and maintain or cause to be taken out and maintained until six (6) months after the City has accepted the public improvements, such insurance as shall protect Contractor and the City for work covered by the Contract including workers’ compensation claims and property damage, bodily and personal injury which may arise from operations under this Contract, whether such operations are by Contractor or anyone directly or indirectly employed by either of them. The minimum amounts of insurance shall be as follows: Commercial General Liability (or in combination with an umbrella policy) $2,000,000 Each Occurrence $2,000,000 Products/Completed Operations Aggregate $2,000,000 Annual Aggregate The following coverages shall be included: Premises and Operations Bodily Injury and Property Damage Personal and Advertising Injury Blanket Contractual Liability Products and Completed Operations Liability Automobile Liability $2,000,000 Combined Single Limit – Bodily Injury & Property Damage Including Owned, Hired & Non-Owned Automobiles Workers Compensation Workers’ Compensation insurance in accordance with the statutory requirements of the State of Minnesota, including Employer’s Liability with minimum limits are as follows: $500,000 – Bodily Injury by Disease per employee $500,000 – Bodily Injury by Disease aggregate $500,000 – Bodily Injury by Accident The Contractor’s insurance must be “Primary and Non-Contributory”. Page 18 of 300 4 237871v2 All insurance policies (or riders) required by this Contract shall be (i) taken out by and maintained with responsible insurance companies organized under the laws of one of the states of the United States and qualified to do business in the State of Minnesota, (ii) shall name the City, its employees and agents as additional insureds (CGL and umbrella only) by endorsement which shall be filed with the City. A copy of the endorsement must be submitted with the certificate of insurance. Contractor’s policies and Certificate of Insurance shall contain a provision that coverage afforded under the policies shall not be cancelled without at least thirty (30) days’ advanced written notice to the City, or ten (10) days’ notice for non-payment of premium. An Umbrella or Excess Liability insurance policy may be used to supplement Contractor’s policy limits on a follow-form basis to satisfy the full policy limits required by this Contract. 15. INDEPENDENT CONTRACTOR. The City hereby retains the Contractor as an independent contractor upon the terms and conditions set forth in this Agreement. The Contractor is not an employee of the City and is free to contract with other entities as provided herein. Contractor shall be responsible for selecting the means and methods of performing the work. Contractor shall furnish any and all supplies, equipment, and incidentals necessary for Contractor's performance under this Agreement. City and Contractor agree that Contractor shall not at any time or in any manner represent that Contractor or any of Contractor's agents or employees are in any manner agents or employees of the City. Contractor shall be exclusively responsible under this Agreement for Contractor's own FICA payments, workers compensation payments, unemployment compensation payments, withholding amounts, and/or self-employment taxes if any such payments, amounts, or taxes are required to be paid by law or regulation. 16. SUBCONTRACTORS. Contractor shall not enter into subcontracts for services provided under this Agreement without the express written consent of the City. Contractor shall comply with Minnesota Statute § 471.425. Contractor must pay Subcontractor for all undisputed services provided by Subcontractor within ten days of Contractor’s receipt of payment from City. Contractor must pay interest of 1.5 percent per month or any part of a month to Subcontractor on any undisputed amount not paid on time to Subcontractor. The minimum monthly interest penalty payment for an unpaid balance of $100 or more is $10. 17. ASSIGNMENT. Neither party shall assign this Agreement, nor any interest arising herein, without the written consent of the other party. 18. WAIVER. Any waiver by either party of a breach of any provisions of this Agreement shall not affect, in any respect, the validity of the remainder of this Agreement. 19. ENTIRE AGREEMENT. The entire agreement of the parties is contained herein. This Agreement supersedes all oral agreements and negotiations between the parties relating to the subject matter hereof as well as any previous agreements presently in effect between the parties relating to the subject matter hereof. Any alterations, amendments, deletions, or waivers of the provisions of this Agreement shall be valid only when expressed in writing and duly signed by the parties, unless otherwise provided herein. Page 19 of 300 5 237871v2 20. CONTROLLING LAW. This Agreement shall be governed by and construed in accordance with the laws of the State of Minnesota. 21. COPYRIGHT. Contractor shall defend actions or claims charging infringement of any copyright or patent by reason of the use or adoption of any designs, drawings or specifications supplied by it, and it shall hold harmless the City from loss or damage resulting there from. 22. RECORDS/AUDIT. The Contractor shall maintain complete and accurate records of time and expense involved in the performance of services. Pursuant to Minnesota Statutes § 16C.05, Subd. 5, any books, records, documents, and accounting procedures and practices of City and Contractor relevant to the Agreement are subject to examination by City and Contactor, and either the Legislative Auditor or the State Auditor as appropriate. City and Contractor agree to maintain these records for a period of six years from the date of performance of all services covered under this Agreement. 23. MINNESOTA GOVERNMENT DATA PRACTICES ACT. Contractor must comply with the Minnesota Government Data Practices Act, Minnesota Statutes Chapter 13, as it applies to (1) all data provided by the City pursuant to this Agreement, and (2) all data, created, collected, received, stored, used, maintained, or disseminated by the Contractor pursuant to this Agreement. Contractor is subject to all the provisions of the Minnesota Government Data Practices Act, including but not limited to the civil remedies of Minnesota Statutes Section 13.08, as if it were a government entity. In the event Contractor receives a request to release data, Contractor must immediately notify City. City will give Contractor instructions concerning the release of the data to the requesting party before the data is released. Contractor agrees to defend, indemnify, and hold City, its officials, officers, agents, employees, and volunteers harmless from any claims resulting from Contractor’s officers’, agents’, city’s, partners’, employees’, volunteers’, assignees’ or subcontractors’ unlawful disclosure and/or use of protected data. The terms of this paragraph shall survive the cancellation or termination of this Agreement. 24. TERMINATION. This Agreement may be terminated by City on two (2) days’ written notice delivered to Contractor at the address on file with the City. Upon termination under this provision if there is no fault of the Contractor, the Contractor shall be paid for goods and services rendered and reimbursable expenses until the effective date of termination. If the City terminates the Agreement because the Contractor has failed to perform in accordance with this Agreement, no further payment shall be made to the Contractor, and the City may retain another Contractor to undertake or complete the work identified in this Agreement. [Signature page follows.] Page 20 of 300 6 237871v2 Dated:__________________, 2026 CITY OF LAKEVILLE By: _________________________________ Luke Hellier, Mayor By: __________________________________ Taylor Snider, Deputy City Clerk Dated:__________________, 2026 CONTRACTOR: EMI AUDIO By _______________________________ _______________________ [print name] Its _____________________ [title] Page 21 of 300 Date: 10/19/2026 U.S. Department of Homeland Security Staffing for Adequate Fire and Emergency Response (SAFER) Grant Acceptance Proposed Action Staff recommends adoption of the following motion: Move to approve a resolution to accept a Staffing for Adequate Fire and Emergency Response(SAFER) Grant through U.S. Department of Homeland Security for $1,524,791.00 to the City of Lakeville Fire Department. Overview The Lakeville Fire Department submitted a SAFER Grant application in June 2026 to secure funding for the hiring of 6 firefighters. On September 28, 2026, the City was notified that the grant had been awarded. This grant will cover portions of the salaries and benefits for these positions over a three-year period, from 2027 to 2029. With the acceptance of this grant, the full- time firefighter staff count will increase to 27, enhancing the City's capacity to provide consistent, reliable, and professional service to the community. Supporting Information None Financial Impact: $1,524,791.00 Budgeted: No Source: 1300.6012 - Salaries Permanent - Regular Envision Lakeville Community Values: Good Value for Public Service, Safety Throughout the Community Report Completed by: Michael Meyer, Fire Chief Page 22 of 300 October 19, 2026 Deferment of Special Assessments for Senior Citizens, Disabled and Military Proposed Action Staff recommends adoption of the following motion: Move to approve the deferment of special assessments for those qualifying residents who are senior citizens, disabled or ordered into active military service for taxable year 2027. Overview The City Council can defer the payment of any special assessment on homestead property owned by the applicant who meets the household income requirements and meets one of the following criteria: 1) is at least 65 years of age or is unemployed due to a total and permanent disability or 2) is a member of the Minnesota National Guard or other military reserves who is ordered into active military service for whom it would be a hardship to make the payments (see Policy #5.14 Section 6). Deferments are classifications that must be reapplied for annually. Residents that don’t meet the hardship criteria established in the policy may still apply to the Council for a waiver. The income requirements for hardship were amended by Council on February 20, 2018 to reflect the poverty guidelines as established by the US Department of Health and Human Services and became effective with the 2018 street reconstruction project. Council also approved the existing deferrals (including deferrals for the 2017 street reconstruction project) be grandfathered into the program using the previous income criteria that states the average annual payment for assessments levied against the property must exceed one percent (1%) of the applicant’s adjusted gross income. If an existing deferral fails to meet the grandfathered criteria and the assessment is then activated, future re-applications for deferral would be based on the new hardship requirements. Deferment applications and income information have been submitted to the City by residents who were assessed as the result of street reconstruction projects. Renewal deferment applications were sent in May with an additional reminder sent in September to those who did not yet submit their applications. There are three senior deferments recommended for approval – no changes from the previous year. At this time all applicants meet the requirements and there are no senior deferments recommended for termination. Supporting Information • Special Assessment Deferments Financial Impact: $0.00 Budgeted: Y☐ N☒ Source: Related Documents: (CIP, ERP, etc.): Envision Lakeville Community Values: Good Value for Public Services Report Completed by: Zach Johnson, City Engineer/Julie Stahl, Finance Director Page 23 of 300 SPECIAL ASSESSMENT DEFERMENTS Address City Project 20245 Hunter Ct.1,851.46$ 2011 Street Reconstruction 6614 Flounder Ct 3,218.47$ 2014 Street Reconstruction 18482 Jaeger Path 5,487.00$ 2024 Street Reconstruction 10,556.93$ Original Assessment Amount Deferred Page 24 of 300 Date: 10/19/2026 Professional Services Agreement with RJM Construction Proposed Action Staff recommends adoption of the following motion: Move to approve a professional services agreement with RJM Construction for construction management services for Fire Station 3. Overview As part of the process of constructing a new Fire Station 3, a construction management company is required to be hired. A construction manager oversees the entire project on a daily basis including the coordination of cost estimating, preparing the bid package with the architect, value engineering the plans before bidding, managing all subcontractors and material suppliers and coordinating communications between the city’s leadership team, architect, the construction company and their sub-contractors. The construction manager is also responsible for setting and keeping schedules, monitoring finances, and making certain that all contractors are completing their work per the approved plans and ensuring the project is completed on time and within budget. The city prepared and advertised an RFQ for construction management service at risk and two companies responded with proposals. After evaluating the two proposals, staff is recommending approval of a professional services agreement with RJM Construction. RJM met and exceeded many of the qualifications listed in the RFQ and has extensive experience in constructing municipal fire stations. They are currently the city’s construction manager for Fire Station 2 and were the construction managers for the FiRST Center. The total cost of construction management services for Fire Station 3 is $998,284 based on an estimated construction cost of $16,000,000. Supporting Information 1. RJM Proposal and Contract Financial Impact: $998,284 Budgeted: Yes Source: Project Budget/Franchise Fees Envision Lakeville Community Values: Safety Throughout the Community Report Completed by: Allyn Kuennen, Assistant City Administrator Page 25 of 300 Page 26 of 300 Lakeville Fire Station 3 - RFP 1 CITY OF LAKEVILLE MUNICIPAL FIRE STATION 3 REQUEST FOR QUALIFICATIONSCONSTRUCTION MANAGER AT RISKSEPTEMBER 14, 2026 830 Boone Avenue NorthGolden Valley, MN 55427 CONTACT: Brad Barickman | Vice President Community brad.barickman@rjmconstruction.com 612-919-3291 TABLE OF CONTENTSFirm Description + Resume of Project ManagerSimilar Project ExperiencePublic Bid MethodsEvidence Insurance/Worker’s CompensationClient ReferencesCost Estimating ProcessWhy RJM Exhibits: AIA Document A305, Fee Proposal, and Certificate of Insurance Page 27 of 300 Lakeville Fire Station 3 - RFP 1 Re: Request for Qualifications - Construction Management Services at Risk- City of Lakeville Municipal Fire Station 3 Dear Allyn, Over the past several years, RJM has built a strong partnership with the City of Lakeville through both project delivery and community involvement. From completing the FiRST Center and constructing Lakeville Fire Station No. 2 to proudly sponsoring the City’s inaugural Police vs. Fire Hockey Game, we have remained committed to supporting the people and organizations that help keep Lakeville safe and thriving. Because of these relationships, we view Fire Station No. 3 as more than a construction project. It is an opportunity to continue investing in the City’s future by delivering a facility that supports emergency response, firefighter wellness, operational efficiency, and the long-term needs of the public safety professionals who serve the Lakeville community every day. RJM brings a unique combination of local experience, public safety expertise, and proven municipal leadership: Established Lakeville Partner - Recent completion of the FiRST Center, ongoing construction of Lakeville Fire Station No. 2, and numerous projects across our municipal, healthcare, community, and commercial sectors provide immediate familiarity with the City’s expectations, stakeholders, and processes. Proven Municipal CM Leadership - Having partnered with more than 50 municipalities, RJM is a recognized leader in Construction Management delivery. We helped deliver Minnesota’s first municipal CM at Risk project and have extensive experience supporting public-sector clients through procurement, City Council approvals, state contract purchasing, and transparent cost management. Public Safety Facility Expertise - For more than 20 years, RJM has specialized in fire stations, public safety training centers, police departments, city halls, and other municipal facilities. This experience allows us to provide valuable insight into budgeting, constructability, phasing, operational requirements, and long-term facility performance. Strong Partnership with Leo A Daly - RJM has successfully partnered with Leo A Daly on multiple public safety projects throughout Minnesota, including work for the Cities of Lakeville, Maple Grove, Cottage Grove, and Woodbury, as well as Washington County. This established relationship promotes seamless collaboration and team continuity as the City transitions from Station No. 2 to Station No. 3. Dedicated Fire Station and Public Safety Insight - RJM’s Fire Station and Public Safety Specialist, Dave Dreelan, brings 35 years of fire service experience, including service as a Deputy Fire Chief. Working alongside City staff, Fire Department leadership, and the design team, Dave provides practical operational insight related to apparatus operations, firefighter wellness, training functions, response readiness, and long-term facility adaptability. RJM is committed to serving as the City’s advocate throughout the process, helping align operational needs, budget expectations, and long-term goals through a collaborative, transparent approach. We appreciate your consideration and look forward to the opportunity to help deliver another successful public safety facility for the City of Lakeville. Sincerely, Brad Barickman | Vice President, CommunityRJM Construction, LLCbrad.barickman@rjmconstruction.com | 952-837-8614 September 14, 2026 Allyn Kuennen | Assistant City Administrator | City of Lakeville20195 Holyoke Aveunue, Lakeville, MN 55044akuennen@lakevillemn.gov Page 28 of 300 Lakeville Fire Station 3 - RFP 2 Since its founding in 1997, RJM Construction LLC has grown into one of Minnesota’s premier contractors, recognized for reliability, technical expertise, and consistent delivery. Headquartered in Golden Valley, Minnesota, RJM was founded by Bob Jossart and Joe Maddy and is led today by President Ted Beckman and CEO/COO Brian Recker, both seasoned industry veterans who have guided the firm’s success for nearly two decades. RJM delivers approximately $250 million in annual construction volume and employs 120 professionals across office and field operations. Our team specializes in community, corporate, healthcare, and multi-housing projects, providing a full range of services including general contracting, construction management, design/build, and preconstruction. Each service is customized to align with our clients’ unique goals and project requirements. We have successfully delivered projects for private, public, and non-profit entities throughout Minnesota. In 2007, RJM pioneered the Construction Manager at Risk approach with the City of Eden Prairie and has since implemented this delivery method across multiple municipalities. Our ability to develop comprehensive bid packages, paired with innovative project strategies, allows us to proactively address challenges, maintain schedules, and deliver projects efficiently while staying aligned with our clients’ vision. At RJM, client needs serve as the foundation of everything we do. From preconstruction through project closeout, our disciplined management approach, collaborative mindset, and attention to detail ensure exceptional results. We are committed to creating innovative, cost-effective spaces that strengthen businesses and build thriving communities. STAFF BREAKDOWN BY DEPARTMENT Executive Leadership: 5 Project Mgmt & Admin: 33 Preconstruction: 9 Finance & Admin: 10 HR: 5 IT: 3 Field Ops & Supervision: 48 Marketing & BD: 3 Service: 1 Safety & Risk Mgmt: 3 INTEGRATED E X P ER TISEPROFESSIONALS 120 FIRM DESCRIPTION OUR HISTORY Organizational Structure for Lakeville Fire Station 3 Brad Barickman will oversee the Phase 1 Pre-Con-struction process from concept design to final bidding. Aaron Hooyer will be engaged and working directly on the project during Phase 1 Pre-Construction. Aaron will then transition to the primary point of contact for all of Phase 2 Construction. Page 29 of 300 Lakeville Fire Station 3 - RFP 3 612-750-4346 | aaron.hooyer@rjmconstruction.com AARON HOOYER RELEVANT EXPERIENCE CLIENT REFERENCES Aaron brings 8 years of valuable expertise to the project team with his well-rounded history including education and community projects varying in size and complexity. Aaron has proven that collaboration with team members is the key to project success and he always puts the client’s needs and concerns first. Passionate and driven, Aaron strives to provide a seamless construction process and make the project an enjoyable experience, from conception to completion, for all team members. Aaron has completed 5+ projects with other team members. Key Responsibilities: -Plan project workflow including schedule, materials, and workforce -Assist estimating team during preconstruction including final bidding -Proactively reassess project scope based on new information and analysis -Closely monitor schedule, budget, and quality to ensure project vision is achieved -Work with superintendent and consultants to drive efficiencies -Recommend course of action based on client needs and requirements Ms. Amy Hanson City of Plymouth 763-509-5526 Battalion Fire Chief Tom Evenson City of Plymouth 763-350-0505 Ms. Chris Fleck City of Eagan 650-675-5329 Mr. Allyn Kuennen City of Lakeville 952-985-4402 City of Lakeville Fire Station 2 Lakeville, MN City of Plymouth Fire Station 2 Plymouth, MN City of Lakeville FiRST Center Lakeville, MN City of Plymouth Fire Station 3 Lakeville, MN City of New Ult Recreation Center New Ulm, MN Hill-Murray School Classroom Renovation Maplewood, MN Bremer Bank Minneapolis, MN Banner Engineering Warehouse Minneapolis, MN City of Apple Valley Police Department Apple Valley, MN SENIOR PROJECT MANAGER EDUCATION TRAINING & CERTS Bachelor of Science Business Administration, Emphasis in Construction Management & FinanceDordt University OSHA 30 Page 30 of 300 Lakeville Fire Station 3 - RFP 4 612-380-0884 | dave.dreelan@rjmconstruction.com 952-837-8614 | brad.barickman@rjmconstruction.com DAVE DREELAN BRAD BARICKMAN FIRE STATION SPECIALIST VICE PRESIDENT, COMMUNITY RELEVANT EXPERIENCE RELEVANT EXPERIENCE CLIENT REFERENCES CLIENT REFERENCES After a successful 35-year career with the City of Mendota Heights and the City of Plymouth Fire Departments, former Deputy Fire Chief Dave Dreelan has joined RJM Construction as Fire Station and Public Safety Specialist. Dave will utilized his public service experience to drive successful outcomes for all public safety construction projects. His commitment to excellence and passion for public safety will ensure that RJM remains a leader in the industry. As Vice President Community, Brad exemplifies leadership, providing strategic direction and management. He is responsible for establishing profitable projects and upholding a superior level of client satisfaction. While Brad’s highly motivated and task-oriented approach sets a standard for everyone on the team, he also focuses on creating and maintaining long-term relationships with clients, understanding their needs and challenges, and helping bring their project vision to life. Fire Chief Andy Etzel | Plymouth763-509-5121 Chief Eric Werner | City of Maple Grove763-494-6100 Operation Chief Zack Bonnema | Chaska Fire | 952-227-7471 Mr. Matt Podhradsky | City of Chaska952-448-9200 Mr. Quinn Hutson | CNH Architects952-431-4433 Mr. Tom Betti | JLG Architects651-767-3773 Mr. Scott Jones | Brennan Construction507-381-7046 Mr. Todd LaVold | Leo A. Daly612-359-4656 Lakeville Fire Station 2Lakeville, MN Lakeville Fire Station 2Lakeville, MN Plymouth Fire Station 2Plymouth, MN Plymouth Fire Station 2Plymouth, MN Chaska Public Safety Facility Chaska, MN Chaska Public Safety Facility | Chaska, MN Page 31 of 300 Lakeville Fire Station 3 - RFP 5 952-240-3088 | john.mckenzie@rjmconstruction.com JOHN MCKENZIE RELEVANT EXPERIENCE CLIENT REFERENCES John began his career in commercial construction in 1999 and has progressed through various roles to become a superintendent. He excels in coordinating subcontractors and managing challenging scheduling demands, particularly in restricted site conditions. His key responsibilities include directing field personnel, ensuring quality and safety standards, maintaining the construction schedule, ordering materials, scheduling inspections, and fostering positive relationships among team members while keeping the job site organized and safe. Mr. Alan Freng | North Metro Safety Training | 763-300-9292 Mr. Erik Olson | JLG Architects 612-767-3773 Mr. Austin Roudebush | City of Lakeville (FiRST Center) 952-985-4461 Mr. Aaron Fields | BWBR 651-262-6929 Lakeville FiRST CenterLakeville, MN Apple Valley Police DepartmentApple Valley, MN North Metro Public Safety TrainingMaple Grove, MN SUPERINTENDENT DRIVEN BY YOURVISION Page 32 of 300 Lakeville Fire Station 3 - RFP 6 SIMILAR PROJECT EXPERIENCE When serving as Construction Manager for the referenced similar projects, RJM Construction provided comprehensive project leadership focused on cost control, schedule management, and proactive risk mitigation. For all listed projects, RJM partnered closely with owners and key stakeholders early in the process to establish a realistic project budget and develop a detailed construction schedule aligned with planned city operations, procurement timelines, and material availability. Our role included managing preconstruction coordination, leading constructability reviews, developing detailed bid packages, and administering contracts to ensure transparency and competitive pricing. Throughout the project lifecycle, RJM implemented interim checkpoints at defined risk-reduction milestones to continuously monitor progress against budget and schedule benchmarks. These checkpoints allowed potential delays or cost impacts to be identified early. When variances occurred, RJM worked collaboratively with the owner and project team to develop and implement recovery plans, ensuring schedules, milestones, and budget limits remained intact. Through disciplined planning, continuous communication, and proactive management, RJM consistently delivered projects that met owner expectations while maintaining accountability for cost, quality, and schedule performance. Page 33 of 300 Lakeville Fire Station 3 - RFP 7 LAKEVILLE, MN LAKEVILLE FIRE STATION 2 PROJECT INFO RJM is proud to serve as the Construction Manager for the new municipal fire station in Lakeville, a pivotal investment in public safety that aims to enhance emergency response capabilities for both current and future community needs. Spanning approximately 45,000-square-feet, this state-of-the-art facility is designed with functionality and preparedness at its core. Key features include dormitory and living quarters for firefighters, seven spacious apparatus bays, administrative offices, meeting and training spaces, and dedicated training and hose tower to ensure continual firefighter readiness and education. The dedicated core project team is led by the Assistant City Administrator, which includes the Fire Chief, City Engineer, Facilities Manager, and our architectural consultant, CNH Architects. As the Construction Manager, RJM is committed to delivering comprehensive preconstruction and construction services while ensuring transparency, quality, and adherence to budget and schedule. This fire station stands as a testament to Lakeville’s commitment to public safety, and RJM is dedicated to overseeing its successful realization, creating a facility that will serve and protect the community for years to come. CLIENTCITY OF LAKEVILLE PROJECT TYPEMUNICIPAL SQUARE FEET45,000 ARCHITECTCNH ARCHITECTS Page 34 of 300 Lakeville Fire Station 3 - RFP 8 LAKEVILLE, MN LAKEVILLE FiRST CENTER PROJECT INFO RJM Construction is partnering with the City of Lakeville to build the FiRST Center, a regional public safety training facility. The project’s estimated budget is between $20 million and $24 million, covering an area of over 45,000-square-feet. The facility is designed to meet the training needs of local law enforcement and emergency responders and includes essential features such as firing ranges, classrooms, meeting spaces, tactical training areas, and administrative offices. This comprehensive environment aims to enhance the effectiveness and preparedness of public safety personnel, ultimately benefiting the wider community. Construction on the project began in spring 2025 and completed in August of 2026. A core project team, led by the Assistant City Administrator and consisting of key stakeholders such as the Police Chief, Fire Chief, and City Engineer, are overseeing the initiative, ensuring every detail aligns with the City’s objectives. This facility symbolizes Lakeville’s commitment to improving public safety and community resilience. CLIENTCITY OF LAKEVILLE PROJECT TYPEMUNICIPAL SQUARE FEET45,350 ARCHITECTLEO A DALY “LEO A DALY has had the opportunity to work with RJM Construction and Brad Barickman, Vice President of their Community work, on several projects where they have consistently proven to be a strong and collaborative partner within the Owner-Architect-Contractor (OAC) team. Their approach reflects a thoughtful balance of flexibility and structure, shaped by years of experience working with municipalities and design teams. RJM demonstrates a clear commitment to the success of both the client and the project, while maintaining a high level of respect for the architect’s role in the process. This creates a productive, team-oriented environment that supports better outcomes for all involved. Their Project Manager, Aaron Hoover, stands out for his proactive and communicative leadership. He consistently goes above and beyond to ensure the Owner is well-informed and guiding decision-making with clarity and transparency. Aaron actively collaborates with the design team to strengthen project outcomes, facilitates the timely flow of critical information, and provides solutions-oriented ideas for architectural review. His ability to balance subcontractor needs with the broader goals and vision of the project is a key strength that contributes to the project’s overall success. RJM Construction is a dependable and engaged partner, and we greatly value the collaborative relationships we have built together.”Client TestimonialTODD LAVOLD | SENIOR ASSOCIATE Page 35 of 300 Lakeville Fire Station 3 - RFP 9 PLYMOUTH, MN PLYMOUTH FIRE STATION 2 PROJECT INFO RJM partnered with CNH Architects and the City of Plymouth to completely rebuild Fire Station 2, located at 12000 Old Rockford Road. This project was initiated after a citywide study identified the need for operational improvements and the capacity to support 24/7 firefighter shifts. The new facility has been designed to enhance the safety, comfort, and functionality for Plymouth’s fire teams. Key features include an apparatus bay, dormitories, a decontamination area, a fitness room, a training facility, a command garage, offices, a classroom, a conference room, and a kitchen. Additionally, exterior improvements, such as a new parking lot, patio, and landscaping, have been included to support daily operations and improve site access. This modernized fire station offers better training opportunities, safer work practices, and more comfortable living quarters, ensuring that the department is well-equipped to meet the growing needs of the community. CLIENTCITY OF PLYMOUTH PROJECT TYPEMUNICIPAL SQUARE FEET28,800 ARCHITECTCNH ARCHITECTS Page 36 of 300 Lakeville Fire Station 3 - RFP 10 PLYMOUTH, MN PLYMOUTH FIRE STATION 3 PROJECT INFO RJM partnered with CNH Architects and the City of Plymouth to completely rebuild Fire Station 3, located at 3300 Dunkirk Lane. This project was initiated after a comprehensive study identified the need for operational upgrades to accommodate 24/7 firefighter shifts. The outcome is a modern, state-of-the- art facility designed to meet the evolving needs of the city’s public safety teams. The new fire station features a variety of functional spaces, including an apparatus bay, dormitories, a decontamination area, a fitness room, a training facility, a command garage, offices, a classroom, a conference room, and a kitchen. Exterior improvements include a new parking lot, patio, and landscaping, enhancing both accessibility and aesthetics. This upgraded facility not only improves daily operations but also promotes safer work practices and provides better training and living conditions for Plymouth’s firefighters. CLIENTCITY OF PLYMOUTH PROJECT TYPEMUNICIPAL SQUARE FEET24,114 ARCHITECTCNH ARCHITECTS Page 37 of 300 Lakeville Fire Station 3 - RFP 11 CHASKA, MN CHASKA PUBLIC SAFETY BUILDING PROJECT INFO The City of Chaska has selected RJM for the development of a new 2-story public safety facility, a critical project aimed at integrating both the police and fire departments into a consolidated, modern space. This decision was made to help overcome existing spatial challenges, as the current separate campuses need to improve operational efficiency. The project encompasses a variety of facilities, including drive-in underground storage for heightened security, specialized K9 unit kennels, on-site living quarters, and advanced training areas covering both physical and technical aspects. The design features dedicated dispatch facilities, spacious fire truck bays, and conference rooms to foster collaboration among public service officers. This approach not only addresses immediate challenges in space, training, parking, and security but also signifies a substantial enhancement in overall safety and well-being. The facility is planned to meet Chaska’s current needs while providing flexibility for future growth, marking a significant step towards a more secure and connected community. CLIENTCITY OF CHASKA PROJECT TYPEMUNICIPAL SQUARE FEET92,000 ARCHITECTCNH ARCHITECTS Page 38 of 300 Lakeville Fire Station 3 - RFP 12 COTTAGE GROVE, MN HERO CENTER PROJECT INFO The City of Woodbury and the City of Cottage Grove collaborated with RJM Construction to oversee the development of the new HERO Center—a regional training facility catering to police, fire, and emergency medical services. This state-of-the-art facility serves as a central hub, uniting safety responders from both local and regional domains. Comprising of classrooms, a shooting range, a canine training yard, a spacious vehicle maneuvering area, virtual reality facilities, and two mock house structures, the HERO Center is designed to accommodate a diverse range of training scenarios. Given the unique nature of the project, various aspects presented new challenges to RJM, Leo A Daly, and the contractors. The team demonstrated adaptability throughout the project, making necessary adjustments along the way to ensure the facility not only met but exceeded the training needs and could withstand various scenarios. CLIENTCITY OF CHASKA PROJECT TYPEMUNICIPAL SQUARE FEET45,000 ARCHITECTLEO A DALY Page 39 of 300 Lakeville Fire Station 3 - RFP 13 PROJECT LOCATION CMa CMr Andover Public Works | 2019 Andover, MN X Apple Valley Police Department | 2025 Apple Valley, MN X Blaine City Hall and Police Department Improvements | 2021 Blaine, MN X Carver County Lake Waconia Waterfront Service Center | 2022 Cologne, MN X Chanhassen Public Works | 2010 Chanhassen, MN X Chaska Public Safety Facility | 2025 Chaska, MN X Chaska Public Works | 2027 Chaska, MN X Elk River Municipal Utilities Field Services Facility | 2021 Elk River, MN X Elk River Public Works | 2013 Elk River, MN X HERO Center | 2019 Cottage Grove, MN X Lakeville Regional Public Safety Training Facility | 2025 Lakeville, MN X Lakeville Fire Station 2 | Under Construction Lakeville, MN X Lino Lakes Public Works | 2027 Lino Lakes, MN X Medina Public Works and Police Department | 2013 Medina, MN X Montevideo Public Works | 2021 Montevideo, MN X Monticello Public Works | 2027 Monticello, MN X North Metro Range - Regional Training Facility | 2019 Maple Grove, MN X Plymouth Fire Station #2 & #3 | 2022 Plymouth, MN X Ramsey Public Works | 2021 Ramsey, MN X Rogers Police Station | 2015 Rogers, MN X Watertown Public Works and City Hall | 2027 Watertown, SD X Woodbury Public Works | 2019 Woodbury, MN X Wright County Sheriff’s Office Training Center | 2020 Maple Lake, MN X Xcel Energy Grand Forks Service Center | 2025 Grand Forks, ND X Xcel Energy Sioux Falls Service Center | 2024 Sioux Falls, SD X PUBLIC SERVICE PROJECT EXPERTISE Page 40 of 300 Lakeville Fire Station 3 - RFP 14 PUBLIC BID METHODS STATE STATUTE CM AT RISK BIDDING REQUIREMENTS RJM Construction pioneered the CM at Risk delivery method for municipalities in 2007 with the City of Eden Prairie. In 2023, the State of Minnesota officially recognized CM at Risk as a legal procurement method for cities, validating an approach RJM has successfully implemented for more than 15 years. This long-standing experience gives RJM a significant advantage. We have developed a transparent, equity-based bidding process that benefits municipalities across Minnesota. It begins with a comprehensive Request for Qualifications (RFQ) process to ensure every qualified contractor has an equal opportunity to participate. Once prequalification is complete, a Request for Bid (RFB) is issued to all approved contractors. Bids are reviewed collaboratively with city staff and the design team. Contractors are then selected, and the Guaranteed Maximum Price (GMP) is established with City Council approval. Our process ensures fairness, cost control, and efficiency while delivering high-quality results for municipal projects. CITY COUNCIL OPTIONS ThThe most successful projects occur when the city council is provided with well-defined options throughout the process. This begins during the design phase, where we present choices that support flexibility and informed decision-making. These options may include timing for accepting alternates, allowances to include in the Guaranteed Maximum Price (GMP), or phased completion strategies such as shell, finish, or full build-out for specific areas. A practical example is bid-day alternates or scope adjustments after design completion. If bids come in favorably, long-term scope items can be added back into the project. If bids exceed the budget, selected items can be removed without compromising core functionality. This approach is an essential tool for managing risk and maintaining control, especially in today’s volatile market conditions. We also prioritize protecting the city council from unnecessary risk. One proven strategy is early procurement of long-lead materials before final bidding. Even as design nears completion, opportunities exist to secure production slots for critical items such as structural steel or precast wall panels. This requires only a modest financial commitment for engineering and shop drawings, not full material purchase. By reserving production capacity early, we minimize inflationary impacts and ensure materials are available when needed, allowing the project to start sooner and maintain schedule integrity. Page 41 of 300 Lakeville Fire Station 3 - RFP 15 BID MARKETING We will reach out to qualified subcontractors via electronic notification and personal phone calls to generate as much interest as possible to increase the number of received bids and ensure the lowest possible price on bid day. RJM has also developed a bidding strategy allowing more local contractor participation for smaller project work scopes through the city’s quote process. By breaking larger bid packages into smaller, more manageable ones, we can often generate more interest from local contractors who may not be capable of performing the entire large scope of work. This strategy encourages local participation and drives the overall project costs down. The quote process also allows for direct negotiation, ensuring only qualified contractors are responding. Furthermore, the contractors are required to issue bid bonds and, if awarded, a performance and payment bond. RJM’s last three municipal construction management projects averaged over 125 bids received.. BEST VALUE In 2007, the Minnesota Legislature enacted a law that enables public agencies to select contractors based on best value instead of solely low bid. Best-value contracting is a procurement process encompassing several factors besides price while awarding and executing construction contracts. Best-value procurement considers factors such as qualifications, schedule, quality, and performance-based criteria to evaluate and select the most suitable contractor. This method is beneficial when a project has unique objectives or challenges that may be difficult to meet through traditional low-bid procurement. RJM recommends that our clients consider best value for specific trades for such projects. This system is advantageous as it requires less decision-making, prepares for the future, and minimizes risk. Even if risks occur, they can be effectively controlled or managed. RJM Construction has Best Value Certified staff who can discuss the benefits of this approach with city staff. PUBLIC BID METHODS Page 42 of 300 Lakeville Fire Station 3 - RFP 16 EVIDENCE OF INSURANCE AND WORKER’S COMPENSATION, CLIENT REFERENCES EVIDENCE OF GENERAL LIABILITY, BUSINESS, AUTOMOBILE INSURANCE AND WORKERS COMPENSATION RJM Construction is fully equipped to meet the specified insurance requirements. For further details, please refer to the attached Certificate of Insurance. CLIENT REFERENCES The following references are from clients whom RJM has built similar projects for and performed the role of construction manager. Matt Podhradsky City of Chaska Administrator 952-448-9200 | mpodhradsky@chaskamn.gov Dave Callister City of Plymouth City Manager 763-509-5301 | dcallister@plymouthmn.gov Chief Eric Werner City of Maple Grove Police Department 763-494-6101 | lewerner@maplegrovemn.gov Allyn Kuennen City of Lakeville Assistant City Administrator 952-985-4402 | akuennen@lakevillemn.gov “I want to thank you for getting us to this point in the project. Your team at RJM has been excellent and trusted partners and we are fortunate to have you working on the expansion!” Eric Werner | Chief of Police - City of Maple GroveNorth Metro Regional Public Safety Training Facility Expansion Page 43 of 300 Lakeville Fire Station 3 - RFP 17 COST ESTIMATING PROCESS PUBLIC-SECTOR RISK MITIGATION FOCUS RJM’s preconstruction process is designed to help the City of Lakeville make informed, confident decisions by identifying risks early, maintaining transparency, and providing clear documentation throughout the project. This approach delivers tangible benefits to the City by: -Reducing the likelihood of costly changes and schedule delays through early identification and resolution of potential design, budget, and constructability challenges. -Supporting accountability and informed decision-making with clear documentation of assumptions, budget impacts, and project decisions, helping City staff effectively communicate recommendations to stakeholders and governing bodies. -Promoting efficient project delivery through collaborative coordination among the City, design team, consultants, and key stakeholders to align expectations, resolve issues proactively, and maintain project momentum. By reducing uncertainty early, the City is better positioned to manage expectations, respond to challenges, and advance the project efficiently. OUR COST ESTIMATING PROCESS Unlike firms where estimating responsibilities are shared with project management staff, RJM’s dedicated estimating department is focused entirely on cost planning and budget management. This specialized approach allows our estimators to perform detailed scope reviews, leverage current market pricing, identify value opportunities, and provide continuous cost guidance, resulting in more accurate OUR APPROACH CONCEPTUAL PHASE SCHEMATIC DESIGN PHASE This estimate is completed by reviewing the general project scope and utilizing gross square footage estimates. Key elements such as soil corrections, utilities, and unique features are accounted for as well as the more standard features of the project. RJM has an extensive database of historical data for similar projects that is utilize in this process. We will also solicit subcontractor feedback for unique work scopes to ensure the information we provide to the City is accurate. At the start, SD estimates are applied to more detailed square footages. At this point, we are beginning to lock in on the overall layout of the building and can start to develop costs based on the desired finish. By the completion of this phase, the estimate will be supported with actual quantities of construction systems. This analysis will save design team resources and allow you to look at multiple scenarios for structure, enclosure, interiors, etc. DESIGN DEVELOPMENT PHASE As the estimate moves through this phase, unit quantities will be available to produce a very detailed estimate. The project’s budget will develop its final details at the end of this phase. This estimate will be fully supported by subcontractor feedback to gain valuable market insight. Page 44 of 300 Lakeville Fire Station 3 - RFP 18 COST ESTIMATING PROCESS Wayzata City Hall and Police Department Renovation $475/square-foot North Metro Regional Public Safety Training Facility $500/square-foot RJM has been proud to receive the Minnesota Subcontractors Association TOPs Award (Teamwork, Opportunities, and Partnering with Subcontractors) for several consecutive years, emphasizing our firm but fair approach. estimates, stronger budget alignment, and better-informed project decisions. RJM’s estimating team utilizes various technological resources to develop a cost model. Materials are quantified with precision in eTakeoff/Dimension and paired with our unit cost database, which is maintained via Sage Estimating. We also rely on virtual building models (BIM) to further enhance estimating accuracy and completeness. RJM’s cost estimating process is entirely open book. We provide detailed information supporting our numbers in an open forum with the project team. An estimate summary highlights the major categories of work and associated costs, while a detailed estimate organizes costs by specification section. These resources enable informed decision-making throughout the design process. As the design progresses, RJM provides continuous, real-time cost evaluation so the team immediately understands the budget implications of design decisions. Through ongoing collaboration between our dedicated estimators, project managers, and trade partners, we proactively identify opportunities to align scope, quality, and budget. This approach saves valuable time, minimizes redesign efforts, and helps the design team understand cost impacts before designs are finalized, improving overall project efficiency and budget certainty. THE RJM DIFFERENCE RJM goes beyond traditional estimating by performing a comprehensive budget validation at approximately 95% design completion, a best practice that distinguishes our approach from many construction managers. Rather than waiting for bids to reveal whether the project is aligned with the budget, RJM proactively confirms that the drawings, specifications, quantities, and project scope are fully coordinated with current market pricing and supported by extensive subcontractor participation. This final validation provides the City of Lakeville with a significantly higher level of cost certainty prior to bidding. By thoroughly evaluating scope, pricing, constructability, and market conditions before procurement, we can identify and resolve potential budget challenges while options remain available, reducing the risk of unexpected bid results, last-minute value engineering, or project delays. For the City, this process transforms bidding from a budget discovery exercise into a budget confirmation exercise. It creates one final opportunity to make informed decisions, refine priorities, and protect project objectives before bid documents are issued. The result is greater confidence that the project can move into procurement with pricing that reflects the design intent, aligns with available funding, and supports a predictable path to successful delivery. Page 45 of 300 Lakeville Fire Station 3 - RFP 19 ADDITIONAL INFORMATION & WHY RJM SCHEDULE MANAGEMENT As an early adopter of LEAN construction principles, RJM Construction incorporates details gained through recent market experience, constructability reviews, subcontractor-provided information regarding critical timelines and material lead times, and critical path milestones to establish a preliminary construction schedule. RJM Construction then conducts pull-planning sessions with the complete subcontractor base to ensure these resources align with the project expectations. These sessions allow us to validate sequencing, evaluate potential efficiency gains, and establish commitments to activity durations and crew sizes to produce a master schedule that meets or improves our initial schedule goals. We closely collaborate with architects, engineers, and other consultants throughout the project lifecycle. Regular coordination meetings and open communication channels allow us to align on design intent, technical requirements, and construction methodologies. This collaborative approach ensures that all project components are integrated seamlessly, minimizing potential conflicts and streamlining decision-making. Once construction begins, we offer productivity assessments and variance reports to monitor workforce needs, ultimately protecting the project schedule. RJM supports the entire project team by establishing a comprehensive schedule considering all critical milestones, from project development to an 11-month warranty walk-through. This commitment to all project stakeholders ensures realistic expectations within efficient work sequences. RJM’s assigned project manager will review all contracts for scheduling needs and critical timelines, identify long lead-time items and critical path milestones, ensure all are in alignment, and then prepare and issue master schedules. Once construction begins, they will offer analysis and variance reports. At RJM, we incorporate efficient, lean construction principles into the project approach to gain efficiencies and monitor workforce needs, ultimately protecting the project schedule. PROJECT SUPERVISION AND MANAGEMENT Project ManagementThe RJM project manager serves as the primary point of contact and is responsible for managing the overall schedule, documentation, and information flow during construction. Key responsibilities include contract administration, budget management, and overseeing the project schedule. Additionally, we will issue meeting minutes, coordinate Requests for Information (RFIs), and maintain daily coordination of all on-site construction activities. Our team will coordinate subcontractors, material deliveries, and the site labor force to exceed expectations for quality, safety, cost control, and schedule. On-Site SupervisionRJM’s superintendent will be on-site every day during construction. Daily huddles with RJM personnel, subcontractors, and the City point person will ensure that all team members are informed of the day’s scope of work, safety reviews, quality assurance, and scheduled deliveries.. Page 46 of 300 Lakeville Fire Station 3 - RFP 20 ADDITIONAL INFORMATION During RJM’s weekly progress meetings, the superintendent will provide the following: -Current status of the work phasing plan -Identification of impacted areas -Safety and site logistics confirmation -Three-week look-ahead schedule -Quality assurance and installation reviews COST CONTROL DURING DESIGN AND CONSTRUCTION During construction, we diligently manage the project budget and contingency. At each project meeting, we will provide an updated budget in an easy-to-follow template, so everyone is aware of the financial status of the project at all times. Should cost issues arise, RJM will collaborate with the design team to provide several options to solve the challenge, mitigating cost impact. All change order requests are scrutinized by RJM prior to presenting to the City. We work with subcontractors to develop options for resolution, often eliminating the proposed change request altogether. By focusing on proactive project management and developing alternative solutions with the project team, most changes can be avoided. Should the City request enhancements to the project, RJM would work with the project team to clarify these requested changes and provide guidance on the most cost-effective way to complete the work. Within the overall budget management, RJM will keep the team aware of the status of the project contingency throughout construction. Similar to the budget update, this document will be tracked in an easy-to-follow template and presented to the project team on a regular basis. As project milestones are met, options for utilizing contingency dollars for owner-desired scope enhancements are given. Through careful planning and tight project cost control, RJM will assist the City of Lakeville in completing the project on budget. THE RJM DIFFERENCE Unlike many construction managers, RJM provides a comprehensive final estimate at approximately 95% design completion. This estimate is fully supported by subcontractor participation and market pricing. The purpose is to confirm that the drawings and specifications remain aligned with the established budget before bidding. Page 47 of 300 Lakeville Fire Station 3 - RFP 21 WHY RJM WHY RJM CONSTRUCTION RJM Construction is a trusted municipal partner with decades of experience delivering fire stations, city halls, public safety facilities, and community assets throughout Minnesota. Having collaborated with more than 50 municipalities, we understand the responsibility of delivering facilities that support essential services, reflect community values, and perform reliably over time. RJM brings a distinct advantage through our established presence in Lakeville, including the recent completion of the FiRST Center, the ongoing construction of Lakeville Fire Station No. 2, and numerous projects completed across our municipal, community, healthcare, and commercial market sectors. This breadth of local experience provides our team with a deep understanding of the City’s expectations, processes, stakeholders, and construction environment, allowing us to deliver immediate value from day one. RJM offers the benefit of an existing partnership with the City and a track record of successfully delivering projects that serve Lakeville residents. Throughout the process, RJM serves as the City’s advocate, helping ensure the project aligns with operational needs, budget expectations, and long-term goals. Furthermore, RJM has partnered with Leo A Daly on multiple recent public safety facility projects with the City of Lakeville, City of Maple Grove, City of Cottage Grove, City of Woodbury, and Washington County. RJM will bring consistency to the team as we transition from Station 2 to Station 3. MUNICIPAL CONSTRUCTION MANAGEMENT LEADERSHIP RJM is a recognized leader in Construction Management delivery. In 2006, we partnered with the City of Eden Prairie to deliver Minnesota’s first municipal CM at Risk project and have successfully applied this approach across public, private, and nonprofit projects ever since. Our experience with both CM at Risk and CM as Advisor provides a seamless, transparent process with no learning curve. We routinely support City staff through procurement, City Council actions, and state contract purchasing while developing clear, defensible bid packages. PUBLIC SAFETY AND MUNICIPAL FACILITY EXPERTISE For more than 20 consecutive years, RJM has specialized in municipal facilities, including fire stations, public safety training centers, police departments, and city halls. This expertise is reinforced by our recent completion of the FiRST Center and ongoing construction of Lakeville Fire Station No. 2, giving our team current, local experience with the operational and technical requirements of modern public safety facilities. Our understanding of apparatus bay operations, specialized training environments, emergency response workflows, and long-term facility maintenance allows us to develop accurate budgets, evaluate cost-effective alternatives, and provide guidance that supports both day-to-day operations and future growth. Lakeville FiRST Center Ribbon Cutting Page 48 of 300 Lakeville Fire Station 3 - RFP 22 WHY RJM DEDICATED FIRE STATION AND PUBLIC SAFETY INSIGHT RJM brings added value through our dedicated Fire Station and Public Safety Specialist, Dave Dreelan. With 35 years of fire service experience, including leadership roles with the Mendota Heights and Plymouth Fire Departments and service as a Deputy Fire Chief, Dave serves as a trusted resource to the project team, providing practical insight into the operational needs of modern fire stations. Working collaboratively with City staff, Fire Department leadership, and Leo A Daly, Dave helps inform discussions related to apparatus operations, response readiness, training functions, firefighter wellness, and long-term facility adaptability. His real-world perspective complements the expertise of the design and construction teams, helping to validate operational assumptions, identify potential considerations early, and support informed decision-making throughout the project. For the City of Lakeville, Dave’s involvement provides an additional layer of operational insight, helping ensure the facility is thoughtfully planned to support the firefighters and emergency personnel who will use it every day, while respecting the roles and expertise of the City, design team, and project stakeholders. A BUILDERS-FIRST APPROACH At RJM Construction, we’re builders first, not just construction managers. Our hands-on approach allows us to identify constructability challenges early, offer practical solutions, and deliver meaningful cost savings. Dedicated, full-time project teams provide consistent supervision from start to finish, while our strong relationships within the subcontracting community promote competitive bidding and reliable performance. ONGOING SUPPORT THROUGH OUR SERVICE DEPARTMENT RJM’s commitment extends beyond construction through our dedicated Service Department. Our experienced team provides responsive maintenance, repairs, and targeted improvements that help municipal facilities operate efficiently over time, offering long-term value and continuity long after project completion. Former Chief Dave DreelanRJM Fire Station Specialist FOSTER RELATIONSHIPS We build lasting trust by investing in genuine relationships. We take responsibility for results and follow through to completion. We respond quickly, clearly, and proactively. We listen deeply to uncover and anticipate true needs. We consistently deliver more value than promised. OWN THE OUTCOME COMMUNICATE WITH URGENCY UNDERSTAND CLIENT NEEDS SURPASS EXPECTATIONS Page 49 of 300 Lakeville Fire Station 3 - RFP 23 EXHIBITS AIA DOCUMENTS A305 INSURANCE CERTIFICATE FEE PROPOSAL Page 50 of 300 Page 51 of 300 Page 52 of 300 Page 53 of 300 Page 54 of 300 Page 55 of 300 Page 56 of 300 Page 57 of 300 Page 58 of 300 Page 59 of 300 Page 60 of 300 Page 61 of 300 ASSETS Revenues 235,979,555$ Cash 2,155,618$ COGS 225,870,551 Current Assets 52,744,791 Gross Profit 10,109,004 Property & Equipment 2,058,335 Operating Expenses 9,103,814 Other Assets 3,722,811 Operating Income (Loss) 1,005,190 TOTAL ASSETS 60,681,555 Interest Expense/Income 384,539 Net Income (Loss)1,389,729$ LIABILITIES Current Liabilities 52,395,920 Other Liabilities 2,880,603 TOTAL LIABILITIES 55,276,523 EQUITY Members Equity 5,405,032 TOTAL LIABILITIES & EQUITY 60,681,555$ Summarized version of audited financial statements prepared by: Bomberg Hanson & Associates, LLC. Minneapolis, Minnesota RJM CONSTRUCTION, LLC. BALANCE SHEETS INCOME STATEMENT December 31, 2023 Year Ending December 31, 2023 Page 62 of 300 ASSETS Revenues 138,193,717$ Cash 2,039,172$ COGS 128,647,705 Current Assets 36,585,908 Gross Profit 9,546,012 Property & Equipment 1,641,470 Operating Expenses 8,967,677 Other Assets 2,808,884 Operating Income (Loss) 578,335 TOTAL ASSETS 43,075,434 Interest Expense/Income 872,880 Net Income (Loss) 1,451,215$ LIABILITIES Current Liabilities 35,370,731 Other Liabilities 2,360,482 TOTAL LIABILITIES 37,731,213 EQUITY Members Equity 5,344,221 TOTAL LIABILITIES & EQUITY 43,075,434$ Summarized version of audited financial statements prepared by: Bomberg Hanson & Associates, LLC. Minneapolis, Minnesota RJM CONSTRUCTION, LLC. BALANCE SHEETS INCOME STATEMENT December 31, 2024 Year Ending December 31, 2024 Page 63 of 300 ASSETS Revenues 128,186,827$ Cash 2,721,938$ COGS 116,724,332 Current Assets 23,279,674 Gross Profit 11,462,495 Property & Equipment 1,754,180 Operating Expenses 9,379,255 Other Assets 3,076,514 Operating Income (Loss) 2,083,240 TOTAL ASSETS 30,832,306 Interest Expense/Income 264,607 Net Income (Loss) 2,347,847$ LIABILITIES Current Liabilities 22,824,027 Other Liabilities 2,186,250 TOTAL LIABILITIES 25,010,277 EQUITY Members Equity 5,822,029 TOTAL LIABILITIES & EQUITY 30,832,306$ Summarized version of audited financial statements prepared by: Wipfli LLP Minneapolis, Minnesota RJM CONSTRUCTION, LLC. BALANCE SHEETS INCOME STATEMENT December 31, 2025 Year Ending December 31, 2025 Page 64 of 300 09/14/2026 RJM Construction, LLC 830 Boone Avenue North Golden Valley, MN 55427 RE: 2026 Workers Compensation Experience Modifications To Whom It May Concern, This letter is to confirm the workers’ compensation experience modification history for RJM Construction, LLC as follows: 1/1/26-27 .58 1/1/25-26 .56 1/1/24-25 .54 Please feel free to contact me if you have any questions or require any further details. Sincerely, Tyler Triem Client Coordinator, Risk O 563.587.5407 F 563.587.6648 TTriem@cottinghambutler.com Page 65 of 300 SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN ACCORDANCE WITH THE POLICY PROVISIONS. INSURER(S) AFFORDING COVERAGE INSURER F : INSURER E : INSURER D : INSURER C : INSURER B : INSURER A : NAIC # NAME:CONTACT (A/C, No):FAX E-MAILADDRESS: PRODUCER (A/C, No, Ext):PHONE INSURED REVISION NUMBER:CERTIFICATE NUMBER:COVERAGES IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must have ADDITIONAL INSURED provisions or be endorsed. If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER. OTHER: (Per accident) (Ea accident) $ $ N / A SUBR WVD ADDL INSD THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. *LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. LIMITS SHOWN ARE INCLUSIVE OF AMOUNTS REQUESTED BY THE CERTIFICATE HOLDER AND MAY NOT REFLECT POLICY LIMIT AMOUNTS IN EXCESS OF THOSE REQUESTED. *Not Applicable in WY $ $ $ $PROPERTY DAMAGE BODILY INJURY (Per accident) BODILY INJURY (Per person) COMBINED SINGLE LIMIT AUTOS ONLY AUTOSAUTOS ONLY NON-OWNED SCHEDULEDOWNED ANY AUTO AUTOMOBILE LIABILITY Y / N WORKERS COMPENSATION AND EMPLOYERS' LIABILITY OFFICER/MEMBER EXCLUDED? (Mandatory in NH) DESCRIPTION OF OPERATIONS below If yes, describe under ANY PROPRIETOR/PARTNER/EXECUTIVE $ $ $ E.L. DISEASE - POLICY LIMIT E.L. DISEASE - EA EMPLOYEE E.L. EACH ACCIDENT EROTH-STATUTEPER LIMITS(MM/DD/YYYY)POLICY EXP(MM/DD/YYYY)POLICY EFFPOLICY NUMBERTYPE OF INSURANCELTRINSR DESCRIPTION OF OPERATIONS / LOCATIONS / VEHICLES (ACORD 101, Additional Remarks Schedule, may be attached if more space is required) EXCESS LIAB UMBRELLA LIAB $EACH OCCURRENCE $AGGREGATE $ OCCUR CLAIMS-MADE DED RETENTION $ $PRODUCTS - COMP/OP AGG $GENERAL AGGREGATE $PERSONAL & ADV INJURY $MED EXP (Any one person) $EACH OCCURRENCE DAMAGE TO RENTED $PREMISES (Ea occurrence) COMMERCIAL GENERAL LIABILITY CLAIMS-MADE OCCUR GEN'L AGGREGATE LIMIT APPLIES PER: POLICY PRO-JECT LOC CERTIFICATE OF LIABILITY INSURANCE DATE (MM/DD/YYYY) CANCELLATION AUTHORIZED REPRESENTATIVE ACORD 25 (2025/12)© 1988-2025 ACORD CORPORATION. All rights reserved. CERTIFICATE HOLDER The ACORD name and logo are registered marks of ACORD HIRED AUTOS ONLY 9/11/2026 Cottingham & Butler 800 Main St. Dubuque IA 52001 888-785-4677 563-583-7339 Zurich American Insurance Company 16535 RJMCONS-01 Continental Casualty Company 20443RJM Construction, LLC 830 Boone Ave N Golden Valley MN 55427-4568 American Guarantee and Liability Insurance 26247 Steadfast Insurance Company 26387 1672466917 A X 1,000,000 X 500,000 5,000 1,000,000 2,000,000 X X GLO 0084162-11 - BOR 1/1/2026 1/1/2027 2,000,000 A 1,000,000 X X BAP 0084161-11 - BOR 1/1/2026 1/1/2027 B X X 5,000,000CUE 7018029834 1/1/2026 1/1/2027 5,000,000 X 10,000 C XWC 0084166-11 - BOR 1/1/2026 1/1/2027 1,000,000 1,000,000 1,000,000 D A Professional/Pollution Builder's Risk EOC 0086225-11 MBR-0084246-12 1/1/2026 4/6/2026 1/1/2027 1/1/2028 Limit Limit $5,000,000 $16,000,000 RE: City of Lakeville Municipal Fire Station 3 City of Lakeville, Leo A Daly and any per written contract are additional insured on the general liability policy per written contract between the named insured and the certificate holder that requires such a status subject to the terms and conditions of the endorsement attached to the policy. City of Lakeville 20195 Holyoke Avenue Lakeville MN 55044 Page 66 of 300 Policy No. Eff. Date of Pol. Exp. Date of Pol. Eff. Date of End. Producer No. Add’l. Prem Return Prem. GLO 0084162-11 01/01/2026 01/01/2027 34937000 INCL Additional Insured – Automatic – Owners, Lessees Or Contractors U-GL-1175-F CW (04/13) Page 1 of 2 Includes copyrighted material of Insurance Services Office, Inc., with its permission. THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. Named Insured: RJM CONSTRUCTION, LLC Address (including ZIP Code): 830 BOONE AVE N. GOLDEN VALLEY, MN 55427-4568 This endorsement modifies insurance provided under the: Commercial General Liability Coverage Part A.Section II – Who Is An Insured is amended to include as an additional insured any person or organization whom you are required to add as an additional insured on this policy under a written contract or written agreement. Such person or organization is an additional insured only with respect to liability for "bodily injury", "property damage" or "personal and advertising injury" caused, in whole or in part, by: 1.Your acts or omissions; or 2.The acts or omissions of those acting on your behalf, in the performance of your ongoing operations or "your work" as included in the "products-completed operations hazard", which is the subject of the written contract or written agreement. However, the insurance afforded to such additional insured: 1.Only applies to the extent permitted by law; and 2.Will not be broader than that which you are required by the written contract or written agreement to provide for such additional insured. B.With respect to the insurance afforded to these additional insureds, the following additional exclusion applies: This insurance does not apply to: "Bodily injury", "property damage" or "personal and advertising injury" arising out of the rendering of, or failure to render, any professional architectural, engineering or surveying services including: a. The preparing, approving or failing to prepare or approve maps, shop drawings, opinions, reports, surveys, field orders, change orders or drawings and specifications; or b. Supervisory, inspection, architectural or engineering activities. This exclusion applies even if the claims against any insured allege negligence or other wrongdoing in the supervision, hiring, employment, training or monitoring of others by that insured, if the "occurrence" which caused the "bodily injury" or "property damage", or the offense which caused the "personal and advertising injury", involved the rendering of or the failure to render any professional architectural, engineering or surveying services. Page 67 of 300 U-GL-1175-F CW (04/13) Page 2 of 2 Includes copyrighted material of Insurance Services Office, Inc., with its permission. C.The following is added to Paragraph 2. Duties In The Event Of Occurrence, Offense, Claim Or Suit of Section IV – Commercial General Liability Conditions: The additional insured must see to it that: 1.We are notified as soon as practicable of an "occurrence" or offense that may result in a claim; 2.We receive written notice of a claim or "suit" as soon as practicable; and 3.A request for defense and indemnity of the claim or "suit" will promptly be brought against any policy issued by another insurer under which the additional insured may be an insured in any capacity. This provision does not apply to insurance on which the additional insured is a Named Insured if the written contract or written agreement requires that this coverage be primary and non-contributory. D.For the purposes of the coverage provided by this endorsement: 1.The following is added to the Other Insurance Condition of Section IV – Commercial General Liability Conditions: Primary and Noncontributory insurance This insurance is primary to and will not seek contribution from any other insurance available to an additional insured provided that: a. The additional insured is a Named Insured under such other insurance; and b. You are required by written contract or written agreement that this insurance be primary and not seek contribution from any other insurance available to the additional insured. 2.The following paragraph is added to Paragraph 4.b. of the Other Insurance Condition of Section IV – Commercial General Liability Conditions: This insurance is excess over: Any of the other insurance, whether primary, excess, contingent or on any other basis, available to an additional insured, in which the additional insured on our policy is also covered as an additional insured on another policy providing coverage for the same "occurrence", offense, claim or "suit". This provision does not apply to any policy in which the additional insured is a Named Insured on such other policy and where our policy is required by a written contract or written agreement to provide coverage to the additional insured on a primary and non- contributory basis. E.This endorsement does not apply to an additional insured which has been added to this policy by an endorsement showing the additional insured in a Schedule of additional insureds, and which endorsement applies specifically to that identified additional insured. F. With respect to the insurance afforded to the additional insureds under this endorsement, the following is added to Section III – Limits Of Insurance: The most we will pay on behalf of the additional insured is the amount of insurance: 1. Required by the written contract or written agreement referenced in Paragraph A. of this endorsement; or 2. Available under the applicable Limits of Insurance shown in the Declarations, whichever is less. This endorsement shall not increase the applicable Limits of Insurance shown in the Declarations. All other terms and conditions of this policy remain unchanged. Page 68 of 300 Policy No. Eff. Date of Pol. Exp. Date of Pol. Eff. Date of End. Producer Add’l Prem. Return Prem. GLO 0084162-11 01/01/2026 01/01/2027 34937000 $ INCL $ Waiver Of Subrogation (Blanket) Endorsement U-GL-925-B CW (12/01) Page 1 of 1 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. This endorsement modifies insurance provided under the: Commercial General Liability Coverage Part The following is added to the Transfer Of Rights Of Recovery Against Others To Us Condition: If you are required by a written contract or agreement, which is executed before a loss, to waive your rights of recovery from others, we agree to waive our rights of recovery. This waiver of rights shall not be construed to be a waiver with respect to any other operations in which the insured has no contractual interest. Page 69 of 300 This endorsement changes the policy to which it is attached and is effective on the date issued unless otherwise stated. (The information below is required only when this endorsement is issued subsequent to preparation of the policy.) Endorsement Effective 01-01-26 Policy No. WC 0084166-11 Endorsement No. Insured RJM CONSTRUCTION, LLC Premium $ INCL. Insurance Company AMERICAN GUARANTEE AND LIABILITY INSURANCE COMPANY Countersigned By WC 00 03 13 (Ed. 4-84) 1983 National Council on Compensation Insurance. WORKERS COMPENSATION AND EMPLOYERS LIABILITY INSURANCE POLICY WC 00 03 13 (Ed. 4-84) WAIVER OF OUR RIGHT TO RECOVER FROM OTHERS ENDORSEMENT We have the right to recover our payments from anyone liable for an injury covered by this policy. We will not enforce our right against the person or organization named in the Schedule. (This agreement applies only to the extent that you perform work under a written contract that requires you to obtain this agreement from us.) This agreement shall not operate directly or indirectly to benefit anyone not named in the Schedule. Schedule ALL PERSONS AND/OR ORGANIZATIONS THAT ARE REQUIRED BY WRITTEN CONTRACT OR AGREEMENT WITH THE INSURED, EXECUTED PRIOR TO THE ACCIDENT OR LOSS, THAT WAIVER OF SUBROGATION BE PROVIDED UNDER THIS POLICY FOR WORK PERFORMED BY YOU AND FOR THAT PERSON AND/OR ORGANIZATION Page 70 of 300 Page 71 of 300 Page 72 of 300 Lakeville Fire Station 3 - RFP 25 City of Lakeville Fire Station 3 RJM Construction - Construction Management Fee Proposal September 14, 2026 Preconstruction Services 7 Months Description Quantity Unit Unit Cost Total Market Sector Leader 41 HRS 215.00$ 8,708$ Senior Project Manager 29 HRS 185.00$ 5,439$ Estimator/Sr. Estimator 210 HRS 165.00$ 34,650$ MEP Director 26 HRS 195.00$ 4,973$ Fire Station Specialist 90 HRS 185.00$ 16,650$ Document Quality Control Team 29 HRS 150.00$ 4,410$ Subtotal Preconstruction & Bidding 74,829$ Discounted Pre-Construction Value 25,000$ General Conditions (Mngmt Labor)12 Months Description Quantity Unit Unit Cost Total Project Executive 130 HRS 215.00$ 27,950$ Project Management 1794 HRS 165.00$ 296,010$ General Superintendent 78 HRS 180.00$ 14,040$ Superintendent 1669 HRS 160.00$ 267,072$ Fire Station Specialist 156 HRS 185.00$ 28,860$ Safety Director 52 HRS 165.00$ 8,580$ Project Coordinator 104 HRS 90.00$ 9,360$ Trucking/Deliveries 104 HRS 103.00$ 10,712$ Truck 2059 HRS 4.50$ 9,266$ Fuel 52 WK 85.00$ 4,420$ Subtotal Reimbursable Expenses 676,270$ General Requirements 12 Months Description Quantity Unit Unit Cost Total Project Technology 52 WK 750.00$ 39,000$ Blue Prints 12 MO 50.00$ 600$ Postage & Delivery 12 MO 50.00$ 600$ Office Equipment 12 MO 400.00$ 4,804$ Site Trailer 12 MO 1,000.00$ 12,009$ Subtotal General Conditions 57,014$ Construction Management Fee Proposed Construction Management Fee 1 LS 1.50%240,000$ CM Fee Based on a Project Value of:16,000,000$ Total Cost of Services 998,284$ **assume complete by March 2027 **discounted rate, includes 425hrs of service *We have included construction management expenses only, 4,087 man hours of service during construction. All items not included above are assumed to be cost of the work and will be part of a competitive procurement process. * The staffing and hours outlined above are an estimate of anticipated services for the noted duration. Once an agreed upon schedule is finalized, the hours may adjust up or down accordingly. Page 73 of 300 Page 74 of 300 Page 75 of 300 Page 76 of 300 Page 77 of 300 Page 78 of 300 Page 79 of 300 Page 80 of 300 Page 81 of 300 Page 82 of 300 Page 83 of 300 Page 84 of 300 Page 85 of 300 Page 86 of 300 Page 87 of 300 Page 88 of 300 Page 89 of 300 Page 90 of 300 Page 91 of 300 Page 92 of 300 Page 93 of 300 Page 94 of 300 Page 95 of 300 Page 96 of 300 Page 97 of 300 Page 98 of 300 Page 99 of 300 Page 100 of 300 Page 101 of 300 Page 102 of 300 Page 103 of 300 Page 104 of 300 Page 105 of 300 Page 106 of 300 Page 107 of 300 Page 108 of 300 Page 109 of 300 Page 110 of 300 Page 111 of 300 Page 112 of 300 Page 113 of 300 Page 114 of 300 Page 115 of 300 Page 116 of 300 Page 117 of 300 Page 118 of 300 Page 119 of 300 Page 120 of 300 Page 121 of 300 Page 122 of 300 Page 123 of 300 Page 124 of 300 Page 125 of 300 Page 126 of 300 Page 127 of 300 Page 128 of 300 Page 129 of 300 Page 130 of 300 Page 131 of 300 Page 132 of 300 Page 133 of 300 Page 134 of 300 Page 135 of 300 Page 136 of 300 Page 137 of 300 Page 138 of 300 Page 139 of 300 Page 140 of 300 Page 141 of 300 Page 142 of 300 Page 143 of 300 Page 144 of 300 Page 145 of 300 Page 146 of 300 Page 147 of 300 Page 148 of 300 Page 149 of 300 Page 150 of 300 Page 151 of 300 Page 152 of 300 Page 153 of 300 Page 154 of 300 Page 155 of 300 Page 156 of 300 Page 157 of 300 Page 158 of 300 Page 159 of 300 Page 160 of 300 Page 161 of 300 Page 162 of 300 Page 163 of 300 Page 164 of 300 Page 165 of 300 Page 166 of 300 Page 167 of 300 Page 168 of 300 Page 169 of 300 Page 170 of 300 Page 171 of 300 Page 172 of 300 Page 173 of 300 Page 174 of 300 Page 175 of 300 Page 176 of 300 Page 177 of 300 Page 178 of 300 Page 179 of 300 Page 180 of 300 Page 181 of 300 Page 182 of 300 Page 183 of 300 Page 184 of 300 Page 185 of 300 Page 186 of 300 Page 187 of 300 Date: 10/19/2026 Resolution to Approve Watermain Improvements for Satellite Water Treatment Plant and Amendment to the Agreement with RJM, City Project No. 27-13 Proposed Action Staff recommends adoption of the following motion: Move to approve a resolution to accept a bid for watermain improvements for the future satellite water treatment plant and approve an amendment to agreement with RJM, City Project #27-13. Overview City staff is currently working on the design of the future satellite water treatment plant, located at the corner of 179th Street and Granby Lane. The project is programmed to start construction in the summer of 2027. Trunk watermain needs to be extended from the future satellite water treatment plant to connect to the existing trunk watermain at 175th Street and Glacier Way for distribution into the system. In addition, trunk raw watermain (carrying untreated water from the wells) needs to be extended from Dodd Boulevard to the future satellite plant. The most efficient and cost-effective alignment for the trunk watermains is under Godwin Court, which is being constructed as part of the Fire Station #2 project. The fire station is currently under construction and is expected to be completed next summer. Staff recommends installing the trunk watermain for the satellite water treatment plant on the Fire Station #2 property as part of the fire station project. On September 17, 2026, bids were received for Lakeville Fire Station #2, Bid Package 3, which included the trunk watermain improvements for the satellite water treatment plant. Twelve bids were received, with the lowest responsible bid submitted by Minnesota Utility and Excavation LLC in the amount of $936,465 for the base bid. The engineer's estimate was $1,300,000. RJM, the construction manager for the fire station, has completed its review of the bids and is recommending accepting the base bid with Minnesota Utility and Excavation LLC in the amount of $936,465. Pending City Council approval, RJM will enter into a contract with Minnesota Utility and Excavation LLC for this work. Due to the long lead time to procure ductile iron watermain, construction is not expected to start until spring 2027. An amendment to the agreement with RJM is also recommended for approval to address contractual requirements to enter into contracts with subcontractors. Page 188 of 300 Supporting Information 1. Resolution 2. Letter of Recommendation 3. Bid Tabulation 4. Amendment to RJM Agreement Financial Impact: $936,465 Budgeted: Yes Source: Water Fund Envision Lakeville Community Values: Good Value for Public Service Report Completed by: Paul Oehme, Public Works Director Page 189 of 300 CITY OF LAKEVILLE RESOLUTION NO. 26- Resolution Accepting a Bid for Watermain Improvements for the Satellite Water Treatment Plant and Directing RJM Construction to Enter into a Contract with Minnesota Utility and Excavation LLC City Project No. 27-13 WHEREAS, the City of Lakeville is planning for a satellite water treatment plant at the corner of 179th Street and Granby Lane, City Project No. 27-13, with construction programmed to begin in the summer of 2027; and WHEREAS, the satellite water treatment plant requires the extension of trunk watermain from the plant to the existing trunk watermain at 175th Street and Glacier Way and the extension of trunk raw watermain from Dodd Boulevard to the plant; and WHEREAS, the most efficient and cost-effective alignment for the trunk watermains is under Godwin Court, which is being constructed as part of the Lakeville Fire Station #2 project, and the trunk watermain improvements were therefore included in Lakeville Fire Station #2, Bid Package 3; and WHEREAS, on September 17, 2026, twelve bids were received for Lakeville Fire Station #2, Bid Package 3, and the lowest responsible bid was submitted by Minnesota Utility and Excavation LLC in the amount of $936,465 for the base bid; and WHEREAS, RJM Construction, the construction manager for the Fire Station #2 project, has reviewed the bids and recommends acceptance of the base bid submitted by Minnesota Utility and Excavation LLC; and WHEREAS, funding for the watermain improvements is budgeted in the Water Fund; and NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Lakeville, Minnesota: The base bid of Minnesota Utility and Excavation LLC in the amount of $936,465 for watermain improvements for the satellite water treatment plant, City Project No. 27-13, is hereby accepted, and RJM Construction is directed to enter into a contract with Minnesota Utility and Excavation LLC for said improvements. ADOPTED by the Lakeville City Council this 19th day of October 2026. CITY OF LAKEVILLE ______________________________ Page 190 of 300 Luke M. Hellier, Mayor ATTEST: _________________________________ Ann Orlofsky, City Clerk Page 191 of 300 September 21, 2026 Allyn Kuennen City of Lakeville Assistant City Administrator 20195 Holyoke Avenue Lakeville, MN 55044 RE: Lakeville Fire Station 2 - Recommendations for Award of Contract Bid Package 3 Dear Mr. Kuennen; On September 17, 2026 bids were received for the Lakeville Fire Station 2, Bid Package 3. At this time RJM has completed a review of the bids and recommending award of the base bid project scope based off the values of the bids received. The following table has a summary of costs associated with this project based off of the bid results. Pending approval of these recommendations, RJM will enter contractual agreements with these vendors for this project. Item: Final Bid: Minnesota Utilities and Excavating LLC $936,465 If you should have any questions, please contact by phone at 612-750-4346. Sincerely, Aaron Hooyer Senior Project Manager RJM Construction Page 192 of 300 Bid Summary by Trade September 17, 2026 Bid Category 33A - Utilities Low Bid or Company Low Bid Company Base Bid Bid Responsible Addenda Addenda Alt #1 Alt #2 Alt #3 Alt #4 Total Contract Security Contractor Verification #1 #2 0 0 0 0 MU&E $936,465 x x x x $175,000 $0 $0 $0 $936,465 Rachel $1,221,325 x x x x $1,221,325 Quad E $1,190,449 x x x x $89,130 $1,190,449 MU&E $936,465 x x x x $936,465 Veit $1,023,291 x x x x $1,023,291 T. Scherber $1,158,313 x x x x -$4,000 $1,158,313 BIT Roads $1,180,161 x x x x $1,180,161 JL Theis $1,399,633 x x x x $80,000 $1,399,633 Krueger Excavating $1,323,000 x x x x $1,323,000 SPU $1,137,377 x x x x $1,137,377 PWS $955,399 x x x x $955,399 Precision $1,302,000 x x x x $60,000 $1,302,000 $0 $0 $0 $0 City of Lakeville Fire Station BP 3 Page 193 of 300 Page 194 of 300 Page 195 of 300 Date: 10/19/2026 Ritter Meadows Private Recreation Building Conditional Use Permit Proposed Action Staff recommends adoption of the following motion: Move to approve a conditional use permit to allow a private recreational facility and adopt the findings of fact. Overview Twin Cities Land Development has submitted an application for a conditional use permit to allow the construction of a private recreation building and amenities within the Ritter Meadows neighborhood. The building will be located at the southwest corner of Kerkhoven Way and Kettle Pass and will serve the detached townhomes and single-family homes within the subdivision. The Planning Commission held a public hearing on the CUP application at its October 5, 2026 meeting. There was one public comment from a current Ritter Meadows resident, asking for more information about the pool, access, and HOA maintenance. The Planning Commission unanimously recommended approval. Supporting Information 1. CUP Form + Findings of Fact 2. October 1, 2026 Planning Commission minutes draft 3. September 23, 2026 Planning report Financial Impact: $0 Budgeted: No Source: Envision Lakeville Community Values: A Sense of Community and Belonging Report Completed by: Kris Jenson, Planning Manager Page 196 of 300 1 (Reserved for Dakota County Recording Information) CITY OF LAKEVILLE DAKOTA COUNTY, MINNESOTA CONDITIONAL USE PERMIT NO. 26-____ 1. Permit. Subject to the terms and conditions set forth herein, the City of Lakeville approves a Conditional Use Permit for Twin Cities Land Development, to allow a private recreation facility with amenities in the Ritter Meadows residential development. 2. Property. The permit is for the following described property located in the City of Lakeville, Dakota County, Minnesota: Lots 6 and 7, Block 2, Ritter Meadows Fourth Addition 3. Conditions. The permit is issued subject to the following conditions: a) The detached townhome to be located on Lot 5, Block 2, Ritter Meadows Fourth Addition must be setback from the pool building a minimum of 28 feet. b) A security based on the materials and installation costs of the approved landscape plan shall be submitted with the building permit. Plantings on the site must be installed per the plan dated September 23, 2026 and an as-built landscape plan submitted prior to inspection of the landscaping on site. 4. Termination of Permit. The City may revoke the permit following a public hearing for violation of the terms of the permit. 5. Lapse. If within one year of the issuance of this permit building construction has not commenced, this permit shall lapse. Page 197 of 300 2 6. Criminal Penalty. Violation of the terms of this conditional use permit is a criminal misdemeanor. Dated: October 19, 2026 CITY OF LAKEVILLE BY:________________________ Luke M. Hellier, Mayor BY:________________________ Ann Orlofsky, City Clerk STATE OF MINNESOTA ) ( COUNTY OF DAKOTA ) The following instrument was acknowledged before me this 19th day of October 2026 by Luke M. Hellier, Mayor and by Ann Orlofsky, City Clerk of the City of Lakeville, a Minnesota municipal corporation, on behalf of the corporation. _____________________________ Notary Public (SEAL) DRAFTED BY: City of Lakeville 20195 Holyoke Avenue Lakeville, MN 55044 Page 198 of 300 1 CITY OF LAKEVILLE DAKOTA COUNTY, MINNESOTA RITTER MEADOWS CONDITIONAL USE PERMIT AMENDMENT FINDINGS OF FACT AND DECISION On October 1, 2026 the Lakeville Planning Commission met at their regularly scheduled meeting to consider the request of Twin Cities Land Development for a conditional use permit for a private recreation building in the RST-2, Single- and Two-Family Residential District at 20160 Kerkhoven Way. The Planning Commission conducted a public hearing on the proposed conditional use permit preceded by published and mailed notice. The applicant was present and the Planning Commission heard testimony from all interested persons wishing to speak. The City Council hereby adopts the following: FINDINGS OF FACT 1. The property is located in Comprehensive Planning District No. 7, which guides the property for Low/Medium Density Residential use. 2. The property is zoned RST-2, Single- and Two-Family Residential District. 3. The legal description of the property is: Lots 6 and 7, Block 2, Ritter Meadows Fourth Addition 4. Section 11-4-3E of the City of Lakeville Zoning Ordinance provides that a conditional use permit may not be issued unless certain criteria are satisfied. The criteria and our findings regarding them are: a) The proposed action has been considered in relation to the specific policies and provisions of and has been found to be consistent with the Official City Comprehensive Plan. Finding: The proposed private recreation facility is consistent with the policies and provisions of District 7 of the 2040 Comprehensive Land Use Plan. The proposed recreation facility will be complimentary to the Ritter Meadows townhome development and recreational needs of its residents. b) The proposed use is or will be compatible with future land uses of the area. Finding: The proposed private recreation facility is compatible with the approved land uses in the area given compliance with the approved plans and stipulations of the conditional use permit. Page 199 of 300 2 c) The proposed use conforms with all performance standards contained in the Zoning Ordinance and the City Code. Finding: The proposed private recreation facility conforms to the performance standards set forth in the Zoning Ordinance given compliance with the stipulations of the conditional use permit. d) The proposed use can be accommodated with existing public services and will not overburden the City’s service capacity. Finding: The proposed private recreation facility will not overburden the City’s sanitary sewer and water systems and can be served with existing public services. e) Traffic generation by the proposed use is within capabilities of streets serving the property. Finding: Traffic generation will not significantly increase due to the private recreation facility. Traffic can be accommodated by the existing streets serving the development. Public sidewalk improvements will be made to allow pedestrian access to the main entrance of the private recreation building. 5. The planning report dated September 23, 2026 prepared by Kris Jenson, Planning Manager, is incorporated herein. DECISION The City Council hereby approves the conditional use permit in the form attached hereto. Dated: October 19, 2026. CITY OF LAKEVILLE BY: ___________________________ Luke M. Hellier, Mayor BY: ___________________________ Ann Orlofsky, City Clerk Page 200 of 300 Planning Commission Meeting Minutes, October 1, 2026 Page 2 There was no public comment. Motion was made by Swaney, seconded by Einck to close the public hearing at 6:05 p.m. Voice vote was taken on the motion. Ayes – unanimous Chair Zimmer asked for comments from the Planning Commission. • Commissioner Traffas asked if the neighbors have been told about the building being constructed and the height of the building. Mr. Blackburn stated he is in regular contact with his neighbors and they are aware of the project. Motion was made by Swenson, seconded by Tinsley to recommend to City Council approval of the conditional use permit to allow a detached accessory structure to exceed 15 feet in height within the RS-3 District and adoption of the findings of fact, subject to the following stipulations: 1. The detached accessory building shall be constructed in the location identified on the site plan approved with the conditional use permit. 2. Sanitary sewer service is not permitted to be extended to the detached accessory structure. 3. The detached accessory building shall be kept, used, and maintained in a manner that is compatible with the existing single-family home on the property and shall not present a hazard to the public health, safety and general welfare. 4. No commercial activity, storage of commercial equipment or use as a dwelling shall take place within any accessory building on the property. Commercial storage or storage for third parties is not permitted. 5. A building permit application shall be submitted to and approved by the Building Inspections Department prior to commencing construction of the detached accessory structure. Ayes: Traffas, Kaluza, Zimmer, Einck, Swaney, Swenson, Tinsley Nays: 0 5b. 20160 Kerkhoven Way Chair Zimmer opened the public hearing to consider the application of Twin Cities Land Development for a conditional use permit for a private recreation building in the RST-2, Single- and Two-Family Residential District. Ben Schmidt, with Twin Cities Land Development, introduced the project. Ms. Jenson presented the staff report. The project proposes a 480 square foot building with an attached pavilion and outdoor pool at 20160 Kerkhoven Way, within the Ritter Meadows development. The proposed site is located on Lots 6 and 7, Block 2, Ritter Meadows Fourth Addition, at the southwest corner of Kerkhoven Way and Kettle Pass. Page 201 of 300 Planning Commission Meeting Minutes, October 1, 2026 Page 3 Access to the building and pool area is via sidewalk that connects to the sidewalk along Kettle Pass. The 30-foot by 60-foot pool will be surrounded by a concrete deck as well as a six-foot-tall black aluminum fence. The pavilion is located outside the fence; one of the bathrooms will be available from within the fenced area while the other two are accessed from the pavilion outside the fenced area. Community Development Department staff recommend approval. Chair Zimmer opened the hearing to the public for comment. Theresa Stokes, 11565 202nd Street West, asked what the depth and size of the pool will be, if the fence will have a lock on the gate that is only accessible to residents, the timing of when the pool will be built, hours of use, proposed costs for the HOA, if it will be freshwater or saltwater, and what the pool maintenance procedures will be. Motion was made by Kaluza seconded by Swaney to close the public hearing at 6:15 p.m. Voice vote was taken on the motion. Ayes – unanimous Mr. Schmidt stated that current residents have the right to opt in or out of the use of the pool and costs associated with the pool would not be passed on to them. The information will be passed to the residents in the future. The pool will only be for residents of the neighborhood excluding those who opt out. The pool will be fenced and locked and only accessible to people who are part of the pool HOA. There will be “normal” pool hours, open during the day, closed at night as well as closed for seasonally. There will be a service that takes care of the maintenance that is required. The pool depth will be from approximately three feet to six feet and will be regular water from the tap that has the required chemicals added. Chair Zimmer asked for comments from the Planning Commission. • Commissioner Swaney asked for clarification if the conditional use permit request is for a recreation building or a pool or both. Ms. Jenson stated that the way the ordinance reads is that private recreation centers and amenities are a conditional use permit in residential districts. There are a number of these scattered throughout the city. The ordinance is general for private recreation, so we put the pool and building together as part of that private recreation for those residents. • Commissioner Swenson asked for clarification of the city’s involvement with HOAs and regulations of the HOAs. Ms. Jenson stated that the city does not have control over the HOAs other than ensuring that townhome units are in an HOA. The city does not have jurisdiction over what the HOAs say unless they’re trying to be less restrictive than city requirements. Commissioner Swenson stated the Planning Commission is voting on how this complies with city regulations. Motion was made by Einck, seconded by Swaney to recommend to City Council approval of the Ritter Meadows private recreation building conditional use permit, and adoption of the findings of fact, subject to the following stipulations: Page 202 of 300 Planning Commission Meeting Minutes, October 1, 2026 Page 4 1. The detached townhome to be located on Lot 5, Block 2, Ritter Meadows Fourth Addition must be setback from the pool building a minimum of 28 feet. 2. A security based on the materials and installation costs of the approved landscape plan shall be submitted with the building permit. Plantings on the site must be installed per the plan dated September 23, 2026, including any revisions approved by the City Forester and an as-built landscape plan submitted prior to inspection of the landscaping on site. Ayes: Kaluza, Zimmer, Einck, Swaney, Swenson, Tinsley, Traffas Nays: 0 5c. City of Lakeville Chair Zimmer opened the public hearing to consider amendments to Title 11 (Zoning) of the City Code. Ms. Jenson presented the proposed amendments and summarized the proposed changes to the City Code. At their September 21, 2026 work session, the City Council discussed proposed changes to Title 6 Motor Vehicles and Traffic, as presented by Police Chief Brad Paulson. The intent of these changes is to address the parking of commercial vehicles on public streets and the parking of recreational vehicles, trailers, etc. on public streets as overflow space from residential properties. While the bulk of the changes are within Title 6, which is not subject to a public hearing and Planning Commission review, some minor amendments to Title 11 would also be required so that language remains consistent across city code. Changes to Section 11-19-7.F Off Street Parking Requirements, General Provisions adds trailers to the text that includes recreational vehicles and equipment and provides other clarifications. Changes to Section 11-22-5 Outdoor Storage, Exceptions; Accessory Use also adds trailers to the requirements for recreational vehicles and equipment and clarifies where these items may be parked. Community Development Department staff recommend approval. Chair Zimmer opened the hearing to the public for comment. There was no public comment. Motion was made by Einck, seconded by Tinsley to close the public hearing at 6:23 p.m. Voice vote was taken on the motion. Ayes – unanimous Chair Zimmer asked for comments from the Planning Commission. • Chair Zimmer asked for clarification of the part that adds language prohibiting parking of commercial vehicles and equipment on public right of way, and if it also continues to say any property. Ms. Jenson stated that is correct, it is just an addition. Currently it says except where Page 203 of 300 City of Lakeville Community Development Memorandum To: Planning Commission From: Kris Jenson, Planning Manager Date: September 23, 2026 Subject: Packet Material for the October 1, 2026 Planning Commission Meeting Agenda Item: Ritter Meadows amenity building conditional use permit BACKGROUND Twin Cities Land Development have submitted an application for a conditional use permit for a swimming pool and pool house at 20160 Kerkhoven Way, within the Ritter Meadows development. The proposed site is located on Lots 6 and 7, Block 2, Ritter Meadows Fourth Addition, at the southwest corner of Kerkhoven Way and Kettle Pass. EXHIBITS A. Location Map B. Zoning Map C. Site Plan D. Floor Plan E. Building Elevations F. Landscape Plan CONDITIONAL USE P ERMIT A NALYSIS Twin Cities Land Development is the developer of the Ritter Meadows subdivision. Section 11-58-9.D allows private recreational buildings and neighborhood community centers subject to approval of a conditional use permit. The project proposes a 480 square foot building with an attached pavilion and outdoor pool. Engineering Review. The plans submitted for the amenity building include an overall site plan, grading, drainage and utility plan, and landscaping plan. Given the limited scope of the Page 204 of 300 2 proposed construction, the Engineering Division will review the grading, drainage, and utility plan at the time of building permit review. Surrounding Area. The amenity building and pool are located within the detached townhome area of the Ritter Meadows development and will be surrounded by detached townhomes. Setbacks. The pavilion portion of the building is setback about 21 feet from the property line along Kettle Pass and 30 feet from the south property line. The building itself is 31 feet from the south property line. The side yard setback between buildings in the RST-2 District is 14 feet, which is required to be doubled for private recreation buildings. The detached townhome to the west of the pool building has not yet been constructed. When a building permit is submitted for that lot, the proposed home must be at least 28 feet from the pool building. The submitted site plan shows a possible building footprint that is over 30 feet from the pool building, demonstrating that meeting the 28-foot setback can be accomplished. Pedestrian Access. The building has direct access to a five (5) foot wide concrete sidewalk along Kettle Pass, which will provide pedestrian access to the site. The neighborhood has a sidewalk on one side of the street, allowing for pedestrian access via sidewalk from the neighborhood. Building. The 480-square foot building includes three individual bathrooms, a pool equipment space, and a small storage area, as well as a covered pavilion area. It does not include any interior gathering space. The building will have white board and batten-style LP siding with a black roof and trim; these materials are consistent with the detached townhomes in the area. Site Plan. Access to the building and pool area is via sidewalk that connects to the sidewalk along Kettle Pass. The 30-foot by 60-foot pool will be surrounded by a concrete deck as well as a six-foot-tall black aluminum fence. The pavilion is located outside the fence; one of the bathrooms will be available from within the fenced area while the other two are accessed from the pavilion outside the fenced area. Landscaping. Plantings are proposed around the perimeter of the fenced area and the building. Arborvitae and juniper plantings will provide screening to the pool from outside the fence as well as from the future home to the west. The fence and plantings at the corner of Kerkhoven Way and Kettle Pass are located outside the site vision triangle, which is measured 45 feet from a point created by the extension of a line along the curb. Nothing within that area should exceed three feet in height to ensure that site lines remain open. The site must be irrigated in compliance with Section 11-21-9.4.e of the Zoning Ordinance. A security based on the materials and installation costs of the approved landscape plan shall be submitted with the building permit as a stipulation of the conditional use permit. Plantings on the site must be installed per the plan and an as-built landscape plan submitted prior to inspection of the landscaping on site. Page 205 of 300 3 Lighting. The site plan does not indicate pole lighting on the property but there will be lighting in the ceiling of the pavilion. Any building-mounted lighting must be downcast and may not shine onto adjacent properties. Ownership. The homeowner’s association for the detached townhomes in the Ritter Meadows development will own and maintain the building and pool. RECOMMENDATION Community Development Department staff recommends approval of the Ritter Meadows private recreation building conditional use permit subject to the following stipulations: 1. The detached townhome to be located on Lot 5, Block 2, Ritter Meadows Fourth Addition must be setback from the pool building a minimum of 28 feet. 2. A security based on the materials and installation costs of the approved landscape plan shall be submitted with the building permit. Plantings on the site must be installed per the plan dated September 23, 2026, including any revisions approved by the City Forester and an as-built landscape plan submitted prior to inspection of the landscaping on site. The findings of fact for the conditional use permit are attached to this report. Page 206 of 300 ±City of Lakeville Location Map Ritter Meadows CUP K E R K H O V EN WAY KETTLE PASS202ND STKEYSTONE CTKEYSTONE AVEK EO KU K AV E 200TH ST K ERKHOVEN WAYEXHIBIT A Site Location Page 207 of 300 ±City of Lakeville Zoning Map Ritter Meadows CUP EXHIBIT B K E R K H O V EN WAY KETTLE PASS202ND STKEYSTONE CTKEYSTONE AVEK EO KU K AV E 200TH ST K ERKHOVEN WAYSite Location Page 208 of 300 Copyright of these documents is owned by Robert Thomas Homes, Inc. and reserves ALL rights. These plans may not be re-used, copied or assigned to another party nor shall they be modified or used in part in other designs without the prior written consent of Robert Thomas Homes, Inc. OF SHEETRITTER MEADOWS POOL HOUSE20160 KERKHOVEN WAYLAKEVILLE, MN 55044DRAWN BY: .. C.O... CUSTOMER .. C.O... PERMIT .. REVISIONS: ----.. .. 1 4KERKHOVEN WAYKETTLE PA S S 5FUTURE HOME10'-0" 10'-0"9'-0"60'-0"30'-0" 7'-0" 30'-0" SIDEWALK POOL DEC K PAVILION POOL 26'-4"21'-6"21' -5 " FENCE 31'-0" 0 10 20 40 SCALE IN FEET POOL DECK AREA: 2,630 SQ. FT. OCCUPANY LOAD: 2630/50 =53 OCCUPANTS POOL AREA: 1,800 SQ. FT. OCCUPANT LOAD: 1800/50=36 OCCUPANTS COVERED PAVILION AREA: 487 SQ. FT. OCCUPANY LOAD: 487/50 =10 OCCUPANTS SPECIFICATIONS: HEIGHT: 6'-0" COLOR: BLACK MATERIAL: ALUMINUM FENCE DETAILS AREA CALCULATIONS RITTER MEADOWS 4th ADDITION LOT 6, BLOCK 2 LOT INFORMATION POOL HOUSE AREA: 480 SQ. FT. Page 209 of 300 Copyright of these documents is owned by Robert Thomas Homes, Inc. and reserves ALL rights. These plans may not be re-used, copied or assigned to another party nor shall they be modified or used in part in other designs without the prior written consent of Robert Thomas Homes, Inc. OF SHEETRITTER MEADOWS POOL HOUSE20160 KERKHOVEN WAYLAKEVILLE, MN 55044DRAWN BY: .. C.O... CUSTOMER .. C.O... PERMIT .. REVISIONS: ----.. .. 2 4 BATH #1BATH #2 BATH #3 POOL EQUIPMENT STORAGE SHWR SHWR SHWR DRINKING FOUNTAINS 3068 3068306830683068COVERED PAVILION FLOOR PLAN SCALE: 3/16 = 1'-0" 12 2/6 x 2/6 PICT. (OBSCURE) 2/6 x 2/6 PICT. (OBSCURE) 2/6 x 2/6 PICT. (OBSCURE) 2/6 x 2/6 PICT. (OBSCURE) 2/6 x 2/6 PICT. (OBSCURE) Page 210 of 300 Copyright of these documents is owned by Robert Thomas Homes, Inc. and reserves ALL rights. These plans may not be re-used, copied or assigned to another party nor shall they be modified or used in part in other designs without the prior written consent of Robert Thomas Homes, Inc. OF SHEETRITTER MEADOWS POOL HOUSE20160 KERKHOVEN WAYLAKEVILLE, MN 55044DRAWN BY: .. C.O... CUSTOMER .. C.O... PERMIT .. REVISIONS: ----.. .. 3 4 8" LP FASCIA 8" LP FRIEZE 6" LP TRIM LP BOARD & BATTEN 8" LP TRIM 12" LP SOFFIT 16" LP COLUMN 8" LP TRIM 6" LP TRIM LP BOARD & BATTEN 6" LP CORNER 8" LP FASCIA 8" LP FRIEZE 6" LP TRIM LP BOARD & BATTEN 6" LP CORNER 8" LP TRIM 6" LP TRIM 8" LP FASCIA 8" LP FRIEZE 6" LP TRIM LP BOARD & BATTEN 8" LP TRIM 12" LP SOFFIT 16" LP COLUMN 6" LP TRIM LP BOARD & BATTEN 8" LP TRIM 8" LP TRIM COVERED PAVILION COVERED PAVILION COVERED PAVILION 6" LP TRIM LP BOARD & BATTEN 16" LP COLUMN ELEVATION SCALE: 1/8 = 1'-0" 13 ELEVATION SCALE: 1/8 = 1'-0" 33 ELEVATION SCALE: 1/8 = 1'-0" 23 ELEVATION SCALE: 1/8 = 1'-0" 43 ASPHALT SHINGLES SIDING AND TRIM TO BE LP SMARTSIDE U.N.O. SOFFIT AND FASCIA TO BE ALUMINUM LP BOARD & BATTEN: SNOWSCAPE WHITE EXPERT FINISH (NPC9246) LP TRIM:SNOWSCAPE WHITE EXPERT FINISH (NPC9246) ALUMINUM SOFFIT: EBONY ALUMINUM FASCIA: EBONY EXTERIOR DOORS: TRICORN BLACK (SW6258) WINDOWS:BLACK SHINGLES:MOIRE BLACK (CERTAINTEED) COLOR SELECTIONS: 20160 Page 211 of 300 05'10'10'20'COVEREDPAVILIONPOOL HOUSEKETTLE PASSKERKHOVEN WAY POOL60'x30'FUTURE RESIDENCEWALKWALKWALKWALKCONCRETEPOOL DECKPoly Edging1.5" River Rock(5) Blue Muffin Viburnum(1) Black Hills Spruce(7) North Pole Arborvitae(4) Techny Arborvitae(3) Prairie Dropseed(1) Miss Kim Lilac(15) Karl F. Reed Grass(3) Karl F. Reed Grass(2) Little Devil Ninebark(4) Karl F. Reed Grass(3) Glow Girl Spirea(6) Blackeyed Susan(1) Spring Snow Crabapple(3) Prairie Dropseed(3) Bobo Hydrangea(1) Cupressina Spruce(8) Moody Blues VeronicaMounded PlantbedBoulder Outcropping(6) Karl F. Reed Grass(7) Bobo HydrangeaPoly Edging1.5" River RockWALKWALK(5) North Pole Arborvitae(7) Taylor JuniperNOTE: BOULDER WALLS TO BE BUILT AS NEEDED TO ACCOMMODATE SITECONDITIONS. TO BE BUILT OUT OF FIELDSTONE BOULDERS - NOT SHOWN ON PLANPool House Landscape Plan 8099 BAVARIA ROADVICTORIA, MN 55386CLIENT:DATE:SCALE:DESIGNER:SHEET:REVISIONS:SHEET:24"X36"3/16" = 1'-0"ONELandscape 1 OF 1Plan - V1 NRITTER MEADOWS 20160 Kerkhoven Way Lakeville, MN 5504409.23.26 David M. Anderson NOTE: HARTMAN COMPANIES RESERVES THE RIGHT TO SUBSTITUTEWITH LIKE PLANT MATERIAL BASED ON AVAILABILITY AT TIME OF INSTALL09.18.26 Orig. Design - V1: 09.23.26 Planting-Bed Update:Page 212 of 300 Date: 10/19/2026 7383 170th Street – Conditional Use Permit Proposed Action Staff recommends adoption of the following motion: Move to approve a conditional use permit to allow a detached accessory structure to exceed 15 feet in height in the RS-3, Single Family Residential District and adopt the findings of fact. Overview Gabriel Hofrenning, Hofrenning Construction, has applied for a conditional use permit to allow a detached accessory structure to exceed 15 feet in height in the RS-3, Single Family Residential District for the property located at 7383 170th Street. The applicant is requesting to construct an accessory building 20-feet in height, 1,050 square feet in area. City Code Section 11-18-9.C. allows additional height of an accessory building by conditional use permit. The property is 0.47 acres in size and currently has a single-family home with a two-car garage. The RS-3 zoning district allows up to 1,500 gross square feet in combined accessory structures. According to Dakota County GIS, the existing garage is 400 square feet. The proposed structure is 1,050 square feet, complying with the gross square feet requirements. The applicant has stated the proposed accessory structure is for a sport court. The additional height is to allow indoor sports not to be disrupted by the ceiling. No home occupation or storage of commercial vehicles or equipment is allowed in the accessory building. The Planning Commission held a public hearing on the CUP application at its October 1, 2026 meeting and unanimously recommended approval. There was no public comment. Supporting Information 1. CUP Form-Findings- PC Minutes 2. Planning Report Financial Impact: $ Budgeted: No Source: Envision Lakeville Community Values: A Home for All Ages and Stages of Life Report Completed by: Heather Botten, Senior Planner Page 213 of 300 (Reserved for Dakota County Recording Information) CITY OF LAKEVILLE DAKOTA COUNTY, MINNESOTA CONDITIONAL USE PERMIT NO. 26-_____ 7383 170th STREET 1. Permit. Subject to the terms and conditions set forth herein, the City of Lakeville hereby approves a Conditional Use Permit to allow a detached accessory structure to exceed 15 feet in height in the RS-3, Single Family Residential District.: 2. Property. The permit is for the following described property in the City of Lakeville, Dakota County, Minnesota: Lot 2, Block 1, Cedar Highlands 5th Addition in the City of Lakeville, Dakota County, Minnesota 3. Conditions. This conditional use permit is issued subject to the following conditions: a) The detached accessory building shall be constructed in the location identified on the site plan approved with the conditional use permit. b) Sanitary sewer service is not permitted to be extended to the detached accessory structure. c) The detached accessory building shall be kept, used, and maintained in a manner that is compatible with the existing single-family home on the property and shall not present a hazard to the public health, safety and general welfare. d) No commercial activity, storage of commercial equipment or use as a dwelling shall take place within any accessory building on the property. Commercial storage or storage for third parties is not permitted. e) A building permit application shall be submitted to and approved by the Building Inspections Department prior to commencing construction of the detached accessory structure. Page 214 of 300 2 f) Revocation. The City may revoke the conditional use permit for cause upon determination that the conditional use permit is not in conformance with the conditions of the permit or is in continued violation of the city code or other applicable regulations. g) Expiration. This conditional use permit shall expire unless the applicant commences the authorized use within one year of the date of this conditional use permit unless an extension is approved by the Zoning Administrator. DATED: October 19, 2026 CITY OF LAKEVILLE BY: _____________________________ Luke M. Hellier, Mayor SEAL BY: _____________________________ Ann Orlofsky, City Clerk STATE OF MINNESOTA ) ( COUNTY OF DAKOTA ) The foregoing instrument was acknowledged before me on this 19th day of October 2026 by Luke M. Hellier, Mayor and by Ann Orlofsky, City Clerk of the City of Lakeville, a Minnesota municipal corporation, on behalf of the corporation. ____________________________ Notary Public DRAFTED BY: City of Lakeville 20195 Holyoke Avenue Lakeville, MN 55044 Page 215 of 300 1 CITY OF LAKEVILLE DAKOTA COUNTY, MINNESOTA CONDITIONAL USE PERMIT 7383 170th Street FINDINGS OF FACT AND DECISION On October 1, 2026 the Lakeville Planning Commission met at its regularly scheduled meeting to consider a conditional use permit to allow a detached accessory structure to exceed 15 feet in height in the RS-3, Single Family Residential District on property located at 7383 170th Street. The Planning Commission conducted a public hearing on the proposed conditional use permit preceded by published and mailed notice. The applicant was present, and the Planning Commission heard testimony from all interested persons wishing to speak. Therefore, the City Council hereby adopts the following: FINDINGS OF FACT 1. The property is currently zoned RS-3, Single Family Residential District. 2. The property is located in Planning District No. 3 of the 2040 Comprehensive Plan, which guides the property for single family residential use and is located in the Low-Density Residential District of the Comprehensive Plan. 3. The legal description of the property is: Lot 2, Block 1, Cedar Highlands 5th Addition in the City of Lakeville, Dakota County, Minnesota 4. Section 11-4-3E of the City of Lakeville Zoning Ordinance provides that a conditional use permit may not be issued unless certain criteria are satisfied. The criteria and our findings regarding them are: a. The proposed action has been considered in relation to the specific policies and provisions of and has been found to be consistent with the official City Comprehensive Plan. The proposed accessory structure on the 0.47 acre property is consistent with the RS-3 District zoning of the property and District 3 recommendations of the 2040 Comprehensive Plan. Page 216 of 300 2 b. The proposed use is or will be compatible with present and future land uses of the area. Provided compliance with the conditional use permit, the detached accessory structure will be compatible with existing and future land uses in the area. c. The proposed use conforms with all performance standards contained in the Zoning Ordinance. Provided compliance with the conditional use permit, the detached accessory structure will conform with all performance standards contained in the Zoning Ordinance and the City Code. d. The proposed use can be accommodated with existing public services and will not overburden the City’s service capacity. The subject property is within the current MUSA. The proposed accessory building will not be connected to city sanitary sewer. e. Traffic generation by the proposed use is within capabilities of streets serving the property. The proposed detached accessory structure will not overburden the streets serving the property. 5. The report dated September 24, 2026 and prepared by Heather Botten, Senior Planner is incorporated herein. DECISION The City Council approves the conditional use permit in the form attached hereto. DATED: October 19, 2026 CITY OF LAKEVILLE BY: ________________________ Luke M. Hellier, Mayor SEAL BY: ________________________ Ann Orlofsky, City Clerk Page 217 of 300 CITY OF LAKEVILLE PLANNING COMMISSION MEETING MINUTES October 1, 2026 Chair Zimmer called the meeting to order at 6:00 p.m. in the Council Chambers at City Hall. The Pledge of Allegiance to the flag was given. Members Present: Chair Christine Zimmer, Vice Chair Scott Einck, Pat Kaluza, Jason Swenson, John Swaney, Amanda Tinsley, Mark Traffas Members Absent: None Staff Present: Kris Jenson, Planning Manager; Tina Goodroad, Community Development Director; Heather Botten, Senior Planner; Dawn Erickson, Community Development Recorder 3.Approval of the Meeting Minutes The September 17, 2026 Planning Commission meeting minutes were approved as presented. 4.Announcements Planning Manager Kris Jenson stated the October 15, 2026 Planning Commission meeting is canceled. The next Planning Commission meeting is scheduled for November 5, 2026. 5a. 7383 170th Street Chair Zimmer opened the public hearing to consider the application of Gabriel Hofrenning, on behalf of Christopher and Jennifer Blackburn for a conditional use permit for an accessory structure to exceed 15 feet in height in the RS-3, Single-Family Residential District. Gabriel Hofrenning, with Hofrenning Construction, introduced the project. Heather Botten, Senior Planner, presented the staff report. The applicant is requesting a 1,050 square foot accessory building that exceeds 15 feet in height, which is allowed by conditional use permit in City Code Section 11-18-9.C. The property is 0.47 acres in size and currently has a single- family home with a two-car garage on it. The RS-3 District allows up to a maximum of 1,500 square feet in combined accessory structures; according to Dakota County GIS, the existing garage is 400 square feet. The applicant indicated that the purpose of the accessory building is for a sport court and storage area. The roof is a low slope, monopitch roof with a 14 foot height at the rear and 20 feet at the front of the building. Community Development Department staff recommend approval. Chair Zimmer opened the hearing to the public for comment. Page 218 of 300 Planning Commission Meeting Minutes, October 1, 2026 Page 2 There was no public comment. Motion was made by Swaney, seconded by Einck to close the public hearing at 6:05 p.m. Voice vote was taken on the motion. Ayes – unanimous Chair Zimmer asked for comments from the Planning Commission. • Commissioner Traffas asked if the neighbors have been told about the building being constructed and the height of the building. Mr. Blackburn stated he is in regular contact with his neighbors and they are aware of the project. Motion was made by Swenson, seconded by Tinsley to recommend to City Council approval of the conditional use permit to allow a detached accessory structure to exceed 15 feet in height within the RS-3 District and adoption of the findings of fact, subject to the following stipulations: 1. The detached accessory building shall be constructed in the location identified on the site plan approved with the conditional use permit. 2. Sanitary sewer service is not permitted to be extended to the detached accessory structure. 3. The detached accessory building shall be kept, used, and maintained in a manner that is compatible with the existing single-family home on the property and shall not present a hazard to the public health, safety and general welfare. 4. No commercial activity, storage of commercial equipment or use as a dwelling shall take place within any accessory building on the property. Commercial storage or storage for third parties is not permitted. 5. A building permit application shall be submitted to and approved by the Building Inspections Department prior to commencing construction of the detached accessory structure. Ayes: Traffas, Kaluza, Zimmer, Einck, Swaney, Swenson, Tinsley Nays: 0 5b. 20160 Kerkhoven Way Chair Zimmer opened the public hearing to consider the application of Twin Cities Land Development for a conditional use permit for a private recreation building in the RST-2, Single- and Two-Family Residential District. Ben Schmidt, with Twin Cities Land Development, introduced the project. Ms. Jenson presented the staff report. The project proposes a 480 square foot building with an attached pavilion and outdoor pool at 20160 Kerkhoven Way, within the Ritter Meadows development. The proposed site is located on Lots 6 and 7, Block 2, Ritter Meadows Fourth Addition, at the southwest corner of Kerkhoven Way and Kettle Pass. Page 219 of 300 City of Lakeville Community Development Memorandum To: Planning Commission From: Heather Botten, Senior Planner Date: September 24, 2026 Subject: Packet Material for the October 1, 2026 Planning Commission Meeting Agenda Item: Gabriel Hofrenning - Conditional Use Permit Application Action Deadline: November 9, 2026 INTRODUCTION Gabriel Hofrenning, Hofrenning Construction has applied for a conditional use permit to allow a detached accessory structure to exceed 15 feet in height in the RS-3, Single Family Residential District for the property located at 7383 170th Street. The applicant is requesting an accessory building 20-feet in height, 1,050 square feet in size. City Code Section 11-18-9.C. allows additional height of an accessory building by conditional use permit. The property is 0.47 acres in size and currently has a single-family home with a two-car garage on it. The RS-3 zoning district allows up to 1,500 gross square feet in combined accessory structures. According to Dakota County GIS, the existing garage is 400 square feet. The proposed structure is 1,050 square feet, complying with the gross square feet requirements. The following exhibits are attached for your review: A. Location Map B. Zoning Map C. Site Plan D. Accessory Building Elevation + Floor plan Page 220 of 300 2 SITE ANALYSIS Consistency with the Comprehensive Plan. A detached structure accessory to a residential home is consistent with the low-density residential land use identified on the 2040 Land Use Plan and Planning District 3 recommendations of the 2040 Comprehensive Plan. Existing Conditions. The subject property is a single-family lot that totals 0.47 acres in area. The existing house was constructed in 1995. The property is located in a developed residential neighborhood. Adjacent Land Uses. The subject property is zoned RS-3, Single Family Residential District. The property is located within a developed neighborhood, with RS-3, Single-Family Residential zoning directly surrounding the property. Accessory Building Use. The applicant indicated that the purpose of the accessory building is for a sport court and approximately 200 square feet of storage area. Sanitary sewer service is not permitted to be extended to the detached accessory building. The structure shall not be used for commercial or home occupation purposes. Setbacks. The minimum setbacks for a detached accessory building in the RS-3 District are 10 feet to the side and rear property lines and 30 feet to the front property line. The proposed accessory structure setbacks are as follows: Front Yard: 30 feet Rear Yard: 10 feet Side Yards: 10 feet The proposed detached accessory building complies with required setbacks. Building Height. The applicant has requested that the detached structure be able to exceed the 15-foot height limit of the RS-3 District. The roof is a low slope, monopitch roof. The rear of the building is 14 feet in height, and the front of the building is 20 feet in height. Section 11-18-9 of city code states that in no case shall the height of an accessory building exceed that of the principal building on the lot on which it is located within the RS-3, RS-4, RST-1, RST- 2, RM-1, and RM-2 districts. The house on the property is a two-story home with a pitched roof. The height of the accessory building is less than the principal home on the property. Driveway Surfacing. A driveway is not required to be installed to provide access to the accessory building. If a structural exterior opening of eight feet or greater is added a driveway consisting of bituminous or concrete would be required. Building Materials The proposed accessory building will have LP siding and a metal roof. The colors shall be consistent and complimentary to the existing home on the property. Page 221 of 300 3 CONDITIONAL USE P ERMIT ANALYSIS The Zoning Ordinance allows the accessory building area requirements to be exceeded by conditional use permit subject to the following criteria as listed in Section 11-18-5: A. There is a demonstrated need and potential for continued use of the structure for the purpose stated. Properties in the RS-3 District are allowed to be a height up to 15 feet unless a conditional use permit is approved to exceed that amount. The property owner has indicated a need for the proposed height of the building for the purpose of utilizing it a sport court. B. No accessory building or private garage shall be utilized for all or a portion of a home occupation, for commercial activities or for commercial storage. The applicant has stated the detached accessory structure is for a sport court. The additional height is to allow indoor sport activities not to be disturbed by ceiling and light fixtures. No home occupation or storage of commercial vehicles or equipment is allowed in any accessory building on the property. C. The accessory building has an evident reuse or function related to a single-family residential environment in urban service areas or hobby farm environment in nonurban service areas of the city. The proposed accessory building space has the evident function of an open area to accommodate an indoor sport court. D. Detached accessory buildings shall be maintained in a manner that is compatible with the adjacent residential uses and does not present a hazard to public health, safety, and general welfare. The proposed detached accessory building (garage) will be in a location that meets setback requirements and will be compatible with adjacent single-family properties. E. The performance standards and criteria of section 11-4-7 of this title shall be considered and a determination made that the proposed activity is in compliance with such criteria. The provisions of section 11-4-7 of the Zoning Ordinance (Conditional Use Permits) have been considered and satisfactorily met. Please refer to the attached findings of fact. Page 222 of 300 4 RECOMMENDATION Community Development Department staff recommends approval of the conditional use permit to allow a detached accessory structure to exceed 15 feet in height within the RS-3 District located at 7383 170th Street, subject to the following stipulations: 1. The detached accessory building shall be constructed in the location identified on the site plan approved with the conditional use permit. 2. Sanitary sewer service is not permitted to be extended to the detached accessory structure. 3. The detached accessory building shall be kept, used, and maintained in a manner that is compatible with the existing single-family home on the property and shall not present a hazard to the public health, safety and general welfare. 4. No commercial activity, storage of commercial equipment or use as a dwelling shall take place within any accessory building on the property. Commercial storage or storage for third parties is not permitted. 5. A building permit application shall be submitted to and approved by the Building Inspections Department prior to commencing construction of the detached accessory structure. Findings of Fact are attached for consideration. Page 223 of 300 Page 224 of 300 Page 225 of 300 DRAWN BY: SCALE: DATE: JOB #: REVISIONS :BY: RIGHT VIEW ELEVATION PLAN1/4"= 1'-0" S.KOLLO 3 4SHEET# PAGE # ELEVATION PLAN 1/4"= 1'-0"MOUNTAINVIEW DRAFTING& DESIGN LLC.SCOTT KOLLO520-258-9686CUSTOM HOMES, STANDARD PLANS, ADU's,ADDITIONS, REMODELS, VIOLATION PROJECTS.F.F.E. 0'-0" LEFT VIEW 1/4"= 1'-0" T.O. (E) DOOR 14'-0" T.O. PLATE 14'-0"HHOFRENNINGCONSTRUCTIONPHONE: 480-622-2601Ritchied@HofrenConstruction.comAZ:ROC361838NEW HOME-REMODELINGTHE BLACKBIRD PROJECT 07/26/2026 0723.26-35 T.O. WINDOW 8'-0" T.O. DOOR 6'-8" T.O. PLATE 14'-0" T.O. PLATE 20'-0" T.O. WINDOW 8'-0" T.O. PLATE 14'-0" T.O. PLATE 20'-0" REAR VIEW 1/4"= 1'-0"FRONT VIEW 1/4"= 1'-0" F.F.E. 0'-0" F.F.E. 0'-0" T.O. PLATE 20'-0" T.O. WINDOW 8'-0" T.O. DOOR 6'-8" 2 MIN. 12 2 MIN. 12 EXTERIOR WALL FINISH & ROOF FINISH WRB AT EXTERIOR WALLS W/TAPED SEAMS, FLASHING AT WINDOWS & DOORS PER MANUF. FLASHING TO COVERED EXPOSED INSULATION. LP SIDING LP TRIM METAL ROOF FOR LOW SLOPE APPLICATION VENTED ALUMINUM SOFFIT AND FASCIA. Page 226 of 300 THE BLACKBIRD PROJECT FOUNDATION/FLOOR PLANS.KOLLO 1/4"= 1'-0" 07/26/2026 0723.26-35JOB #: SCALE: DRAWN BY: DATE: REVISIONS :BY: DISCREPANCIES ARE FOUND ON THESE PLANS. IF M.V. DRAFTING IS NOT THESE PLANS ARE APPROVED FOR CONSTRUCTION AND FINAL BIDDING AS APPROVED BY COUNTY AND/OR CITY OFFICIALS ONLY. IF PLANS ARE NOT APPROVED AND STAMPED BY COUNTY AND/OR CITY OFFICIALS, THEY MAY NOT BE USED FOR CONSTRUCTION AND/ OF FINAL BIDDING. MOUNTAIN VIEW DRAFTING IS NOT LIABLE IF UNAUTHORIZED PLANS ARE USED FOR CONSTRUCTION AND/ OR FINAL OWNER, AND DESIGNER PRIOR TO CONSTRUCTION IF ANY NOTIFIED THE CONTRACTOR. SHALL ASSUME ALL RESPONSIBILITY. BIDDING. THE GENERAL CONTRACTOR MUST NOTIFY TOTAL: 1050 SQ.FT UNDER ROOF: 1050 SQ.FT 1 4SHEET# PAGE # FND/FLOOR PLAN FOUNDATION PLAN 1/4"= 1'-0"SCALE: *NOTE: INTERIOR ROOM DIMENSIONS ARE BASED ON UNFINISHED ROOM SIZE'S.4A FLOOR PLAN 1/4"= 1'-0"SCALE:MOUNTAINVIEW DRAFTING& DESIGN LLC.SCOTT KOLLO520-258-9686CUSTOM HOMES, STANDARD PLANS, ADU's,ADDITIONS, REMODELS, VIOLATION PROJECTS.2'-4"6'-7"12'-0"10'-6"3'-7" 28'-2"6'-10" 35'-0"5'-8"9'-5"9'-8"5'-5"10'-8"8'-8"10'-8"30'-0"6'-10"28'-2" 35'-0"6'-0"9'-0"9'-0"6'-0"30'-0"GARDEN SHED STORAGE STORAGE SPORT COURT 6'-2"X10'-3" 8'-4" X 6'-2" 9'-9" X 6'-2" 27'-6" X 29'-0"3068 S.C.3068 S.C.2-2068 S.C.4040 WDW4040 WDW4020 WDW4040 WDW 3068 S.C. 4040 WDW 4020 WDW4020 WDW10"3'-0"25'-7"4'-0"1'-7" 35'-0"13'-6"3'-0"13'-6"30'-0"30'-0"35'-0" 1/8" PER FOOT SLOPE LANDING @ 48" X 36" LANDING @ 48" X 36" LANDING @ 60" X 36" HHOFRENNINGCONSTRUCTIONPHONE: 480-622-2601Ritchied@HofrenConstruction.comAZ:ROC361838NEW HOME-REMODELING212 1 FOUNDATION DESCRIPTION: 6" MIN. CRUSHED STONE BENEATH 2" XPS FOAM INSULATION. 6 MIL. VAPOR RETARDER. 4,000 PSI MIN. CONCRETE. 4" THICK SLAB. A.B. @ 48" O.C. W/7" MIN. EMBEDMENT. 3" MIN.T&B (TYP.) 1-#4 REBAR CONT. BOT.1-#4 REBAR CONT. TOP INTERIOR 2X4 WALL STUDS @ 16" O.C. (TYP.) USE 1/2" DRY WALL BOTH SIDES (IMPACT RESISTANT RECOMMENDED) INTERIOR 2X4 WALL STUDS @ 16" O.C. (TYP.) USE 1/2" DRY WALL BOTH SIDES (IMPACT RESISTANT RECOMMENDED) REFERENCE SECTION FOR FOUNDATION FINISH. 2" XPS INSULATION EXTENDED HORIZONTALLY FROM SLAB EDGE 24" MIN. (TYP.) 2" XPS INSULATION AT SLAB EDGE CONTINUOUS TO BOTTOM OF SLAB EDGE, CUT 45° ANGLE @ TOP OF INSULATION, FINISH WITH ALUMINUM FLASHING OVER INSULATION.(TYP.) Page 227 of 300 Date: 10/19/2026 Spirit of Brandtjen Farm Commercial 8th Addition - Release of Agreements Proposed Action Staff recommends adoption of the following motion: Move to approve the partial release of Development Contracts, CUP’s, Easements and Encroachment Agreements for the property at Lot 1, Block 1, Spirit of Brandtjen Farms Commercial 8th Addition. Overview The City has received a request to release and discharge certain agreements against Lot 1, Block 1, Spirit of Brandtjen Farms Commercial 8th Addition between 1993 – 2000. The agreements proposed for release are identified in the attached document prepared by the City Attorney. Since the agreements were originally approved, the property has been rezoned and the agreements are no longer applicable to the property. As a result, there is no longer a need to maintain these agreements as recorded encumbrances against the property. Supporting Information 1. DOCS-#240431-v1- RELEASE_OF_DEVELOPMENT_CONTRACTS_CONDITIONAL_USE_PERMITS Financial Impact: $ Budgeted: No Source: Envision Lakeville Community Values: Diversified Economic Development Report Completed by: Heather Botten, Senior Planner Page 228 of 300 240431v1 PARTIAL RELEASE OF DEVELOPMENT CONTRACTS, CONDITIONAL USE PERMITS, EASEMENTS AND ENCROACHMENT AGREEMENT Date: ________________, 2026 FOR VALUABLE CONSIDERATION, the real property in Dakota County, Minnesota, legally described as follows: Lot 1, Block 1, Spirit of Brandtjen Farm Commercial 8th Addition, Dakota County, Minnesota, according to the recorded plat thereof; is hereby permanently and forever released from the obligations, liens, encumbrances, restrictions, terms and conditions created by the following: a. Planned Unit Development Agreement Conditional Use Permit and Excavation Permit, filed August 12, 1993, as Abstract Document No. 1143318; b. Planned Unit Development Conditional Use Permit and Excavation Permit, filed June 8, 1994, as Abstract Document No. 1221449; c. Planned Unit Development Conditional Use Permit and Excavation Permit Amendment to Conditional Use Permit No. 97-07, filed May 20, 1997, as Abstract Document No. 1421688; d. Planned Unit Development Conditional Use Permit and Excavation Permit Amendment to Conditional Use Permit No. 98-18, filed July 14, 1998, as Abstract Document No. 1515868; and e. Planned Unit Development Agreement, filed July 17, 2000, as Abstract Document No. 1707621. Page 229 of 300 2 240431v1 CITY OF LAKEVILLE (Seal) By ____________________________________ Luke M. Hellier, Mayor By ____________________________________ Ann Orlofsky, City Clerk STATE OF MINNESOTA ) ) ss. COUNTY OF DAKOTA ) The foregoing instrument was acknowledged before me this _____ day of ____________, 2026, by Luke M. Hellier and Ann Orlofsky, respectively the Mayor and the City Clerk of the City of Lakeville, a Minnesota municipal corporation, on behalf of the corporation and pursuant to the authority granted by its City Council. ___________________________________ Notary Public DRAFTED BY: CAMPBELL KNUTSON, Professional Association Grand Oak Office Center I 860 Blue Gentian Road, Suite 290 Eagan, Minnesota 55121 Telephone: (651) 452-5000 AMP/smt Page 230 of 300 Date: 10/19/2026 Agreement with Pember Companies, Incorporated for King Park Field 6 Site Improvements Proposed Action Staff recommends adoption of the following motion: Move to approve Agreement with Pember Companies, Inc. for King Park Field 6 Site Improvements. Overview King Park Field 6 has been budgeted for site improvements in 2026. The 2026 Park Dedication Fund includes $170,000 for this project which consists of the removal, upgrade and replacement of the existing backstop, concrete maintenance strip, modular retaining wall, and pavement. Staff is seeking to replace the current backstop and sideline fencing with a 24-foot-tall backstop. The new backstop and fencing will provide additional protection for spectators needed during sporting events. Request for proposals were sent to three contractors. Pember Companies, Incorporated provided the low proposal in the amount of $214,213.30. Supporting Information 1. Agreement with Pember Companies, Incorporated for King Park Field 6 Site Improvements 2. Bid Abstract 3. Bid Tab Financial Impact: $214,213.30. Budgeted: Yes Source: Park Dedication Envision Lakeville Community Values: Envision Lakeville Community Values: Good Value for Public Services Report Completed by: Mark Kruse, Parks Superintedent Page 231 of 300 1 184651v1 FORM OF AGREEMENT BETWEEN CITY OF LAKEVILLE AND CONTRACTOR FOR NON-BID CONSTRUCTION CONTRACT THIS AGREEMENT made this nineteenth day of October, 2026, by and between the CITY OF LAKEVILLE, a Minnesota municipal corporation (“Owner” or “City”) and Pember Companies, Inc., a corporation (“Contractor”). Owner and Contractor, in consideration of the mutual covenants set forth herein, agree as follows: 1. CONTRACT DOCUMENTS. The following documents shall be referred to as the “Contract Documents”, all of which shall be taken together as a whole as the contract between the parties as if they were set verbatim and in full herein: A. This Agreement. B. The City’s Request for Proposal for King Park Field #6 Site Improvements, dated September 28, 2026. C. Specifications dated September 28, 2026 prepared by SRF Consulting Group, Inc. D. Contractor’s Proposal. In the event of a conflict among the provisions of the Contract Documents, the order in which they are listed above shall control in resolving any such conflicts. Contract Document “A” has the first priority and Contract Document “D” has the last priority. 2. OBLIGATIONS OF THE CONTRACTOR . The Contractor shall provide the goods, services, and perform the work in accordance with the Contract Documents. Contractor shall not begin any work until the City has received the signed contract and has reviewed and approved the insurance certificates and has given the Contractor a written notice to proceed. Contractor shall exercise the same degree of care, skill, and diligence in the performance of the services as is ordinarily possessed and exercised by a contractor under similar circumstances. City shall not be responsible for discovering deficiencies in the accuracy of Contractor’s services. This Contract may be terminated by the City at any time upon discovery by the City that the Contractor or any of its subcontractors has submitted a false statement under oath verifying compliance with any of the minimum criteria set forth in Minnesota Statute § 16C.285, Subdivision 3, the Responsible Contractor statute. 3. CONTRACT PRICE. Owner shall pay Contractor for completion of the Work, in accordance with the Contractor’s Proposal, per unit price. Additional work performed without the City’s written approval will not entitle Contractor to an increase in the Contract Price or an extension of the Contract Time. 4. PAYMENT PROCEDURES. A. Contractor shall submit Applications for Payment. Applications for Payment will be processed by the Parks Superintendent. Page 232 of 300 2 184651v1 B. Progress Payments; Retainage. Owner shall make 95% progress payments on account of the Contract Price on the basis of Contractor’s Applications for Payment during performance of the Work. C. Payments to Subcontractors. (1) Prompt Payment to Subcontractors. Pursuant to Minn. Stat. § 471.25, Subd. 4a, the Contractor must pay any subcontractor within ten (10) days of the Contractor’s receipt of payment from the City for undisputed services provided by the subcontractor. The Contractor must pay interest of 1 ½ percent per month or any part of a month to the subcontractor on any undisputed amount not paid on time to the subcontractor. The minimum monthly interest penalty payment for an unpaid balance of $100.00 or more is $10.00. For an unpaid balance of less than $100.00, the Contractor shall pay the actual penalty due to the subcontractor. (2) Form IC-134 (attached) required from general contractor. Minn. Stat. § 290.92 requires that the City of Lakeville obtain a Withholding Affidavit for Contractors, Form IC-134, before making final payments to Contractors. This form needs to be submitted by the Contractor to the Minnesota Department of Revenue for approval. The form is used to receive certification from the state that the vendor has complied with the requirement to withhold and remit state withholding taxes for employee salaries paid. D. Final Payment. Upon final completion of the Work, Owner shall pay the remainder of the Contract Price as recommended by the Parks Superintendent. Final completion shall be when all of the work is completed per the contract and 80% of the permanent cover is established, as determined by the Parks and Recreation Director. 5. COMPLETION DATE. The Work must be completed by November 20, 2026. 6. CONTRACTOR’S REPRESENTATIONS . A. Contractor has examined and carefully studied the Contract Documents and other related data identified in the Contract Documents. B. Contractor has visited the Site and become familiar with and is satisfied as to the general, local, and Site conditions that may affect cost, progress, and performance of the Work. C. Contractor is familiar with and is satisfied as to all federal, state, and local laws and regulations that may affect cost, progress, and performance of the Work. Page 233 of 300 3 184651v1 D. Contractor has carefully studied all: (1) reports of explorations and tests of subsurface conditions at or contiguous to the Site and all drawings of physical conditions in or relating to existing surface or subsurface structures at or contiguous to the Site (except Underground Facilities) which have been identified in the General Conditions and (2) reports and drawings of a Hazardous Environmental Condition, if any, at the site. E. Contractor has obtained and carefully studied (or assumes responsibility for doing so) all additional or supplementary examinations, investigations, explorations, tests, studies, and data concerning conditions (surface, subsurface, and Underground Facilities) at or contiguous to the Site which may affect cost, progress, or performance of the Work or which relate to any aspect of the means, methods, techniques, sequences, and procedures of construction to be employed by Contractor, including any specific means, methods, techniques, sequences, and procedures of construction expressly required by the Bidding Documents, and safety precautions and programs incident thereto. F. Contractor does not consider that any further examinations, investigations, explorations, tests, studies, or data are necessary for the performance of the Work at the Contract Price, within the Contract Times, and in accordance with the other terms and conditions of the Contract Documents. G. Contractor is aware of the general nature of work to be performed by Owner and others at the Site that relates to the Work as indicated in the Contract Documents. H. Contractor has correlated the information known to Contractor, information and observations obtained from visits to the Site, reports and drawings identified in the Contract Documents, and all additional examinations, investigations, explorations, tests, studies, and data with the Contract Documents. I. The Contract Documents are generally sufficient to indicate and convey understanding of all terms and conditions for performance and furnishing of the Work. J. Subcontracts: (1) Unless otherwise specified in the Contract Documents, the Contractor shall, upon receipt of the executed Contract Documents, submit in writing to the Owner the names of the Subcontractors proposed for the work. Subcontractors may not be changed except at the request or with the consent of the Owner. (2) The Contractor is responsible to the Owner for the acts and omissions of the Contractor's subcontractors, and of their direct and indirect Page 234 of 300 4 184651v1 employees, to the same extent as the Contractor is responsible for the acts and omissions of the Contractor's employees. (3) The Contract Documents shall not be construed as creating any contractual relation between the Owner and any subcontractor. (4) The Contractor shall bind every subcontractor by the terms of the Contract Documents. 7. WORKER’S COMPENSATION. The Contractor shall obtain and maintain for the duration of this Contract, statutory Worker’s Compensation Insurance and Employer’s Liability Insurance as required under the laws of the State of Minnesota. 8. INSURANCE. Prior to the start of the project, Contractor shall furnish to the City a certificate of insurance showing proof of the required insurance required under this Paragraph. Contractor shall take out and maintain or cause to be taken out and maintained until six (6) months after the City has accepted the public improvements, such insurance as shall protect Contractor and the City for work covered by the Contract including workers’ compensation claims and property damage, bodily and personal injury which may arise from operations under this Contract, whether such operations are by Contractor or anyone directly or indirectly employed by either of them. The minimum amounts of insurance shall be as follows: Commercial General Liability (or in combination with an umbrella policy) $2,000,000 Each Occurrence $2,000,000 Products/Completed Operations Aggregate $2,000,000 Annual Aggregate The following coverages shall be included: Premises and Operations Bodily Injury and Property Damage Personal and Advertising Injury Blanket Contractual Liability Products and Completed Operations Liability Automobile Liability $2,000,000 Combined Single Limit – Bodily Injury & Property Damage Including Owned, Hired & Non-Owned Automobiles Workers Compensation Workers’ Compensation insurance in accordance with the statutory requirements of the State of Minnesota, including Employer’s Liability with minimum limits are as follows: $500,000 – Bodily Injury by Disease per employee $500,000 – Bodily Injury by Disease aggregate $500,000 – Bodily Injury by Accident The Contractor’s insurance must be “Primary and Non-Contributory”. Page 235 of 300 5 184651v1 All insurance policies (or riders) required by this Contract shall be (i) taken out by and maintained with responsible insurance companies organized under the laws of one of the states of the United States and qualified to do business in the State of Minnesota, (ii) shall name the City, its employees and agents as additional insureds (CGL and umbrella only) by endorsement which shall be filed with the City. A copy of the endorsement must be submitted with the certificate of insurance. Contractor’s policies and Certificate of Insurance shall contain a provision that coverage afforded under the policies shall not be cancelled without at least thirty (30) days’ advanced written notice to the City, or ten (10) days’ notice for non-payment of premium. An Umbrella or Excess Liability insurance policy may be used to supplement Contractor’s policy limits on a follow-form basis to satisfy the full policy limits required by this Contract. 9. WARRANTY. The Contractor shall be held responsible for any and all defects in workmanship and materials which may develop in any part of the contracted service, and upon proper notification by the City shall immediately replace, without cost to the City, any such faulty work. 10. INDEMNIFICATION. To the fullest extent permitted by law, Contractor agrees to defend, indemnify and hold harmless the City, and its employees, officials, and agents from and against all claims, actions, damages, losses and expenses, including reasonable attorney fees, arising out of Contractor’s negligence or its performance or failure to perform its obligations under this Contract. Contractor’s indemnification obligation shall apply to subcontractor(s), or anyone directly or indirectly employed or hired by Contractor, or anyone for whose acts Contractor may be liable. Contractor agrees this indemnity obligation shall survive the completion or termination of this Contract. 11. PERFORMANCE AND PAYMENT BONDS. For a contract price of $175,000 or greater: Prior to commencement of work, Contractor shall furnish the City performance and payment bonds satisfying the requirements of Minnesota Statutes § 574.26 each in the amount of the contract price. 12. MISCELLANEOUS. A. Terms used in this Agreement have the meanings stated in the General Conditions. B. Owner and Contractor each binds itself, its partners, successors, assigns and legal representatives to the other party hereto, its partners, successors, assigns and legal representatives in respect to all covenants, agreements, and obligations contained in the Contract Documents. C. Any provision or part of the Contract Documents held to be void or unenforceable under any law or regulation shall be deemed stricken, and all remaining provisions shall continue to be valid and binding upon Owner and Contractor, who agree that the Contract Documents shall be reformed to Page 236 of 300 6 184651v1 replace such stricken provision or part thereof with a valid and enforceable provision that comes as close as possible to expressing the intention of the stricken provisions. D. Data Practices/Records. (1) All data created, collected, received, maintained or disseminated for any purpose in the course of this Contract is governed by the Minnesota Government Data Practices Act, Minn. Stat. Ch. 13, any other applicable state statute, or any state rules adopted to implement the act, as well as federal regulations on data privacy. (2) All books, records, documents and accounting procedures and practices to the Contractor and its subcontractors, if any, relative to this Contract are subject to examination by the City. E. All reports, plans, models, software, diagrams, analyses, and information generated in connection with performance of this Agreement shall be the property of the City. The City may use the information for its purposes. F. Patented devices, materials and processes. If the Contract requires, or the Contractor desires, the use of any design, devise, material or process covered by letters, patent or copyright, trademark or trade name, the Contractor shall provide for such use by suitable legal agreement with the patentee or owner and a copy of said agreement shall be filed with the Owner. If no such agreement is made or filed as noted, the Contractor shall indemnify and hold harmless the Owner from any and all claims for infringement by reason of the use of any such patented designed, device, material or process, or any trademark or trade name or copyright in connection with the Project agreed to be performed under the Contract, and shall indemnify and defend the Owner for any costs, liability, expenses and attorney's fees that result from any such infringement. G. In providing services hereunder, Contractor shall abide by all statutes, ordinances, rules and regulations pertaining to the provisions of services to be provided. H. Assignment. Neither party may assign, sublet, or transfer any interest or obligation in this Contract without the prior written consent of the other party, and then only upon such terms and conditions as both parties may agree to and set forth in writing. I. Waiver. In the particular event that either party shall at any time or times waive any breach of this Contract by the other, such waiver shall not constitute a waiver of any other or any succeeding breach of this Contract by Page 237 of 300 7 184651v1 either party, whether of the same or any other covenant, condition or obligation. J. Governing Law/Venue. The laws of the State of Minnesota govern the interpretation of this Contract. In the event of litigation, the exclusive venue shall be in the District Court of the State of Minnesota for Dakota County. K. Severability. If any provision, term or condition of this Contract is found to be or become unenforceable or invalid, it shall not affect the remaining provisions, terms and conditions of this Contract, unless such invalid or unenforceable provision, term or condition renders this Contract impossible to perform. Such remaining terms and conditions of the Contract shall continue in full force and effect and shall continue to operate as the parties’ entire contract. L. Entire Agreement. This Contract represents the entire agreement of the parties and is a final, complete and all-inclusive statement of the terms thereof, and supersedes and terminates any prior agreement(s), understandings or written or verbal representations made between the parties with respect thereto. M. Permits and Licenses; Rights-of-Way and Easements. The Contractor shall give all notices necessary and incidental to the construction and completion of the Project. The City will obtain all necessary rights-of-way and easements. The Contractor shall not be entitled to any additional compensation for any construction delay resulting from the City’s not timely obtaining rights-of-way or easements. N. If the work is delayed or the sequencing of work is altered because of the action or inaction of the Owner, the Contractor shall be allowed a time extension to complete the work but shall not be entitled to any other compensation. P. Records/Audit. The Contractor shall maintain complete and accurate records of time and expense involved in the performance of services. Pursuant to Minnesota Statutes § 16C.05, Subd. 5, any books, records, documents, and accounting procedures and practices of City and Contractor relevant to the Agreement are subject to examination by City and Contactor, and either the Legislative Auditor or the State Auditor as appropriate. City and Contractor agree to maintain these records for a period of six years from the date of performance of all services covered under this Agreement. 13. TERMINATION. Page 238 of 300 Page 239 of 300 King Park Field #6 Site Improvements Quote Abstract City of Lakeville SRF Consulting Group, Inc. Project No. 18436 October 14, 2026 Unit Price Total Unit Price Total Unit Price Total (in Dollars) (In Dollars) (in Dollars) (In Dollars) (in Dollars) (In Dollars) 1 Mobilization 1 LS $12,000.00 $12,000.00 $14,700.00 $14,700.00 $24,245.00 $24,245.00 2 Provide all necessary construction surveying and staking to meet layout and grading requirements for all work - complete. 1 LS $3,000.00 $3,000.00 $3,179.00 $3,179.00 $2,500.00 $2,500.00 3 Remove chain link fencing as shown on the plans, including fabric, posts, and footings as encountered – complete. 1 LS $4,000.00 $4,000.00 $2,200.00 $2,200.00 $10,240.00 $10,240.00 4 Salvage exisiting metal dugout roof, complete. 1 LS $5,000.00 $5,000.00 $3,850.00 $3,850.00 $2,500.00 $2,500.00 5 Remove concrete pavement as shown on the plans including concrete maintenance strip and pads 675 SF $3.50 $2,362.50 $6.27 $4,232.25 $2.75 $1,856.25 6 Remove bituminous pavement as shown on the plans including saw cutting – complete.155 SY $9.00 $1,395.00 $12.10 $1,875.50 $12.15 $1,883.25 7 Remove modular block retaining wall – complete.1 LS $2,000.00 $2,000.00 $2,500.00 $2,500.00 $2,200.00 $2,200.00 8 Remove timber retaining wall – complete. 1 LS $1,500.00 $1,500.00 $1,000.00 $1,000.00 $1,500.00 $1,500.00 9 Remove existing drainage structure and abandon outlet pipe – complete.1 LS $1,000.00 $1,000.00 $1,663.26 $1,663.26 $650.00 $650.00 10 *On-site earthwork as required to achieve plan grades and on-site earthwork balance - complete, including 1) stripping and stockpiling of topsoil; 2) common excavation of subsoil materials to subgrade elevations identified for paving areas and; 3) maintenance of grades throughout construction including all silt fence, bio rolls, or other approved method; 4) final grading to specified tolerances -complete 1 LS $8,000.00 $8,000.00 $3,700.00 $3,700.00 $17,500.00 $17,500.00 11 Furnish and install bio-rolls 395 LF $3.50 $1,382.50 $5.00 $1,975.00 $3.85 $1,520.75 12 Furnish and install 4” perforated HDPE drain tile with fine filter aggregate wrapped in geotextile fabric on all sides - complete. 67 LF $26.00 $1,742.00 $26.04 $1,744.68 $25.35 $1,698.45 Pember Companies, Inc.KING PARK FIELD #6 SITE IMPROVEMENTS – QUOTE ABSTRACT October 14, 2026 Engineer's Estimate UNIT LEGENDS: LS=Lump Sum, SF=Square Feet, SY=Square Yards, EA=Each, LF=Lineal Foot, FF=Face Feet, CY=Cubic Yards No. Item - Description Estimated Qty.Unit Friedges Landscaping Inc. Page 1 of 2 Page 240 of 300 King Park Field #6 Site Improvements Quote Abstract City of Lakeville SRF Consulting Group, Inc. Project No. 18436 October 14, 2026 13 Furnish and install 6” dia. HDPE drainage pipe including all fittings and connection to existing outlet pipe – complete. 305 LF $22.00 $6,710.00 $19.76 $6,026.80 $34.50 $10,522.50 14 Furnish and install 18” turf catch basin including casting and grate – complete.1 EA $2,200.00 $2,200.00 $1,765.01 $1,765.01 $2,250.00 $2,250.00 15 Furnish and install 15” square catch basin including casting and grate – complete.1 EA $1,900.00 $1,900.00 $1,534.59 $1,534.59 $2,000.00 $2,000.00 16 Furnish and install 3" thick bituminous trail including 6" compacted Class V aggregate base - complete. Includes bituminous curb along south side of main trail. 280 SY $45.00 $12,600.00 $40.70 $11,396.00 $64.00 $17,920.00 17 Furnish and install 5” thick concrete walk including 6” compacted depth Class 5 aggregate base -complete. 410 SF $11.00 $4,510.00 $18.00 $7,380.00 $14.35 $5,883.50 18 Furnish and install 16” wide concrete maintenance strip.156 LF $32.00 $4,992.00 $43.70 $6,817.20 $26.00 $4,056.00 19 Furnish and install 8” wide x 18” high concrete curb (behind retaining wall) – complete.52 LF $34.00 $1,768.00 $64.90 $3,374.80 $78.50 $4,082.00 20 Furnish and install big block retaining wall including structural soil geogrid (as required), type V geotextile fabric, and crushed drainage stone – complete. FF quantity represents exposed wall face. Does not include below ground quantity. 108 FF $130.00 $14,040.00 $241.30 $26,060.40 $161.00 $17,388.00 21 Furnish and install 24’ high chain link backstop/foul line fencing as shown on the plans and details. 154 LF $250.00 $38,500.00 $555.50 $85,547.00 $411.50 $63,371.00 22 Furnish and install 8’ high chain link fence (dugout) including gate, concrete footings, and connection to foul line fence - complete. 54 LF $110.00 $5,940.00 $99.00 $5,346.00 $121.00 $6,534.00 23 Furnish and install 5’ high chain link fence including concrete footings - complete.25 LF $55.00 $1,375.00 $60.50 $1,512.50 $106.10 $2,652.50 24 Re-install metal dugout roof including all required footings, columns, and integration into proposed fencing. 1 LS $10,000.00 $10,000.00 $8,800.00 $8,800.00 $2,560.00 $2,560.00 25 Furnish and install 10’ long surface mounted players bench - complete.2 EA $1,850.00 $3,700.00 $1,835.00 $3,670.00 $2,100.00 $4,200.00 26 Furnish and install general turf seed mix as shown on the plans and specifications, including Category 20 erosion control blanket (all disturbed areas) - complete. 0.1 AC $15,000.00 $1,500.00 $25,000.00 $2,500.00 $25,000.00 $2,500.00 $153,117.00 $214,349.99 $214,213.20 TOTAL QUOTE: Page 2 of 2 Page 241 of 300 QUOTE OPENING CITY OF LAKEVILLE King Park Field #6 Site Improvements Thursday, October 14, 2026 – 4:00 p.m. Contractor RCVF Quote Pember Companies, Inc. X $214,213.30 Friedges Landscaping Inc. X $214,349.99 Engineer’s Estimate $153,117.00 H:\Projects\18000\18436\TechData\DeliverablesDocs\18436_King Park Field #6_Bid Tab_101426.docx Page 242 of 300 Date: 10/19/2026 Discuss Local Affordable Housing Aid (LAHA) Proposed Action Staff recommends adoption of the following motion: Provide direction to staff on distribution of LAHA funds. Overview The 2023 Legislature passed a housing bill with $1 billion in new funding for various housing programs. The Legislature appropriated state funds for the programs and established a metro wide sales tax for housing needs, including a portion of this tax as local housing aid for metropolitan cities. The new law establishes a 0.25% metropolitan regional sales tax, with a portion of the proceeds allocated to metropolitan cities over 10,000 in population. Lakeville received a distribution of aid under this legislation of $229,464 in 2024. Lakeville’s 2025 allocation was $635,458 and the 2026 allocation is $693,945.96. Cities can use this aid for emergency rental assistance, costs of operating emergency facilities, financial support to nonprofit affordable housing providers, and projects for the construction, acquisition, rehabilitation, demolition or removal of existing structures, construction financing, permanent financing, interest rate reduction, refinancing, and gap financing of housing. Cities will be able to use this aid only for affordable housing assistance to households at 115 percent of the area median income (AMI) for homeownership projects, and 80 percent AMI for rental housing projects. For a household of four, 115% AMI is $151,250 and at 80% AMI is $105,200 (2026 income guidelines). Cities must spend this aid by December 31st in the fourth year following the year after the aid was received. Funds must be committed within three years. Beginning in 2025, cities must submit an annual report with documentation on any unspent funds, and documentation of qualifying projects completed or planned. Uses of Funds Lakeville collaborated with the Dakota County CDA to administer our 2024 and 2025 funds. The CDA identified two programs which build upon existing CDA programs and which the CDA could efficiently administer on cities’ behalf: Page 243 of 300 • Enhanced single-family home improvement loan program (combined with radon mitigation) which would increase the number of homes improved from 60-70 per year to 115-120 per year countywide. Radon mitigation grant program which would provide funds for radon testing and mitigation in at least 40 homes per year countywide. These two programs are proposed to be combined to ensure funding is spent in a timely manner. A radon test is conducted for each improvement loan candidate with funds automatically provided if a radon mitigation is required based on test results. While funds remain from 2024 and 2025 for this program, the CDA would like to build on the success of 2024 and 2025 and continue collaboration on administering the housing preservation program and is requesting a commitment of $250,000 of the 2026 allocation. To date 16 families have been served, with LAHA funds (CDA also uses CDBG funds for this program) with several in process. Both the City and CDA will increase its advertising and prepare direct notices to older neighborhoods in Lakeville to ensure this funding is utilized. If the City Council supports this request, the city will have the remaining $443,945.96 to commit to a qualifying project(s). Considering this, staff has continued conversations with the CDA to build a senior apartment building on a portion of the remaining Fischer property recently purchased. We are anticipating a letter of intent to purchase one of the remaining outlots for 2028 construction. Remaining funds could be used to support the construction of this building, including extension of utilities that will serve the entire site. Funds could also be used for other qualifying projects based on State Statute (attached). The City could also hold the funds for future gap financing for future affordable housing development. Policy Questions 1. Does the City Council support collaboration with the Dakota County CDA for continued administration of the Home Improvement Loan Program/Radon Mitigation Grant Program? 2. Does the city support setting aside funds for the construction costs related to the future construction of a senior housing building by the CDA? Supporting Information 1. Lakeville_LAHA_Agreement 2. 2026-Area-Median-Income-Guidelines-NWHP-1-6 3. State Statute Page 244 of 300 Financial Impact: $250,000 LAHA funds commitment to CDA Budgeted: No Source: Envision Lakeville Community Values: A Home for All Ages and Stages of Life Report Completed by: Tina Goodroad, Community Development Director Page 245 of 300 EXHIBIT B TO SUBRECIPIENT AGREEMENT DAKOTA COUNTY COMMUNITY DEVELOPMENT AGENCY (CDA) AND THE CITY OF LAKEVILLE Local Affordable Housing Aid (LAHA) funds will be committed to the following Qualifying Projects. Exhibit B will be amended on an annual basis, or as needed, through the term of this Agreement. CURRENT ALLOCATION YEAR - 2026 All funds must be committed by December 31, 2029, and fully expended by December 31, 2030 Qualifying Project 1: HOME IMPROVEMENT LOAN PROGRAM – Administered by CDA o Description: The Home Improvement Loan Program assists low and moderate-income homeowners in improving and maintaining their homes in a decent, safe, and sanitary condition. The program offers deferred loans up to $35,000 with zero percent interest rates to homeowners earning 115 percent or below area median income, and prioritizing homeowners with incomes at or below 80 percent area median income. o Schedule: Ongoing o Budget: $250,000.00 Qualifying Project 2: RADON TESTING AND MITIGATION GRANT PROGRAM – Administered by CDA o Description: The Radon Testing and Mitigation Grant Program assists clients of the Home Improvement Loan Program with free radon testing and installation of a mitigation system, if needed. Clients will receive free radon tests to be performed by professional radon testing providers. Clients whose homes have radon levels greater than 4.0 pCi/L (picocuries of radon per liter of air) will receive a mitigation system. Every effort will be made to ensure the radon levels in the subject homes post-mitigation will not exceed 2.0 pCi/L. o Schedule: Ongoing o Budget: Combined with Home Improvement Loan Program budget Page 246 of 300 ALLOCATION YEAR – 2025 All funds must be committed by December 31, 2028, and fully expended by December 31, 2029 Qualifying Project 1: HOME IMPROVEMENT LOAN PROGRAM – Administered by CDA o Description: The Home Improvement Loan Program assists low and moderate-income homeowners in improving and maintaining their homes in a decent, safe, and sanitary condition. The program offers deferred loans up to $35,000 with zero percent interest rates to homeowners earning 115 percent or below area median income, and prioritizing homeowners with incomes at or below 80 percent area median income. o Schedule: Ongoing o Remaining Budget as of October 1, 2026: $188,968 Qualifying Project 2: RADON TESTING AND MITIGATION GRANT PROGRAM – Administered by CDA o Description: The Radon Testing and Mitigation Grant Program assists clients of the Home Improvement Loan Program with free radon testing and installation of a mitigation system, if needed. Clients will receive free radon tests to be performed by professional radon testing providers. Clients whose homes have radon levels greater than 4.0 pCi/L (picocuries of radon per liter of air) will receive a mitigation system. Every effort will be made to ensure the radon levels in the subject homes post-mitigation will not exceed 2.0 pCi/L. o Schedule: Ongoing o Budget: Combined with Home Improvement Loan Program budget ALLOCATION YEAR – 2024 All funds must be committed by December 31, 2027, and fully expended by December 31, 2028 Qualifying Project 1: HOME IMPROVEMENT LOAN PROGRAM – Administered by CDA • Description: The Home Improvement Loan Program assists low and moderate- income homeowners in improving and maintaining their homes in a decent, safe, and sanitary condition. The program offers deferred loans up to $35,000 with zero percent interest rates to homeowners earning 115 percent or below area median Page 247 of 300 income, and prioritizing homeowners with incomes at or below 80 percent area median income. • Schedule: Ongoing • Remaining Budget as of October 1, 2026: $76,376.84 Qualifying Project 2: RADON TESTING AND MITIGATION GRANT PROGRAM – Administered by CDA o Description: The Radon Testing and Mitigation Grant Program assists clients of the Home Improvement Loan Program with free radon testing and installation of a mitigation system, if needed. Clients will receive free radon tests to be performed by professional radon testing providers. Clients whose homes have radon levels greater than 4.0 pCi/L (picocuries of radon per liter of air) will receive a mitigation system. Every effort will be made to ensure the radon levels in the subject homes post-mitigation will not exceed 2.0 pCi/L. o Schedule: Ongoing o Remaining Budget as of October 1, 2026: Combined with Home Improvement Loan Program budget Page 248 of 300 2026 Area Median Income Guidelines – Minneapolis -St. Paul -Bloomington Effective May 26th, 2026 Household Size AMI% 1 2 3 4 5 6 7 8 30% 27,650 31,600 35,550 39,450 42,650 45,800 50,040 55,720 50% 46,050 52,600 59,200 65,750 71,050 76,300 81,550 86,800 60% 55,250 63,100 71,000 78,900 85,200 91,500 97,850 104,150 80% 73,650 84,200 94,700 105,200 113,650 122,050 130,450 138,900 100% 92,050 105,200 118,350 131,500 142,000 152,550 163,050 173,600 115% 105,900 121,000 136,150 151,250 163,350 175,450 187,550 199,650 120% 110,500 126,250 142,000 157,800 170,400 183,050 195,650 208,300 130% 119,650 136,750 153,850 170,950 184,650 198,300 212,000 225,650 Page 249 of 300 477A.35 Local Affordable Housing Aid (2025 Minnesota Statutes) Subd. 4.Qualifying projects. (a) Qualifying projects include: (1) emergency rental assistance for households earning less than 80 percent of area median income as determined by the United States Department of Housing and Urban Development; (2) financial support to nonprofit affordable housing providers in their mission to provide safe, dignified, affordable and supportive housing; (3) projects designed for the purpose of construction, acquisition, rehabilitation, demolition or removal of existing structures, construction financing, permanent financing, interest rate reduction, refinancing, and gap financing of housing to provide affordable housing to households that have incomes which do not exceed, for homeownership projects, 115 percent of the greater of state or area median income as determined by the United States Department of Housing and Urban Development, and for rental housing projects, 80 percent of the greater of state or area median income as determined by the United States Department of Housing and Urban Development, except that the housing developed or rehabilitated with funds under this section must be affordable to the local work force; (4) financing the operations and management of financially distressed residential properties; (5) funding of supportive services or staff of supportive services providers for supportive housing as defined by section 462A.37, subdivision 1. Financial support to nonprofit housing providers to finance supportive housing operations may be awarded as a capitalized reserve or as an award of ongoing funding; and (6) costs of operating emergency shelter facilities, including the costs of providing services. (b) Recipients must prioritize projects that provide affordable housing to households that have incomes which do not exceed, for homeownership projects, 80 percent of the greater of state or area median income as determined by the United States Department of Housing and Urban Development, and for rental housing projects, 50 percent of the greater of state or area median income as determined by the United States Department of Housing and Urban Development. Priority may be given to projects that: reduce disparities in home ownership; reduce housing cost burden, housing instability, or homelessness; improve the habitability of homes; create accessible housing; or create more energy- or water-efficient homes. (c) Gap financing is either: (1) the difference between the costs of the property, including acquisition, demolition, rehabilitation, and construction, and the market value of the property upon sale; or Page 250 of 300 (2) the difference between the cost of the property and the amount the targeted household can afford for housing, based on industry standards and practices. (d) If aid under this section is used for demolition or removal of existing structures, the cleared land must be used for the construction of housing to be owned or rented by persons who meet the income limits of paragraph (a). (e) If an aid recipient uses the aid on new construction of a building containing more than four units, the loan recipient must construct, convert, or otherwise adapt the building to include: (1) the greater of: (i) at least one unit; or (ii) at least five percent of units that are accessible units, and each accessible unit includes at least one roll-in shower, water closet, and kitchen work surface meeting the requirements of section 1002 of the current State Building Code Accessibility Provisions for Dwelling Units in Minnesota; and (2) the greater of: (i) at least one unit; or (ii) at least five percent of units that are sensory- accessible units that include: (A) soundproofing between shared walls for first and second floor units; (B) no florescent lighting in units and common areas; (C) low-fume paint; (D) low-chemical carpet; and (E) low-chemical carpet glue in units and common areas. Nothing in this paragraph relieves a project funded by this section from meeting other applicable accessibility requirements. Page 251 of 300 Date: 10/19/2026 Streetlight Policy Review Proposed Action Staff recommends adoption of the following motion: No action required - staff is seeking input from the City Council. Overview Staff will give a brief overview of the streetlight system and proposed changes to the streetlight policy. Supporting Information 1. Backgroud 2. Draft Streetlight Policy Financial Impact: N/A Budgeted: Yes Source: Streetlight Fund Envision Lakeville Community Values: Design that Connects the Community Report Completed by: Paul Oehme, Public Works Director Page 252 of 300 Background On January 7, 1991, the City Council adopted the recommendations of the streetlight study, Reflections on Light Waves. This marked the first update to the City’s street lighting policy, originally approved in 1978. The 1991 update recognized residential street lighting as a shared benefit that promotes safety and security. It also replaced the separate rates for Dakota Electric and Northern States Power customers with a single rate for all residents and changed the commercial and industrial rate from a flat fee per account to a charge based on street frontage. Lakeville now manages over 8,050 lights in the community. Since the policy has not been reviewed in 35 years staff feels updates should be considered to better reflect operations, funding, or infrastructure replacement for a city of Lakeville’s size and growth trajectory. Over the past several months, staff has reviewed current conditions, utility agreements, peer city practices, and funding structures. This background summarizes key findings and presents changes the City Council to consider. Current State of the Streetlight System Utility Partnerships The City contracts with both Xcel Energy and Dakota Electric Association (DEA) for streetlight maintenance and operations. Xcel Energy: There are 1,286 streetlights in the Xcel Energy territory. Most of these lights were installed with new developments under the 25-year pre-pay agreements. Once the 25-year agreement expires, the City bears 100% of replacement costs — including poles, fixtures, cable, and underground wiring. There are currently 218 streetlights older than 25 years old. Most of Xcel’s streetlights have been replaced with LED lights. Dakota Electric Association (DEA): There are 5,690 streetlights in the DEA territory. DEA currently maintains their streetlights in perpetuity. New streetlights installed have the LED lights. Other items of note on DEA streetlight program: • DEA will no longer install lights on trails or outside the public right-of-way, effective with a formal policy change. This change is due to maintenance challenges including limited access, overgrown vegetation and potential damage to trail pavement from heavy equipment. • DEA does not proactively replace high-pressure sodium (HPS) fixtures with LED — replacements occurs as needed on failure equipment. • DEA is evaluating a potential system-wide HPS-to-LED conversion but no decision has been made. • DEA inspects streetlights on a five-year cycle and maintains a GIS-based outage reporting tool. Infrastructure Age & Capital Liability • Currently there are 218 streetlights older than 25 years in the Xcel territory and many more streetlights will be over 25 years old in the next 5 years. • Replacement costs have increase over the past 5 years and can be as high as $10,000 per light • Replacement costs include poles, fixtures, and underground electrical infrastructure. Streetlight Fund • Annual streetlight fee revenue: approximately $1.4M • The Street light budget allocates $250,000 annually for replacements • The current fee structure primarily covers operating costs (electricity, maintenance) with a modest replacement reserve. • Staff has reviewed parcel data and compared it with accounts that are currently being charged a streetlight fee. There are over 1,690 parcels not currently being charged a streetlight fee that should be charged based on benefit. This has an approximate impact of an additional $71,000+ revenues for the Streetlight Fund. Page 253 of 300 Policy Comparison Staff benchmarked Lakeville against five peer Minnesota cities: Eagan, Woodbury, Plymouth, Maple Grove, and Apple Valley. Lakeville is an outlier in nearly every policy category: Policy Element Lakeville Peer Cities (Eagan, Woodbury, Plymouth, Maple Grove & Apple Valley) Formal streetlight policy 1991 study only All 5 peers have modern operational policies Street classification lighting standards Included All 5 peers have defined spacing/illumination standards Lighting design standards Needs updating All 5 peers have design standards manuals LED/modern fixture standards Outdated All 5 peers have LED standards or conversions underway Developer installation requirements Included All 5 peers require developer installation Resident request/petition process Included 4 of 5 peers have formal request procedures Trail/park/pedestrian lighting standards Not addressed 4 of 5 peers address pedestrian lighting Policy review/update mechanism Needs updating All 5 peers have a review cycle Street Light Fee Comparison — Twin Cities Suburbs Data compiled May 2026 | Based on 2025–2026 adopted utility rate schedules City Fee (Residential SF) Est. Annual Cost Rate Calculation Method Notes / Structure Apple Valley $8.25/unit/qtr ~$33.00 Flat per unit Single-family, duplex, townhomes ≤8 units. Multi-family (>8 units, apts, condos, mobile homes) = $2.48/unit/month. Commercial calculated individually on residential equivalents. Burnsville $3.31/Month ~$39.72 Per Utility account Fees are broken out for Continuous St Lighting and Major Rdwy Lighting. Eagan $3.30/qtr or $12.21/qtr $13.20– $48.84 Two-tier: universal base + neighborhood All residential & business accounts pay $3.30/qtr Community Streetlight & signal fee. Residents with neighborhood lighting also pay $8.91/qtr Neighborhood fee. Max combined = $12.21/qtr. Lakeville $10.63/qtr per dwelling ~$42.52 Fee schedule line item Streetlights are billed quarterly alongside water, sewer, and env.rsrcs. Maple Grove $9.20/qtr per REU ~$36.80 Per-REU cost pass- through (electric bill proration) Residential: flat $9.20/qtr per REU. Non-residential: per- 1,000 sq.ft. across 3 rate tiers (Rate A: $1.53; Rate B: $0.70; Rate C: $0.43/qtr). Rate is prorated from city's total Xcel/CenterPoint streetlight electric bill. Savage $4.00/month ~$48.00 Flat per account Flat monthly streetlight fee billed on all residential utility accounts alongside water, sewer, stormwater, and MDH fee. Page 254 of 300 Woodbury $12.00/qtr (lighted) or $4.00/qtr (non-lighted) $16–$48 Two-tier: lighted vs. non-lighted property Lighted residential properties (streetlights adjacent to property) pay $12/qtr. Non-lighted properties pay $4/qtr. Non-residential rates based on property size. Rate reflects Xcel pass-through + depreciation. Updated after a formal rate equity study. The following cities fund their streetlight costs through property taxes and report in the General Fund: Blaine, Bloomington, Chanhassen, Eden Prairie, Plymouth and Prior Lake. Suggested Policy Changes Suggested Policy Changes Options / Considerations Trail and Parking lot lights paid through Street light fund The City may want to fund all trails and parking lots through the lighting fund instead of out the general fund. Address inconsistencies in streetlight utility billing Streetlight utility billing is currently applied inconsistently across some residential areas. It is recommended to revise the policy to apply streetlight utility charges uniformly to all utility accounts citywide. Update Policy based on identified policy gaps The Streetlight policy has not been updated since 1991. Staff is recommending updating the policy based on identified policy gaps. Recommended Next Steps Staff would like to receive comments from the City Council and gather more information on the suggested policy changes. Page 255 of 300 CITY OF LAKEVILLE Draft - RESOLUTION NO. 26-____ RESOLUTION ESTABLISHING THE CITY OF LAKEVILLE STREETLIGHT POLICY WHEREAS, the City of Lakeville has provided streetlight service in various areas of the City, and the growth of the City and rising costs of electrical energy, maintenance, and infrastructure replacement have significantly increased the City’s financial obligations; and WHEREAS, the City’s streetlight system currently consists of approximately 8,050 lights with service provided through contractual agreements with Xcel Energy and Dakota Electric Association (DEA); and WHEREAS, Resolution No. 78-3 (January 16, 1978) established the City’s original streetlight policy, and Resolution No. 91-07 (January 7, 1991) adopted a streetlight study and established rates; and WHEREAS, City Code Section 7-3-5-4 provides that charges for street lighting shall be made against all property benefited by the streetlights, at rates established by resolution of the City Council; and WHEREAS, the City Council finds that streetlighting on residential streets, collector and arterial roadways, intersections, and trails promotes pedestrian and traffic safety and personal and property security, and benefits all properties within the City; and WHEREAS, those resolutions have not been comprehensively updated in over 35 years and should be updated to reflect the City’s current infrastructure, technology, funding needs, utility partnerships, and operational practices; and WHEREAS, staff has reviewed current conditions, utility agreements, peer city practices, and funding structures and has recommended updates to better reflect Lakeville’s current size, growth trajectory, and long-term capital obligations; and WHEREAS, the City Council finds it necessary and appropriate to consolidate and replace the prior streetlight resolutions with a single updated policy; NOW THEREFORE BE IT RESOLVED by the City Council of the City of Lakeville, Minnesota that the following streetlight policy is hereby adopted, superseding Resolution No. 78-3 and Resolution No. 91-07 in their entirety: SECTION 1. DEVELOPMENT REQUIREMENTS 1. Any new residential, commercial, or industrial development shall have a streetlight plan prepared by the developer and submitted as part of the development plans. Said plan must be approved by the City Council, and the costs of the approved installation shall be paid by the developer. Page 256 of 300 2. Developer installed lights for new subdivisions shall be established in development contracts consistent with City Engineer specifications and these policies. Streetlights shall be installed and activated in accordance with the development contract timeline. SECTION 2. STREETLIGHTS IN EXISTING AREAS 3. Any area of the City already developed but without streetlighting may have streetlights installed if a majority of property owners submit a formal petition for streetlight improvements. The cost of installation shall be assessed or billed to the benefiting property in accordance with applicable law. 4. The City shall maintain a resident request and petition process for streetlight service that is transparent, accessible, and consistently applied citywide. 5. Adding trail and parking lot lights will not go through a petition process. City staff will review if lights are needed and will make a recommendation to the City Council if lights should be added. SECTION 3. STREETLIGHT UTILITY BILLING 6. Streetlight utility charges shall be applied uniformly to all utility accounts citywide. All residential properties within the City limits shall be assessed the same residential rate per unit, regardless of the utility provider serving the property (Xcel Energy or Dakota Electric Association), dwelling type, or occupancy. 7. Multiple-family residential dwellings shall be billed on a per-unit basis at the same rate as single-family dwellings. 8. Commercial and industrial properties shall be billed on a per-front-foot basis in accordance with the City’s fee schedule. Institutional land uses (including schools and churches) shall be billed on the same basis as commercial/industrial properties. 9. Streetlight utility rates shall be reviewed annually as part of the City’s fee schedule process and set by resolution of the City Council. The rate structure shall reflect the full cost of operations, maintenance, and capital replacement needs. 10. City staff shall review streetlight billing periodically and at least every five (5) years, to ensure that all property owners benefiting from streetlights are being billed in accordance with this policy. As part of this review, Public Works and Finance shall reconcile streetlight installations and activations with utility billing records and correct any accounts found not to be billed. SECTION 4. CITY-FUNDED STREETLIGHTS 11. On any public right-of-way including a street intersection or along a State or County highway where the City Council determines that a higher level of streetlighting is required to protect the public health, safety, and welfare, the installation, monthly energy and maintenance cost for lighting shall be funded by Page 257 of 300 the City from its streetlight utility fund or General Fund, as determined by the City Council. 12. Trail lighting, pedestrian path lighting, and parking lot lighting on City property shall be funded through the streetlight utility fund or through the relevant departmental fund as determined by the City Council. SECTION 5. FIXTURE STANDARDS AND ENGINEERING DESIGN 13. All new streetlights installed in the City shall use LED fixtures meeting current energy efficiency and lighting quality standards. High-pressure sodium (HPS) and other legacy fixture types shall be replaced with LED on a planned lifecycle basis or upon failure. 14. Spacing, illumination levels, and fixture specifications for streetlights by street classification shall be established in the City’s Engineering Design Standards, as developed by the City Engineer and approved by the City Council. 15. The City shall coordinate with Xcel Energy and Dakota Electric Association to ensure utility partners understand and comply with City streetlight standards. Staff shall update City streetlight practices as the utilities’ maintenance and installation policies change. SECTION 6. CAPITAL REPLACEMENT AND INFRASTRUCTURE LIFECYCLE 16. For streetlights in the Xcel Energy territory where 25-year prepay agreements have expired or will expire, the City bears full replacement costs including poles, fixtures, cable, and underground wiring. The street light budget shall include adequate funding to address known and projected replacement obligations on a planned basis. 17. Streetlight replacement reserve targets shall be incorporated into the City’s annual budget and CIP. Annual streetlight fee revenue and reserve levels shall be reviewed as part of the fee schedule process to ensure funding adequacy. SECTION 7. POLICY REVIEW 1. This policy shall be reviewed at least every five (5) years by City staff and presented to the City Council for update as needed to reflect changes in technology, utility agreements, state law, community growth, and best practices among peer cities. BE IT FURTHER RESOLVED that Resolution No. 78-3 (January 16, 1978) and Resolution No. 91-07 (January 7, 1991) are hereby repealed and superseded in their entirety by this resolution. BE IT FURTHER RESOLVED that this resolution shall be effective upon adoption. Page 258 of 300 APPROVED AND ADOPTED by the City Council of the City of Lakeville, Minnesota this ______ day of _____________, 20__. City of Lakeville By: _____________________________________ Luke Hellier, Mayor Attest: __________________________________ Ann Orlofsky, City Clerk Page 259 of 300 Page 1 Date: 10/19/2026 Proposed 2027 Enterprise Fund Budgets & Utility Rate Projections Proposed Action: Staff is seeking direction from the Council regarding: • Planned/proposed Utility fund budgets and 2027 rate recommendations • Proposed 2027 Liquor fund budget Overview The rate changes for 2027 include a 6% increase to Water rates, 2% increase to Sewer rates, 7% increase to the Environmental Resources rate, and 2% for the Street Light rate. The 10-year projections are included by Fund and incorporate the anticipated revenues from the 2027 rate changes, proposed 2027 budgets, staff projections for future years, and the Capital Improvement Plan. Program Summary Cash targets One of the financial targets is a certain level of unassigned cash by fund at the end of each year. For Water and Sanitary Sewer, this amount is currently $500,000. For Street Lights and Environmental Resources, the amount is currently $100,000. Our model also includes an estimate of planned capital expenditures for the following year when calculating the amount of cash on hand needed at the end of each period. Many of the City’s capital improvement projects are led and/or influenced by the County, and although we determine jointly what needs to be replaced, the cost is somewhat out of our control, and the level of predictability in our costs is reduced. We have included estimates of the utility costs related to these projects; however, some costs are unknown until the project is underway. At some point in the future, we may desire to increase the unassigned cash targets beyond $500,000 and $100,000. Risks The projected cash and revenue amounts by year can vary significantly from actuals depending on weather and usage. The 10-year projections discussed and portrayed in charts below are based on our predictions at a point in time, and our best guess of normal volumes based on our historical data. Effective 1/1/2023, Lakeville implemented four separate water tiers, when historically it was three tiers. In October 2024, Lakeville transitioned to a new Utility Billing system. This impacts the consistency of reports we have available to analyze the data, and limits the number of years of historical data we can review based on the new tier system Therefore, our assumption of “normal” volume levels may shift over time as we progress under the new tier structure, in combination of whether a year has more or less rainfall, and as we have more data in the new utility billing system to analyze. Aging infrastructure Page 260 of 300 Page 2 The 10-year rate projections include estimates for replacement or upgrade of aging utilities infrastructure. The chart below includes various statistics related to the current utility infrastructures, and illustrates the significant cost involved in maintaining the infrastructure. Infrastructure item: Statistic Water Water mains (miles) 401 Fire hydrants 4,686 Wells 20 Water Towers 6 Water capital asset gross historical cost $199,187,000 Sanitary Sewer Sanitary sewer mains (miles) 306 Sanitary sewer lift stations 19 Sanitary sewer capital asset gross historical cost $113,111,000 Source: City of Lakeville 2025 Annual Comprehensive Financial Report Proposed 2027 rates and impact The following chart reflects the fee changes that have been incorporated into the proposed revenues for each of the Utility Funds in the next year: 2027 2026 Qu ar t er ly r at es Basis Pr op osed Act u al Water base Account 12.27$ 11.58$ 0.69$ 6% Water tier 1 -up to 6,000 gallons per quarter Gallonage*1.60$ 1.51$ 0.09$ 6% Water tier 2 -over 6,000 and up t o 15,000 gallons per quarter (additional 9,000 gallons max)Gallonage*1.77$ 1.67$ 0.10$ 6% Water tier 3 -over 15,000 and up to 30,000 gallons per quarter (additional 15,000 gallons max)Gallonage*3.42$ 3.23$ 0.19$ 6% Water tier 4 -over 30,000 gallons per quarter Gallonage*6.12$ 5.67$ 0.45$ 8% Irrigation sprinkler accounts Gallonage*6.12$ 5.67$ 0.45$ 8% Water test ing fee**3.81$ 3.81$ -$ 0% Sanitary sew er base Account 11.91$ 11.68$ 0.23$ 2% Sanitary sew er usage Gallonage*5.91$ 5.79$ 0.12$ 2% Sanitary sew er non metered accounts Account 118.29$ 115.90$ 2.39$ 2% Street lights Account 10.84$ 10.63$ 0.21$ 2% front footage 0.3033$ 0.2974$ 0.0059$ 2% Environmental Resources Fee Account 17.12$ 16.00$ 1.12$ 7% Environmental Resources Fee Annual 68.48$ 64.00$ 4.48$ 7% * Per 1000 gallons ** The Wat er t esting f ee is mandated by the stat e-- this is a pass-through fee f or the City. Pr op osed 2027 Ut ilit y Fee St r u ct u r e In cr ease Page 261 of 300 Page 3 The estimated impact to an average residential user during a winter quarter is an increased cost of $5.49, which is approximately $1.83 per month. The estimated impact to a residential user with average summer usage is an increased cost of $10.32 per quarter, which is approximately $3.44 per month. The estimated impact on a high irrigation residential user is an increased cost of $37.03 per quarter, which is approximately $12.34 per month. PERSONNEL REQUESTS There are no new positions requested that impact the 2027 Utility budgets. WATER OPERATING FUND The proposed 2027 Water Operating Fund budget reflects the cost of operating the City’s water system as well ongoing well rehabilitation, watermain maintenance as part of the 2027 Street Reconstruction Project and other 2027 street projects. This fund has annual debt service obligations of $964K-$1.27 million in the next five years for $5.350 million in remaining bond principal at 12/31/2026, from bonds issued between 2014 and 2021. Debt is not planned to be issued for regular major maintenance projects in the future, however bonds will be needed to fund a portion of the new satellite water treatment plant (currently planned to issue bonds and start construction in 2027). Imp act of Ut ilit y Rat e In cr eases (p er q u ar t er )- Av g Win t er Usag e 2027 2026 Ch an g e W ater 37.80$ 35.67$ 2.13$ Sewer 100.56 98.53 2.03 Street Lights 10.84 10.63 0.21 Environmental Res ourc es 17.12 16.00 1.12 State Surcharge 3.81 3.81 - Tota l 170.13$ 164.64$ 5.49$ Imp act of Ut ilit y Rat e In cr eases (p er q u ar t er )- Av g Su mmer Usag e 2027 2026 Ch an g e W ater 116.03$ 109.07$ 6.96$ Sewer 100.56 98.53 2.03 Street Lights 10.84 10.63 0.21 Environmental Res ourc es 17.12 16.00 1.12 State Surcharge 3.81 3.81 - Tota l 248.36$ 238.04$ 10.32$ Imp act of Ut ilit y Rat e In cr eases (p er q u ar t er )- Hig h Ir r ig at ion Usag e 2027 2026 Ch an g e W ater 479.25$ 445.58$ 33.67$ Sewer 100.56 98.53 2.03 Street Lights 10.84 10.63 0.21 Environmental Res ourc es 17.12 16.00 1.12 State Surcharge 3.81 3.81 - Tota l 611.58$ 574.55$ 37.03$ Page 262 of 300 Page 4 The 10-year water projection attachment includes the following assumptions related to the new satellite water treatment plant: 1) Estimated project costs of $44 Million 2) 20-year bonds to be issued in 2027 for approximately $39 Million of the $44 Million project costs 3) Water Operating fund contributes approximately $5.5M toward the project from funds that have been set aside over the past few years (includes PFAS funding noted below). 4) City uses all eligible funding received from recent PFAS legal settlements (approximately $1.29 Million received through September 2026) 5) Water Operating fund (via utility bill revenues) will contribute toward the annual debt payments starting with $1 Million in 2029 and increasing to $2.8 Million annually by 2032. With the financial targets/health of the Water Operating Fund in mind, as well as previous feedback received from City Council related to funding the new satellite plant, the rate changes proposed include the following- 1) The Water Operating Fund will need to contribute approximately $2.8 Million per year toward annual debt payments, as noted above. 2) Rather than have a significant increase in a single year to find $2.8 Million in excess revenues, the current plan assumes the Water Trunk Fund can absorb the majority of the first few years of debt payments so that rate increases to the rate payors can be phased in over three years. 3) The proposed rates also include a higher increase for the top tier water (tier 4) and irrigation rates compared to the other water rates. In 2027, while the other rates have a proposed increase of 6%, the top tier and irrigation rates are proposed to increase at 8%. The 10-year projections assume this higher increase on the top tier will continue going forward. In addition to growth in the city, it is the higher water users necessitating additional water capacity, therefore a higher contribution toward the new treatment plant appears to be reasonable. This also reduces the impact on users who are focusing more on water conservation. The underlying goals with annual rate adjustments are as follows: • Maintain a minimum cash balance to fund three months of operating expenses, debt service payments, major maintenance expenses (net of any bond proceeds during the period), emergency maintenance expenses (target of $500K), and accumulate a cash contribution toward the Water Treatment Plant project to reduce the amount of bonds needed on that project; • Avoid issuing debt for major maintenance projects in future years and reduce the amount of bonds needed for the Water Treatment Plant construction in 2027. This means that the current users of the water system are paying for the depreciation of the system (replacement costs) as we go. The current debt outstanding is scheduled to be completely paid off by 2036 (excluding any new bonds issued for the water treatment plant project). • Maintain a debt service coverage ratio of at least 125%. • Maintain a ratio of unrestricted net assets that is at least 50% of the subsequent year’s operating expenses. The proposed water rates for 2027 (and projected increases for 2028-2036) are projected to have the following impacts on the financial targets for the years 2027-2036: Page 263 of 300 Page 5 • Achieve cash target for all future years except for 2031. The target for unassigned cash is currently projected to be below target for 2031, which is something we will monitor as we proceed in the coming years. • Achieve debt service coverage ratio for all years after 2031. • Achieve unrestricted net assets percentage for all years 2027-2036 except for 2031. Staff develops the rate projections using a combination of historical financial and volume data as well as assumptions about future growth and volumes. The revenue assumptions are largely based on historical experience, and weather changes (drought vs rainy conditions) can have a significant impact on the water revenues received, which could then impact rate projections for future years. The projected water rate increases over the next 10 years, using 20-year bonds for repayment, are as follows: After the existing and new debt matures, the current projections indicate that we may be able to hold water rates flat for several years and/or decrease the rates and still meet financial targets. SANITARY SEWER OPERATING FUND The proposed 2027 Sanitary Sewer Fund budget reflects the cost of operating the City’s wastewater system as well as sewer main repair projects, and other major maintenance. In addition, the Metropolitan Wastewater Charge as communicated by the Met Council will have an 6.67% increase for the City of Lakeville in 2027. The wastewater charges are the most significant component of the Sanitary Sewer Fund annual budget. The City does not control this cost, although the cost is based on our share of the discharge into the regional wastewater system. To keep rates lower and due to the current cash position in the fund, we are only proposing a 2% increase rather than an amount closer to the Met Council increase. The 2027 revenues for sanitary sewer sales are based on increasing the rates by 2%. Years 2027- 2036 reflect annual increases of 2%-5%. The underlying goals with these rate adjustments are as follows: • Maintain a minimum cash balance to fund three months of operating expenses, debt service payments, and emergency maintenance expenses. • Maintain a debt service coverage ratio of at least 125%. There is no debt currently held by the Sewer Fund, nor any debt planned to be issued in the future. • Maintain a ratio of unrestricted net assets that is at least 50% of the subsequent year’s operating expenses. The 2027 sewer rates and projected increases for 2028-2036 are projected to have the following impacts on the financial targets: • Cash targets met in all years 2027-2036 • Achieve debt service coverage ratio for all years 2027-2036 • Achieve unrestricted net assets percentage for all years 2027-2036 2027 2028 2029 2030 2031 2032 2033 2034 2035 2036 Base rate/lower tiers 6%6%6%5%5%0%0%0%0%0% tier 4/irrigation rates 8%8%8%7%7%2%2%2%2%2% Page 264 of 300 Page 6 Currently, the projected sewer revenues by year are not sufficient to meet the forecasted expenses by year for all the next 10 years. On the other hand, the cash position by year is projected to exceed the desired cash position/targets. Since we would prefer to increase rates by the smallest possible amount to cover costs, staff is comfortable with the revenues being slightly under the expenses by year, knowing there is excess cash to cover the shortfall. We will continue reviewing each year to balance minimal rate changes with meeting the financial targets. STREET LIGHTING OPERATING FUND The Street Lighting Operating Fund reflects the cost of operating city street lights. The 2027 revenues for the Street Lighting Operating Fund reflect a rate increase of 2%. Increases of 1-3% are planned for 2027-2033, with no increase or a possible decrease in 2034-2036. Current cash projections include some Xcel street light replacements based on available information from Xcel and staff estimates, but the timing of those projects is uncertain. As those projects are scheduled in the future, rates may need to be adjusted accordingly. The underlying goals of street light rates are as follows: • Maintain a minimum cash balance to fund three months of operating expenses, debt service payments, and emergency maintenance expenses ($100K). • Maintain a debt service coverage ratio of at least 125%. The remaining street light debt was paid off during 2026. • Maintain a ratio of unrestricted net assets that is at least 50% of the subsequent year’s operating expenses. The current Street Light rate estimates are projected to have the following impacts on the financial targets: • Achieve cash targets for nine of the 10 years presented • Achieve debt service coverage ratio for all years presented • Achieve unrestricted net assets percentage for all years presented There are currently over 1,690 utility billing accounts that are not charged the street light fee, and staff is recommending that Council consider whether the street light fee should be added to these accounts. Staff estimates that this would result in over $71,000 additional revenues on an annual basis. ENVIRONMENTAL RESOURCES OPERATING FUND The Environmental Resources Fund reflects the cost of managing, promoting, and protecting the City’s natural resources including lakes, wetlands, streams, prairies and woodlands. The 2027 budget includes annual storm water rehabilitation projects as well as grant-funded projects. The revenues for this Fund are based on an increase of 7%, with annual increases between 1%-7% projected for 2028-2036. The underlying goals with these rate adjustments are as follows: • Maintain a minimum cash balance to fund three months of operating expenses, debt service payments, and emergency maintenance expenses ($100K). Page 265 of 300 Page 7 • Maintain a debt service coverage ratio of at least 125%. • Maintain a ratio of unrestricted net assets that is at least 50% of the subsequent year’s operating expenses. The proposed Environmental Resources rate projections are anticipated to have the following impacts on the financial targets: • Meeting all cash targets for all years presented except for 2030-2031. This will be monitored as we get closer to those years • The Environmental Resources Fund currently does not hold any debt, so the debt service coverage ratio target is not applicable. • Slightly below unrestricted net assets target percentage for 2028-2033, but back up to the target in 2034-2036. This will be monitored as projections are updated in subsequent years. CHARTS The following charts reflect the expenses, revenues, and projected cash position for each of the utility funds, including proposed rate increases. These will be referenced during our discussion. WATER CHARTS The water charts below are based on scenario #1, the satellite water treatment plant project. Page 266 of 300 Page 8 Note- Cash position with rate increases line includes anticipated contributions to the water treatment plant project in 2027 (assumes payment toward the project in 2028, so the above chart shows a drop in both the cash position and the desired cash position at the end of 2028). Page 267 of 300 Page 9 Note- The sharp increase in expenses in 2028 represents the contribution to the water treatment plant project. Page 268 of 300 Page 10 Page 269 of 300 Page 11 SEWER CHARTS Page 270 of 300 Page 12 Page 271 of 300 Page 13 STREET LIGHT CHARTS Page 272 of 300 Page 14 *The desired cash position for the Street Light Operating Fund includes a reserve for unscheduled capital replacement, which is our current estimate from data obtained from Xcel Energy. Page 273 of 300 Page 15 ENVIRONMENTAL RESOURCES CHARTS Page 274 of 300 Page 16 2027 Liquor Fund Budget The 2026 sales revenues of all four stores combined are looking to come in under budget by $1.5M, but profit margins are better so Gross Profit is up $122K from the 2026 budget. Operating expenditures (including depreciation) in 2026 are expected to come in $64K below budget. After transfers out of $2.3M, the Liquor Fund anticipates ending 2026 with a decrease in net position of $1.2M versus the budgeted decrease in net position of $1.5M. Anticipating the Federal legislative change that will remove THC sales, staff is proposing to decrease the 2027 sales and gross profit budgets to reflect that. The budgeted 2027 gross profit is $665K (10%) less than the 2026 budget. The new Keokuk location’s projected gross profit for 2026 is roughly $17K more than budgeted. The 2027 budget reflects the following decreases in sales revenues (combined total decrease of 12%): • Heritage – (10.6%) • Galaxie – (17%) • Kenrick – (9%) • Keokuk – (11%) Personnel expense decrease of $21K reflects staffing transitions/reorganization, city-support services (IT/Finance/HR/Communications), and step/COLA increases of existing liquor staff. The net operating income for 2027 (before transfers out and depreciation expense) is $710K. The 2027 budget includes $2 million in transfers from the Liquor Fund to support other City endeavors. If not for these Liquor Fund transfers, the tax levy would need to be raised, or other funding sources identified to cover these expenditures. The 2027 budgeted transfers, along with prior year comparisons, include the following: Expenditure type 2021 Actual 2022 Actual 2023 Actual 2024 Actual 2025 Actual 2026 Projected 2027 Budget Debt - PD station bonds $400,000 $400,000 $400,000 $400,000 $400,000 $400,000 $400,000 Debt -Keokuk store bonds* $0 $177,910 $348,900 $350,500 $346,800 $347,800 $348,357 Equip Fund- capital equip $500,000 $500,000 $500,000 $500,000 $900,000 $1,500 000 $1,200,000 Tech Fund- capital equip $31,300 $38,500 $ 38,500 $59,500 $67,610 $9,795 $26,084 Gen Fund- admin/tech $150,075 $164,085 $238,286 $0 $0 $0 $0 Gen Fund- fireworks $15,000 $15,000 $30,000 $30,000 $30,000 $30,000 $30,000 Total $1,096,375 $1,295,495 $1,555,686 $1,340,000 $1,744,410 $2,287,552 $2,004,441 *The debt service for the Keokuk liquor store was not previously shown as a transfer. Page 275 of 300 Page 17 Financial Targets of Liquor Fund The Fund Balance Policy, last amended on January 3, 2023 contains the following parameters for the Liquor Fund. The Liquor Fund is used to account for the financial activities associated with operating a municipal liquor operation. When evaluating the use of funds, the city intends to meet the following management targets: • Available cash on hand to cover the following objectives: o Three months of operating cash o Following year debt service payments o Next year planned capital expenditures not financed with bonds • Income Before Contributions and Transfers not less than 125% of annual debt service on existing and planned debt. The Liquor Fund estimates are projected to have the following impacts on the financial targets: • Achieves cash targets for years 2027-2029 • Achieves debt service coverage ratio for years 2028-2030 • The last debt payment for the Galaxie store is in 2027. BUDGET AND FEE SCHEDULE REVIEW SCHEDULE Nov 16 Meeting – Final 2027 Budget Review; 2026 Yearend Preview Dec 7 Meeting – Public Budget Meeting (Truth in Taxation) / Adopt 2027 Budget & 2027 Tax Levy / Adopt 2027 Fee Schedule Attachments: 1) Utility Financial Planning Models- Staff Proposal a. Water Fund (pg.1-3) b. Sewer Fund (pg.4-6) c. Environmental Resources (pg.7-8) d. Street Lighting Fund (pg.9-10) 2) Liquor Fund Budget a. 2027 Budget Summary by Department/Store b. Liquor Store Proforma c. Projected Working Capital From: Justin Miller, City Administrator Julie Stahl, Finance Director Page 276 of 300 Table 1 Water Fund Summary Water Fund 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 2036 Revenues 11,844,018 10,845,639 11,468,739 12,135,939 12,822,311 13,565,026 13,712,725 13,915,356 14,120,504 14,354,161 14,599,910 Expenses 14,370,725 12,980,702 17,911,132 13,689,397 15,162,350 17,758,680 15,789,071 16,665,201 16,854,519 17,033,866 17,218,924 Revenue Over (Under) Expense (2,526,707) (2,135,064) (6,442,393) (1,553,457) (2,340,039) (4,193,654) (2,076,346) (2,749,845) (2,734,015) (2,679,705) (2,619,013) Projected Ending Cash by Purpose For future capital and unassigned 2,277,501 2,619,331 2,224,776 1,666,702 1,292,001 292,032 1,591,494 2,534,187 3,770,246 5,075,584 6,713,337 For planned capital 5,217,157 5,078,194 1,567,835 1,159,754 752,042 840,000 371,000 371,000 371,000 371,000 371,000 3M PFAS Settlement funds (restricted to PFAS remediation)1,294,843 1,294,843 - For 3-months of operating cash 1,970,098 1,825,767 1,888,152 2,011,420 2,532,428 1,959,511 2,173,553 2,215,468 2,259,159 2,302,090 2,348,813 For following year debt service 1,374,207 1,366,906 2,271,157 3,215,206 3,283,301 3,588,040 3,433,551 3,309,862 3,048,913 3,049,900 2,800,000 Projected Ending Cash 12,133,806 12,185,041 7,951,920 8,053,082 7,859,773 6,679,583 7,569,598 8,430,517 9,449,318 10,798,573 12,233,150 - - - - - - - - - Net Position Ending unrestricted net position 13,953,806 14,024,741 9,811,517 9,932,775 9,759,763 8,600,073 9,510,792 10,392,624 11,432,546 12,803,133 14,259,256 As % of expense 97%108%55%73%64%48%60%62%68%75%83% Target: 50% or higher Net Revenues as % of Debt Service 90% 76% 111% 114% 124% 89%176% 155% 170% 172% 175% Target: 50% or higher 1.25x Projected Rate changes by year-all but top tier 6%6%6%5%5%0%0%0%0%0% Projected Rate changes by year-top tier/irrigation only 8% 8% 8% 7% 7% 2% 2% 2% 2% 2% Page 277 of 300 Table 7 Water Fund Pro Forma Lakeville Finance Plan Water Fund 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 2036 Actual Actual Estimated Proj Proj Proj Proj Proj Proj Proj Proj Proj Proj Revenues Services charges 7,980,515 8,526,075 9,951,000 9,612,874 10,330,607 11,103,075 11,786,351 12,533,326 12,709,952 12,889,748 13,072,784 13,280,375 13,491,792 Connection permits - - - - - - - - - - - - - Sales of meters 20,362 37,168 79,000 79,000 79,000 79,000 79,000 79,000 79,000 79,000 79,000 79,000 79,000 Penalties and other revenues 176,406 176,406 55,000 55,550 56,106 56,667 57,233 57,806 58,384 58,967 59,557 60,153 60,754 Investment income and other earnings 628,623 972,697 410,118 399,814 304,626 198,798 201,327 196,494 166,990 189,240 210,763 236,233 269,964 Intergovernmental revenues 36,828 20,179 15,673 - - - - - - - - - - Other revenues and special items 11,302 650,066 672,425 38,400 38,400 38,400 38,400 38,400 38,400 38,400 38,400 38,400 38,400 Special assessments 160,802 160,802 160,802 160,000 160,000 160,000 160,000 160,000 160,000 160,000 160,000 160,000 160,000 Transfers in - - - - - - - - - - - - - Capital contributions 5,683,152 7,447,865 500,000 500,000 500,000 500,000 500,000 500,000 500,000 500,000 500,000 500,000 500,000 Total Revenues 14,697,990 17,991,258 11,844,018 10,845,639 11,468,739 12,135,939 12,822,311 13,565,026 13,712,725 13,915,356 14,120,504 14,354,161 14,599,910 Expenses Fixed Expenses Personnel services 1,537,095 1,796,907 1,923,787 1,964,855 2,023,801 2,084,515 2,147,050 2,211,462 2,277,805 2,346,140 2,416,524 2,489,020 2,563,690 Major maintenance not capitalized 1,109,663 522,602 3,096,920 1,369,500 627,942 725,604 1,061,950 2,983,593 527,473 1,215,234 1,208,714 1,202,803 1,193,500 Transfer out Debt Service Fund 523,569 522,045 248,369 250,519 248,219 1,251,594 2,250,544 2,749,088 3,052,128 3,049,788 3,052,050 3,048,913 3,049,900 Transfer out Other Funds 14,200 9,758 3,044 8,106 5,518,835 26,614 950 8,850 7,670 20,348 28,920 22,679 13,251 Interest and fiscal expense 117,565 83,071 189,293 154,025 133,538 97,988 62,838 39,038 25,588 13,288 3,906 - - Depreciation 4,355,435 4,541,249 4,630,198 4,667,998 4,702,324 4,754,020 4,795,514 4,826,815 4,860,315 4,882,090 4,903,865 4,925,640 4,947,415 Subtotal Fixed Expenses 7,657,527 7,475,632 10,091,611 8,415,003 13,254,658 8,940,334 10,318,846 12,818,845 10,750,979 11,526,887 11,613,979 11,689,054 11,767,756 Variable Expenses Commodities 633,237 579,360 981,579 1,004,870 1,024,967 1,045,467 1,066,376 1,087,704 1,109,458 1,131,647 1,154,280 1,177,365 1,200,913 Other charges for services/disposal of assets 1,684,873 1,713,229 3,297,535 3,560,829 3,631,506 3,703,596 3,777,128 3,852,131 3,928,634 4,006,667 4,086,261 4,167,446 4,250,255 Subtotal Variable Expenses 2,318,110 2,292,589 4,279,114 4,565,699 4,656,473 4,749,063 4,843,505 4,939,835 5,038,092 5,138,314 5,240,540 5,344,812 5,451,168 Total Expenses 9,975,637 9,768,221 14,370,725 12,980,702 17,911,132 13,689,397 15,162,350 17,758,680 15,789,071 16,665,201 16,854,519 17,033,866 17,218,924 Beginning net position 128,899,158 133,621,511 141,844,548 139,317,841 137,182,777 130,740,384 129,186,927 126,846,888 122,653,234 120,576,888 117,827,043 115,093,027 112,413,322 Change in Net Position 4,722,353 8,223,037 (2,526,707) (2,135,064) (6,442,393) (1,553,457) (2,340,039) (4,193,654) (2,076,346) (2,749,845) (2,734,015) (2,679,705) (2,619,013) Ending net position 133,621,511 141,844,548 139,317,841 137,182,777 130,740,384 129,186,927 126,846,888 122,653,234 120,576,888 117,827,043 115,093,027 112,413,322 109,794,309 Page 278 of 300 Table 8 Water Fund Projected Year End Cash Balance Lakeville Ending Cash Balance Water Fund 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 2036 Estimate Proj Proj Proj Proj Proj Proj Proj Proj Proj Proj Use of Cash Operations & Maintenance 9,273,152 7,880,391 7,303,066 7,552,606 8,045,680 10,129,714 7,838,046 8,694,212 8,861,873 9,036,634 9,208,358 Capital Acquisition 3,057,970 1,012,000 873,037 1,567,835 1,159,754 752,042 840,000 371,000 371,000 371,000 371,000 Other Interfund Transfers 3,044 8,106 5,518,835 26,614 950 8,850 7,670 20,348 28,920 22,679 13,251 Debt Service (includes transfers for debt)1,519,331 1,374,207 1,366,906 2,271,157 3,215,206 3,283,301 3,588,040 3,433,551 3,309,862 3,048,913 3,049,900 Total Use of Cash 13,853,497 10,274,704 15,061,844 11,418,212 12,421,590 14,173,907 12,273,756 12,519,111 12,571,655 12,479,226 12,642,509 Source of Cash Revenues 11,344,018 10,345,639 10,968,739 11,635,939 12,322,311 13,065,026 13,212,725 13,415,356 13,620,504 13,854,161 14,099,910 Total Source of Cash 11,344,018 10,345,639 10,968,739 11,635,939 12,322,311 13,065,026 13,212,725 13,415,356 13,620,504 13,854,161 14,099,910 Net Change in Other Assets and Liabilities (353,762) (19,700) (140,015) (116,565) (94,031) (71,308) (48,955) (35,325) (30,049) (25,679) (22,825) Change in Cash Balance (2,863,241) 51,235 (4,233,121) 101,163 (193,310) (1,180,189) 890,014 860,920 1,018,801 1,349,256 1,434,577 Projected Ending Cash 12,133,806 12,185,041 7,951,920 8,053,082 7,859,773 6,679,583 7,569,598 8,430,517 9,449,318 10,798,573 12,233,150 Ending Cash by Purpose Unassigned 2,277,501 2,619,331 2,224,776 1,666,702 1,292,001 292,032 1,591,494 2,534,187 3,770,246 5,075,584 6,713,337 For capital improvements WTF Expansion 4,205,157 4,205,157 - - - 3M PFAS Settlement funds (restricted to PFAS remediation)1,294,843 1,294,843 - For next year planned capital 1,012,000 873,037 1,567,835 1,159,754 752,042 840,000 371,000 371,000 371,000 371,000 371,000 Long term capital needs (watermain replacement) For 3-months of operating cash 1,970,098 1,825,767 1,888,152 2,011,420 2,532,428 1,959,511 2,173,553 2,215,468 2,259,159 2,302,090 2,348,813 For following year debt service 1,374,207 1,366,906 2,271,157 3,215,206 3,283,301 3,588,040 3,433,551 3,309,862 3,048,913 3,049,900 2,800,000 Projected Ending Cash 12,133,806 12,185,041 7,951,920 8,053,082 7,859,773 6,679,583 7,569,598 8,430,517 9,449,318 10,798,573 12,233,150 Note: Cash balances include cash and investments. Beginning Cash 14,997,047 12,133,806 12,185,041 7,951,920 8,053,082 7,859,773 6,679,583 7,569,598 8,430,517 9,449,318 10,798,573 Plus revenues 11,344,018 10,345,639 10,968,739 11,635,939 12,322,311 13,065,026 13,212,725 13,415,356 13,620,504 13,854,161 14,099,910 Plus bond proceeds - - - - - - - - - - - Less capital assets acquisition (3,057,970) (1,012,000) (873,037) (1,567,835) (1,159,754) (752,042) (840,000) (371,000) (371,000) (371,000) (371,000) Less principal on debt (1,055,000) (950,000) (980,000) (915,000) (895,000) (490,000) (505,000) (365,000) (250,000) - - Less interest and fiscal charges (215,962) (173,688) (138,687) (104,563) (69,662) (44,213) (30,912) (18,763) (7,812) - - Less operating and other costs (9,273,152) (7,880,391) (7,303,066) (7,552,606) (8,045,680) (10,129,714) (7,838,046) (8,694,212) (8,861,873) (9,036,634) (9,208,358) Plus transfers in - - - - - - - - - - - Less transfers out other (3,044) (8,106) (5,518,835) (26,614) (950) (8,850) (7,670) (20,348) (28,920) (22,679) (13,251) Less transfers out debt service (248,369) (250,519) (248,219) (1,251,594) (2,250,544) (2,749,088) (3,052,128) (3,049,788) (3,052,050) (3,048,913) (3,049,900) Net change in other assets (409,424) (33,000) (33,330) (33,663) (34,000) (34,340) (34,683) (35,030) (35,380) (35,734) (36,092) Net change in other liabilities 55,662 13,300 (106,685) (82,902) (60,031) (36,968) (14,272) (295) 5,331 10,055 13,267 Total Change in Cash (2,863,241) 51,235 (4,233,121) 101,163 (193,310) (1,180,189) 890,014 860,920 1,018,801 1,349,256 1,434,577 Projected Ending Cash 12,133,806 12,185,041 7,951,920 8,053,082 7,859,773 6,679,583 7,569,598 8,430,517 9,449,318 10,798,573 12,233,150 Must be zero - - - - - - - - - - - Must be zero - - - - - - - - - - - Page 279 of 300 Table 2Sanitary Sewer FundSummarySanitary Sewer Fund2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 2036Revenues 11,099,828 11,163,648 11,231,510 11,528,629 12,039,267 12,461,866 13,018,298 13,706,197 14,447,540 15,201,695 16,041,266 Expenses 10,930,246 11,635,335 12,560,420 13,009,226 13,523,319 14,014,790 14,787,723 15,449,398 16,158,912 16,838,770 17,551,296 Revenue Over (Under) Expense169,582 (471,687) (1,328,910) (1,480,597) (1,484,053) (1,552,925) (1,769,425) (1,743,202) (1,711,372) (1,637,076) (1,510,030) Projected Ending Cash by PurposeFor future capital and unassigned 6,811,838 7,607,072 7,361,481 6,914,368 6,633,633 5,757,165 5,191,025 3,378,226 3,158,579 3,022,528 2,538,521 For planned capital 2,563,068 703,003 872,835 932,723 812,041 1,302,171 848,884 2,150,682 650,000 660,595 1,150,000 For 3-months of operating cash 2,275,806 2,496,949 2,598,625 2,724,610 2,837,303 3,019,567 3,173,386 3,332,055 3,496,392 3,669,627 3,857,517 For following year debt service 292 - - - - - - - - - - Projected Ending Cash 11,651,003 10,807,024 10,832,941 10,571,701 10,282,976 10,078,903 9,213,295 8,860,962 7,304,971 7,352,750 7,546,038 Net PositionEnding unrestricted net position 13,501,860 12,490,820 12,512,697 12,247,377 11,954,530 11,746,295 10,876,483 10,519,904 8,959,624 9,003,072 9,191,985 As % of expense 124% 107% 100% 94% 88% 84% 74% 68% 55% 53% 52%Target: 50% or higherNet Revenues as % of Debt Servicen/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/aTarget: 1.25XProjected Rate changes by yearn/a 2.00% 2.00% 2.00% 4.00% 3.00% 4.00% 5.00% 5.00% 5.00% 5.00%Page 280 of 300 Table 10Sanitary Sewer FundPro FormaLakevilleFinance PlanSanitary Sewer Fund2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 2036Estimated Proj Proj Proj Proj Proj Proj Proj Proj Proj ProjRevenuesServices charges 10,287,000 10,372,373 10,461,335 10,757,805 11,274,974 11,704,791 12,266,325 12,975,864 13,726,016 14,519,071 15,357,447 Penalties and other revenues - - - - - - - - - - - Investment income and other earnings 240,932 291,275 270,176 270,824 264,293 257,074 251,973 230,332 221,524 182,624 183,819 Intergovernmental revenues - - - - - - - - - - - Other revenues and special items 43,730 - - - - - - - - - - Transfers in 28,166 - - - - - - - - - - Capital contributions 500,000 500,000 500,000 500,000 500,000 500,000 500,000 500,000 500,000 500,000 500,000 Total Revenues 11,099,828 11,163,648 11,231,510 11,528,629 12,039,267 12,461,866 13,018,298 13,706,197 14,447,540 15,201,695 16,041,266 ExpensesFixed ExpensesPersonnel services 1,477,952 1,574,520 1,621,756 1,670,408 1,720,521 1,772,136 1,825,300 1,880,059 1,936,461 1,994,555 2,054,391 Personal services / FTE changes - - - - - - - - - - - Major maintenance not capitalized 312,365 410,000 681,373 605,603 596,949 503,592 662,472 680,234 688,715 682,803 673,500 Transfers out General Fund - - - - - - - - - - - Transfer out Debt Service Fund - - - - - - - - - - - Transfer out Other Funds 3,044 8,106 18,835 26,614 950 8,850 7,670 20,348 28,920 22,679 13,251 Interest and fiscal expense 3,771 292 - - - - - - - - - Depreciation 2,447,138 2,523,715 2,553,790 2,588,111 2,623,929 2,656,730 2,701,784 2,735,507 2,801,774 2,830,524 2,859,538 Subtotal Fixed Expenses4,244,270 4,516,633 4,875,754 4,890,736 4,942,349 4,941,308 5,197,227 5,316,148 5,455,870 5,530,560 5,600,680 Variable ExpensesCommodities 165,030 174,310 177,796 181,352 184,979 188,679 192,452 196,301 200,227 204,232 208,317 Other charges for services/disposal of assets 433,407 450,691 459,514 468,514 477,693 487,056 496,607 506,348 516,284 526,419 536,757 MCES disposal charge 6,087,539 6,493,701 7,047,356 7,468,624 7,918,298 8,397,747 8,901,437 9,430,601 9,986,530 10,577,559 11,205,542 Bond issuance cost - - - - - - - - - - - Subtotal Variable Expenses6,685,976 7,118,702 7,684,666 8,118,490 8,580,971 9,073,482 9,590,496 10,133,251 10,703,042 11,308,210 11,950,615 Total Expenses 10,930,246 11,635,335 12,560,420 13,009,226 13,523,319 14,014,790 14,787,723 15,449,398 16,158,912 16,838,770 17,551,296 Beginning net position 86,380,794 86,550,376 86,078,688 84,749,779 83,269,182 81,785,129 80,232,205 78,462,780 76,719,578 75,008,206 73,371,131 Change in Net Position 169,582 (471,687) (1,328,910) (1,480,597) (1,484,053) (1,552,925) (1,769,425) (1,743,202) (1,711,372) (1,637,076) (1,510,030) Ending net position 86,550,376 86,078,688 84,749,779 83,269,182 81,785,129 80,232,205 78,462,780 76,719,578 75,008,206 73,371,131 71,861,100 0.556944351Page 281 of 300 Table 11Sanitary Sewer FundProjected Ending Cash BalanceLakevilleEnding Cash BalanceSanitary Sewer Fund2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 2036Estimate Proj Proj Proj Proj Proj Proj Proj Proj Proj ProjUse of CashOperations & Maintenance 8,476,293 9,103,222 9,987,795 10,394,501 10,898,440 11,349,210 12,078,268 12,693,544 13,328,218 13,985,568 14,678,507 Capital Acquisition 1,060,217 2,563,068 703,003 872,835 932,723 812,041 1,302,171 848,884 2,150,682 650,000 660,595 Interfund Transfers 3,044 8,106 18,835 26,614 950 8,850 7,670 20,348 28,920 22,679 13,251 Debt Service 3,771 292 - - - - - - - - - Total Use of Cash9,543,325 11,674,688 10,709,633 11,293,949 11,832,113 12,170,101 13,388,109 13,562,776 15,507,820 14,658,247 15,352,352 Source of CashRevenues 10,571,662 10,663,648 10,731,510 11,028,629 11,539,267 11,961,866 12,518,298 13,206,197 13,947,540 14,701,695 15,541,266 Bond Proceeds - - - - - - - - - - - Interfund Transfer 28,166 - - - - - - - - - - Total Source of Cash10,599,828 10,663,648 10,731,510 11,028,629 11,539,267 11,961,866 12,518,298 13,206,197 13,947,540 14,701,695 15,541,266 Net Change in Other Assets and Liabilities 41,104 167,061 4,040 4,080 4,121 4,162 4,204 4,246 4,289 4,331 4,375 Change in Cash Balance 1,097,607 (843,979) 25,918 (261,240) (288,725) (204,073) (865,608) (352,333) (1,555,992) 47,780 193,288 Beginning Cash Balance10,553,396 11,651,003 10,807,024 10,832,941 10,571,701 10,282,976 10,078,903 9,213,295 8,860,962 7,304,971 7,352,750 Projected Ending Cash 11,651,003 10,807,024 10,832,941 10,571,701 10,282,976 10,078,903 9,213,295 8,860,962 7,304,971 7,352,750 7,546,038 Ending Cash by PurposeUnassigned 6,811,838 7,607,072 7,361,481 6,914,368 6,633,633 5,757,165 5,191,025 3,378,226 3,158,579 3,022,528 2,538,521 For next year planned capital 2,563,068 703,003 872,835 932,723 812,041 1,302,171 848,884 2,150,682 650,000 660,595 1,150,000 For 3-months of operating cash 2,275,806 2,496,949 2,598,625 2,724,610 2,837,303 3,019,567 3,173,386 3,332,055 3,496,392 3,669,627 3,857,517 For following year debt service 292 - - - - - - - - - - Projected Ending Cash 11,651,003 10,807,024 10,832,941 10,571,701 10,282,976 10,078,903 9,213,295 8,860,962 7,304,971 7,352,750 7,546,038 Note: Cash balances include cash and investments.Beginning Cash 10,553,396 11,651,003 10,807,024 10,832,941 10,571,701 10,282,976 10,078,903 9,213,295 8,860,962 7,304,971 7,352,750 Plus revenues 10,571,662 10,663,648 10,731,510 11,028,629 11,539,267 11,961,866 12,518,298 13,206,197 13,947,540 14,701,695 15,541,266 Plus bond proceeds - - - - - - - - - - - Less capital assets acquisition and COI (1,060,217) (2,563,068) (703,003) (872,835) (932,723) (812,041) (1,302,171) (848,884) (2,150,682) (650,000) (660,595) Less principal on debt - - - - - - - - - - - Less interest and fiscal charges (3,771) (292) - - - - - - - - - Less operating and other costs (8,476,293) (9,103,222) (9,987,795) (10,394,501) (10,898,440) (11,349,210) (12,078,268) (12,693,544) (13,328,218) (13,985,568) (14,678,507) Plus transfers in 28,166 - - - - - - - - - - Less transfers out other (3,044) (8,106) (18,835) (26,614) (950) (8,850) (7,670) (20,348) (28,920) (22,679) (13,251) Less transfer out debt service - - - - - - - - - - - Net change in other assets 206 - - - - - - - - - - Net change in other liabilities 40,898 167,061 4,040 4,080 4,121 4,162 4,204 4,246 4,289 4,331 4,375 Total Change in Cash 1,097,607 (843,979) 25,918 (261,240) (288,725) (204,073) (865,608) (352,333) (1,555,992) 47,780 193,288 Projected Ending Cash 11,651,003 10,807,024 10,832,941 10,571,701 10,282,976 10,078,903 9,213,295 8,860,962 7,304,971 7,352,750 7,546,038 Must be zero - - - - - - - - - - - Must be zero- - - - - - - - - - - Page 282 of 300 Environmental Resources Summary of Financial Targets- 10-yr projectionsEnvironmental Resources FundRevised 9.29.262027 2028 2029 2030 2031 2032 2033 2034 2035Ending Cash by PurposeUnassigned (target $100,000) 586,266 287,716 113,046 40,657 65,050 159,625 363,179 317,701 142,500 For 3-months of operating cash 752,717 769,981 787,655 805,751 824,279 843,251 862,676 882,567 902,936 For following year debt service - - - - - - - - - For next year planned capital - - - - - 36,596 - 282,819 438,397 Ending Cash by Purpose 1,338,983 1,057,697 900,701 846,409 889,329 1,039,471 1,225,855 1,483,087 1,483,833 Unrestricted Net AssetsUnrestricted Net Assets 1,535,463 1,307,746 1,208,839 1,200,206 1,291,639 1,493,313 1,713,844 1,995,890 2,022,137 Subsequent Year's Operating Expense* 3,010,870 3,079,923 3,150,621 3,223,005 3,297,118 3,373,003 3,450,705 3,530,270 3,611,745 Unrestricted Net Assets as % of Expense 51%42% 38% 37% 39% 44% 50%57% 56%Revenues (A)2,823,488 2,705,090 2,902,040 3,062,104 3,233,647 3,417,097 3,547,534 3,649,258 3,754,947 Expenditures (B)3,394,319 3,010,870 3,079,923 3,150,621 3,223,005 3,297,118 3,373,003 3,450,705 3,530,270 Cash 1,338,983 1,057,697 900,701 846,409 889,329 1,039,471 1,225,855 1,483,087 1,483,833 Net Revenue for Debt Coverage (A-B)(570,831) (305,780) (177,883) (88,517) 10,642 119,979 174,531 198,553 224,677 Total Env Resources Fund Debt Service - - - - - - - - - Debt Service Coverage Ratio N/A N/A N/A N/A N/A N/A N/A N/A N/ARate increase* 7.0% 7.0% 7.0% 5.0% 5.0% 5.0% 3.0% 2.0% 2.0%Change in Net Position (343,724) (308,717) (180,908) (91,633) 7,433 116,674 171,127 195,047 221,066 TargetsMinimum Unassigned Cash Balance 100,000 Unrestricted Net Assets as % of Expense 50%Debt Service Coverage 1.25No New Debt After 20XX n/aPage 283 of 300 Statement of Revenue, Expense and Changes in Net Position10-year Forecast2027 2028 2029 2030 2031 2032 2033 2034 20352026 ESTIMATED ESTIMATED ESTIMATED ESTIMATED ESTIMATED ESTIMATED ESTIMATED ESTIMATED ESTIMATEDESTIMATES BUDGET BUDGET BUDGET BUDGET BUDGET BUDGET BUDGET BUDGET BUDGETRevenuesEnvironmental Resources Fees2,152,602 2,325,407 2,511,783 2,712,782 2,874,780 3,046,144 3,227,405 3,354,000 3,451,419 3,551,375 Other fees/misc108,000 108,000 108,000 108,000 108,000 108,000 108,000 108,000 108,000 108,000 Revenues from development contracts- MS4 ins21,092 22,053 23,527 25,104 26,309 27,575 28,906 29,745 30,321 30,910 Grants/donations302,588 321,844 35,000 35,000 35,000 35,000 35,000 35,000 35,000 35,000 Investment income76,847 46,184 26,780 21,154 18,014 16,928 17,787 20,789 24,517 29,662 Total Revenues2,661,129 2,823,488 2,705,090 2,902,040 3,062,104 3,233,647 3,417,097 3,547,534 3,649,258 3,754,947 ExpensesPersonnel services891,029 918,043 945,584 973,952 1,003,170 1,033,265 1,064,263 1,096,191 1,129,077 1,162,949 Commodities71,977 75,664 77,177 78,721 80,295 81,901 83,539 85,210 86,914 88,652 Contractual services2,948,533 2,320,612 2,367,024 2,414,365 2,462,652 2,511,905 2,562,143 2,613,386 2,665,654 2,718,967 Contractual services- projection adjustment (459,916) (469,114) (478,497) (488,067) (497,828) (507,784) (517,940) (528,299) Depreciation Expense75,000 80,000 81,000 82,000 83,000 84,000 85,000 86,000 87,000 88,000 Total Expenses3,986,539 3,394,319 3,010,870 3,079,923 3,150,621 3,223,005 3,297,118 3,373,003 3,450,705 3,530,270 Net Operating Income (loss)(1,325,410) (570,831) (305,780) (177,883) (88,517) 10,642 119,979 174,531 198,553 224,677 Other Receipts (Disbursements)Transfer to Equipment Fund (40,500) Transfer to CPF- Technology Fund (1,070) (2,851) (2,937) (3,025) (3,115) (3,209) (3,305) (3,404) (3,506) (3,612) Transfer to Sanitary Sewer Operating (28,166) - - - - - - - - - Transfer from Equipment Fund- 229,958 - - - - - - - - Net Other(69,736) 227,107 (2,937) (3,025) (3,115) (3,209) (3,305) (3,404) (3,506) (3,612) 1,042,785 Net Increase (Decrease) in net assets (1,395,146) (343,724) (308,717) (180,908) (91,633) 7,433 116,674 171,127 195,047 221,066 Net position, January 14,800,955 3,405,809 3,062,085 2,753,369 2,572,461 2,480,828 2,488,261 2,604,935 2,776,062 2,971,109 Net position, December 313,405,809 3,062,085 2,753,369 2,572,461 2,480,828 2,488,261 2,604,935 2,776,062 2,971,109 3,192,174 - - - - - - - - - - ENVIRONMENTAL RESOURCES OPERG:\Budget\2027 Budget\Revenues- Utilities\2027 Rates- Env Resources and St Lights : Env Resources ProForma10/2/2026Page 284 of 300 Street Light Summary Street Light FundRevised 9.29.20262027 2028 2029 2030 2031 2032 2033 2034 2035 2036Ending Cash by PurposeUnassigned (target $100,000) 257,694 176,897 108,988 102,600 102,024 141,302 139,502 140,792 139,085 153,389 For 3-months of operating cash 305,711 314,883 324,329 334,059 344,081 354,403 365,035 375,986 387,266 398,884 For following year debt service (no debt in this fund) - - - - - - - - - - Reserve for unscheduled capital replacement (Xcel) 75,000 75,000 125,000 125,000 150,000 175,000 300,000 450,000 650,000 750,000 For next year planned capital 250,000 300,000 250,000 250,000 250,000 250,000 250,000 250,000 250,000 250,000 Ending Cash by Purpose 888,405 866,779 808,317 811,659 846,105 920,705 1,054,538 1,216,779 1,426,351 1,552,272 Unrestricted Net AssetsUnrestricted Net Assets 1,109,197 1,087,571 1,029,109 1,032,451 1,066,897 1,141,497 1,275,330 1,437,571 1,647,143 1,773,064 Subsequent Year's Operating Expense* 1,222,845 1,259,530 1,297,316 1,336,236 1,376,323 1,417,612 1,460,141 1,503,945 1,549,063 1,595,535 Unrestricted Net Assets as % of Expense 91% 86% 79% 77% 78% 81% 87% 96% 106% 111%Revenues 1,431,330 1,451,219 1,501,067 1,550,658 1,620,682 1,700,923 1,801,445 1,872,382 1,963,517 1,924,984 Expenditures 1,447,228 1,472,845 1,559,530 1,547,316 1,586,236 1,626,323 1,667,612 1,710,141 1,753,945 1,799,063 Cash 888,405 866,779 808,317 811,659 846,105 920,705 1,054,538 1,216,779 1,426,351 1,552,272 Net Revenue for Debt Coverage (15,898) (21,626) (58,463) 3,342 34,446 74,600 133,833 162,241 209,573 125,921 Total Street Light Fund Debt Service 0 - - - - - - - - - Debt Service Coverage Ratio N/A N/A N/A N/A N/A N/A N/A N/A N/A N/ARate increase 2% 1% 3% 3% 3% 3% 3% 0% 0% -6%Change in Net Position (15,898) (21,626) (58,463) 3,342 34,446 74,600 133,833 162,241 209,573 125,921 TargetsMinimum Unassigned Cash Balance 100,000 Unrestricted Net Assets as % of Expense 50%Debt Service Coverage 1.25No New Debt n/a*Excludes major maintenance estimatesPage 285 of 300 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035ESTIMATED ESTIMATED ESTIMATED ESTIMATED ESTIMATEDESTIMATED ESTIMATED ESTIMATED ESTIMATED ESTIMATEDGL Acct # BUDGET BUDGET BUDGET BUDGET BUDGET BUDGET BUDGET BUDGET BUDGET BUDGETPROPOSED QUARTERLY RATE:10.62 10.84 10.94 11.27 11.61 11.96 12.32 12.69 12.69 12.69 PROPOSED INCREASE %:5% 2% 1% 3% 3% 0% 0% 3% 0% 0%RevenuesStreet light fees-Residential 7575.7575.45401,139,391 1,164,778 1,182,426 1,225,299 1,267,958 1,337,958 1,417,958 1,510,397 1,580,397 1,670,397 Street light fees-Comm/Ind 7575.7575.4540.01230,609 235,222 237,574 244,701 252,042 252,042 252,042 259,603 259,603 259,603 Street light fees - Developer 7575.7575.454120,000 25,000 25,000 25,000 25,000 25,000 25,000 25,000 25,000 25,000 Penalties- - - - - - - - - - Service charge - - - - - - - - - - Other (interest)7,082 6,330 6,219 6,067 5,658 5,682 5,923 6,445 7,382 8,517 Total Revenues1,397,082 1,431,330 1,451,219 1,501,067 1,550,658 1,620,682 1,700,923 1,801,445 1,872,382 1,963,517 ExpensesPersonnel services21,064 28,231 29,078 29,950 30,849 31,774 32,727 33,709 34,721 35,762 Commodities20 24 25 25 26 27 28 29 30 30 Contractual services1,402,559 1,158,973 1,193,742 1,229,554 1,266,441 1,304,434 1,343,567 1,383,874 1,425,391 1,468,152 Major maintenance projects30,000 260,000 250,000 300,000 250,000 250,000 250,000 250,000 250,000 250,000 Total Expenses1,453,643 1,447,228 1,472,845 1,559,530 1,547,316 1,586,236 1,626,323 1,667,612 1,710,141 1,753,945 Net Operating Income (loss)(56,561) (15,898) (21,626) (58,463) 3,342 34,446 74,600 133,833 162,241 209,573 Other Receipts (Disbursements)Transfers from/(to) General Fund - - - - - - - - - - Transfers from/(to) Other fundsBond Proceeds/premium amortization - - - - - - - - - - Investment incomeDebt Service Payments-Interest - - - - - - - - - Capital outlay acquisitions- - - - - - - - - - Net Other- - - - - - - - - - Net Increase (Decrease)(56,561) (15,898) (21,626) (58,463) 3,342 34,446 74,600 133,833 162,241 209,573 Net Assets, January 11,181,656 1,125,095 1,109,197 1,087,571 1,029,109 1,032,451 1,066,897 1,141,497 1,275,330 1,437,571 Net assets, December 311,125,095 1,109,197 1,087,571 1,029,109 1,032,451 1,066,897 1,141,497 1,275,330 1,437,571 1,647,143 - - - - - - - - - - STREET LIGHT OPERATING FUNDStatement of Revenue, Expense and Changes in Net PositionG:\Budget\2027 Budget\Revenues- Utilities\2027 Rates- Env Resources and St Lights : Street Light Pro Forma10/2/2026Page 286 of 300 10/14/2026 LIQUOR BUDGET - 2027 SUMMARY BY STORE Calculations As Of 12/31/2026 2026 2027 $ Variance % Var. 2024 2025 Adopted 2026 DEPT Request vs.Rqst vs. GL Number Activity Activity Budget Projected REQUESTED Adopted Adopted Fund: 7800 LIQUOR FUND Account Category: Estimated Revenues 7800 - LIQUOR FUND 40,043 181,120 - - 30,000 30,000 #DIV/0! 7810 - HERITAGE REVENUES 5,697,132 5,554,602 5,886,419 5,627,154 5,241,729 (644,690) -11.0% 7830 - GALAXIE REVENUES 6,477,596 6,126,465 6,810,068 6,135,464 5,632,878 (1,177,190) -17.3% 7840 - KENRICK REVENUES 4,854,032 4,725,392 5,023,135 4,850,899 4,555,071 (468,064) -9.3% 7850 - KEOKUK REVENUES 5,714,729 5,615,427 6,155,508 5,689,343 5,449,458 (706,050) -11.5% 7880 - EMPORIUM REVENUE 65,504 71,145 79,870 52,020 50,700 (29,170) -36.5% Estimated Revenues 22,849,036 22,274,151 23,955,000 22,354,880 20,959,836 (2,995,164) -12.5% Less Transfer in - - - - - - #DIV/0! Less non-operating revenues (214,289) (284,212) (105,000) (50,000) (30,000) 75,000 -71.4% Operating Revenues 22,634,747 21,989,939 23,850,000 22,304,880 20,929,836 (2,920,164) -12.2% Account Category: Appropriations 7800 - LIQUOR FUND 1,339,950 1,712,651 2,346,140 2,287,552 2,004,441 (341,699) -14.6% 7800 - GALAXIE BOND PRIN PMT 260,000 265,000 270,000 270,000 280,000 10,000 3.7% 7811 - HERITAGE EXPENSES 5,325,542 5,279,203 5,629,332 5,225,877 5,098,764 (530,568) -9.4% 7831 - GALAXIE EXPENSES 5,840,863 5,495,773 6,157,051 5,526,925 5,353,744 (803,307) -13.0% 7841 - KENRICK EXPENSES 4,747,789 4,618,404 5,035,262 4,693,934 4,604,492 (430,770) -8.6% 7851 - KEOKUK EXPENSES 5,361,213 5,275,600 5,913,700 5,399,157 5,309,073 (604,627) -10.2% 7881 - EMPORIUM EXPENSES 118,523 113,380 132,802 130,784 133,129 327 0.2% Appropriations 22,993,880 22,760,011 25,484,287 23,534,229 22,783,643 (2,700,644) -10.6% Less Bond Prin Pmt - Galaxie (260,000) (265,000) (270,000) (270,000) (280,000) (10,000) 3.7% Less Transfer out (1,339,950) (1,712,651) (2,346,140) (2,287,552) (2,004,441) 341,699 -14.6% Less OPEB (non-cash)8,603 224,332 (160,000) - - 160,000 -100.0% Less non-operating expenses (113,848) (192,840) - - - - #DIV/0! Operating Expenses 21,288,685 20,813,852 22,708,147 20,976,677 20,499,202 (2,208,945) -9.7% Net Operating Income 1,346,062 1,176,087 1,141,853 1,328,203 430,634 (711,219) -62.3% CHANGE IN NET POSITION TOTAL ESTIMATED REVENUES 22,849,036 22,274,151 23,955,000 22,354,880 20,959,836 (2,995,164) -12.5% TOTAL APPROPRIATIONS 22,993,880 22,760,011 25,484,287 23,534,229 22,783,643 (2,700,644) -10.6% Total Fund 7800 LIQUOR FUND:(144,844) (485,860) (1,529,287) (1,179,349) (1,823,807) (294,520) 19.3% Page 287 of 300 CITY OF LAKEVILLE - LIQUOR STORE PROFORMA Actual Actual Actual Projected Budget 2023 2024 2025 2026 2027 2028 2029 2030 Sales 22,692,543 22,647,730 21,991,286 22,304,880 20,929,836 21,557,731 22,204,463 22,870,597 Cost of goods sold 16,474,954 16,331,345 15,737,400 15,582,914 14,994,717 15,278,565 15,736,922 16,209,030 Gross profit 6,217,589 6,316,385 6,253,886 6,721,966 5,935,119 6,279,166 6,467,541 6,661,567 Gross Profit %27.40%27.89%28.44%30.14%28.36%29.13%29.13%29.13% Total Oper Exp (Excluding Depr) 4,481,571 4,239,364 4,282,143 4,648,783 4,746,813 4,831,929 4,965,646 5,103,538 Net operating income 1,736,018 2,077,021 1,971,743 2,073,183 1,188,306 1,447,237 1,501,895 1,558,029 Total other revenues/(expenses)180,254 93,551 221,425 50,000 30,000 85,300 86,153 87,015 Net income before transfers 1,916,272 2,170,572 2,193,168 2,123,183 1,218,306 1,532,537 1,588,048 1,645,044 Total transfers (974,900) (989,500) (1,365,851) (1,939,795) (1,656,084) (1,400,624) (1,365,486) (1,355,687) Net income 941,372 1,181,072 827,317 183,388 (437,778) 131,913 222,562 289,357 Bond principal payments (348,883) (350,450) (346,800) (349,257) (348,357) (348,557) (348,357) (349,107) Income after bond principal pmts 592,489 830,622 480,517 (165,869) (786,135) (216,644) (125,795) (59,750) FINANCIAL METRICS Projected Ending Cash by Purpose Future and unassigned 2,049,682 1,920,599 1,412,750 1,739,305 442,624 (330,052) (1,123,886) (2,473,871) Planned capital - - 160,000 115,000 109,464 128,598 34,880 431,860 3--months of operating cash 1,120,393 1,059,841 1,070,536 1,162,196 1,186,703 1,207,982 1,241,412 1,275,884 Subsequent year debt service *638,350 631,775 629,750 632,100 348,100 347,900 348,650 351,800 Projected Ending Cash 3,808,425 3,612,215 3,273,036 3,648,600 2,086,892 1,354,428 501,056 (414,326) Income before Contributions & Transfers Net Revenue for Debt Coverage 1,916,272 2,170,572 2,193,168 2,123,183 1,218,306 1,532,537 1,588,048 1,645,044 Total CY Debt Service**1,034,400 1,038,350 1,031,775 1,029,750 1,032,100 748,100 747,900 748,650 Debt Service Coverage Ratio 185%209%213%206%118%205%212%220% * Includes Galaxie (2017A HRA Lse Rev) and Keokuk (2018B Tax Abate) bonds ** Includes transfer to Debt Service for Police Station Bonds to meet policy objectives for ending cash and net position. 10/15/2026 Page 288 of 300 2026 2026 2027 2028 2029 2030 2023 2024 2025 ADOPTED DEPART BUDGET BUDGET BUDGET BUDGET ACTUAL ACTUAL ACTUAL BUDGET ESTIMATE ESTIMATE ESTIMATE ESTIMATE ESTIMATE Revenues Rentals & Events 41,763 51,106 54,081 68,080 37,500 37,500 38,625 39,784 40,977 Liquor sales 22,650,780 22,596,623 21,937,205 23,781,920 22,267,380 20,892,336 21,519,106 22,164,679 22,829,620 Cost of goods sold (16,474,954) (16,331,345) (15,737,400) (17,250,117) (15,582,914) (14,994,717) (15,278,565) (15,736,922) (16,209,030) Net revenues 6,217,589 6,316,384 6,253,886 6,599,883 6,721,966 5,935,119 6,279,166 6,467,541 6,661,567 Expenses Personnel services 2,913,425 3,012,937 3,085,721 3,382,463 3,343,995 3,361,470 3,451,857 3,545,039 3,641,111 Commodities 111,452 72,675 79,707 82,544 66,185 86,653 88,573 90,557 92,608 Contractual services 1,185,276 1,162,351 1,710,081 1,621,161 1,612,776 1,678,168 1,676,444 1,729,804 1,779,961 Total expenses 4,210,153 4,247,963 4,875,509 5,086,168 5,022,956 5,126,291 5,216,873 5,365,400 5,513,680 Net operating income/(loss)2,007,436 2,068,421 1,378,377 1,513,715 1,699,010 808,828 1,062,293 1,102,141 1,147,886 Other Receipts (Disbursements) Interest income 220,139 126,404 181,120 105,000 50,000 30,000 85,300 86,153 87,015 Other income (278) 73,615 101,745 - - - - - - Sale of capital assets - (69,896) (27,973) - - - - - - Capital outlay acquisitions - - (160,000) (85,000) (115,000) (109,464) (128,598) (34,880) (431,860) Lease interest (39,607) (36,572) (33,467) - - - - - - Debt principal payments (250,000) (260,000) (265,000) (270,000) (270,000) (280,000) - - - Total other (69,746) (166,449) (203,575) (250,000) (335,000) (359,464) (43,298) 51,273 (344,845) Net incr(decr) before transfers 1,937,690 1,901,972 1,174,802 1,263,715 1,364,010 449,364 1,018,995 1,153,414 803,041 Transfer to Gen Fund (Fireworks)(30,000) (30,000) (30,000) (30,000) (30,000) (30,000) (30,000) (30,000) (30,000) Transfer to Building Fund (1,218,246) - - - - - - - - Transfer to Equipment Fund (1,636,700) (500,000) (900,000) (1,500,000) (1,500,000) (1,200,000) (900,000) (900,000) (900,000) Transfer to Technology Fund (44,900) (59,500) (35,851) (68,340) (9,795) (26,084) (70,624) (35,486) (25,687) Transfer to DSF (Keokuk Bonds)(348,883) (350,450) (346,800) (347,800) (349,257) (348,357) (348,557) (348,357) (349,107) Transfer to DSF Police Station Bonds (400,000) (400,000) (400,000) (400,000) (400,000) (400,000) (400,000) (400,000) (400,000) Total transfers (1,323,783) (1,339,950) (1,712,651) (2,346,140) (2,289,052) (2,004,441) (1,749,181) (1,713,843) (1,704,794) Net increase/(decrease)613,907 562,022 (537,849) (1,082,425) (925,042) (1,555,077) (730,186) (560,429) (901,753) Working capital, Jan 1 4,192,587 4,806,494 5,368,516 5,085,298 4,830,667 3,905,625 2,350,548 1,620,362 1,059,932 Working capital, Dec 31 4,806,494 5,368,516 4,830,667 4,002,873 3,905,625 2,350,548 1,620,362 1,059,932 158,179 Total Working Capital 4,806,494 5,368,516 4,830,667 4,002,873 3,905,625 2,350,548 1,620,362 1,059,932 158,179 Work Cap -Rsrvd for future (Kenrick sale)1,429,361 1,241,965 1,047,663 847,359 850,361 653,058 455,755 249,272 38,197 Work Cap - Available for operations 3,377,133 4,126,551 3,783,003 3,155,514 3,055,264 1,697,490 1,164,606 810,661 119,982 LIQUOR FUND PROJECTED WORKING CAPITAL Page 289 of 300 Date: 10/19/2026 Review 2027 Proposed Fee Schedule Proposed Action Staff is seeking direction from the Council regarding planned/proposed changes to City fees. Overview Staff reviews the fee schedule annually as part of the budget process and makes recommendations to the City Council for changes or additions as needed. The goal of fee changes is to recover our best estimate of costs incurred by the City in providing services. The Council is required to announce the time and place of the council meeting at which the 2027 official fee schedule would be discussed, and which would allow for stakeholder input. A public hearing as required by State Statute 462.353 is being held on December 7, 2026. The requirements to adopt a fee schedule set out in Minnesota Statute 462.353 subd. 4 will be met at the December 7, 2026 Council meeting. The public hearing will allow citizens and other interested parties to voice their opinions regarding the fees and charges. The input received from the October 19th meeting and public hearing on December 7th will be incorporated into the 2027 Official Fee Schedule. The 2027 Official Fee Schedule will be incorporated into the City Code with an effective date of January 1, 2027 unless noted otherwise. New fees, including fees that have historically been charged but haven’t been reflected on the fee schedule, and proposed changes are indicated in the table on the attachment alongside their present amount. Please see the explanation for proposed changes below. Supporting Information 1. Explanation of Proposed 2027 Fee Schedule Changes 2. 2027 Proposed Fee Schedule Changes Financial Impact: $ Budgeted: Yes Source: City fees Envision Lakeville Community Values: Good Value for Public Service Report Completed by: Julie Stahl, Finance Director Page 290 of 300 Page 1 Explanations of Fee Changes 1. The residential, commercial, and industrial park dedication fees are proposed to increase by 2% as of January 1, 2027, to coincide with the increase in estimated market value of unplatted land. 2. Revised the staff hourly fees to reflect estimates for 2027 cost of living adjustments. Consistent with prior years, the rates are calculated using 2.5 times payroll costs (to account for benefit and other indirect costs). 3. Added fees for tax abatement and tax increment financing applications to the fee schedule. These are not new fees, as they have historically been listed in separate policies. 4. Added franchise fees to fee schedule, which have all been previously authorized in separate agreements. These are not new fees, nor are amounts changing. 5. Removed separate application fee for dynamic display sign, as the city’s costs are now covered by a sign permit fee. 6. Outdoor park shelter rental fees for non-residents were updated based on market comparison. 7. Microphone rental fee was combined with the general sound system access at an increased rate of $100 instead of each piece having a separate $50 fee. 8. Added East Community Park shelter to the rental fees, and increased the non-resident shelter rental fees based on market comparison. 9. Increased Ed Mako ELC Rental fees for both resident and non-residents based on market comparison. 10. Added a separate fee for Scout Troop rental of enclosed shelter space. There has been a significant increase in bookings due to schools not being available, resulting in additional staff time to coordinate the rentals. 11. Removed rental fees for picnic tables and snowshoes as these items are no longer available for separate rental (picnic tables are provided as part of shelter rentals). 12. Private program fees for rental of park green space updated to be $45 per day in conjunction with changes to the Private Program policy to better match park requests. 13. Field rental fees simplified to be based on resident or non-resident groups and updated to market rates. 14. Youth athletic association participation fees updated based on market rates. 15. Removed fee for Epson portable projector as this equipment is no longer available for rental. 16. Removed the security deposit on the Portable Fender Sound System fee since any damage/loss would be covered by the room rental deposit. 17. Combined rental fee for Heritage Center microphone with the overall sound system rental for a total fee of $100 instead of two separate $50 fees. 18. Removed late check out fee for rentals at the Heritage Center as this fee would be deducted from security deposit. 19. Removed the Parks & Recreation Facility Attendant staff rate, because this fee has been built into the room rental rates and is separately charged. 20. Updated various Arts Center rental-related and piano tuning fees after a market comparison. 21. Removed the year in the Land Use Map fee so it is generic to whichever Land Use Map is requested. 22. Removed the line item to provide CD copies of planning & zoning publications, because the City no longer has a method by which to provide these. Instead, electronic copies are typically provided by flash drive or posting files online, and the line item for electronic copies in the General Government Services section covers this method. Page 291 of 300 Page 2 23. Removed the fee for the 1st Extension of the Conditional Use Permit (CUP). An applicant can request a one-year extension on a CUP, which can be approved administratively, so no fee is needed. Additional extensions beyond the first will still incur a fee of $250. 24. Increased cost of providing a zoning letter to reflect the same hourly fee for the Senior Planner staff rate, to allow the City to recover its costs in providing the letter. 25. Revised the staff hourly fees to reflect estimates for 2027 cost of living adjustments. Consistent with prior years, the rates are calculated using 2.5 times payroll costs (to account for benefit and other indirect costs). 26. Revised the Dangerous dog $100 fee to note that it is for annual registration. 27. Added two new fees including 1) a $300 fee for requesting a hearing to review a dangerous dog designation, and 2) an additional dangerous dog designation hearing fee for actual costs incurred beyond the $300 and up to $1000 per Minnesota Statute § 347.541. The second fee will only be charged if the dangerous dog designation is upheld. These fees will allow the City to recover legal services costs incurred during this process (the City provides an impartial hearing officer when an owner requests a hearing). 28. Increased the fee for use of the Aerial Truck in accordance with the most recently published FEMA rates. 29. Increased the Fire department contract services rate from $60/hour to $75/hour to account for increases in payroll costs, and other fire response fees to account for increases in staff costs. 30. Increased the Public Safety Staff Services fees for estimated 2027 cost of living adjustments, the goal being to ensure City costs are recovered for when these services are billed. 31. Increased fees for the FiRST Center by a rounded 3%, which aligns with discussions regarding financial models and terms established in Capital Member agreements. 32. Revised the staff hourly fees to reflect estimates for 2027 cost of living adjustments. Consistent with prior years, the rates are generally calculated using 2.5 times payroll costs (to account for benefit and other indirect costs). 33. Sewer rates are proposed to increase to cover infrastructure improvements on lift stations in the 2027-2031 Capital Improvement Plan, as well as a 6.67% increase in the MCES charges, which are not controllable by the City. The recommended increase is a $0.23 per quarter for the basic sewer charge and $0.12 per thousand gallons of discharge. For the average residence using 15,000 gallons, the increase in the quarterly bill will be $2.03. More detail is provided in the October 19th Utility Budget/Rate memo. 34. Water rates are proposed to increase to cover infrastructure improvements as proposed in the 2027-2031 Capital Improvement Plan, as well as cost increases for normal operating expenses. This includes construction of a Satellite Water Treatment Plant estimated to cost over $44 Million, to be financed with a combination of bonds and available funds in the Water Operating and Water Trunk funds. The recommended increase is $0.69 per quarter for the basic water charge and $0.09 per thousand gallons of consumption (tier 1), $0.10 per thousand gallons of consumption (tier 2), $0.19 per thousand gallons of consumption (tier 3), $0.45 per thousand gallons of consumption (tier 4 and irrigation sprinklers), and .54 per thousand gallons for bulk water usage. For the average residence using 15,000 gallons of water, the increase in the quarterly bill will be $2.13. More detail is provided in the October 19th Utility Budget/Rate memo. 35. Increased the fee for third and subsequent out of cycle meter reads, and the special meter read for tenant/owner changes to be $76/visit, consistent with the utility service call fees (during normal business hours). Page 292 of 300 Page 3 36. The water service call fees are proposed to be increased from $74/visit to $76/visit for calls during normal business hours. The after-business hours rate of $206/visit will stay the same for 2027. The purpose of these increases is to better reflect the actual costs incurred by the City in performing the service calls. These fees are charged for water disconnection, water reconnection, other service calls, and for meter reading of customers who have opted out of the radio-read type meters (meter must be read manually). The after-business hours charge is higher due to the minimum 2.5 hours paid to staff for after-hours work per the union contract. 37. Increased fees for mini manhole cover installation to ensure we are recovering costs incurred in providing these services (increase due to increase in staff costs). 38. The threshold for utility bill refunds has been at $10/account for several years. The cost of processing utility billing refunds via check payment is estimated to be approximately $25 per refund. Therefore, an increased threshold of $25/account is proposed. 39. Street Light rates are proposed to increase to cover costs projected in the 2027-2031 Capital Improvement Plan, as well as normal operating increases. The recommended increase is a $0.21 per quarter for the quarterly fee. Staff has also proposed that the commercial/industrial/institutional (C/I/I) rate changes from simply $0.3033/front foot/quarter to be the GREATER of $0.3033/front foot/quarter or $10.84/account/quarter, so that a C/I/I customer account is not charged less than a residential customer. More detail is provided in the October 19th Utility Budget/Rate memo. 40. Environmental Resources rates are proposed to increase to cover costs projected in the 2027- 2031 Capital Improvement Plan, as well as normal operating increases. The recommended increase is $1.12 per quarter for the quarterly fee. More detail is provided in the October 19th Utility Budget/Rate memo. 41. Increased the refundable deposit charged with rental of the Emporium room from $80 to $200 to give renters a stronger incentive to leave the room in great condition. The current $80 does not cover a damaged table, broken equipment, wall damage or significant clean- up. 42. Increased the wetland delineation and wetland application fees from $325 to $400 to account for increased labor costs to process those applications. Page 293 of 300 ITEM/ACTIVITY 2026 Fee Proposed 2027 Fee 1 Residential (High-Density) $3,133 per dwelling unit $3,196 per dwelling unit Residential (Medium-Density) $4,087 per dwelling unit $4,169 per dwelling unit Residential (Low-Density) $6,007 per dwelling unit $6,127 per dwelling unit Commercial $9,761 per acre $9,956 per acre Industrial $5,783 per acre $5,899 per acre 2 City Engineer $210.00 $216.00 Assistant City Engineer $187.00 $192.00 Senior Project Engineer $176.00 $181.00 Project Engineer $157.00 $161.00 Civil Engineer $132.00 $136.00 Graduate Engineer $117.00 $121.00 GIS Manager $148.00 $152.00 GIS Analyst $117.00 $121.00 Environmental Resources Manager $157.00 $161.00 Environmental Resources Specialist $124.00 $128.00 Environmental Resources Technician $111.00 $114.00 City Forester $148.00 $152.00 Forester Technician $98.00 $101.00 Administrative Assistant $98.00 $101.00 Public Works Coordinator $187.00 $192.00 Construction Services Superintendent $176.00 $181.00 Senior Construction Representative $132.00 $136.00 Construction Representative $117.00 $121.00 3 Tax abatement application process: 1) $500 initial fee; non-refundable, submitted with initial application for staff review and preliminary approval $500.00 $500.00 2) $3,000 final fee (submitted only if preliminary approval is granted to begin creating the tax abatement project area, notices and resolutions) $3,000.00 $3,000.00 Tax Increment Financing (TIF) application process: 1) $1,000 initial fee (non-refundable, submitted with the completed application for preliminary review ) $1,000.00 $1,000.00 2) $5,500 final fee (due if preliminary approval is granted and the Tax Increment Financing Plan is prepared) $5,500.00 $5,500.00 2027 PROPOSED FEE SCHEDULE CHANGES* City of Lakeville *This schedule only includes the proposed changes/additions to fees, and is not the full fee schedule. Connection Charges and Development Fees Park Dedication Fee Engineering Charges Engineering and Construction Services Staff Services (Hourly fees are associated with staff time on City/County capital improvement projects, City and Developer-Installed Public Improvement Projects and planning applications (preliminary and final plat engineering review excluded). Fees may be billed based on the titles below or any changes to the position titles during the year. General Government services Tax Abatement and Tax Increment Financing Applications Page 294 of 300 ITEM/ACTIVITY 2026 Fee Proposed 2027 Fee 4 Electric franchise fees, per customer (Dakota Electric and Xcel Energy) Residential $6.00/month $6.00/month Small Commercial & Industrial-Non-Demand $16.00/month $16.00/month Small Commercial & Industrial-Demand $35.00/month $35.00/month Large Commercial & Industrial $120.00/month $120.00/month Gas franchise fees, per customer (Centerpoint Energy) Residential/Firm A $6.00/month $6.00/month Firm B $35.00/month $35.00/month Firm C $120.00/month $120.00/month Small Volume Dual Fuel A (SVDF A)$120.00/month $120.00/month Small Volume Dual Fuel B (SVDF B)$120.00/month $120.00/month Large Volume Dual Fuel (LVDF)$120.00/month $120.00/month Large Volume Firm (LGS/LVF)$120.00/month $120.00/month Gas franchise fees, per customer (Minnesota Energy) Residential $6.00/month $6.00/month Class 1 Customers (0-1,500 Therms Annually)$16.00/month $16.00/month Class 2-4 Customers (1,501-2,000,000 Therms Annually)$35.00/month $35.00/month Class 5 Customers (Greater than 2,000,000 Therms Annually)$120.00/month $120.00/month Cable franchise fees Cable franchise fee 5% of gross revenues 5% of gross revenues PEG fee, per subscription $0.50 per month $0.50 per month 5 1. Application fee $100.00 $100.00 6 Non-Resident Half Day $110.00 $120.00 Full Day $160.00 $170.00 7 TV-Sound System Access with microphone $50.00 $100.00 Microphone $50.00 $50.00 8 Resident Half Day $100.00 $100.00 Full Day $130.00 $130.00 Non-Resident Half Day $130.00 $140.00 Full Day $190.00 $200.00 9 Resident $45/hr, 2 hour minimum $200 refundable deposit $50/hr, 2 hour minimum $200 refundable deposit Non-Resident $55/hr, 2 hour minimum $200 refundable deposit $60/hr, 2 hour minimum $200 refundable deposit 10 Scout Troop Rental n/a- new fee in 2027 $10/hr, 2 hour minimum 11 Picnic Tables $5.00/day + $150.00 refundable deposit $5.00/day + $150.00 refundable deposit Snowshoe Rental $5.00/day + $75.00 refundable deposit $5.00/day + $75.00 refundable deposit Special Event Fees -For rental of park spaces for larger events. See the Facility User Guide for additional details. Fee includes an application fee, refundable deposit and an overall rental fee. $25 - application fee; $150 refundable deposit; $500 for rental of an entire park space including $25 - application fee; $150 refundable deposit; $500 for rental of an entire park space including 12 Private Program Fees - For rental of park green spaces for recurring rentals. See the Facility User Guide for additional details. Fee includes an annual permit, a base fee for one to ten daily uses of park green space, and an additional fee per day for rentals longer than 10 daily uses. $25 - annual permit; $100 1-10 daily uses of park green space; $5 for each additional day after the first 10 day increment $45/day Dynamic Display Sign (Adopted by Ordinance) Licenses Parks & Recreation- Shelter/Buildings Outdoor Park Shelter Rental Fees John Hennen Pavilion Rental Fees Antlers Park Shelter A, East Community Park Shelter Rental Fees Antlers Park Shelters B & C Shelter Rental Fees Ed Mako ELC Rental Fees Franchise Fees Enclosed Shelter Rental Fees Other shelter-related fees Page 295 of 300 ITEM/ACTIVITY 2026 Fee Proposed 2027 Fee 13 Parks & Recreation- Field Rental fees See separate Park Facility Usage policy for complete details and policy related to the fees enumerated below. The scheduling priority and group fees are as follows (see policy for additional details) •Group 1- All city sponsored activities and programs •Group 2- Recognized Lakeville Athletic Groups and Clubs •Group 3- Recognized Lakeville community service and civic non-profit organizations and agencies (ex- Rotary, Lions) •Group 4- Lakeville residents •Group 5- Private companies, non-resident individuals and groups. Baseball, Softball and Athletic Deck (per field/deck, per hour) 1,2 (Groups 2 and 3- field rental fee is waived for regular season league play and tournaments) Group 2- $15 Group 3-$17 Group 4- $19 Group 5- $21 Resident Group- $20 Non-Resident Group-$25 Athletic Deck striping (by request, per deck, per time) Group 2- $50 Group 3-$55 Group 4- $60 Group 5- $70 Resident Group- $50 Non-Resident Group-$70 Grand Prairie Baseball Field Stadium $150/game Resident Group- $150/game Non-Resident Group- $200/game Outdoor Hockey Rinks (with or without ice)- per hour/per rink See below for separate light fees. Group 2, 3, 4- $15 Group 5-$25 Resident Group- $20 Non-Resident Group-$30 Sand Volleyball, per hour/per court Group 2, 3, 4- $15 Group 5-$25 Resident Group- $20 Non-Resident Group-$30 Pickleball Court, per hour/per court Group 2, 3, 4- $15 Group 5-$25 Resident Group- $20 Non-Resident Group-$30 Light fees- Per Rink/Field, per Evening Group 2, 3, 4- $35 Group 5-$45 Resident Group- $35 Non-Resident Group-$45 Disc Golf Course, per day Group 2, 3, 4- $100 Group 5-$200 Resident Group- $100 Non-Resident Group-$200 Youth Athletic Association Participation Fee (Lakeville) $10 per player, per season $15 per player, per season 14 Youth Athletic Association Participation Fee (Non-Lakeville) $250 per field, per season $300 per field, per season 15 Epson Portable Projector $50.00 $50.00 16 Portable Fender Sound System, one cordless handheld mic $50.00 (plus $250 security deposit) $50.00 (plus $250 security deposit) 17 Heritage Room Sound System access with microphone $50.00 $100.00 Heritage Room microphone $50.00 $50.00 18 Late Check out fee $50, charged up front, and returned if out by time listed on permit. If time extends 30min. past permit time, $200/hr $50, charged up front, and returned if out by time listed on permit. If time extends 30min. past permit time, $200/hr Parks & Recreation Staff Services (hourly fees are associated with staff time to facilitate rentals when the building would not otherwise be open). 19 Facility Attendant $78.00/hour $78.00/hour Other Heritage Center charges Heritage Center Page 296 of 300 ITEM/ACTIVITY 2026 Fee Proposed 2027 Fee 20 4 hour minimum rental time 25% discount available for Community Theater events advertised in the Playbill.$70.00/hour for 1st 4 hours $55.00/additional hour $75.00/hour for 1st 4 hours $60.00/additional hour Tech booth $60.00/performance $60.00/day Piano Tuning Fee (Available upon request with 2 week notification)$115.00 $150.00 2 hour minimum rental time 25% discount available for Community Theater events advertised in the Playbill.$50.00/hour for 1st 2 hours $45.00/additional hour $60.00/hour for 1st 2 hours $50.00/additional hour South lawn OR North lawn (up to 200 people)$150.00/day $200.00/day South lawn OR North lawn (over 200 people)$200.00/day $250.00/day 21 2020 Land Use Map * Map Fee * Map Fee 22 Publications listed above available in CD format No Charge No Charge 23 - 1st Extension $50.00 no fee - Additional Extensions $250.00 $250.00 24 Zoning Letter $148.00 $152.00 25 Code Enforcement Officer $111.00 $114.00 Senior Planner $148.00 $152.00 Planning Manager $198.00 $204.00 Community Development Director $235.00 $242.00 26 Dangerous dog annual registration $100.00 $100.00 27 Potentially dangerous dog designation hearing request fee n/a- new fee in 2027 $300.00 Dangerous dog designation hearing fee, if the designation is upheld (per Minnesota Statutes § 347.541, subdivision 4). Incremental costs beyond $300 and up to $1,000 will be charged. n/a- new fee in 2027 Actual hearing expenses, up to $1,000 (per statute) 28 Aerial Truck $220.00/hr $260.00/hr 29 Fire department contract services $60.00/hr/person $75.00/hr/person Fire inspection services (provided to other cities) Regular time Overtime $115.00/hour $141.00/hour $115.00/hour $147.00/hour 30 Police Officers $125.00 $130.00 Reserve Officers $25.00 $65.00 Community Service Officers $60.00 $65.00 Fire Chief $235.00 $242.00 Assistant Fire Chief $186.00 $192.00 Fire Captain $133.00 $152.00 Firefighter (FT)$105.00 $121.00 Other public safety charges THEATER/AUDITORIUM (Theater Seating) Technical Services Fees Piano Fees Large Meeting Room • dimensions: 42' x 44', 1848 square feet • Projector Screen and TV with HDM1 port • sink and limited countertop space • capacity: 118 without tables, or 64 with banquet seating Police and Fire Staff Services (hourly fees) Planning & Zoning Publications Conditional Use Permit, Interim Use Permit and Variance Extension (Adopted by Ordinance) Other planning and zoning fees Planning and Zoning Staff Services (hourly fees) Animal Fees/Licenses Outdoor rental on Arts Center grounds • Rental events using the lawn and/or the parking lot will be charged a fee based on the number of people attending the event. Set up shall be under the supervision of LAAC or Parks Staff. Electric service may require additional set fees. Public Safety FEMA Emergency Incident Charges (1 hour minimum, excludes personnel cost) Arts Center Response fees/fire Page 297 of 300 ITEM/ACTIVITY 2026 Fee Proposed 2027 Fee 31 Mats Room (Defensive Tactics)$260/day $270/day Full classroom (114 seats)$500/day $515/day Half classroom (57 seats )$250/day $260/day 50-yd Shooting Range $235/hr $242/hr 25-yd Shooting Range $235/hr $242/hr Virtual Reality $100/hr $103/hr RBT - Indoor & Outdoor $525/day $540/day Reality-Based Training Areas $525/day $540/day - Includes flexible wall system, customizable environments (including smoke) - Training Elements include: < Ladder rescue drills - balcony, windows and rooftop < Ground ladder training < SCBA confidence course < Search & rescue- Training 32 Part-time seasonal $49.00 $50.00 Service Tech $104.00 $107.00 Maintenance II $104.00 $107.00 Lead Maintenance $122.00 $122.00 Lead Service Tech $122.00 $122.00 Fleet, Streets, Parks Supervisor $148.00 $152.00 Superintendent $176.00 $181.00 Administration $98.00 $101.00 *See Engineering section for Construction Services staff rates. Part-time seasonal $49.00 $50.00 Maintenance I $78.00 $80.00 Maintenance II $104.00 $107.00 Lead Maintenance $122.00 $122.00 Supervisor $148.00 $152.00 Superintendent $187.00 $192.00 Administration $98.00 $101.00 33 Base Charge- per dwelling unit, per quarter $11.68 $11.91 Usage Charge • Based on actual consumption during the first or second quarter of the year, depending on location within the City, or actual water consumption during the billing period. • When an account is newly established, the maximum sewer usage charge shall be set at 18,000 gallons. Sewer for the remainder of the year will be set at this figure or actual usage, whichever is less. • Residential customers shall be billed for a minimum of 5,000 gallons per quarter. • For apartments and manufactured homes served by a single meter, the usage charge is determined by dividing the total gallons of water by the # of units. $5.79/1000 Gal $5.91/1000 Gal Flat rate- per dwelling unit, per quarter shall be charged to those residential customers who do not have metered water. $115.90 $118.29 Base Charge- per account, per quarter $11.68 $11.91 Usage Charge • Based on actual consumption during the first quarter of the year, or actual water consumption during the billing period, whichever is less. $5.79/1000 Gal $5.91/1000 Gal SEWER USAGE RATES- Quarterly Charges Residential, Apartments and Manufactured Homes FiRST Center- Fire Training Facility Pricing Utilities staff services (per hour) (Hourly fees are typically charged in cases where FEMA is involved, if City staff assists another Streets and Parks staff services (per hour) (Hourly fees are typically charged in cases where FEMA is involved, or if City staff assists Public Works Commercial, Industrial and Institutional FiRST Center- General Facility Pricing* Page 298 of 300 ITEM/ACTIVITY 2026 Fee Proposed 2027 Fee 34 Base Charge- per dwelling unit, per quarter $11.58 $12.27 Usage Charge • Based on actual metered gallons consumed each quarter Tier 1- up to 6,000 gallons per quarter 1.51/1000 Gal 1.60/1000 Gal Tier 2- over 6,000 gallons up to 15,000 gallons per quarter (additional 9,000 gallons max) 1.67/1000 Gal 1.77/1000 Gal Tier 3- over 15,000 gallons up to 30,000 gallons per quarter (additional 15,000 gallons max) 3.23/1000 Gal 3.42/1000 Gal Tier 4- over 30,000 gallons per quarter 5.67/1000 Gal 6.12/1000 Gal Irrigation sprinkler meters 5.67/1000 Gal 6.12/1000 Gal Base Charge- per account, per quarter $11.58 $12.27 Usage Charge • Based on actual metered gallons consumed each quarter Tier 1- up to 6,000 gallons per quarter 1.51/1000 Gal 1.60/1000 Gal Tier 2- over 6,000 gallons up to 15,000 gallons per quarter (additional 9,000 gallons max) 1.67/1000 Gal 1.77/1000 Gal Tier 3- over 15,000 gallons up to 30,000 gallons per quarter (additional 15,000 gallons max) 3.23/1000 Gal 3.42/1000 Gal Tier 4- over 30,000 gallons per quarter 5.67/1000 Gal 6.12/1000 Gal Irrigation sprinkler meters 5.67/1000 Gal 6.12/1000 Gal Account fee set up charge, per water card $25.00/card $25.00/card New account set up deposit $100/new account $100/new account Usage Charge o Based on actual metered gallons consumed each quarter $6.74/1000 Gal $7.28/1000 Gal For those accounts whereby an accurate reading cannot be determined due to a faulty meter; water consumption shall be established to be 18,000 gallons per quarter per dwelling unit. 35 Out of Cycle Meter Read (during normal business hours only) First and second out of cycle meter read no charge no charge Third and subsequent out of cycle meter reads $74.00/visit $76.00/visit Special meter read for tenant/owner changes $74.00/visit $76.00/visit 36 During normal business hours $74.00/visit $76.00/visit 37 Mini Manhole Cover *Includes cost of mini manhole plus an additional 15% for staff administrative processing time. Actual cost of mini manhole cover + 15% Actual cost of mini manhole cover + 15% Mini Manhole Cover plus installation *Includes cost of mini manhole plus an additional 15% for staff administrative processing time, and staff time to install (including staff use of City patch truck). Actual cost of mini manhole cover + 15%; plus $294 for installation Actual cost of mini manhole cover + 15%; plus $301 for installation 38 Utility Bill Refunds (for customers no longer requiring utility services at a particular property): •No refunds issued for balances under $25.00 •Balances greater than or equal to $25.00 will be applied to the resident’s active account (if they remain in Lakeville), or refunded via check (for customers with no remaining active account). Commercial, Industrial and Institutional Bulk Water Accounts OTHER UTILITY FEES Water Disconnection, Reconnection or other Service Call Other WATER USAGE RATES- Quarterly Charges Residential, Apartments and Manufactured Homes Page 299 of 300 ITEM/ACTIVITY 2026 Fee Proposed 2027 Fee 39 Residential and multiple family units $10.63/dwelling unit/quarter $10.84/dwelling unit/quarter Commercial, Industrial and Institutional $0.2974/front foot/quarter the greater of $0.3033/front foot/quarter or $10.84/account/quarter New subdivisions, as part of development contract $42.52/residential dwelling unit $43.36/residential dwelling unit Residential and multiple family units $42.52/dwelling unit $43.36/dwelling unit Manufactured homes and Manufactured Home Parks No charge No charge 40 -Single family (residential equivalent utility factor) Environmental Resources Fee $16.00/dwelling unit/quarter $17.12/dwelling unit/quarter Utility accounts not served by water and/or sanitary sewer shall be billed annually. -Residential equivalent utility factor Environmental Resources Fee $64.00/dwelling unit/year $68.48/dwelling unit/year New subdivisions, as part of development contracts; one-time fee $64.00/dwelling unit $68.48/dwelling unit Classification and (Utility Factor) 1 - Single Family Residential (1.00) 2 - Agricultural with a homestead (1.00) 3- Duplex (0.50) 4 - Manufactured Homes (0.25) 5 - Townhomes (0.50) 6 - Apartments (0.25) 7 - Commercial/Industrial (4.20) 8 - Church, School, Institutions (4.20) 9 - Golf Courses (4.20) 10 - Parking Lots as a principal use (4.20) 41 Deposit (refundable) $80.00 $200.00 42 Wetland Delineation $325.00 Minimum fee plus any incremental hourly staff fee $400.00 Minimum fee plus any incremental hourly staff fee Wetland Application $325.00 Minimum fee plus any incremental hourly staff fee $400.00 Minimum fee plus any incremental hourly staff fee Engineering Charges Wetland Conservation Act Administration Utility accounts NOT served by water and/or sanitary sewer Other Environmental Resources Fee Calculation: STREET LIGHTS Utility accounts served by water and/or sanitary sewer Utility accounts NOT served by water and/or sanitary sewer shall be billed annually ENVIRONMENTAL RESOURCES FEE (stormwater maintenance) Utility accounts served by water and/or sanitary sewer Emporium Room Rental Emporium Room at Keokuk Liquor Store Page 300 of 300