HomeMy WebLinkAbout98-055 CITY OF LAKEVILLE
RESOLUTION
DATE: Anr; ~ ti ~ ~ AAg RESOLUTION NO: 98-55
MOTION BY: Sindt SECONDED BY: Mulvihill
RESOLUTION AUTHORIZING BARR ENGINEERING TO
PREPARE PLANS AND SPECIFICATIONS FOR WELL NO. 13,
IMPROVEMENT PROJECT 98-11A, AND
AUTHORIZING CITY ENGINEER TO
PREPARE PLANS AND SPECIFICATIONS FOR WELL COLLECTION PIPE FOR
WELL NO. 13, CITY IMPROVEMENT PROJECT 98-11B
WHEREAS, Well No. 13 is recommended to be constructed in 1998 in accordance to
Lakeville's Comprehensive Water System Plan update; and
WHEREAS, on March 16, 1998, the City Council approved Lakeville's 5-Year Capital
Improvement Plan which included financing for Well No. 13 is in 1998; and
• WHEREAS, in order for Well No. 13 to be ut on-line, it is necess that a well
p ~`Y
collection pipe be extended along Ipava Avenue to connect Well No. 13 to existing collection
pipe extending from the Water Treatment Plant;. and
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of
Lakeville, Minnesota:
1. Barr Engineering is hereby authorized to prepare plans and specifications for Well No.
13, Improvement Project 98-11A.
2. The City Engineer is authorized to prepare plans and specifications for the necessary
well collection pipe which will be extended along Ipava Avenue, Improvement Project 98-11B.
APPROVED AND ADOPTED this 6th day of April, 1998.
CITY O AKEVILLE
By:
ane Zaun, a or
TTEST:
Charlene Friedges, City ~ rk