HomeMy WebLinkAbout99-040 CITY OF LAKEVILLE
• RESOLUTION
DATE' February 16, 1999 RESOLUTION NO• 99-40
MOTION BY: Sindt SECONDED BY: Mulvihill
RESOLUTION AUTHORIZING PRELIMINARY ENGINEERING, FEASIBILITY
STUDY,AND ENVIRONMENTAL ASSESSMENT WORKSHEET FOR IPAVA
AVENUE AND 195TH/192ND STREET, CENTRAL AREA
CITY IMPROVEMENT PROJECT 98-10
WHEREAS, in accordance with the Capital Improvement Plan for 1999, Ipava
Avenue is to be constructed from the Lakeville Senior High School northerly to the
existing Ipava Avenue; and
WHEREAS, the realignment of 192°d Street east of Ipava Avenue to 195` Street is
included in the 1999 CIP; and
WHEREAS, TKDA has prepared a proposal for the preparation of preliminary
• report (feasibility study) and preliminary engineering for the proposed project; and
WHEREAS, a mandatory Environmental Assessment Worksheet (EAW) is
required under the rules of the Environmental Quality Board; and
WHEREAS, the preparation of the EAW is considered extra services and is
proposed to be prepared at an hourly rate not to exceed $9,860.00.
NOW, THEREFORE, BE IT RESOLVED, that the City of Lakeville authorizes
TKDA to prepare a Preliminary Engineering, Feasibility Study, and Environmental
Assessment Worksheet for Ipava Avenue and 195'/192°d Street, Central Area.
APPROVED AND ADOPTED, this 16th day of February, 1999.
CITY OF LAKEVILLE
By:
D ane Zaun, M r
ATTE T:
harlene Friedges, City C rk