Loading...
HomeMy WebLinkAbout98-055 CITY OF LAKEVILLE RESOLUTION DATE: Anr; ~ ti ~ ~ AAg RESOLUTION NO: 98-55 MOTION BY: Sindt SECONDED BY: Mulvihill RESOLUTION AUTHORIZING BARR ENGINEERING TO PREPARE PLANS AND SPECIFICATIONS FOR WELL NO. 13, IMPROVEMENT PROJECT 98-11A, AND AUTHORIZING CITY ENGINEER TO PREPARE PLANS AND SPECIFICATIONS FOR WELL COLLECTION PIPE FOR WELL NO. 13, CITY IMPROVEMENT PROJECT 98-11B WHEREAS, Well No. 13 is recommended to be constructed in 1998 in accordance to Lakeville's Comprehensive Water System Plan update; and WHEREAS, on March 16, 1998, the City Council approved Lakeville's 5-Year Capital Improvement Plan which included financing for Well No. 13 is in 1998; and • WHEREAS, in order for Well No. 13 to be ut on-line, it is necess that a well p ~`Y collection pipe be extended along Ipava Avenue to connect Well No. 13 to existing collection pipe extending from the Water Treatment Plant;. and NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Lakeville, Minnesota: 1. Barr Engineering is hereby authorized to prepare plans and specifications for Well No. 13, Improvement Project 98-11A. 2. The City Engineer is authorized to prepare plans and specifications for the necessary well collection pipe which will be extended along Ipava Avenue, Improvement Project 98-11B. APPROVED AND ADOPTED this 6th day of April, 1998. CITY O AKEVILLE By: ane Zaun, a or TTEST: Charlene Friedges, City ~ rk