HomeMy WebLinkAbout86-002
~ ITEM
t e
CITY OF LAKEVILLE
RESOLUTION
Date January 6, 1986 Resolution No. 86-2
Motion by Harvey Seconded by Nelson
RESOLUTION ESTABLISHING STORM SEWER CHARGES
WHEREAS, the City consulting engineers have completed the Compre-
hensive Storm Drainage Plan, Phase II, and the plan has been adopted by
the City Council on December 17, 1979; and
WHEREAS, it is necessary for the City to establish storm sewer
rates that are current with the estimated cost of construction of the
planned improvements for an effective storm drainage system.
NOW, THEREFORE, BE IT RESOLVED by the Lakeville City Council:
1. The storm sewer charge set by this resolution shall be imposed:
a. On new plats, or developing commercial, industrial and
institutional parcels of property.
b. On previously platted but undeveloped property as a
condition to the City allowing the construction of roads or
installation of public utilities.
c. On storm sewer improvement projects.
2. The storm sewer charges shall be:
a. Type I - Single and two family lots, $.084 cents per square
foot per gross area.
b. Type II - Multiple family lots, $.092 cents per square foot
per gross area.
c. Type III - Commercial/industrial/institutional lots., $.118
cents per square foot per gross area.
d. Unplatted property - to be determined by the City Engineer
based upon the amount of run-off generated, and type of
property use.
Y
~
e. A charge per square foot shall be added to the above rates
for property in the Crystal Lake Drainage District as
follows:
Type I $.0065
Type II $.0071
Type III $.0091
3. This resolution shall be updated from time to time to reflect
increased costs.
APPROVED AND ADOPTED by the City Council of the City of Lakeville,
Minnesota, this 6th day of January, 1986, to be effective February 1,
1986.
CITY OF LAKEVILLE
Duane Zaun, M y r
ATTEST:
~a~~
Patrick E. McGarvey, City Clerk
2