Loading...
HomeMy WebLinkAbout08-004 CITY OF LAKEVILLE RESQLUTIQN No. os-4 RESOLUTION APPROVING CHANGE ORDERS RELATING TO THE LAKEVILLE ARENA PROJECT WHEREAS, approved contracts for the Lakeville Arena Project on November 20, 2006. BE IT RESOLVED by the City Council of the City of Lakeville, Minnesota that the change orders for the Lakeville Arena Project are approved as follows: Category Contractor Amount Carpentry Kellington $ 3,258.00 Carpentry Kellington $ 115.00 .Elevator Thyssenkrupp Elevator $ 1,044.00 Concrete curb Mn State Curb and Gutter $ .6,432.00 Painting Swanson Youngdale $ 578.00 Glazing United Glass $ :4,520.00 Metal fabrications Metro Manufacturing $ 355.00 Overhead Coiling Doors Overhead Door $ 1,100.00 • Non-Load Bearing Steel Framing .Berg Drywall $ (1,101.00) Electric Weber Electric $ 10,316.00 Masonry Weise Masonry $ .2,321.00 Ceramic the Grazzini $ 3,630.00 Roofing Aduddell Roofing $ 5,141.00 Concrete Northland $ (5,000.00) Precast stadia Hanson Structural Precast $ 1,091.00 Earthwork and grading Frattalone Companies $ 1,028.00 Resilient flooring Becker Arena Products $ 31,715.90 Mechanical Cool. Air Mechanical $ (3,358.00) Total contract $ 63,185.90 APPROVED AND ADOPTED this Th day of January 2008 by the: City Council of the City of Lakeville, Minnesota. CITY OF~AKEVILLE, MINNESOTA By: H 1 D 1, ayor • AT ST: Charlene Friedges, Ci lerk