Loading...
HomeMy WebLinkAbout84-002 . - s CITY OF LAKEVILLE RESOLUTION Date January 3, 1984 Resolution No. 84-2 Motion by Enright Seconded by Harvey RESOLUTION ESTABLISHING STORM SEWER CHARGES WHEREAS, the City consulting engineers have completed the Compre- hensive Storm Drainage Plan, Phase II, and the plan has been adopted by the City Council on December 17, 1979; and WHEREAS, it is necessary for the City to establish storm sewer rates that are current with the estimated cost of construction of the planned improvements for an effective storm drainage system. NOW, THEREFORE, BE IT RESOLVED by the Lakeville City Council: 1. The storm sewer charge set by this resolution shall be imposed: a. On new plats, or developing commercial, industrial and institutional parcels of property. b. On previously platted but undeveloped property as a condition to the City allowing the construction of roads or installation of public utilities. c. On storm sewer improvement projects. 2. The storm sewer charges shall be: a. Type I - Single and two family lots, $.080 cents per square foot per gross area. b. Type II - Multiple family lots, $.088 cents per square foot per gross area. c. Type III - Commercial/industrial/institutional lots, $.112 cents per square foot per gross area. d. Unplatted property - to be determined by the City Engineer based upon the amount of run-off generated, and type of property use. f ~ . ~ ~ ~ J Y e. A charge per square foot shall be added to the above rates for property in the Crystal Lake Drainage District as follows: Type I $.0062 Type II $.0068 Type III $.0087 3. This resolution shall be updated from time to time to reflect increased costs. APPROVED AND .ADOPTED by the City Council of the City of Lakeville, Minnesota, this. 3rd day of January, 1984. CITY OF LAKEVILLE BY: Duane Zaun, May ATTEST: atric E. McGarvey, City Clerk 2