The`City Administrator/Clerk presented the Council with a tabulation of the
election results of the November 2, 1976 election..
76.588 Motion was made by Zaun, eeonded by Clarkson to approve the canvas of the
.November 2, 1976 election.
Ro11 call was taken on the motion. Ayes, Mako, Zaun and Clarkson.
76.58 Motion was made by Mako, seconded by Zaun to adjourn the special Council
meeting.
Ro11 call'was taken on the motion. Ayes, Mako., .Zaun and Clarkson.
Time, $:00 P.M.
At this time Mayor Mako asked all present to stand and pledge allegiance to
the flag.
Roll call was .taken. Present: Emond, Mako, Curry,. Zaun and Clarkson.
Also present: Robert Rosene, Consulting City Engineer; Pat Farrell, City
At orney.; Patrick McGarvey, City Administrator; James Robinette, Public
..Works. Director. Also presentwere: Otto Bonestroo and Robert Frigaard
of the :Consulting Engineering firm..
At his time Mayor Mako explained to the citizens-present that the intent
of the meeting was to give Mr. Rosene his request for a hearing before the
City Council.toexplain his views on what had happened 'on various City im-
provement projects. Mayor Mako explained that the Council, would make no
decision after the presentation at this night's meeting. He further ex-
plained after Mr. Rosene had made his presentation, that the Council would
ask questions and then the citizens could ask any questions theq wished.
At this time Mr. Rosene gave a presentation concerning how they write their
specifications, especially when ..they pertain to sanitary sewer or water
systems. He explained that their specifications are considered to be per-
formance-specifications and that tests are taken'at the conclusion. of the
construction work to determine whether or not the work is the standard set
forth in the specifications.
He explained that it is the primary responsibility, in his opinion, _for
the: contractor to supervise his work.'
Mr. Rosene reviewed the current Knutson Orchard Lake utility project and
the. problems involved with that project.
At this point Councilman. Clarkson reQuested_Mr. Rosene-to .explain why".there
had been over 20 broken valves or areas in the clay pipe in the Lakeville
Hills area on this project.
Mr. Rosene explained that he felt most were due to not properly digging the
trench,.. especially at the. bell area or in carelessly backfilling over the
....pipe. "
Mr, Clarkson also questioned why the Engineer .specified reinforced concrete
pipe in .the area `crossing the .swamp east of the Chart House.
Mr. Rosene explained that reinforced concrete pipe is used in many areas
below the water table or-a swamp, that't would be very expensive to use
ductile iron pipe.
At this point, Councilman Clarkson, Zaun and Curry asked questions concern-
ing the .Orchard Lake gro~ect. They also questioned the installation of the
0-rings on the Middle School line 'and the infiltration problems on the Ipana
to Valley. Park sewer line.
Councilman Emond asked. why the current project on-'Orchard .Lake put the pipe
-1-
.f • ~ •
CITY OF LAKEVILLE SPECIAL COUNCIL MEETING
NOVEMBER 3, 1976
across the swamp east of the Chart House rather than going around it.
Mr. Rosene answered these'questons, with the latter answer being that it
was.. considered: appropriate to put the reinforced concrete pipe across the
swamp`whch, when installed properly, would not be subjec to excessive
infiltration-because it was below the swamp. He also stated that the costs
involved of the type of material vs.-another `material or another location
would have to be weighed `in making ;these decisions.
Mayor Mako ques ioned the`on-site inspection policy on the°current projects
as compared to previous projects.
Mr. Rosene explained that in earlier years their service in the City of
Lakeville xesident on-site inspection had not:been°required, but that be-
ginning in-1975 the City changed the contract with-the firm and resident
inspection `has been requested by the City and provided.'
Mrs. Curry questioned about the street project in front of her house and
the lack of borings. on the original installation. The question was also
raised as to whether or not borings were required on the Valley Park tennis
courts before the project began.
At -this time, Mr. Fred :Fredrickson,`.who was a former member of the Water and
Sewer Committee of the Cty'addressed the Council. Mr. Fredrickson 'stated
that in his opinion the. testing and inspection in Lakeville has been more
stringent than. in the'City of Bloomington.- ~ Mr. Fredrickson also
explained to the Council about the proper installation of 0-rings on sewer
pipe. and stated that he personally inspected.the line that had been installed
in the Middle School to the treatment plant in the early 1970's as he was an
unsuccessful bidder on that project. He stated that at`the time .the line
had been finished that'he personally did not observe-any infiltration in the
line when he inspected it.
Mr. Fredrickson also stated that it was the Water and<Sewer Committee's de-
cisions back in the 1960's that resulted-in the current lift station at the
Chart House being used with its discharge into the'sewer system and smaller
lift stations in the Lake"Marion area as a temporary, and cost saving.,
measure to buy time until the ultimate additional trunk line is built to
serve the northwest `sector of Lakeville.
At this time,_the Mayor opened the meeting to questions from citizens pre-
sent.
Mr. Steve Johnson questioned the location of the fire hydrant on County Road
44 in front of his Meager Beginning Studio building and stated that the fire
hydrant had been moved ju t that day.
Mr. Tom Smith addressed the Council and stated that he did not feel there was $
inches of rock on Junelle Path after the water and .sewer went in in-front of
his home. Mr. Rosene stated that he would inspect. the road with Mr. Smith
to determine whether or-not this was sos
Dick Whittier questioned about the grade and settlement at the intersection'.
of 205th and Bughes Streets. Mr."Frigaard answered stating that there was
a flat area in this Bart ofthe.Cty and grades were such that a fast:run-
off was not possible. It was agreed that the City would look into the: matter
at that earner.
Nancy Jensen asked the question of 'what can be done to prevent future problems
'and to prevent additional reassessments. Mr.` Rosene explained that in new
plats being approved from here on the City requires the utilities and streets
to be in before the houses go in, which was not the case in 'all subdivisions
in the past.
Gerry Whittier questioned on-site inspection and how it works. It was ex-
plained that the Engineering Consultant provides inspection from their em-
ployees and that the City personnel also inspect the projects at the end
before they are accepted.'
Peggy Mound asked about dead end water ines'in her area and who_inspects-
them when a developer installs the project.
-2_
ti • l
CITY OF LAKEVILLE SPECIAL COUNCIL MEETING
NOVEMBER 3, 1976
76.590 Motion was made by Emond, seconded by Clarkson to adjourn the C6uncil meeting.
'Roll call was taken on the motion. Ayes, Emond and Clarkson, Nays, Mako, Curry
and Zaun,
At this time Marianne Curry stated that the criticism of the Engineering firm
was not intended but that she felt elected officials have an obligation to
ask questions concerning the performance of Consultants and contractors work-
ing for the City when p~o~sl~ms arise. ~
76.591 Motion was made by Mako, .seconded bg Curry fo adjourn the Council meeting.