HomeMy WebLinkAbout02-27-69 COUNCIL MEETING FEBRUARY7, 1969--3:00 P.M.
.Item 1 The meeting was called to order by Mayar Aronson with Mako and
Sullivan present..
Item 2 The bids for the Valley Park reservoir were declared closed at 3:00 P.M.
Bob Roser~e opened and read the bids which are as follows:
Base Bid Bid Bond Alternate No. 1
Minneapolis Tank & Mfg. $63,703 5~ add 8,133 for pilaste
Chicago Bridge & Iron Co. 68,450 5~ 81,450
Pittsburgh-DesMoines Steel Co. 61,400 5% 73,800
The first two companies would start work ten days after the bid is
awarded and be done by Oct. 1.
Pittsburg DesMoines would start April 30 and be done by Aug. 30.
Sullivan moved to authorize Mr. Rosene to take the bids and tabulate
them and return a recommendation as soon as passible. Mako 2nd the
motion. All 3 for. Motion carried.
Item 3 Mr. Rosene discussed the McCarthy Well Co. report with the council
and recommended that the report be ignored as he did not feel this report
was valid.
Item 4 Sull>ivan made a motion seconded by Mako to adjourn. Meeting adjourned.
Respectfully submitted,
Marceline Nemstrom, ViT ag e~-
~s L
tV,.,
t~