HomeMy WebLinkAboutItem 06.eOctober 4, 2010
APPROVE JOINT POWERS AGREEMENT WITH VERMILLION RIVER
WATERSHED JOINT POWER ORGANIZATION TO INSTALL
POND IRRIGATION SYSTEM AT KING PARK
Proposed Action
Staff recommends adoption of the following motion: Move to approve Joint Powers
Agreement with Vermillion River Watershed Joint Powers Organization (VRWJPO) for a
grant in the amount of $44,000.
Overview
Through the VRWJPO cost -share program, staff is looking to install a pond irrigation
system for Fields 7 and 8 at King Park. The irrigation system will use the existing
stormwater pond on the north east side of the site. The pond drainage area consists of
5 acres of pavement from Dodd Road and current gravel parking lot for King Park.
Currently, the stormwater pond discharges to Middle Creek a tributary to the Vermillion
River. By using the stormwater pond to irrigate the fields there will be reduced demand
on the city water supply, as well as reduced runoff to Middle Creek.
This site will also serve as a Water Conservation demonstration site for both the City of
Lakeville and the VRWJPO. The irrigation system will be designed to provide irrigation
for two fields and compatible with our current irrigation management systems
throughout the City. The cost to install the system is $49,265. The grant from the
VRWJPO will cover $44,000 of the cost of installation of the system. The City's
contribution will be $5,265.
Primary Issues to Consider
• The agreement requires the City to maintain and operate irrigation system.
The operation and maintenance cost is very nominal and is expected to be
similar to existing systems throughout the City.
Supporting Information
• Joint Powers Agreement with VRWJPO
• Grant application and design
Llk
Gerald S. Michaud
Parks & Recreation Director
Item No.
Financial Impact: $5,265.00 Budgeted: Source: MN DNR
Related Documents (CIP, ERP, etc.):
Notes:
WHEREAS, the Project would reduce deman
conditions; and during large storm events, would prey
Creek, a tributary of the Vermillion River; and
WHEREAS, the estimated cost of the Project is $5
the VRWJPO; and
WHEREAS, the VRWJP
Cost Sharing Policy that provi
potential partners for various water
WHEREAS, th
and pursuant to s
NOW,
derive from this
ershed Plan
e VRWJPB re
ent efforts aff
ARTICLE 1
PURPOSE
ARTICLE 2
PARTIES
Dakota County Contract #
JOINT POWERS AGREEMENT
BETWEEN THE VERMILLION RIVER WATERSHED JOINT POWERS ORGANIZATION
AND
THE CITY OF LAKEVILLE
FOR COST SHARE RELATED TO
WATER CONSERVATION DEMONSTRATION PROJECT
AT KING PARK
WHEREAS, Minn. Stat. § 471.59 authorizes local governmental units to jointly or cooperatively exercise any power
common to the contracting parties; and
WHEREAS, the Vermillion River Watershed Joint Powers Organization is a w,
consisting of Dakota and Scott Counties (VRWJPO) governed by the Vermillion
(VRWJPB) and is charged with carrying out the duties set forth in Minn. Stat.
provided by law; and
WHEREAS, the City of Lakeville (City) is a governmental and pali`iil sbdivision"e State of Minnesota; and
WHEREAS, the City is the fee title holder of real property irpakota County, Minnesot
Park (Property); and
WHEREAS, the City has proposed a water conservation der•�aati. °r -fit on the Pro
y p p � prty that would re -use
stormwater from a pond to irrigate two baseball fields (Project); and
bpd management body
r Watrshed Joint Powers Board
B.211 to 1038.255 and as otherwise
monly known as King
he City's municip'm er supply during dry or drought
rge of stormw -Q.II, tants from the pond into Middle
s requesting cost share contribution from
November 3, 2005, and said Watershed Plan contains a
d 1J the cost sharing between the VRWJPO and
hg the Vermillion River Watershed; and
for improvements affecting the Vermillion River Watershed
or up to a 100% cost share; and
ual promises and benefits that the VRWJPO and the City shall
ity hereby enter into this Agreement for the purposes stated herein.
The purpose of this Agreement efine the responsibilities and cost sharing obligations of the VRWJPO and the City
for the Project.
The parties to this Agreement are the Vermillion River Watershed Joint Powers Organization (VRWJPO) acting through its
Joint Powers Board (VRWJPB) and the City of Lakeville, Minnesota (City).
This Agreement shall be effective the date of the signatures of the parties to this Agreement and shall remain in effect
until December 31, 2010, or until completion by the parties of their respective obligations under this Agreement, whichever
occurs first, unless earlier terminated by law or according to the provisions of this Agreement.
The VRWJPO and the City agree to cooperate and use their reasonable efforts to ensure prompt implementation of the
various provisions of this Agreement and to in good faith, undertake resolution of antspute in an equitable and timely
manner.
5.1 The VRWJPO shall cost share with the City in an amount no
($44,000.00) for material and labor costs directly related t
5.2 The VRWJPO shall make payment to the City after
VRWJPO has verified that the Project has been installed
Project, which are attached hereto and incorporated herein a
5.3 The VRWJPO may refuse to pay any claim
claim shall not preclude the VRWJPO from q
right to offset any overpayment or disallowanc
6.1
6.2
6.3
AUTHORIZED PURPO
by the City for the pay
INSTALLATION REQUIRE
in Exhibit 1. A ,,n p e 'cations
ACKNOW DGMEN
VRW I' p any promotio
Projdbt. M 1 ' section shall s
6.4 COMPLIAN " ,�ITH LAWS /S
ordinances, rule=s: regulatio
ARTICLE 4
COOPERATION
A
CITY'S
ARTICLE 3
TERM
ARTICLE 5
PAYMENT
Is not specifically
g the propriety
reducing fu
ARTICLE 7
INDEMNIFICATION
2
e- Forty -Fa
instal ation of the Pr
ousand and No/100 Dollars
oject has been ea - Wed and the
tth the design specifications for said
zed by this Agreement, Payment of a
claim. The VRWJPO reserves the
ments.
ded under the terms of this Agreement may only be used
are funds pr
nd labor costs rectly related to the installation of the Project.
ct shall s installed in accordance with the design specifications
ions require prior approval from VRWJPO staff,
propriately acknowledge the funding assistance provided by the
reports, publications, notices, and presentations relating to the
ion or termination of this Agreement.
DARDS. The City shall abide by all federal, state, or local laws, statutes,
n constructing the Project.
Each party to this Agreement shall be liable for the acts of its officers, employees or agents and the results thereof to the
extent authorized by law and shall not be responsible for the acts of the other party, its officers, employees or agents.
The provisions of the Municipal Tort Claims Act, Minn. Stat. ch. 466 and other applicable laws govern liability of the
VRWJPO and the City. This section shall survive the expiration or termination of this Agreement.
8.1 AUTHORIZED REPRESENTATIVES. The following named persons are designated the Authorized
Representatives of the parties for purposes of this Agreement. These persons have authority to bind the party
they represent and to consent to modifications, except that the authorized representative shall have only the
authority specifically or generally granted by their respective governing boards. Notice required to be provided
pursuant to this Agreement shall be provided to the following named persons and addresses unless otherwise
stated in this Agreement, or in a modification of this Agreement:
TO THE VRWJPO: Joseph A. Harris or successor, Chat
Vermillion River Watershed Joint
14955 Galaxie Avenue
Apple Valley, MN 55124
Telephone: (952) 891 -70,
Any alterations, varia
have been reduced to w
of the VRWJPO and the Ci
TO THE CITY:
In addition, notification to the VRWJPO regarding termination this Agreement by the other party shall be
provided to the Office of the Dakota Cou i ttorney, Civil Di:. 1560 Highway 55, Hastings, Minnesota
55033.
8.2 LIAISONS. To assist the parties in the day -to
provide ongoing consultation, a liaison shall be
City shall keep each other con . -lly informed, •
execution of this Agreemen .�sing persons a
VRWJ
ARTICLE 8
AUTHORIZED REPRESENTATIVES AND LIAISONS
Holly Dahl or succe
City of Lakeville
20195 Holyoke
Lakeville, MW-
Telephone: (952
Travis Thiel
Telephone: (9
g, of an
the design
Telepho+" = ` 952) 985 -4520
ARTICLE 9
ODIFICATIONS
or waivers of the provisions of this Agreement shall only be valid when they
the parties respective Boards, and signed by the Authorized Representatives
ARTICLE 10
TERMINATION
'91 - 7546
r
rganization
of this A• ="-ment and to ensure compliance and
JPO and the City, The VRWJPO and the
ge in the designated liaison. At the time of
d liaisons:
10.1 IN GENERAL. Either party may terminate this Agreement for cause by giving seven days' written notice or
or without cause by giving 30 days' written notice, of its intent to terminate, to the other party. Such notice to
terminate for cause shall specify the circumstances warranting termination of the Agreement. Cause shall mean
a material breach of this Agreement and any supplemental agreements or amendments thereto. This Agreement
may also be terminated by the VRWJPO in the event of a default by the City. Notice of Termination shall be
made by certified mail or personal delivery to the authorized representative of the other party. Termination of this
Agreement shall not discharge any liability, responsibility or right of any party, which arises from the performance
of or failure to adequately perform the terms of this Agreement prior to the effective date of termination.
3
10.2 TERMINATION BY VRWJPO FOR LACK OF FUNDING. Notwithstanding any provision of this Agreement to the
contrary, the VRWJPO may immediately terminate this Agreement if it does not obtain funding from the
Minnesota Legislature, Minnesota Agencies, or other funding source, or if it's funding cannot be continued at a
level sufficient to allow payment of the amounts due under this Agreement. Written notice of termination sent by
the VRWJPO to the City by facsimile is sufficient notice under this section. The VRWJPO is not obligated to pay
for any services that are provided after written notice of termination for Zack of funding. The VRWJPO will not be
assessed any penalty or damages if the Agreement is terminated due to lack of funding.
This Agreement shall be governed by and construed in accordance with the subst
of Minnesota, without giving effect to the principles of conflict of laws. All proce
venued in the County of Dakota, State of Minnesota. This section shall survi
Agreement.
APPROVED AS TO FORM:
Assistant Dakota County Attorney Date
VRW Res. No. 10-
K -10 -344
ARTICLE 11
MINNESOTA LAW TO GOVERN
ARTICLE 12
MERGER
This Agreement is the final expression of the agreement of th9 omplete and exc
terms agreed upon and shall supersede all prior negotiations, und lta ndin•_0a greements.
ARTICLE 13
VERABILITY
The provisions of this Agreement shall be deemed se any part of t
unenforceable, such rendering shall not affect the valid' elan• .i . ability of th
part or parts that are void, invalid or otherwise unenforce.. •le s.� i,r so tiai
with respect to either party.
IN WITNESS WHEREOF, the p.' s here`x e executed to° s Agreement on the date(s) indicated below.
4
CITY OF LAKEVILLE
e i And procedural laws of the State
s related to this Agreement shall be
'ration or termination of this
statement of the
ement is rendered void, invalid, or
emainder of this Agreement unless the
mpair the value of the entire Agreement
By
By
Holly Dahl, Mayor
Date of Signature:
By
City Clerk
Date of Signature:
VERMILLION RIVER WATERSHED
JOINT POWERS ORGANIZATION
Joseph A. Harris, Chair
Date of Signature:
DATE: August 31, 2010
DESIGN BY: IMM
DRAWN BY: RPM
DESIGN #: kIng082610
et• i] kt 0 0 0,"
TORO,
Count on It, lila
'44,74.L$742t=
King Park
Lakeville, MN
SCALE, L.O.
2010 Vermillion River Watershed
Cost - Share Request
September 1, 2010
Project Title: Water Conservation Project at King Park
Applicant: Mac Cafferty, City of Lakeville
Project Location: Lakeville, MN
Project Description:
King Park is located southeast of Dodd Blvd. across from the City of Lakeville Police
Station and Lifetime Fitness (see attached map). As part of the 1994 Park Bond
referendum, funding was allocated for the purchase and development of King Park. King
Park is a youth athletic complex situated on 50 acres in which 45 are currently classified
as active acres. Construction of King Park initially entailed 8 baseball fields, a parking
lot, portable restrooms, and trail system. Construction began in 1996 and was completed
in 1997. Fencing of all 8 fields has been completed and a permanent concession, park
shelter and public restroom building was added to King Park in 2007. The primary user
of King Park is the youth Lakeville Baseball Association. It is estimated that King Park
serves tens of thousands of patrons annually for baseball activities.
The property is located in the Middle Creek sub - watershed that flows to the Vermillion
River. Currently, there is no permanent irrigation system for the fields. A portable
irrigation system connected to the City's water supply is used when needed to currently
water the fields. With the assistance of the Vermillion River Watershed Joint Powers
Organization, the City of Lakeville would like to install a pond irrigation system that
would utilize the existing 0.35 acre stormwater treatment pond to irrigate Fields 7 and 8.
The pond drainage area consists of 5 acres of pavement from Dodd Blvd. and current
gravel parking lot for King Park.
Overall Site Goals:
• Provide a local demonstration site to showcase water conservation through the use
of stormwater pond irrigation.
• Use existing stormwater pond onsite to irrigate Fields 7 and 8.
• Reduce dependency on City water supply for the irrigation of the athletic fields at
King Park.
• Improve water quality, reduce stormwater pollutants and reduce runoff to Middle
Creek (Tributary to Vermillion River).
Description
Cost
Materials
Controllers
$ 4,410.11
Sprinkler heads
$ 6,801.20
Pipe
$ 2,800.84
Valves /Boxes
$ 1,027.33
Wire
$ 622.04
Fittings & Misc.
$ 2,276.14
Pumping station & Accessories
$ 7,795.53
Sub -total
$25,733.17
10% discount
- (2,573.32)
MN sales tax
$ 1,592.24
SUB -TOTAL
$24,752.10
Labor
Installation
$18,000.00
Electrical
$13,500.00
SUB -TOTAL
$31,500.00
GRAND TOTAL
$56,252.10
Description
Cost
Field restoration (seed/sod)
$2,500
Labor and Equipment
$3,000
Fence removal and reinstall
$500
Design (30 hours)
$900
Construction Administration
(32 hours)
$960
Upkeep and Maintenance of
System
Unknown
TOTAL
$7,860
Description
Cost
Materials
-$ 5,783.47
Labor
-$ 5,000.00
Sub -total
-$ 10,783.47
TOTAL #7 ONLY
$ 45,468.63
Cost Estimate /Timeline:
The irrigation system was designed to provide irrigation for two fields. The system will
be designed to be compatible with the City's current irrigation control system utilized at
other athletic facilities in the City. The cost estimate includes the material and
installation of the irrigation system on Fields 7 and 8. Also included is an alternate
deduct for Field 8. After contractor quotes are received and reviewed, it will determined
by the City of Lakeville and the VRJPO staff if the installation should move forward on
one or two fields. If the irrigation system is installed on only one field, the system will be
designed so that it possible to expand it to the other field in the future.
Cost Estimate for Fields #7 & 8
Deduct (Field #7 only)
In -Kind Services
Requested Amount:
The City of Lakeville is requesting the Vermillion River Watershed to partner with the
City to install a stormwater pond irrigation system at King Park. The project will serve
as a local water conservation demonstration site. The project will not only reduce the
demand on the City's water supply but it will also result in improved water quality,
reduced stormwater pollutants and reduced runoff to Middle Creek (Tributary to
Vermillion River).
The total estimated cost of the project to install the irrigation system in both Fields 7 and
8 is $64,112.10. The City's contribution will consist of in -kind services for design
assistance, construction administration, assistance with restoration, and upkeep and
maintenance of the system. The City is requesting a cost share from the VRWJPO for the
remaining cost of the project which is $56,252.10.