Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
0756
ORDINANCE N0.756 CITY OF LAKEVILLE DAKOTA COUNTY, MINNESOTA AN ORDINANCE ADOPTING FEES THE CITY COUNCIL OF THE CITY QF I..AKEVILLE, MINNESOTA ORDAINS: L LfCENSES A. Billboard: 1. Doublerfaced... $ 100.00.. 2. Single-faced........._ $ 50.00 3. Illuminated $ 25.00 ff. PERMITS A. Building Permits TQTAL VALUATION FEE $1 AO to $500.00 $23.50 $501.00 to 2,000.00. $23.50 for the first $500.00 plus $3.05 for each additional $100.00, or fraction thereof, to and including $2,000.00 $2,001.QO to $25,000.00 $69.25 for the first $2,000.00 plus $14.00 for each additional $1,000.00, or fraction thereof, to and including $25,000.00 $25,001.00 to $50,000.00 $391.25 far the first $25,000 plus $10.1Q for each additional $1,000.00, or fraction thereof, to andincuding $50,000.00 $50,001.00 to $100,000.00 $643.75 for the first $50,000.00 plus $7.00 for each additional $1,000.QO, or fraction thereof; to and including $100,000,00 $100,001.00 to $500,000.00 $993.75 for the first $100,000.00 plus $5.60 for each additional $1,000.00, or fraction thereof, to and including $500,00.00 $500,001.00 to $1,000,000.00 $3,233.75 for the first $500,000.00 plus $4.75 for each aditonal $1,000.00, or fraction thereof, to and including $1,000,000.00 $1,000,001.00 and up $5,608.75 forthe first $1,000,000.00 plus $3.15 for each additional $1,000.00, or fraction thereof B. Plan Check. Fees 65% of building permit fee for permits with valuations greater than $10,000. C. Plumbing Permits Requirement: Master License Number or pipe layers certificate, $25, 000 license bond and current Certificate of Liability Insurance to be filed with City. Nate: State Department of Health Bond and Insurance Certificate will satisfy this requirement. Residential -Minimum (includes surcharge) (repairs and alterations, lawn sprinkler systems) $ 40.00 Complete installation (includes surcharge) $ 85.00 Commercial - 1.5%° of contract/valuation price up to $10,000 and 1.0% of contract/valuation price above $10,000 plus surcharge (.0005 times contract/valuation) Commercial -Minimum ..(includes surcharge} $ 40.00 RPZ Valve (new) No Gharge RPZ Valve (replacement or rebuild) No Charge Water Softener (includes surcharge) 20.00. D. Heating t'ermits Residential -Minimum repairs and alterations (includes surcharge)......... $ 40.00 Complete installation (includes surcharge)............... $ 85.00 Commercial - 1.5% of contract/valuation price up to $10,000 and 1.0% of contract/valuat'ron price above $10,000 plus surcharge (.005 times contract/valuation) Commercial minimum includes surchar a 40.00 g ) E. Sewer and Water Permits Requirement: Master License Number, $25, OOOLicense Bond and current Certificate of Liability Insurance to be filed with City. Note: State Department of Health Bond and Insurance .Certificate will satisfy this requirement Residential -Minimum repairs and alterations (includes surcharge)...........$ 40.00 City water and sewer including conversion (includes surcharge)......., 85.00 Commercial -One ,percent (1 ofi contract/valuation price plus surcharge (.0005 times contract/ valuation) Commercial -minimum (includes surcharge) $ 40.00 Private sewer systems: New installation (includes surcharge):.................. $ 75.00 Private sewer system. repair (includes surcharge) 75.00 F. Electrical Permits Fees are hereby adopted pursuant to Minnesota Statutes 326.2441. G. Well Permits Effective February 1, 1989, all well permits are issued by Dakota County:. 2 M. Manufactured Home Inspections Installation permit (includes surcharge) $ 60.00 Building permit TOTAL VALUATION FEE $1.00 TO $500.00 $23.50 $501.00 TO $2,000.00 $23.50.for the first$500.00.plus $3.05 for each additional $100.00, or fraction thereof, to and including $2,000.00 $2,001.00 to $25,000.00 $69.25 for the first $2,000.00 plus $14.00 for each additional $1,000.00, or fraction thereof, to and including $25,000.00 $25,001.00 t© $50,000.00 $391.25 for the first $25,000.00 plus $10.10 for each additional $1,000.00, or fraction thereof, to and including $50,000.00 $50,001.00 to $100,0. 00.00 $643.75 for the first $50,000.00 plus $7.00 for each additional. $1,000.00; or fraction thereof, to andrncluding $100,000.00 $100,001.00 #o $500,000.00 $993.75 for the first $100,000.00 plus $5.60 for each additional $1,000.00, or fraction thereof, to and: incuding $500,000.00 $500,001.00 to $1,000,000.00 $3,233.75 for the first $500,000.00 plus $4:75 for each additional $1,000.00, or fraction thereof, to and including .$1,000,000.00 $1,000,001.00 and up $5,608.75 for the first $1,000,000.00 plus $3.15 for each additional $1,000.00, or fraction thereof and 65°/© plan review fee f©r valuations greater than $10,000. 1. Swimming Paols All aground pools, regardless of capacity, and above=ground pools that exceed 5,000 gallons (includes surcharge) 50.00 J. Zoning Permit 20.00 K. Signs Permanent installation (No surcharge) 50.00 Temporary installation (10 days only) (No surcharge) $ 25.00 L. Moving Structure (plus letterof credit or cash escrows (No surcharge) 1-00.00 M. Demolition. 1. Residential Accessory structures No Charge 2. All structures other than residential accessory 50.00 (Also requires a $2,000 site restoration escrow) N. Fire Systems Fire Line -One percent of contract/valuation price plus surcharge (.0005 times 3 Contract/valuation) O. Sprinkler Fire Protection Requirement: State Fire Protection Contractor License to be filed with the City. 1.5% of contract/va/uation price up to $10,000 and 1.0% of contract/va/uation price above $10,000 plus surcharge (.0005 times contractlvaluation .Minimum $40.OOlincludes surcharge. P. Miscellaneous Commercial Mechanical Refrigeration, piping, fuel tanks, etc. - 7.5°fo of contract/valuation price up to $1D,000 and 7 % of the contract/valuation price in excess of $10,000 plus surcharge (.0005 times contract /valuation) Minimum (includes surcharge) 40.00 Q. Miscellaneous Inspections: Actual cost Minimum (includes surcharge) ...................................................................$-40.00 R. Re=Roof,.. Re-Side, Window Replacement Residential (includes surcharge) 25.00 Commercia (includes surcharge) $150.00 S. Windows -Comprehensive or Egress 1. Residential (includes surcharge) $ 25:00 2. Commercial (includes surcharge) $150.00 T. Residentiallmprovements 1. Permit Fee limitation on minor residential improvements for the installation, or replacement of a residential fixture or appliance that: (a) does not require modification to electric or gas service; (b) has a total cost of $500 or less, excluding the cost of the fixture or appliance; and (c) is improved, .installed, or replaced by the home owner or a licensed contractor. 2. Residential Improvement Permit fee will be $15 or 5 percenf of the cost of the improvement, installation, or replacement, whichever is greater. 4 .III.. PLANNING AND ZONING Note: Services pen`ormed by City personnel will be billed at 2.5 times actual payroll hourly rate. Services provided by City consultant will be billed at current consultant rates. A. Platting (Also refer to Section VII) Sketch Plan Review - $1,000 escrow legal notices, planning, engineering. and: legal services provided by staff and/or consultants Preliminary Plat - $250.00 per addition. In addition to the fee, a $1,000 escrow is to be .paid for legal notices, planning, engineering and legal services provided by staff and/or consultants. Final Plat - $150.00 per addition. In addition to the fee, a $1,000 escrow is to be paid-for legal notices, planning, engineering and legal services provided by staff and/or consultants. B. Planned Unit development - $500.00 plus $1,000 escrow for legal notices, planning, engineering and legal services provided by staff and/or consultants C. PUD Amendment - $250.00 plus $500.00 escrow #or legal notices planning, engineering and legal services provided by staff and/or consultants D. Variance 1) Single family (includes legal notice publications) $200,00 2) All others, -plus $500.00 escrow for legal notices, planning, engineering and: legal. services provided by staff and/or consultants .................$300.00 E. Conditional Use Permit/CUP Amendment 1) Single family (includes legal notice publications) $200.00 2) All others, plus $500.00 escrow for legal. notices, planning, engineering and legal services provided by staff and/or consultants ......:...:.........:........:..$300.00 F. Conditional Use Permit Extension No Charge G. Home .Occupation .Permit $ 25.00 H. Interim Use Permit/IUP Amendment - 1) Single family (includes legal notice publications) $200:00 2) All others, plus $500.00 escrow for legal notices, planning,.engineeringavd legal services provided by staff and/or consultants ................$300.00 L Rezoning - $500.00. plus $1,000 escrow for legal notices, planning, engineering and legal services provided by staff and/or consultants 5 J. Special Home Occupation Permit (includes legal notice publications)..... $200.00 . K. Administrative Subdivision - $50.00 plus all applicable dedication requirements and $500.00 escrow for legal notices, planning, engineering and legal services provided by staff and/or consultants L. Street and Easement Vacations - $150.00 plus $500.00 escrow for legal notices, planning, engineering and legal services provided by staff and/or consultants M. Zoning Ordinance Text Amendment - $500.00 plus $1,000 escrow for legal notices,. planning, engineering and legal services provided by staff and/or consultants N. Lot Release $ :19...50 O. Parking Deferment (plus $20~ escrow. for legal services) 50.00 P. Comprehensive Plan Amendment - $500.00 plus $1,000 escrow for legalnotices, planning, engineering and legal services provided by staff and/or consultants Q. Sits Plan - $50.00 plus $500 escrow foraplanning, engineering and legal services provided by staff and/or consultants R. Administrative Permit (per City Ordinance 11-8-3) $ 50.00 IV ENGINEERING A. Pla, tting Sketch plan review Services performed by City personnel will be hourly and billed at 2.5 times actual payroll hourly rate applied to the Planningand Zoning escrows Preliminary Plat - $150.00/acre $ 500.00 minimum $3,200.00 maximum Final Plat - $150.00/acre $ 500.00. maximum 6 J B. Construction Plan Review Site, grading, drainage, utility and street plan and specifications review Services penfrormed by City Personnel will be hourly and billed at 2.5 times actual hourly rate. A cash escrow maybe required (if not collected through Planning and Zoning). C. Wetland Conservation Act Administration (platting or non-plattinq_action) Permit to fill a wetland as allowed,by the Wetland Conservation Act $75.DO Services performed by City Personnel in administering the Wetland Conservation Act will be billed at 2.5 times the actual payroll hourly rate. A minimum escrow of $250.00 will be required (ifi not collected through Planning and Zoning actions) for: Wetland delineation/delineation review, replacement plan review, mailings and administration, construction inspection and annual monitoring until successful establishment of mitigation -area. In addition to the above. fees, a deposit will be required to fund special studies such as environmental assessment worksheets, transportation, drainage,: noise impacts, indirect source permits,. etc. .The amount of deposit to be based on the site, complexity, diversity and location of the project D. General Engineerng 1. Developer Installed Improvements: A. Engineering contract administration - 3.0% of project construction cost* or 3.25% of security in the form of a cash disbursement agreement Assumes .normal construction conditions and project scheduling. B. Construction observation and final .inspection hourly as charged by City's consultant. Services. performed by City personnel will be hourly and bifled of 2.5 times'actual ..payroll hourly rate. C. City record and base map preparation- GIS fee..,.....,..........$75 parcel/lot 2. City Installed Improvements: A. Engineering contract administration - 2.0% of project construction cost B. Preliminary report - as charged by consultants or 20% of design fee if performed by City staff C. Final design - as charged by consultants or as per standard ASCE fee curve if performed by City staff 7 D. Construction observation and final inspection- hourly as charged by City's consultant. Services performed by City personnel will be hourly and billed at 2.5 times actual payroll hourly rate. r Ordinance shall be effective immediately following its passage and publication. -Dated this 5th day of January, 2004 CITY OF LAKEVILLE B Y• Robert D. John n, Mayor AT _ST: 1` C arlene Friedg s, City erk 8 CITY OF LAKEVILLE DAKOTA COUNTY, MINNESOTA SUMMARY OF ORDINANCE NO. 756 , AN ORDINANCE ADOPTING A FEE SCHEDULE This ordinance prescribes fees sufficient to defray the costs incurred by the City of Lakeville in reviewing, investigating and. administering applications for the amendment to an official control established pursuant to Minnesota Statutes Sections 462.351 to 462.364 and applications for permits or approvals required under an official control established pursuant to those sections. This ordinance also prescribes billboard license fees. and building permit and related fees. A printed copy of the ordinance is available for inspection by any person during regular office hours at the office of the City Clerk. APPROVED FOR PUBLICATION this 20 day of January 2004, by the City Council of the City of Lakeville, Minnesota. CITY OF LAKEVILLE ~ . David Luick, Acting Mayor ~TTES i` '"~1 harlene Friedges, City/' Jerk I .109824 PUBLIC NOTICE CITY OF LAKEVILLE DAKOTA COUNTY, MINNESOTA SUMMARY OF ORDINANCE NO. 756, AN ORDINANCE ADOPTING A FEE SCHEDULE This ordinance prescribes fees suffi- cient to defray the costs incurred by the City of Lakeville in reviewing, investigat- ing and administering applications for the amendment to an official control established pursuant to Minnesota Sta- tutes Sections 462.351 to 463.364 and applications for permits or approvals re- quired under an official control establish- ed pursuant to those sections. This ordi- nance also prescribes billboard license fees and buidling permit and related fees. A printed copy of the ordinance is available for inspection by any person during regular office hours at the office of the City Clerk. APPROVED FOR PUBLICATION this 20 day of January 2004, by the City Council of the City of Lakeville, Minnesota. CITY OF LAKEVILLE BY: David Luick, Acting Mayor ATTEST: Charlene Friedges, City Clerk T151 1/24/04 AFFIDAVIT OF PUBLICATION STATE OF MINNESOTA County of Dakota SS TAD JOHNSON, being duly sworn, on oath says that he is an authorized agent and employee of the publisher of the newspaper known as Thisweek Newspapers, and has full knowledge of the facts which are stated below: (A)The newspaper has complied with all of the requirements constituting qualification as a legal newspaper, as provided by Minnesota Statutes 33 IA.02, 33 I A.07 and other applic- able laws, as amended. (B)The printed which is attached was cut from the columns of said newspaper, and was printed and pub - fished once eael r first published en Saturday, the52 I '1 day of ,;wog swceem+ve•weeks; it was , and was thereafter printed and published on every Saturday to and including Saturday, the day of ; and print- ed below is a copy of the lower case alphabet from A to Z, both inclusive, which is hereby acknowledged as being the size and kind of type used in the composition and publication of the notice: BY: abcdefghij kl mnop grstuvwxyz TITLE: Managing Editor Subscribed and sworn to before me on this rto day of Notary Public CAROL J. HAVERLAND NOTARY KELT — MINNESOTA My Commission Expires 1-31-2005