Loading...
HomeMy WebLinkAbout99-040 CITY OF LAKEVILLE • RESOLUTION DATE' February 16, 1999 RESOLUTION NO• 99-40 MOTION BY: Sindt SECONDED BY: Mulvihill RESOLUTION AUTHORIZING PRELIMINARY ENGINEERING, FEASIBILITY STUDY,AND ENVIRONMENTAL ASSESSMENT WORKSHEET FOR IPAVA AVENUE AND 195TH/192ND STREET, CENTRAL AREA CITY IMPROVEMENT PROJECT 98-10 WHEREAS, in accordance with the Capital Improvement Plan for 1999, Ipava Avenue is to be constructed from the Lakeville Senior High School northerly to the existing Ipava Avenue; and WHEREAS, the realignment of 192°d Street east of Ipava Avenue to 195` Street is included in the 1999 CIP; and WHEREAS, TKDA has prepared a proposal for the preparation of preliminary • report (feasibility study) and preliminary engineering for the proposed project; and WHEREAS, a mandatory Environmental Assessment Worksheet (EAW) is required under the rules of the Environmental Quality Board; and WHEREAS, the preparation of the EAW is considered extra services and is proposed to be prepared at an hourly rate not to exceed $9,860.00. NOW, THEREFORE, BE IT RESOLVED, that the City of Lakeville authorizes TKDA to prepare a Preliminary Engineering, Feasibility Study, and Environmental Assessment Worksheet for Ipava Avenue and 195'/192°d Street, Central Area. APPROVED AND ADOPTED, this 16th day of February, 1999. CITY OF LAKEVILLE By: D ane Zaun, M r ATTE T: harlene Friedges, City C rk