Loading...
HomeMy WebLinkAboutItem 10March 3, 2011 Item No. HOSANNA 4 111 ADDITION MARCH 7, 2011 CITY COUNCIL MEETING Proposed Action Staff recommends adoption of the following motion: Move to approve: a) a resolution approving a Comprehensive Plan amendment to re -guide property to High Density Residential, b) an ordinance rezoning property from RM -1 and RM -2, Medium Density Residential District to PUD, Planned Unit Development District, c) a resolution approving the Hosanna 4 Addition preliminary and final plat and, d) a resolution vacating public drainage and utility easements and adopt the findings of fact as presented. Adoption of this motion will allow the development of a 93 unit senior housing facility connected to Hosanna Lutheran Church. Overview Representatives of Hosanna Lutheran Church and Ebenezer Management Services have submitted plans to develop a 93 unit senior housing facility located on the Hosanna Lutheran Church property at 9600 — 163 Street. Hosanna 4 Addition proposes a senior housing facility consisting of 22 independent living units, 47 assisted living units and 24 memory care units as well as the future construction of a chapel and classroom addition to the church. The Planning Commission held a public hearing and unanimously recommended approval of the Hosanna 4 Addition planning at their February 17, 2011 meeting with the 15 stipulations listed in the February 11, 2011 planning report as amended. Revised grading, erosion control, landscaping, site plan, master site plan, floor plan and parking lot lighting plans have been submitted to reflect the amended stipulations recommended by the Planning Commission. Primary Issues To Consider • Why have the preliminary and final plat plans been revised? • What private easements are required for the Hosanna 4 Addition? • What flexibilities are being requested with the proposed Planned Unit Development? Supporting Information • Resolution approving a Comprehensive Plan amendment • Ordinance rezoning property to PUD, Planned Unit Development • Resolution approving the Hosanna 4 Addition preliminary and final plat • Resolution vacating public drainage and utility easements • Signed Development Contract and Planned Unit Development Agreement • Findings of fact • Revised plans for grading, erosion control, landscaping, site, master site,floor and parking lot lighting. • February 17, 2011 Planning Commission meeting minutes • February 16, 2011 Parks, Recreation and Natural Resources Committee minutes • February 16, 2011 Dakota County Plat Commission letter • February 11, 2011 planning and engineering reports t Frank Dempsey, AICP, As�ociat / er Financial Impact: $ None Budgeted: Y/N Source: Related Documents (CIP, ERP, etc.):Zoning and Subdivision Ordinances and Comprehensive Plan. Notes: Hosanna 4 Addition March 4, 2011 Page 2 of 2 Response to the Primary Issues to Consider. • Why have the preliminary and final plat plans been revised? The Planning Commission recommended that raised curb landscaped islands be installed on the new parking lot west of the proposed senior housing facility as required by the Zoning Ordinance, that the lighting plan reflect the revised design of the parking lot and that the underground parking plan reflect the 18.5 foot deep parking spaces. The revised plans reflect the Planning Commission's recommendations. • What private easements are required for the Hosanna 4 Addition? A private easement and maintenance agreement is required between Hosanna and Ebenezer to allow shared access, shared parking and the senior housing monument sign to be located on Hosanna property. The easement has been submitted. • What flexibilities are being requested with the proposed Planned Unit Development? 1. Building height in excess of 35 feet for the senior housing facility 2. Interconnection of buildings across property lines 3. Underground parking stall depth of 18.5 feet 4. Shared parking and driveways across property lines 5. Monument sign for the senior housing facility to be located on Hosanna Lutheran Church property. 2 CITY OF LAKEVILLE DAKOTA COUNTY, MINNESOTA RESOLUTION NO. RESOLUTION APPROVING A COMPREHENSIVE PLAN AMENDMENT TO CHANGE THE LAND USE DESIGNATION OF PROPERTY FROM PUBLIC AND QUASI PUBLIC TO HIGH DENSITY RESIDENTIAL WHEREAS, on February 17, 2011, the Lakeville Planning Commission met to consider the application of Hosanna Lutheran Church for a Comprehensive Plan amendment to change the land use designation of property from Public and Quasi Public to High Density Residential to allow the construction of a 93 unit senior housing facility. The Planning Commission conducted a public hearing on the proposed Comprehensive Plan Amendment preceded by published and mailed notice; and WHEREAS, the proposed Comprehensive Plan Amendment has been submitted to adjacent governmental units and the affected school district and no objections have been expressed; and WHEREAS, the City Council has considered the proposed Comprehensive Plan amendment. NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Lakeville, Minnesota: 1. The Comprehensive Plan amendment will not have a substantial impact on or contain a substantial departure from Metropolitan System Plans. 2. The Comprehensive Plan amendment is hereby approved, contingent upon the approval of the Comprehensive Plan amendment to the Metropolitan Council. DATED this 7 day of March 2011. ATTEST: BY: Charlene Friedges, City Clerk STATE OF MINNESOTA ) CITY OF LAKEVILLE ) I hereby certify that the foregoing Resolution No. is a true and correct copy of the resolution presented to and adopted by the City Council of the City of Lakeville at a duly authorized meeting thereof held on the 7 day of March 2011, as shown by the minutes of said meeting in my possession. Charlene Friedges, City Clerk Drafted By: City of Lakeville 20195 Holyoke Avenue Lakeville, MN 55044 CITY OF LAKEVILLE BY: Mark Bellows, Mayor (SEAL) 2 Section 1. Ordinance No. 867 is hereby amended to rezone the following described property located within the City of Lakeville, Dakota County, Minnesota from RM -1 and RM -2, Medium Density Residential District to PUD, Planned Unit Development District: Section 2. The zoning map of the City of Lakeville shall not be republished to show the aforesaid rezoning, but the City Clerk shall appropriately mark the zoning map on file in the City Clerk's office for the purpose of indicating the rezoning, hereinabove shown thereon are hereby incorporated by reference and made a part of this Ordinance. Section 3. This ordinance shall be effecting upon its passage and publication, Metropolitan Council approval of the Comprehensive Plan amendment for the subject property and the recording of the Hosanna 4 Addition final plat. Adopted by the Lakeville City Council this 7 day of March, 2011. ATTEST: AN ORDINANCE AMENDING ORDINANCE NO. 867 BEING THE ZONING ORDINANCE OF THE CITY OF LAKEVILLE THE CITY COUNCIL OF THE CITY OF LAKEVILLE ORDAINS: Charlene Friedges, City Clerk ORDINANCE NO. CITY OF LAKEVILLE DAKOTA COUNTY, MINNESOTA Lots 1 and 2, Block 1, Hosanna 4 Addition CITY OF LAKEVILLE BY: Mark Bellows, Mayor (Reserved for Dakota County Recording Information) CITY OF LAKEVILLE RESOLUTION NO. 11- RESOLUTION APPROVING THE PRELIMINARY AND FINAL PLAT OF HOSANNA 4 ADDITION WHEREAS, the owner of the property described as HOSANNA 4 ADDITION has requested preliminary and final plat approval; and WHEREAS, the preliminary and final plat was reviewed by the Planning Commission and the Parks, Recreation and Natural Resources Committee; and WHEREAS, the preliminary and final plat is acceptable to the City; NOW THEREFORE BE IT RESOLVED by the Lakeville City Council: 1. The HOSANNA 4 ADDITION preliminary and final plat is approved subject to the developer's execution of the development contract and planned unit development agreement and security requirements. 2. The Mayor and City Clerk are hereby authorized to sign the development contract and planned unit development agreement and the final plat mylars following Metropolitan Council approval of the Comprehensive Plan Amendment. 3. The City Clerk is directed to file a certified copy of this resolution with the Dakota County Recorder. DATED this 7 th day of March, 2011 ATTEST: Charlene Friedges, City Clerk STATE OF MINNESOTA ) CITY OF LAKEVILLE ) I hereby certify that the foregoing Resolution No. is a true and correct copy of the resolution presented to and adopted by the City Council of the City of Lakeville at a duly authorized meeting thereof held on the 7 th day of March, 2011 as shown by the minutes of said meeting in my possession. Drafted By: City of Lakeville 20195 Holyoke Avenue Lakeville, MN 55044 2 CITY OF LAKEVILLE Mark Bellows, Mayor Charlene Friedges City Clerk (SEAL) (Reserved for Dakota County Recording Information) CITY OF LAKEVILLE RESOLUTION NO. 11 RESOLUTION VACATING PUBLIC DRAINAGE AND UTILITY EASEMENTS WHEREAS, the Planning Commission has conducted a public hearing, preceded by two (2) weeks published notice, to consider the following described public drainage and utility easement vacation; and WHEREAS, the City Council has determined that it is in the public interest to vacate said public drainage and utility easements. NOW, THEREFORE, BE IT RESOLVED by the Lakeville City Council: ATTEST: 1. The following public drainage and utility easements are hereby vacated subject to the recording of the Hosanna 4 Addition final plat: All public drainage and utility easements within Hosanna Third Addition. 2. The City Clerk is directed to file a certified copy of this resolution with the Dakota County Recorder. DATED this 7 day of March, 2011. BY: Charlene Friedges, City Clerk CITY OF LAKEVILLE BY: Mark Bellows, Mayor STATE OF MINNESOTA ) ( CITY OF LAKEVILLE ) I hereby certify that the foregoing Resolution No. is a true and correct copy of the resolution presented to and adopted by the City Council of the City of Lakeville at a duly authorized meeting thereof held on the 7 day of March, 2011 as shown by the minutes of said meeting in my possession. Drafted By: City of Lakeville 20195 Holyoke Avenue Lakeville, MN 55044 Charlene Friedges City Clerk Seal (reserved for recording information) DEVELOPMENT CONTRACT AND PLANNED UNIT DEVELOPMENT AGREEMENT (Developer Installed Improvements) HOSANNA 4 ADDITION AGREEMENT dated , 2011, by and between the CITY OF LAKEVILLE, a Minnesota municipal corporation ( "City "), and EBENEZER MANAGEMENT SERVICES, INC., a Minnesota corporation (the "Developer "). 1. REQUEST FOR PLAT AND PLANNED UNIT DEVELOPMENT APPROVAL. The Developer has asked the City to approve a plat and planned unit development for HOSANNA 4 TH ADDITION (referred to in this Contract as the "plat "). The land is situated in the County of Dakota, State of Minnesota, and is legally described as: Outlot A and Lot 1, Block 1, HOSANNA 3 ADDITION, according to the recorded plat thereof 2. CONDITIONS OF PLAT AND PLANNED UNIT DEVELOPMENT APPROVAL. The City hereby approves the plat and planned unit development on condition that the Developer enter into this Contract, furnish the security required by it, and record the plat with the County Recorder or Registrar of Titles within 100 days after the City Council approves the final plat. 156389v02 1 LKVL:HosAt*A 4TH ADDITION SRN:r02/24/2011 (Ebenezer Management Services, Inc.) 3. RIGHT TO PROCEED. Within the plat or land to be platted, the Developer may not grade or otherwise disturb the earth, remove trees, construct sewer lines, water lines, streets, utilities, public or private improvements, or any buildings until all the following conditions have been satisfied: 1) this agreement has been fully executed by both parties and filed with the City Clerk, 2) the necessary security has been received by the City, and 3) the plat has been filed with the Dakota County Recorder's Office. 4. PHASED DEVELOPMENT. If the plat is a phase of a multi - phased preliminary plat, the City may refuse to approve final plats of subsequent phases if the Developer has breached this Contract and the breach has not been remedied. Development of subsequent phases may not proceed until Development Contracts for such phases are approved by the City. Park charges, sanitary sewer charges, and storm sewer charges referred to in this Contract are not being imposed on outlots, if any, in the plat that are designated in an approved preliminary plat for future subdivision into lots and blocks. Such charges will be calculated and imposed when the outlots are final platted into lots and blocks. 5. PRELIMINARY PLAT STATUS. If the plat is a phase of a multi - phased preliminary plat, the preliminary plat approval for all phases not final platted shall lapse and be void unless final platted into lots and blocks, not outlots, within two (2) years after preliminary plat approval. 6. CHANGES IN OFFICIAL CONTROLS. For two (2) years from the date of this Contract, no amendments to the City's Comprehensive Plan, except an amendment placing the plat in the current metropolitan urban service area, or official controls shall apply to or affect the use, development density, lot size, lot layout or dedications of the approved plat unless required by state or federal law or agreed to in writing by the City and the Developer. Thereafter, notwithstanding anything in this Contract to the contrary, to the full extent permitted by state law, the City may require compliance with any amendments to the City's Comprehensive Plan, official controls, platting or dedication requirements enacted after the date of this Contract. 7. DEVELOPMENT PLANS. The plat shall be developed in accordance with the following plans. The plans shall not be attached to this Contract. With the exception of Plans A, B, C and D, the plans may be prepared, subject to City approval, after entering the Contract, but before commencement of 156389v02 2 LKVL:HosANNA 4 TH ADDITION SRN:r02 /24/2011 (Ebenezer Management Services, Inc.) any work in the plat. The erosion control plan may also be approved by the Dakota County Soil and Water Conservation District. If the plans vary from the written terms of this Contract, the written terms shall control. The plans are: Plan A — Plat Plan B — Final Grading, Drainage, and Erosion Control Plan Plan C — Tree Preservation Plan Plan D — Master PUD Site Plan Plan E — Plans and Specifications for Public and Private Improvements Plan F — Landscape Plan Plan G — Site Plan Plan H — Site Lighting Plan 8. IMPROVEMENTS. The Developer shall install and pay for the following: A. Private Sanitary Sewer Service B. Private Water Service C. Public and Private Storm Sewer System D. Site Grading, Stormwater Treatment/Infiltration Basins, and Erosion Control E. Underground Utilities F. Setting of Iron Monuments G. Surveying and Staking The improvements shall be installed in accordance with the City subdivision ordinance; City standard specifications for utility and street construction; and any other ordinances including Section 11 -16 -7 of the City Code concerning erosion and drainage and Section 4 -1 -4 -2 prohibiting grading, construction activity, and the use of power equipment between the hours of 10 o'clock p.m. and 7 o'clock a.m. The Developer shall submit plans and specifications which have been prepared by a competent registered professional engineer to the City for approval by the City Engineer. The Developer shall instruct its engineer to provide adequate field inspection personnel to assure an acceptable level of quality control to the extent that the 156389v02 3 LKVL:HosANNA 4 ADDITION SRN:r02 /24/2011 (Ebenezer Management Services, Inc.) Developer's engineer will be able to certify that the construction work meets the approved City standards as a condition of City acceptance. In addition, the City may, at the City's discretion and at the Developer's expense, have one or more City inspectors and a soil engineer inspect the work on a full or part -time basis. The Developer, its contractors and subcontractors, shall follow all instructions received from the City's inspectors. The Developer's engineer shall provide for on -site project management. The Developer's engineer is responsible for design changes and contract administration between the Developer and the Developer's contractor. The Developer or his engineer shall schedule a pre- construction meeting at a mutually agreeable time at the City with all parties concerned, including the City staff, to review the program for the construction work. Within thirty (30) days after the completion of the improvements and before the security is released, the Developer shall supply the City with a complete set of reproducible "as constructed" plans and an electronic file of the "as constructed" plans in an AutoCAD.DWG file or a .DXF file, all prepared in accordance with City standards. In accordance with Minnesota Statutes 505.02, the final placement of iron monuments for all lot corners must be completed before the applicable security is released. The Developer's surveyor shall also submit a written notice to the City certifying that the monuments have been installed. 9. CONTRACTORS /SUBCONTRACTORS. City Council members, City employees, and City Planning Commission members, and corporations, partnerships, and other entities in which such individuals have greater than a 25% ownership interest or in which they are an officer or director may not act as contractors or subcontractors for the public improvements identified in Paragraph 8 above. 10. PERMITS. The Developer shall obtain or require its contractors and subcontractors to obtain all necessary permits, including but not limited to: • Dakota County for County Road Access and Work • Minnesota Department of Health for Watermains • NPDES Permit for Stormwater Connections • MPCA for Sanitary Sewer and Hazardous Material • DNR for Dewatering • City of Lakeville for Building Permits • MCES for Sanitary Sewer Connections • City of Lakeville for Retaining Walls in County Rights -of -Way Removal and Disposal LKVL:HOSANNA 4 ADDITION 156389v02 4 SRN:r02 /24/2011 (Ebenezer Management Services, Inc.) 11. DEWATERING. Due to the variable nature of groundwater levels and stormwater flows, it will be the Developer's and the Developer's contractors and subcontractors responsibility to satisfy themselves with regard to the elevation of groundwater in the area and the level of effort needed to perform dewatering and storm flow routing operations. All dewatering shall be in accordance with all applicable county, state, and federal rules and regulations. DNR regulations regarding appropriations permits shall also be strictly followed. 12. TIME OF PERFORMANCE. The Developer shall install all required public and private improvements by November 30, 2011. 13. LICENSE. The Developer hereby grants the City, its agents, employees, officers and contractors a license to enter the plat to perform all work and inspections deemed appropriate by the City in conjunction with plat development. 14. EROSION CONTROL. Prior to initiating site grading, the erosion control plan, Plan B, shall be implemented by the Developer and inspected and approved by the City or Dakota County Soil and Water Conservation District. The City or Dakota County Soil and Water Conservation District may impose additional erosion control requirements if they would be beneficial. All areas disturbed by the excavation and backfilling operations shall be reseeded within 48 hours after the completion of the work or in an area that is inactive for more than seven (7) days unless authorized and approved by the City Engineer. Except as otherwise provided in the erosion control plan, seed shall be in accordance with the City's current seeding specification which may include certified oat seed to provide a temporary ground cover as rapidly as possible. All seeded areas shall be fertilized, mulched, and disc anchored as necessary for seed retention. The parties recognize that time is of the essence in controlling erosion. If the Developer does not comply with the erosion control plan and schedule or supplementary instructions received from the City or the Dakota County Soil and Water Conservation District, the City may take such action as it deems appropriate to control erosion. The City will endeavor to notify the Developer in advance of any proposed action, but failure of the City to do so will not affect the Developer's and City's rights or obligations 156389v02 5 LKVL:HosANNA 4TH ADDITION SRN:r02 /24/2011 (Ebenezer Management Services, Inc.) hereunder. If the Developer does not reimburse the City for any cost the City incurred for such work within ten (10) days, the City may draw down the letter of credit to pay any costs. No development, utility or street construction will be allowed and no building permits will be issued unless the plat is in full compliance with the approved erosion control plan. 15. GRADING PLAN. The plat shall be graded in accordance with the approved grading development and erosion control plan, Plan "B ". The plan shall conform to City of Lakeville specifications. Prior to the issuance of a certificate of occupancy, the Developer shall provide the City with an "as constructed" grading plan certified by a registered land surveyor or engineer that all storm water treatment basins, swales, and ditches have been constructed on public easements or land owned by the City. The "as constructed" plan shall include field verified elevations of the following: a) cross sections of storm water treatment basins; b) location and elevations along all swales, wetlands, wetland mitigation areas if any, ditches, locations and dimensions of borrow areas /stockpiles, and installed "conservation area" posts; and c) lot corner elevations and building pads, and all other items listed in City Code Section 10- 3 -5.NN. The City will withhold issuance of a certificate of occupancy until the approved certified grading plan is on file with the City and all erosion control measures are in place as determined by the City Engineer. The Developer certifies to the City that all lots with building footings placed on fill have been monitored and constructed to meet or exceed FHA/HUD 79G specifications. 16. CLEAN UP. The Developer shall clean dirt and debris from streets that has resulted from construction work by the Developer, builders, subcontractors, their agents or assigns. Prior to any construction in the plat, the Developer shall identify in writing a responsible party and schedule for erosion control, street cleaning, and street sweeping. 17. OWNERSHIP OF IMPROVEMENTS. Upon completion of the work and construction required by this Contract and final acceptance by the City, the improvements lying within public easements shall become City property without further notice or action. 18. CITY ENGINEERING ADMINISTRATION AND CONSTRUCTION OBSERVATION. The Developer shall pay a fee for in -house engineering administration. City engineering administration will 156389v02 6 LKVL:HosANNA 4TH ADDITION SRN:r02 /24/2011 (Ebenezer Management Services, Inc.) include monitoring of construction observation, consultation with Developer and his engineer on status or problems regarding the project, coordination for final inspection and acceptance, project monitoring during the warranty period, and processing of requests for reduction in security. Fees for this service shall be three percent (3 %) of construction costs identified in the Summary of Security Requirements if using a letter of credit, assuming normal construction and project scheduling. The Developer shall pay for construction observation performed by the City's in -house engineering staff or consulting engineer. Construction observation shall include part or full time inspection of proposed public utilities and street construction and will be billed on hourly rates estimated to be seven percent (7 %) of the estimated construction cost. 19. STORM SEWER. Development of Hosanna 4 Addition includes the construction of public and private storm sewer systems. The public storm sewer consists of the modification to the existing outlet of the regional stormwater basin located north of the church. The reconstructed public storm sewer will be located within a permanent drainage and utility easement, as shown on the plat, and maintained by the City. The privately -owned and maintained storm sewer will be located within Outlot A and Lots 1 and 2 and will collect and convey stormwater runoff generated from within the lots to existing private storm sewer. The trunk storm sewer area charge for Lot 1 of the plat was paid with the Hosanna 3 Addition plat in 2002. The trunk storm sewer area charge has not been collected on the expansion area of Lots 1 and 2, Block 1, Hosanna 4 Addition and must be paid in cash at the time of final plat approval. The trunk storm sewer area charge for the expansion area of Lots 1 and 2 is calculated as follows: 2,092,692 s.f. Gross Area of Hosanna 4 Addition - 15,681 s.f. Area of 162n St. ROW Dedication - 703,287 s.f. Area of Outlot A, Hosanna 4 Addition - 1,284,541 s.f. Area of Lot 1, Block 1, Hosanna 3rd Addition x $0.186/s.f. Area Charge $ 16, 588.04 20. CRYSTAL LAKE SURCHARGE. The Crystal Lake Surcharge for Lot 1 of the plat was paid with the Hosanna 3rd Addition plat in 2002. The Crystal Lake Surcharge has not been collected on 156389v02 7 LKVL:HosANNA 4 ADDITION SRN:r02 /24/2011 (Ebenezer Management Services, Inc.) the expansion area of Lots 1 and 2, Block 1, Hosanna 4 Addition and must be paid in cash at the time of final plat approval. The Crystal Lake Surcharge for the expansion area of Lots 1 and 2 is calculated as follows: 2,092,692 s.f. - 15,681 s.f. - 703,287 s.f. - 1,284,541 s.f. x $0.0144/s.f. $ 1,284.24 Gross Area of Hosanna 4 Addition Area of 162 St. ROW Dedication Area of Outlot A, Hosanna 4 Addition Area of Lot 1, Block 1, Hosanna 3rd Addition Surcharge 21. SANITARY SEWER. Development of Hosanna 4 Addition will not require public sanitary sewer construction. The existing building on Lot 1 of the plat is connected to public sanitary sewer. 8- inch sanitary sewer will be extended from public sanitary sewer located along the north property line of Lot 1 to provide service to the proposed senior housing building on Lot 2. The proposed sanitary sewer service for Lot 2 crosses through Lot 1; therefore, a private utility easement must be established between the two parcel owners. Before the City signs the final plat, the Developer must submit the appropriate documentation of the required private utility easement. The sanitary sewer service will be privately - owned and maintained by the owner of Lot 2. The trunk sanitary sewer area charge for Lot 1 of the plat was paid with the Hosanna 3rd Addition plat in 2002. The sanitary sewer availability charge has not been paid on the expansion area of Lots 1 and 2, Hosanna 4 Addition and must be paid with the building permit. The proposed area of Lots 1 and 2, Hosanna 4 Addition is 31.54 acres. The trunk sanitary sewer availability charge was previously collected on 29.49 acres (Lot 1, Block 1, Hosanna 3rd Addition), therefore, 93.50% of the sanitary sewer availability charge has been satisfied. The remaining 6.50% will be applied to the sanitary sewer availability charge due with Hosanna 4 Addition. The sanitary sewer availability charge is $307.00 per residential equivalent unit and shall be calculated when the M.C.E.S. SAC Units for the proposed senior housing building have been determined. 22. WATERMAIN. Development of Hosanna 4 Addition will not require public watermain construction. The existing building on Lot 1 of the plat is connected to public watermain. 8 -inch watermain 156389v02 8 LKVL:HosANNA 4 ADDITION SRN:r02 /24/2011 (Ebenezer Management Services, Inc.) will be extended from public watermain located along the north property line of Lot 1 to provide service to the proposed senior housing building on Lot 2. In addition, 6 -inch watermain will connect to an existing fire protection system within Lot 1 that will be reconfigured around the perimeter of Lot 2 to provide additional fire flow availability to both Hosanna! Lutheran Church and the proposed senior housing building. The proposed water service for Lot 2 crosses through Lot 1 and the looped fire protection system crosses through both Lots 1 and 2; therefore, a private utility easement must be established between the two parcel owners. Before the City signs the final plat, the Developer must submit the appropriate documentation of the required private utility easement. The water service and looped fire protection system will be privately -owned and maintained by the Developer. The parent parcels of Hosanna 4th Addition were previously assessed for the watermain improvements along 162n Street that were completed with City Project 91 -3. The assessment has been paid. 23. SEDIMENTATION BASIN. Development of Hosanna 4 Addition includes the construction of a sedimentation basin. The sedimentation basin will be located within Outlot A and will provide pretreatment and skimming of a portion of the stormwater runoff generated within the proposed senior housing campus site to protect regional infiltration basin CL -16 -1 from clogging with sediment. The sedimentation basin will be privately -owned and maintained by the Developer. Before the City signs the final plat, the Developer shall provide the City with an appropriately executed and notarized temporary drainage and utility easement over all of Outlot A. The temporary easement will expire when Outlot A is final platted into lots and blocks. 24. RETAINING WALLS. Development of Hosanna 4 Addition includes construction of eight (8) retaining walls. The retaining walls vary in height ranging from 3 and 10 feet. All modular block walls constructed must meet MnDOT requirements. All modular block walls greater than four feet in height must be designed by a registered engineer and will require a separate building permit from the City's Building Inspection Department prior to construction. All modular block walls requiring a separate building permit from the City Building Inspection Department must be inspected during construction and certified by the 156389v02 9 LKVL:HOSANNA 4TH ADDITION SRN:r02 /24/2011 (Ebenezer Management Services, Inc.) design engineer following construction. Before the City signs the final plat, the Developer shall post a $126,390.00 security to guarantee appropriate construction of the approved retaining walls. For safety reasons, the Developer may want to consider installing fencing on top of all walls that require a separate building permit from the City Building Inspection Department and on any wall 30- inches in height or greater that is with five (5) feet of a pedestrian area. All retaining walls will be privately -owned and maintained by the Developer. 25. CONSTRUCTION ACCESS. Construction traffic access and egress for grading, utility, parking lot and building construction is restricted to Itasca Trail and 163 Street via 162 Street (CSAH- 46). 26. PARK DEDICATION AND TRAILS. Development of Hosanna 4 Addition will not require public trail construction. The City Parks, Trails and Open Space Plan does not designate any area within the proposed plat as future park land. The City's park dedication requirement for Lot 1 of the plat was satisfied through a cash contribution paid with the Hosanna Addition plat in 1996. The park dedication requirement for Lot 2 has not been met and will be satisfied through a cash contribution based on the rate in effect at the time of final plat approval and is calculated as follows: Number of Units 22 2 45 24 Unit Type Independent Living Guest Rooms Assisted Care Memory Care 156389v02 10 Park Dedication fee Rate $4,153.00 /unit $1,038.25/unit $1,038.25/unit $ 00.00 /unit TOTAL Total $ 91,366.00 $ 2,076.50 $ 46,721.25 $ 00.00 $140,163.75 The $140,163.75 park dedication fee for Hosanna 4 Addition must be paid by the Developer in cash at the time of final plat approval. 27. STREET LIGHT OPERATION COSTS. A cash fee for one -year of streetlight operating expenses for Lot 2 must be paid at the time of final plat approval. Consistent with City policy, the streetlight operating fee is based as a commercial development so as to provide a more comparable rate to the anticipated usage. The cash fee is calculated as follows: LKVL:HOSANNA 4 ADDITION SRN:r02 /24/2011 (Ebenezer Management Services, Inc.) 100.00 ff (165`" St. Front Footage) x $0.214/ff /qtr x 4 qtrs = $85.60 28. SURFACE WATER MANAGEMENT UTILITY FEE. A cash fee for one -year of surface water management expenses for Lot 2 must be paid at the time of final plat approval calculated as follows: 93 dwelling units x 0.25 REU x $7.00 /unit/qtr x 4 qtrs = $651.00 29. LANDSCAPING. Landscaping must be installed in accordance with the approved landscape plan. The Developer shall post a $70,000.00 security at the time of final plat approval to guarantee installation of the approved landscape improvements. 30. TREE PRESERVATION. The Developer must post security for tree preservation on an Individual lot basis for each lot containing a "save" significant tree. The security is $1,500.00 for each lot with a "save" significant tree and $1,000.00 for each outlot with a "save" significant tree and is calculated as follows for Hosanna 4 Addition: Block 1: Lots 1 and 2 2 lots @ $1,500.00 each = $3,000.00 Prior to the issuance of building permits in this subdivision, the Developer's forester shall certify that all trees designated to be saved on the tree preservation plan are saved or replaced in compliance with Subdivision Ordinance requirements. 31. SPECIAL PROVISIONS. The following special provisions shall apply to plat development: A. Implementation of the recommendations listed in the February 11, 2011, Engineering report. B. Implementation of the recommendations of the Parks, Recreation, and Natural Resources Committee. C. The planned unit development (PUD) flexibilities for Hosanna 4 Addition include building height, interconnection of buildings across property lines, shared parking and access, underground parking garage stall depths, and shared freestanding monument sign. D. "No Parking" signs must be installed by and at the expense of the Developer in locations required by the City Fire Marshal to ensure adequate emergency fire access. 156389v02 11 LKVL:HOSANNA 4 ADDITION SRN:r02 /24/2011 (Ebenezer Management Services, Inc.) plan. E. Interior concrete sidewalks must be constructed as identified on the approved site F. Before the City signs the final plat, the Developer shall provide the City with a fully executed copy of the required joint parking and access agreement allowing Hosanna! Lutheran Church and the Developer shared driveway and surface parking lot use. G. Before the City signs the final plat, the Developer shall provide the City with a fully executed copy of the required agreement between Hosanna! Lutheran Church and the Developer for the freestanding monument sign adjacent to 165 Street. H. Signs larger than two square feet shall be limited to the allowances provided for in the O -R District except that a free standing sign is to be a monument type structure with a height not to exceed six feet, 28 square feet in area and set back not Tess than 15 feet from any public right -of -way. A wall sign not exceeding 50 square feet is permitted on the north face of the senior housing facility building. A sign permit is required prior to the installation of any signs. I. The exterior building materials must comply with the requirements established by Section 11- 61 -19.B of the City zoning ordinance. J. Exterior lighting must be installed according to the approved lighting plan and in compliance with City zoning ordinance requirements. K. The trash enclosure must be constructed according to the approved plans and according to City zoning ordinance requirements. L. The future chapel and classroom addition to Hosanna Lutheran Church are allowed by the Planned Unit Development, shall be subject to the approval of a building permit, and shall be constructed according to the approved plans. M. Prior to City Council approval of the final plat, the Developer shall furnish a boundary survey of the proposed property to be platted with all property corner monumentation in place and marked with lath and a flag. Any encroachments on or adjacent to the property shall be noted on the survey. The Developer shall post a $300.00 security for the final placement of interior subdivision iron monuments at 156389v02 12 LKVL:HosANNA 4TH ADDITION SRN:r02 /24/2011 (Ebenezer Management Services, Inc.) property corners. The security was calculated as follows: 3 Tots /outlots at $100.00 per Iot/outlot. The security will be held by the City until the Developer's land surveyor certifies that all irons have been set following site grading and utility and street construction. In addition, the certificate of survey must also include a certification that all irons for a specific lot have either been found or set prior to the issuance of a building permit for that lot. N. The Developer shall pay a cash fee for the preparation of record construction drawings and City base map updating. This fee is $75.00 per lot/outlot for a total charge of $225.00. O. Before the City signs the final plat, the Developer shall post a $17,085.00 security to guarantee placement of the on -site private signs and pavement markings. P. The Developer is required to submit the final plat in electronic format. The electronic format shall be either AutoCAD.DWG file or a .DXF file. All construction record drawings (e.g., grading, utilities, streets) shall be in electronic format in accordance with standard City specifications. The Developer shall also submit one complete set of reproducible construction plans on Mylar. 32. SUMMARY OF SECURITY REQUIREMENTS. To guarantee compliance with the terms of this agreement, payment of real estate taxes including interest and penalties, payment of special assessments, payment of the costs of all public and private improvements, and construction of all public and private improvements, the Developer shall furnish the City with a letter of credit, in the form attached hereto, from a bank ( "security ") for $298,775.27, plus a cash fee of $2,111.60 for City engineering administration. The amount of the security was calculated as follows: CONSTRUCTION COSTS: Sanitary Sewer Connection $ 750.00 Watermain Connection 750.00 Storm Sewer 14,558.00 Site Grading /Erosion Control /Restoration & Grading Certification 54,328.50 CONSTRUCTION SUB -TOTAL $ 70,386.50 OTHER COSTS: Developer's Design (6.0 %) $ 4,223.19 Developer's Construction Survey (2.5 %) 1,759.66 156389v02 13 LKVL:HOSANNA 4TH ADDITION SRN:r02 /24/2011 (Ebenezer Management Services, Inc.) City Legal Expenses (Est. 0.5 %) 351.93 City Construction Observation (Est. 7.0 %) 4,927.06 Developer's Record Drawings (0.5 %) 351.93 Retaining Walls 126,390.00 On -site Private Signs and Pavement Markings 17,085.00 Landscaping 70,000.00 Tree Preservation 3,000.00 Lot Corners /Iron Monuments 300.00 OTHER COSTS SUB -TOTAL $ 228,388.77 TOTAL SECURITIES: $ 298,775.27 This breakdown is for historical reference; it is not a restriction on the use of the security. The bank shall be subject to the approval of the City Administrator. The City may draw down the security, without notice, for any violation of the terms of this Contract or if the security is allowed to lapse prior to the end of the required term. If the required public improvements are not completed at least thirty (30) days prior to the expiration of the security, the City may also draw it down. If the security is drawn down, the proceeds shall be used to cure the default. Upon receipt of proof satisfactory to the City that work has been completed and financial obligations to the City have been satisfied, with City approval the security may be reduced from time to time by ninety percent (90 %) of the financial obligations that have been satisfied. Ten percent (10 %) of the amounts certified by the Developer's engineer shall be retained as security until all improvements have been completed, all financial obligations to the City satisfied, the required "as constructed" plans have been received by the City, a warranty security is provided, and the public improvements are accepted by the City Council. The City's standard specifications for utility and street construction outline procedures for security reductions. 33. SUMMARY OF CASH REQUIREMENTS. The following is a summary of the cash requirements under this Contract which must be furnished to the City at the time of final plat approval: Park Dedication Sanitary Sewer Availability Charge (6.50 %) Trunk Storm Sewer Area Charge Crystal Lake Surcharge Street Light Operating Fee 156389v02 14 $ 140,163.75 Due with Building Permit 16, 588.04 1,284.24 85.60 LKVL:HOSANNA 4 ADDITION SRN:r02/24/201 1 (Ebenezer Management Services, Inc.) Surface Water Management Utility Fee City Base Map Updating City Engineering Administration (3 %) TOTAL CASH REQUIREMENTS 651.00 225.00 2,111.60 $ 161,109.23 34. WARRANTY. The Developer warrants all improvements required to be constructed by it pursuant to this Contract against poor material and faulty workmanship. The warranty period for streets is one year. The warranty period for underground utilities is two years and shall commence following completion and acceptance by City Council. The one year warranty period on streets shall commence after the final wear course has been installed and accepted by the City Council. The Developer shall post maintenance bonds in the amount of twenty -five percent (25 %) of final certified construction costs to secure the warranties. The City shall retain ten percent (10 %) of the security posted by the Developer until the maintenance bonds are furnished the City or until the warranty period expires, whichever first occurs. The retainage may be used to pay for warranty work. The City's standard specifications for utility and street construction identify the procedures for final acceptance of streets and utilities. 35. RESPONSIBILITY FOR COSTS. A. Except as otherwise specified herein, the Developer shall pay all costs incurred by it or the City in conjunction with the development of the plat, including but not limited to Soil and Water Conservation District charges, legal, planning, engineering and inspection expenses incurred in connection with approval and acceptance of the plat, the preparation of this Contract, review of construction plans and documents, and all costs and expenses incurred by the City in monitoring and inspecting development of the plat. B. The Developer shall hold the City and its officers, employees, and agents harmless from claims made by itself and third parties for damages sustained or costs incurred resulting from plat approval and development. The Developer shall indemnify the City and its officers, employees, and agents for all costs, damages, or expenses which the City may pay or incur in consequence of such claims, including attorneys' fees. 156389v02 15 LKVL:HOSANNA 4 ADDITION SRN:r02 /24/2011 (Ebenezer Management Services, Inc.) C. The Developer shall reimburse the City for costs incurred in the enforcement of this Contract, including engineering and attorneys' fees. D. The Developer shall pay, or cause to be paid when due, and in any event before any penalty is attached, all special assessments referred to in this Contract. This is a personal obligation of the Developer and shall continue in full force and effect even if the Developer sells one or more lots, the entire plat, or any part of it. E. The Developer shall pay in full all bills submitted to it by the City for obligations incurred under this Contract within thirty (30) days after receipt. If the bills are not paid on time, the City may halt plat development and construction until the bills are paid in full. Bills not paid within thirty (30) days shall accrue interest at the rate of eighteen percent (18 %) per year. F. In addition to the charges and special assessments referred to herein, other charges and special assessments may be imposed such as but not limited to sewer availability charges ( "SAC "), City water connection charges, City sewer connection charges, and building permit fees. 36. DEVELOPER'S DEFAULT. In the event of default by the Developer as to any of the work to be performed by it hereunder, the City may, at its option, perform the work and the Developer shall promptly reimburse the City for any expense incurred by the City, provided the Developer, except in an emergency as determined by the City, is first given notice of the work in default, not Tess than forty-eight (48) hours in advance. This Contract is a license for the City to act, and it shall not be necessary for the City to seek a Court order for permission to enter the land. When the City does any such work, the City may, in addition to its other remedies, assess the cost in whole or in part. 37. MISCELLANEOUS. A. The Developer represents to the City that the plat complies with all city, county, metropolitan, state, and federal laws and regulations, including but not limited to: subdivision ordinances, zoning ordinances, and environmental regulations. If the City determines that the plat does not comply, the City may, at its option, refuse to allow construction or development work in the plat until the Developer does comply. Upon the City's demand, the Developer shall cease work until there is compliance. 156389v02 16 LKVL:HOSANNA 4TH ADDITION SRN:r02 /24/2011 (Ebenezer Management Services, Inc.) B. Third parties shall have no recourse against the City under this Contract. C. Breach of the terms of this Contract by the Developer shall be grounds for denial of building permits, including lots sold to third parties. D. If any portion, section, subsection, sentence, clause, paragraph, or phrase of this Contract is for any reason held invalid, such decision shall not affect the validity of the remaining portion of this Contract. E. Grading, curbing, and one lift of asphalt shall be installed on all private streets and parking areas prior to issuance of a certificate of occupancy. F. If building permits are issued prior to the acceptance of public improvements, the Developer assumes all liability and costs resulting in delays in completion of public improvements and damage to public improvements caused by the City, Developer, its contractors, subcontractors, material men, employees, agents, or third parties. No sewer and water connections or inspections may be conducted and no one may occupy a building for which a building permit is issued on either a temporary or permanent basis until the streets needed for access have been paved with a bituminous surface and the utilities are accepted by the City Engineer. G. The action or inaction of the City shall not constitute a waiver or amendment to the provisions of this Contract. To be binding, amendments or waivers shall be in writing, signed by the parties and approved by written resolution of the City Council. The City's failure to promptly take legal action to enforce this Contract shall not be a waiver or release. H. This Contract shall run with the land and may be recorded against the title to the property. The Developer covenants with the City, its successors and assigns, that the Developer is well seized in fee title of the property being final platted and /or has obtained consents to this Contract, in the form attached hereto, from all parties who have an interest in the property; that there are no unrecorded interests in the property being final platted; and that the Developer will indemnify and hold the City harmless for any breach of the foregoing covenants. 156389v02 17 LKVL:HosnrrNA 4 111 ADDITION SRN:r02 /24/2011 (Ebenezer Management Services, Inc.) I. Developer shall take out and maintain or cause to be taken out and maintained until six (6) months after the City has accepted the public improvements, public liability and property damage insurance covering personal injury, including death, and claims for property damage which may arise out of Developer's work or the work of its subcontractors or by one directly or indirectly employed by any of them. Limits for bodily injury and death shall be not less than $500,000 for one person and $1,000,000 for each occurrence; limits for property damage shall be not less than $200,000 for each occurrence; or a combination single limit policy of $1,000,000 or more. The City shall be named as an additional insured on the policy on a primary and noncontributory basis, and the Developer shall file with the City a certificate evidencing coverage prior to the City signing the plat. The certificate shall provide that the City must be given ten (10) days advance written notice of the cancellation of the insurance. J. Each right, power or remedy herein conferred upon the City is cumulative and in addition to every other right, power or remedy, express or implied, now or hereafter arising, available to City, at law or in equity, or under any other agreement, and each and every right, power and remedy herein set forth or otherwise so existing may be exercised from time to time as often and in such order as may be deemed expedient by the City and shall not be a waiver of the right to exercise at any time thereafter any other right, power or remedy. K. The Developer may not assign this Contract without the written permission of the City Council. The Developer's obligation hereunder shall continue in full force and effect even if the Developer sells one or more Tots, the entire plat, or any part of it. L. Retaining walls that require a building permit shall be constructed in accordance with plans and specifications prepared by a structural or geotechnical engineer licensed by the State of Minnesota. Following construction, a certification signed by the design engineer shall be filed with the City Engineer evidencing that the retaining wall was constructed in accordance with the approved plans and specifications. All retaining walls identified on the development plans or by special conditions referred to in this Contract shall be constructed before any other building permit is issued for a lot on which a retaining wall is required to be built. 156389v02 18 LKVL:HOSANNA 4 ADDITION SRN:r02 /24/2011 (Ebenezer Management Services, Inc.) 38. NOTICES. Required notices to the Developer shall be in writing, and shall be either hand delivered to the Developer, its employees or agents, or mailed to the Developer by certified mail at the following address: 9600 163 Street West, Lakeville, Minnesota 55044. Notices to the City shall be in writing and shall be either hand delivered to the City Administrator, or mailed to the City by certified mail in care of the City Administrator at the following address: Lakeville City Hall, 20195 Holyoke Avenue, Lakeville, Minnesota 55044. [The remainder of this page has been intentionally left blank. Signature pages follow.] 156389v02 19 LKVL:HOSANNA 4 ADDITION SRN:r02 /24/2011 (Ebenezer Management Services, Inc.) (SEAL) STATE OF MINNESOTA ) ( ss. COUNTY OF DAKOTA ) CITY OF LAKEVILLE BY: AND Mark Bellows, Mayor Charlene Friedges, City Clerk The foregoing instrument was acknowledged before me this day of , 2011, by Mark Bellows and by Charlene Friedges, the Mayor and City Clerk of the City of Lakeville, a Minnesota municipal corporation, on behalf of the corporation and pursuant to the authority granted by its City Council. NOTARY PUBLIC 156389v02 20 LKVL:HOSANNA 4 TH ADDITION SRN:r02 /24/2011 (Ebenezer Management Services, Inc.) 1 DRAFTED BY: CAMPBELL, KNUTSON Professional Association 317 Eagandale Office Center 1380 Corporate Center Curve Eagan, MN 55121 Telephone: (651) 452 -5000 RNK:srn 156389v02 ASTRID I. SMITH Notary Public- Minnesota My Commission Expires Jan 31, 2015 DEVELOPER: EBENEZER MAN BY: Its STATE OF MINNESOTA ) ( ss. COUNTY OF DAKOTA The foregoing instrument was acknowledged before me this ae day of '?EB 2011, by / F THOMAS the /WE - 5/o ENT CEO Ebenezer Management Services, Inc., a Minnesota corporation. NOTARY PUBLIC Af Es ' O L / Y G. 60 ERVICES, INC. of 21 LKVL,:HOSANNA 4 TH ADDITION SRN:r02 /24/20I 1 (Ebenezer Management Services, Inc.) HOSANNA! LUTHERAN CHURCH OF LAKEVILLE, a Minnesota non - profit corporation, fee owner of all or part of the subject property, the development of which is governed by the foregoing Development Contract, affirms and consents to the provisions thereof and agree to be bound by the provisions as the same may apply to that portion of the subject property owned by it. Dated this, day of I , 2011. STATE OF MINNESOTA ) (ss. /n) COUNTY OF by Church of L DRAFTED BY: CAMPBELL KNUTSON Professional Association 317 Eagandale Office Center 1380 Corporate Center Curve Eagan, Minnesota 55121 (651) 452 -5000 RNK:srn FEE OWNER CONSENT TO DEVELOPMENT CONTRACT HOSANNA! LUTHERAN CHURCH OF LAKEVILLE BY: The foregoing instrument was acknowledged before me this �2rday of 2011, / the &/<e /7I^G Z- P -e! of Hosanna! Lutheran eville, a Minnesota non - profit corporation, on its behalf. 156389v02 22 NOTARY PUBLIC .±, My Commission Expires Jan. 31, 2013 ,4 4, MARYANNE STRONG s NOTARY PUBLIC MINNESOTA LKVL:HosANNA 4" ADDITION SRN:r02/24/2011 (Ebenezer Management Services, Inc.) BANK OF THE WEST, a California banking corporation, which holds a mortgage on the subject property, the development of which is governed by the foregoing Development Contract, agrees that the Development Contract shall remain in full force and effect even if it forecloses on its mortgage. STATE OF COUNTY OF MORTGAGE CONSENT TO DEVELOPMENT CONTRACT Dated this day of , 2011. The foregoing instrument was acknowledged before me this day of 2011, by and by the and of Bank of the West, a California banking corporation, on its behalf. DRAFTED BY: CAMPBELL KNUTSON Professional Association 317 Eagandale Office Center 1380 Corporate Center Curve Eagan, Minnesota 55121 (651) 452 -5000 RNK:srn (ss. BANK OF THE WEST BY: Its AND Its NOTARY PUBLIC 156389v02 23 LKVL:HOSANNA 4TH ADDITION SRN:r02 /24/2011 (Ebenezer Management Services, Inc.) CITY OF LAKEVILLE DAKOTA COUNTY, MINNESOTA HOSANNA 4 ADDITION ZONING MAP AMENDMENT On February 17, 2011, the Lakeville Planning Commission met at its regularly scheduled meeting to consider the application of Hosanna Lutheran Church for a Zoning Map amendment rezoning land included within the proposed Hosanna 4 Addition final plat from RM -1 and RM -2, Medium Density Residential District to PUD, Planned Unit Development District. The Planning Commission conducted a public hearing on the proposed rezoning preceded by published and mailed notice. The applicant was present and the Planning Commission heard testimony from all interested persons wishing to speak. The City Council hereby adopts the following: FINDINGS OF FACT 1. The property is currently zoned RM -1, Medium Density Residential District, RM -2, Medium Density Residential District and O -R, Office /Residential Transition District. 2. The property is located in Planning District 2, which guides the property for residential and public /quasi - public uses. 3. The applicant is requesting a Zoning Map amendment rezoning the subject site to PUD, Planned Unit Development District for the purpose of developing a continuing care senior housing facility. 4. The legal description of the property is Lots 1 and 2, Block 1 and Outlot A, Hosanna 4 Addition. 5. In considering the proposed Zoning Map amendment, the Planning Commission's judgment is to be based upon, but not limited to, the factors outlined in Section 11 -3 -3.E of the Zoning Ordinance: a) The proposed action has been considered in relation to the specific policies and provisions of and has been found to be consistent with the official City Comprehensive Plan. The proposed rezoning is consistent with District 8 recommendations contained in the 2008 Comprehensive Plan. The proposed use will expand life cycle housing options within the City for aging residents consistent with the goa /s and policies of the Comprehensive Plan. 1 b) The proposed use is or will be compatible with present and future land uses in the area. The proposed use will be compatib /e with existing residential land uses to the south and west. c) The proposed use conforms with all performance standards contained within the Zoning Ordinance and the City Code. The proposed use complies with the application performance standards established by the Zoning Ordinance and City Code except as allowed by the proposed PUD. d) The proposed use can be accommodated with existing public services and will not overburden the City's service capacity. The proposed use can be accommodated with existing and proposed public services and will not overburden the City's service capacity. e) Traffic generation by the proposed use is within the capabilities of streets serving the property. Traffic generated by the proposed use will be accommodated by the existing transportation system serving the subject property. 5. The planning report prepared by Associate Planner, Frank Dempsey, AICP, dated February 11, 2011 is incorporated herein. Dated: March 7, 2011 2 CITY OF LAKEVILLE BY: Mark Bellows, Mayor BY: Charlene Friedges, City Clerk L FILE mU SCALE 40 MEM& Feb24 2011.12 apre 00 0 D O 0 C Z o A 0z z _1 > A A c z 00 z - o r > z m 0 c r m I :9l a ll I € r fall ! i t ; 5 i ow § 14 11 1 iii i ig g Pir 'll' 1 1 1 ' „I .; e l c, 0 l ay C ;Id 6 � gg Ptr 1 a O D O z z O U) Al 112 HOPI 411 ' IV Si ; &gill I fi E Po ee g g m al O cn C [-4-• J J 0 >003> Z K Z Z �' D � ry m 2 -1 z z m m O� D m 0) m D Z z o O >0 Z z r Z G) 9 3 mg lag Dzi 1 J EXISTING SHRUBS TO REMAIN - TYP REDTWIG DOGWOOD ROPOSED EVERGREEN TREE- TYP. BLACK HILLS SPRUCE ST RN AF AS AM M5 KF R5 KW I BJ RC I PT RJ RN 50 1H .7.t:P;N ;. 16 265 112 24 g"g'°NOmm•Nu INDICATES AREA TO BE SEEDED WITH MNDOT SEED MIX 260 INDICATES AREA TO BE SEEDED WRH MNDOT SEED MIX 325 INDICATES AREA OF 4' DEEP ROCK MULCH OVER LANDSCAPE FABRIC 160104IES AREA TO BE 50DDED —STAKE ALL 50D ON 311 SLOPES OR GREATER 41 CONT #1 CONT /1 CONT 41 CONT 41 001 41 CONT !1 CONT /1 CONT 41 CCNT /1 CONT 41 CONT /1 CONT CONT /I COMP 00NT CONT l5 CONT i5 CONT /5 CON1 45 CONT /5 CON' 45 CON1 1.5'646 1 5'648 2.5 Bed 2.5 4B 1.5 E POT OF GOLD CONEFLOWER KOBOLD BLAZING STAR STRIP1EASE H05TA SALNA MARCUS RUSSIAN SAGE AUTUMN FIRE SEDUM ARIZONA SUN GAILLARDIA AUGUST MOON HOSTA i g i 1 OAYULLY KEY WEST ASIILBE ANNABELLE HYDRANGEA DAYULLY BUSH HONEYSUCKLE ARTIC FIRE DOGWOOD RHODODENDRON PURPLE GEM UTTLE PRINCES SPIREA BUFFALO JUNIPER RHODODENDRON P41 COMPACT 0001410 DOOWO00 TAUTON YEW PACOOA TREE RED JEWEL CRAB RED MAPLE SWAMP WHITE OAK THORNLESS HAWTHORN 311YN NONW00 Rudbeekla pot of gold Liable .pleat, kobold Hoetu etiptoaee Salvia memoroaa marcue Perovskla Rile spire Sedum autumn Rre Galllardlo arl.tato adxonie sun Haste august mean A4lllea moonshine' Calamaaroetie z acutlfolia kart foantert Hemeroeallle 'Happy Rotuma' Astlbe elmplicifalla key west Hydrangeo arboreecene annabello Hemerocallie steps supreme' DlorWla lunnicera comm. elalanlfera farrow Rhododendron purple gem Spimeo japonica IItte princes. podwoo 111'd w,pwpopo45 olayog oulgoa onrdrunr Comue emcee 1sant1 Taws x media teuton Cans altemdolk Malu. jewelcole Apr rubrum 'Northwood' Duercu. Bicolor Crata.gus sue —galls var. Jeannie L FILE mU SCALE 40 MEM& Feb24 2011.12 apre 00 0 D O 0 C Z o A 0z z _1 > A A c z 00 z - o r > z m 0 c r m I :9l a ll I € r fall ! i t ; 5 i ow § 14 11 1 iii i ig g Pir 'll' 1 1 1 ' „I .; e l c, 0 l ay C ;Id 6 � gg Ptr 1 a O D O z z O U) Al 112 HOPI 411 ' IV Si ; &gill I fi E Po ee g g m al O cn C [-4-• J J 0 >003> Z K Z Z �' D � ry m 2 -1 z z m m O� D m 0) m D Z z o O >0 Z z r Z G) 9 3 mg lag Dzi 1 J EXISTING SHRUBS TO REMAIN - TYP REDTWIG DOGWOOD ROPOSED EVERGREEN TREE- TYP. BLACK HILLS SPRUCE m cn 0 —i A rn ( P1 1b -11 SMACK IMME hill} �Ikl�il, ilfl# �II��II- iltld�Ikifil- fltl #.�Iklllltl #'Itlk11 #I�k���l�l #I ITASCA TRAIL z 1 i HOSANNA SENIOR HOUSING PHOTMETRIC PLAN COLLINS ELECTRICAL CONSTRUCTION CO. m cn 0 —i A rn ( P1 1b -11 SMACK IMME hill} �Ikl�il, ilfl# �II��II- iltld�Ikifil- fltl #.�Iklllltl #'Itlk11 #I�k���l�l #I ITASCA TRAIL z 1 i RILE PV0100IOM8■1041001&&G&O Ep LAYOUT 080 SCALE 10 OATERRIE 40024 201.12414 USER I1V0 %HERO? 10018 sw10g 100W_SI■■gl0018AyESlGN0.g 1001bt1&N.E1y 101091ptp r P \ A 3 A n n 00 z n 00 z 0 0 00 C 0 N N a 0 C 0 S 0 0 T e 73 Z m Z0 - 0 D ZD 7 zD 7J Z 0 r -< Z N _ on `m n rn rr < n /T < N rn D 2 < Z 0 w 2 8 O N m 3 F Z m m �F ? � a°3 T 0 73 rn r 0 3 Z D c 0 0 0 n - 1 ' 3 OOwo p00 ' • 3 °ro0 y1N Za .. m e g u° \�• Z J0�`•' J ► m-. . m i• V.. % G« 3N Q)- 101`�� 0_ <3 iY]I6_ y N l°i1 DUI ASy R �w 4 � a 1 A `L UI ip ` � o 1 �m E D n! r m 00 0 0 0 DOc o 2147)-1 i , Z� Z $ }F I� 0 Z _ 0 t_ 0 Z � Q - - -I r 2 -i lb4 I D� 2 Z o Or 4 0 m 00 Z T <y m D Z Z = O 0C E EI2o 4" 0 Z ' Ifr D q m m Z a >. ow r gl£ O r Z o Dn 0 iS 1 R FILE P02010510-0105.00-01SA_EROSArs LAYOUT EROS SCALE 50 DATEMME 1.24 2011.114*n F § � W L • Z 2 ) z - 0 O -1 ; ■ z q 2 2 $ 2 ƒ - - \ ✓ m> > >zz >z) ZHOr tn cn o o o � � - 9 C c c)-J 2 Z K Z I F -I - 0 ' 2 > == > ; 1 - . 3 3 @ 00 00 m, z Z m$ > Viz 0 | • 2 P AIL MN ,: S3 C C C 3 — IL 5, 3 m N w 3 fD 3w II EMI NEMO 1191111 9019 9i YY Ilk/ al / Pro d Pro Line Sze verry CO X88 3 3 3 • O a 9 c r0 0 z 0 R 0 _ _ 8 -0 O m0) T z (A -0 Z_ Z OZO fnXO O *fffPi mat o— o 0 0 0 ;U D f w 0 0) m 0 0 z 0 m r- 0 z meg ..IS , 999m ! �99�I9� ►?� :_ 1J C C C C D cn N N d Oq r 0 A O c C CD cn (n A CI rD N h N (D -p ao C C w0 0 O m Q 33 1 D 3 0 A Am m m A n IIIIIIIIIIII y 0 y21 so;g6 " EXISTING UTILITY NOT TO SCALE ;; ` EASEMENT fi g, ' \ I \ : } I O < <s w a (n \ Z Z Ce Z U F- _ U1 ,.. W Z . 0 m Ci Cr) • Z ,••i Q cr I-OI' M r THE WESTERLY LINE OF OUTLOT A, HOSANNA 4TH ADDITION. TEMPORARY DRAINAGE AND UTILITY EASEMENT EXHIBIT TEMPORARY EASEMENT AREA = 26,816 Sq. Ft. \ � i \ ✓ \ \ l \ i C � 1 woo S �Z o3o , 59 . , v .i 11 —987 THE WESTERLY LINE OF LOT 1, BLOCK 1 HOSANNA 4TH ADDITION. A 989 AN EASEMENT FOR TEMPORARY DRAINAGE AND UTILITY PURPOSES OVER, UNDER AND ACROSS THAT PART OF OUTLOT A, HOSANNA 4TH ADDITION DESCRIBED AS FOLLOWS: BEGINNING AT THE NORTHWEST CORNER OF LOT 1, BLOCK 1, SAID HOSANNA 4TH ADDITION; THENCE SOUTH 0 DEGREES 18 MINUTES 13 SECONDS WEST, ALONG THE WESTERLY LINE OF SAID LOT 1, A DISTANCE OF 58.04 FEET; THENCE NORTH 54 DEGREES 22 MINUTES 22 SECONDS WEST A DISTANCE OF 62.66 FEET; THENCE SOUTH 72 DEGREES 30 MINUTES 59 SECONDS WEST A DISTANCE OF 175.83 FEET; THENCE NORTH 0 DEGREES 00 MINUTES 58 SECONDS WEST A DISTANCE OF 122.03 FEET TO A POINT ON THE WESTERLY LINE OF OUTLOT A, HOSANNA 4TH ADDITION; THENCE NORTH 89 DEGREES 59 MINUTES 02 SECONDS EAST, ALONG SAID WESTERLY LINE, A DISTANCE OF 35.60 FEET; THENCE NORTH 57 DEGREES 56 MINUTES 19 SECONDS EAST, ALONG SAID 111 WESTERLY LINE, A DISTANCE OF 130.64 FEET; THENCE SOUTH 45 DEGREES Engineering•Surveying ,� 1 Landscape Architecture 29 MINUTES 18 SECONDS EAST A DISTANCE OF 102.83 FEET; THENCE SOUTH 0 DEGREES 50 MINUTES 16 SECONDS WEST A DISTANCE OF 44.94 FEET TO HANSEN THORP PELLINEN OLSON, inc. THE POINT OF BEGINNING. 7510 Market Place Ddve• Eden Pralde, MN 55344 952 - 929-0700 • 952 - 829-7806 fax 12. The following setbacks are required for the continuing care senior facility on Lot 2: Klamath Trail: 30 feet (building) 15 feet (parking) Side Yard: 20 feet (shoreland overlay district) OHWL: 150 feet 13. A private agreement for shared parking and driveway access and shared storm water drainage facilities between Lots 1 and 2 must be completed prior to City Council consideration of the final plat. The agreement must include maintenance responsibilities. 14. The developer must install "fire lane" signage along the driveway in front of the senior housing facility as recommended by the Fire Department. 15. Any rooftop mechanical equipment must be screened from public view in compliance with Zoning Ordinance requirements. 16. Landscaping shall be installed consistent with the approved landscape plan. A $97,000 security must be submitted to guarantee installation of the approved landscaping. 17. Detailed light fixture plans for exterior lighting must be submitted with the building permit for the Kingsley Shores Senior Living facility. Lighting must comply with the requirements of Section 11 -16 -17 of the Zoning Ordinance. 18. Development signage shall be installed consistent with the approved plans. Signage for the Kingsley Shores Senior Living development is subject to the following conditions: • The combined freestanding sign on Lot 1 shall be constructed consistent with the approved site plan. • No additional freestanding signs shall be allowed on Lot 1. The Zoning Ordinance allows two wall signs for the future building on Lot 2 because it is a corner lot. • No wall signs shall be allowed for the senior housing facility on Lot 2. Ayes: Lillehei, Davis, Blee, Grenz, Drotning, Maguire. Nays: 0 Break at 6:56 p.m. Reconvened at 7:06 p.m. ITEM 6. HOSANNA 4TH ADDITION Planning Commission Meeting February 17, 2011 Page 5 Chair Davis opened the public hearing to consider the application of Hosanna Lutheran Church of Lakeville for the following, located at 9600 - 163rd Street: A. Comprehensive Plan amendment to re -guide property from Public and Quasi Public to High Density Residential, B. Zoning Map amendment to rezone property Planning Commission Meeting February 17, 2011 Page 6 from RM -1 and RM -2, Medium Density Residential District to PUD, Planned Unit Development District, C. Development and final stage planned unit development for a senior housing facility, D. Preliminary and final plat of two lots and one outlot to be known as Hosanna 4th Addition, and E. Vacation of drainage and utility easements. The Recording Secretary attested that the legal notice had been duly published in accordance with State Statutes and City Code. Jim Hayes, member of Hosanna Church, presented an overview of their request. He indicated that Sheppard on the Lake in Prior Lake is a model for this proposed development. Mr. Hayes stated that a neighborhood meeting was held and no negative comments were received about the project. They are hoping for occupancy in 2012. He estimated that the proposed chapel construction is one to two years out. Jill Keiser from Ebenezer Management Company stated that with this proposed development there are 24 memory care units and 69 housing units with services, which allows the residents to add level of services as needed. Ward Issacson with Pope Architects and Charles Howley with HTPO presented a short 3 -D video and a powerpoint. Mr. Issacson indicated that they are not changing any driveway access points onto City streets. He also indicated that they would like a proposed tower that would identify the campus with a maximum height of 60 feet to also be approved at tonight's meeting. Mr. Issacson listed some of the senior housing facilities' amenities, which will include an outdoor courtyard, beauty parlor, and a movie theatre. Associate Planner Frank Dempsey presented the planning report. Mr. Dempsey stated that he was informed earlier today that the underground parking stalls are actually 18 feet in depth and not 19 feet as shown on the plans and as stated in the planning report. Mr. Dempsey stated that the proposed development is consistent with the intent of the Zoning Ordinance for use of a PUD District and complies with applicable performance standards of the Zoning Ordinance and Subdivision Ordinance. Mr. Dempsey stated that should the Planning Commission recommend approval of this proposal, Planning Department staff recommends the 15 stipulations listed in the February 11, 2011 planning report, and adoption of the Findings of Fact dated February 17, 2011 Chair Davis opened the hearing to the public for comment. Dan Neudecker of Pope Architects representing the applicant stated that they are in agreement with the stipulations in the staff report. He clarified that the underground parking stall measurement of 19 feet was to the outside of the wall so Planning Commission Meeting February 17, 2011 Page 7 essentially they are requesting that 18 1 /2 foot parking stalls be approved tonight. He stated the applicant agrees to add parking lot islands on the west side of the parking lot as stipulated in the planning report except they would like to keep the painted island in the northwest corner of the parking lot for snow removal purposes. He reiterated that the church would like to get approval of the 60 foot marker at tonight's meeting. 11.08 Motion was made and seconded to close the public hearing at 7:47 Ayes: Davis, Blee, Grenz, Drotning, Maguire, Lillehei. Nays: 0 Chair Davis asked for comments from the Planning Commission. Discussion points were: • The lighting plan should be revised to include the new parking lot layout. • Clarified the number of existing (26) and proposed new (10) handicapped parking spaces. • Clarified that a fence is proposed around the outdoor sitting area for the memory care units. • Traffic flow, egress and ingress locations were addressed. The addition of the parking stalls on the west side of the site . was considered a positive compared to having church parishioners park across Ipava in the elementary school parking lot. The existing drop off in front of the church will remain the same. • Screening associated with the relocation of the detached storage building needs to be addressed. It was clarified that there won't be any loss of parking stalls with the relocation of the storage building. • Discussed the chapel as part of this PUD approval. The height of the proposed chapel will be 20 feet maximum at the mid point of the roof and will be lower than the height of the existing church. • Planning Commission members were comfortable with leaving the raised curb island out in the northwest corner of the parking lot so there will be a place to push snow into the adjacent drainage area. • Commissioner Drotning felt that the expanded parking lot design could have been better, but he will accept it. He felt that parking lot circulation will be better with the existing church parking lot than it will be with the redesigned parking lot. • This senior housing facility will be developed by an LLC with partial ownership between the church and Ebenezer. Shared parking, sign, and maintenance agreements will be provided prior to the City Council meeting. Signage will be co- located on the church property, which will be identified in the development agreement. Stipulations 6 and 13 were recommended to be amended as follows: Planning Commission Meeting February 17, 2011 Page 8 • The trash enclosure for the senior housing facility was identified on the plans. It will be a freestanding structure located next to the loading area on the south side of the building. • Mr. Dempsey stated that a future 60 foot cross structure was identified as a future construction by Hosanna in 1996. He indicated that the Zoning Ordinance allows a structure height of 35 feet unless a greater height if approved by CUP. He stated the structure height increase can also be approved as part of the PUD. The Planning Commission was not comfortable approving the 60 foot cross structure at tonight's meeting. They felt they needed more detailed information on the design of the structure before they could make a recommendation to the City Council. • Mr. Hayes indicated that the cross structure is not in its final design yet. Only the height has been determined. He stated that it would probably be constructed in about 2 years with the construction of the chapel. He did not want to delay the senior housing project and was willing to come back with a separate CUP application and more details for consideration of the cross structure height. • Commissioner Maguire asked how the memory care residents are secure from the general public. Mr. Neudecker indicated that there is a locked entrance to the memory care area. The memory care residents have their own secure dining and outdoor sitting areas. • Commissioner Grenz confirmed that the width of both the surface and underground parking stalls are 10 feet. • Vice Chair Lillehei requested that the 18 feet deep underground parking stalls be identified in the staff memo to City Council along with revised plans. 6. The plans must be revised to include raised concrete curb islands with landscaping as required by the Zoning Ordinance prior to City Council consideration, with the exception of the northwest island which may be painted. 13. Exterior lighting shall be installed according to the lighting plan approved by the City Council and in compliance with the Zoning Ordinance requirements. 11.09 Motion was made and seconded to recommend to City Council approval of the following, located at 9600 - 163rd Street: A. Comprehensive Plan amendment to re- guide property from Public and Quasi Public to High Density Residential, B. Zoning Map amendment to rezone property from RM -1 and RM -2, Medium Planning Commission Meeting February 17, 2011 Page 9 Density Residential District to PUD, Planned Unit Development District, C. Development and final stage planned unit development for a senior housing facility, D. Preliminary and final plat of two lots and one outlot to be known as Hosanna 4th Addition, and E. Vacation of drainage and utility easements, subject to the following 15 stipulations listed in the February 11, 2011 planning report, as amended, and adoption of the Findings of Fact dated February 17, 2011: 1. The recommendations listed in the February 11, 2011 engineering report. 2. The recommendations of the Parks, Recreation and Natural Resources Committee. 3. The rezoning to PUD is subject to Metropolitan Council approval of the Comprehensive Plan amendment re- guiding the property for high density residential use. 4. "No Parking" signs must be installed by and at the expense of the developer in locations required by the Fire Marshal to ensure adequate emergency fire access. 5. Interior concrete sidewalks shall be constructed as identified on the approved site plan. 6. The plans must be revised to include raised concrete curb islands with landscaping as required by the Zoning Ordinance prior to City Council consideration, with the exception of the northwest island which may be painted. 7. Landscaping shall be installed consistent with the approved landscape plan and Zoning Ordinance requirements. A security of $70,000 shall be required with the final plat to guarantee installation of the landscape improvements. 8. The developer shall provide a joint parking and access agreement allowing Hosanna and Ebenezer shared driveway and surface parking lot use. 9. A signed agreement between the church and Ebenezer for the freestanding monument sign adjacent to 165th Street will be required prior to City Council consideration. 10. The exterior building materials shall comply with the requirements established by Section 11- 61 -19.B of the Zoning Ordinance. 11. Park dedication requirements shall be satisfied as a cash fee in lieu of land subject to review by the Parks, Recreation and Natural Resources Committee and approval of the City Council. 12. Signs larger than two square feet shall be limited to the allowances provided for in the O -R District except that a freestanding sign is to be a monument type structure with a height not to exceed six feet, 28 square feet in area and set back not less than 15 feet from any public right -of -way. A wall sign not exceeding 50 square feet is permitted on the north face of the senior housing facility building. A sign permit is required prior to the installation of any signs. Planning Commission Meeting February 17, 2011 Page 10 13. Exterior lighting shall be installed according to the lighting plan approved by the City Council and in compliance with the Zoning Ordinance requirements. 14. The trash enclosure shall be constructed according to the approved plans and according to the Zoning Ordinance requirements. 15. The future chapel and classroom addition to Hosanna Lutheran Church are allowed by the Planned Unit Development and shall be subject to the approval of a building permit and constructed according to the approved plans. Ayes: Blee, Grenz, Drotning, Maguire, Lillehei, Davis. Nays: 0 Break at 8:24 p.m. Reconvened at 8:35 p.m. ITEM 7. MALT -O -MEAL COMPANY Chair Davis opened the public hearing to consider the application of Malt -O -Meal Company for the vacation of a conservation easement at the Malt -O -Meal Technical Center, located at 20802 Kensington Drive. The Recording Secretary attested that the legal notice had been duly published in accordance with State Statutes and City Code. Paul Holtzhueter, Vice President of Business Development from Malt -O -Meal, presented an overview of their request and the Company's short and long range growth plans for their Lakeville facility. Mr. Holtzhueter stated that Malt -O -Meal has made a commitment to Lakeville. Efficiency is important to them. He indicated that they want to expand on this site and keep everything at one location in Lakeville. He stated they want to be good neighbors to the residential homeowners to the north. Kevin Rolfes, Design Consultant and Stephen Mastey, Landscape Consultant spoke about landscaping and buffers. Their main objective for this site is to preserve the buffer area along the north property line. In addition, they want to enhance the buffer area by strategically placing some large white pines between the Malt -O- Meal property and the neighbors to the north. They have proposed a conceptual landscape plan but they indicated the most effective way to implement the landscape plan is to wait until spring to perform a site analysis and inventory the existing trees in an effort not to damage them or their roots when installing the new trees. February 16, 2011 Dakota County Surveyor's Office Western Service Center • 14955 Galaxie Avenue suite # 335 • Apple Valley, MN 55124 952- 891 -7087 • Fax 952- 891 -7127 • www.dakotacounty.us City of Lakeville 20195 Holyoke Avenue Lakeville MN 55044 -9177 Re: HOSANNA 4 ADDITION The Dakota County Plat Commission met on February 14, 2011, to consider the preliminary plan of the above referenced plat. The plat is adjacent to CSAH 46, and is therefore subject to the Dakota County Contiguous Plat Ordinance. The final plat meets the necessary half right -of -way needs of 100 feet along CSAH 46. Restricted access is shown along CSAH 46. The Plat Commission has approved the final plat and will recommend approval to the County Board of Commissioners when the plat is submitted in signed mylar form. Mylars should be submitted to the County Board within one year of the Plat Commission's final approval. No work shall commence in the County right of way until a permit is obtained from the County Transportation Department and no permit will be issued until the plat has been filed with the County Recorder's Office. The Plat Commission does not review or approve the actual engineering design of proposed accesses or other improvements to be made in the right of way. The Plat Commission highly recommends early contact with the Transportation Department to discuss the permitting process that reviews the design and may require construction of highway improvements, including, but not limited to, turn lanes, drainage features, limitations on intersecting street widths, medians, etc. Please contact Gordon McConnell regarding permitting questions at (952) 891 -7115 or Todd Tollefson regarding Plat Commission or Plat Ordinance questions at (952) 891 -7070. Sincerely, 07 Todd B. Tollefson Secretary, Plat Commission CITY OF LAKEVILLE PARKS, RECREATION & NATURAL RESOURCES COMMITTEE Meeting Minutes for February 16, 2011 ITEM 1 Call to order Meeting was called to order at 6:00 p.m. DRAFT ITEM 2 Roll call of members Present: Bob Boerschel Judy Hayes, Scott Kelly, Howard Lovelace, Jeanne Peterson, Jerry Zell Absent: Tom Goodwin Staff Present: Parks & Recreation Director Steve Michaud, Recording Secretary Patty Ruedy ITEM 3 Approval of the February 2, 2011 meeting minutes The Parks, Recreation & Natural Resources Committee meeting minutes were approved as presented. ITEM 4 Citizen comments There were no citizens present. ITEM 5 Hosanna! 4 Addition preliminary and final plat Hosanna! Lutheran Church submitted an application to develop in conjunction with Ebenezer Management Services, a 93 -unit senior living facility west of the existing Hosanna! Lutheran Church. The plans also propose a 397 -seat chapel and future classrooms on the west side of the church building. After review of the site, there are no park and trail facilities identified that would be affected by the proposed expansion. A park dedication fee will be required. The facility proposes to build 69 units, consisting of 22 independent and 47 assisted living units. There will also be 24 memory care units. Using a reduced formula established by the Parks and Recreation advisory committee and approved by City Council when the Highview Hills facility was built, the Hosanna! project will be required to pay a total of $140,163.75 to meet the park dedication ordinance requirements. The reduced park dedication formula is spelled out in the planning report. (11.03) Motion made by Peterson, seconded by Zell to recommend City Council consider approval of Hosanna! 4 Addition preliminary and final plat. The project will be required to pay a cash park dedication as outlined in the planning report. Finally, the developer is required to follow other recommendations outlined in the Planning and Engineering reports as they pertain to this plat. The developer is also required to follow the natural resources requirement detailed in the Planning and Engineering reports associated with tree preservation, grading, drainage, and erosion control and further recommendations by the Dakota County Soil and Water Conservation District, if applicable. Ayes -5 Nays -0 Motion passed. Judy Hayes arrived at 6:10 p. rn. ITEM 6 Kingsley Shores Senior Living preliminary and final plat Frank Schoeben, Frisbie Architects and CEI Engineering submitted applications for a 101- continuing care senior housing facility known as Kingsley Shores Senior Living. The project location is east of the Chart House Restaurant on the north side of Klamath Trail, west of Kenrick Trail. State statutes require a platting action, whether it be commercial or residential, to enact the park dedication ordinance. If a platting action is not enacted the City may not require the developer to comply with the park dedication ordinance. The property, on which Kingsley Shores Senior Living will be constructed, will not be platted. The property was platted several years ago and the owners paid a Memorandum To: Planning Commission From: % Frank Dempsey, Associate Planner Date: February 11, 2011 Subject: Packet Material for the February 17, 2011 Planning Commission Meeting Agenda Item: Hosanna 4 Addition 1. Comprehensive Plan Amendment from Public and Quasi Public to High Density Residential. 2. Zoning Map amendment to rezone property from RM -1 and RM -2, Medium Density Residential District to PUD, Planned Unit Development District. 3. Development and final stage planned unit development for a senior housing facility. 4. Preliminary and final plat. 5. Vacation of Easements. Application Action Deadline: April 19, 2011 INTRODUCTION No, City of Lakeville Planning Department Hosanna! Lutheran Church has submitted applications and development plans together with Ebenezer Management Services for the construction of a 93 unit senior living facility on the Hosanna Lutheran Church property located north of 165 Street, south of 162 Street (CSAH 46) and west of Ipava Avenue. The plans also propose a future 7,010 square foot, 397 seat chapel plus future additional classrooms on the west side of the church building. The Comprehensive Plan guides the subject property for public and quasi - public use, medium and medium /high density residential, and office /residential transition within the current MUSA. The subject site is currently zoned RM -1, Medium Density Residential District, RM -2, Medium Density Residential District and O -R, Office /Residential Transition District. Applications required for the proposed development include a Comprehensive Plan amendment to change part of the guided land use from public and quasi public to high density residential, a Zoning Map amendment rezoning the property from RM -1 and RM -2, Medium Density Residential District to PUD, Planned Unit Development District, PUD Development Stage and Final Plans, vacation of public drainage and utility easements, and preliminary and final plat. EXHIBITS A. Zoning and Location Map B. Proposed 2030 Land Use Plan Amendment C. Architectural Cover Page D. Existing Conditions Survey E. Preliminary Plat F. Final Plat (2 pages) G. Grading Plan H. Utility Plan I. Erosion and Sediment Control Plan J. Landscape Plan (2 pages) K. Tree Preservation Plan L. Master PUD Site Plan M. Site Plan and Cross Section Plan (2 pages) N. Site Details, Signage and Trash Enclosure Plan 0. Senior Housing and Future Chapel Floor Plans and Elevations (2 pages) P. Senior Housing Building Elevations Plan Q. Photo Simulated Views from the South R. Site Lighting Plan S. Easement Vacation Plan T. Neighborhood Meeting Notes U. January 18, 2011 Dakota County Plat Commission Letter ANALYSIS History — The following is a brief historic outline of the zoning and previous City approved planning actions for the development of the Hosanna! Lutheran Church property: o 1996 — Preliminary and final plat of Hosanna Addition and Conditional Use Permit No. 96 -01 to allow the initial construction of the church. o 1998 — Amendment to Conditional Use Permit No. 96 -01 to allow the construction of Phase II of the church including additional classrooms and parking. o 2000 — Hosanna 2nd Addition preliminary and final plat and an amendment to Conditional Use Permit No. 96 -01 to allow the construction of a 1,500 seat sanctuary and expanded parking lot and a 2,665 square foot addition for administrative offices. The expansion included the construction of 513 2 additional parking spaces to accommodate the new sanctuary and activity space west of the new sanctuary addition. O 2002 — Amendment to Conditional Use Permit No. 96 -01 to allow the construction of a detached accessory building greater than 788 square feet and higher than 15 feet. O 2002 — The preliminary and final plat of Hosanna 3rd Addition re -plats existing Lot 1, Block 1 and Outlot A, Hosanna 2 Addition to allow an expansion of the parking lot to accommodate a total of 1,800 sanctuary seats and to allow the platting of an Outlot for a future monument sign. O 2003 — A conditional use permit amendment to expand the sanctuary seating from 1,800 to 2,500 and a parking lot expansion. Comprehensive Plan Amendment. The Comprehensive Plan currently guides the Hosanna Lutheran Church property for Public and Quasi - Public, Medium and Medium/ High Density Residential, and Office /Residential Transition. The gross area of the subject site is 48 acres. Of the 48 acres, 16.5 acres will remain as an outlot as shown on the proposed preliminary and final plat plans. The net area of the senior housing facility lot (Lot 2) is 3.54 acres. An amendment to the Comprehensive Plan to change the guided land use of Lot 2 from Public and Quasi - Public to High Density Residential is required and will be submitted to the Metropolitan Council for their approval following an action by the City Council to approve the amendment. The policies outlined by the Comprehensive Plan state that the City should provide a variety of housing types, styles and choices to meet changing life cycle needs of Lakeville's population including the development of multiple family housing alternatives as a life cycle housing option. This includes the promotion of a variety of dwelling unit types and balanced housing stock, including active and assisted senior living facilities. Senior oriented housing is a major component of the City's life cycle housing options. The proposed Ebenezer - Hosanna Lutheran Church development is consistent with the policies of the Comprehensive Plan to expand life cycle housing options within the City and responds specifically to the identified needs. Zoning Map Amendment. The subject site is currently zoned RM -1, Medium Density Residential District, RM -2, Medium Density Residential District and O -R, Office /Residential Transition District. The area of the site proposed for the senior living facility is proposed to be guided for high density residential and rezoned to PUD, Planned Unit Development to allow the mixed uses associated with the senior living and care facility as an integral part of the existing Hosanna Lutheran Church development. 3 Churches are allowed in residential districts by conditional use permit. Multiple family housing including senior assisted living and continuing care facilities are also allowed in the RH -1, Multiple Family Residential District and the O -R, Office /Residential Transition District. The service intensive facilities proposed as part of the project including assisted living, memory care and care suite units involving varying degrees of professional medical assistance and care. City staff recommends establishment of a PUD District for the proposed site development based upon the requirements of the RH -1 District except as specifically modified as part of a PUD Development Stage Plan. The proposed senior housing use of the PUD District is defined as a continuing care retirement facility. These facilities are unique land uses that provide multiple elements of senior adult living within an integrated facility allowing aspects of independent living with increased care as lifestyle needs change with time. Housing options within a continuing care retirement facility may include various combinations of senior adult detached, senior adult attached, congregate care, assisted living and nursing care allowing residents to live in one facility as their medical needs evolve. The facilities may also contain special services such as medical, dining, recreational and some limited, supporting retail and service facilities such as a small branch bank office, beauty salon or store selling convenience goods. Proposed PUD Flexibilities. 1. Building height in excess of 35 feet for the senior housing facility. 2. Interconnection of buildings across property lines. 3. Underground parking stall depth of 19 feet. 4. Shared parking and driveways across property lines. 5. Monument sign for the senior housing facility to be located on Hosanna Lutheran Church property. PRELIMINARY AND FINAL PLAT Existing Conditions. The subject site consists of Hosanna Lutheran Church with a main sanctuary seating capacity of 2,500 and a parking area with 1,256 parking spaces of which 1,000 parking spaces are required. There is also a smaller sanctuary that seats approximately 700, 14 classrooms and various meeting rooms and administrative office space. A 1,232 square foot, 20 foot tall detached garage is located next to the parking lot south of the church and is proposed to be relocated next to the parking lot on the north side of the church as noted on the site plan. The 16.5 acre Outlot A is a mowed field for open space and outdoor sports. A six acre portion of Outlot A adjacent to 162 Street (CSAH 46) is planned for future commercial development as allowed by the Comprehensive Plan and Zoning Ordinance. 4 Streets. The subject site abuts 165 Street which is a major collector street as designated by the Transportation Plan. The property also abuts Ipava Avenue and 162 Street (CSAH 46) (A -Minor Expanders) and 163 Street (local street). No additional road right -of -way is required for 163 165 and Ipava Avenue. Because the subject site abuts a County road, the preliminary plat is subject to review by the Dakota County Plat Commission. Twenty -five feet of additional right -of -way is being dedicated for CSAH 46 as required by Dakota County. The Dakota County Plat Commission approved the preliminary plat at their January 18, 2011 meeting and will consider the final plat at their February 14, 2011 meeting. Access. Proposed access to the site will be from existing private driveways intersecting 163 Street and from 165 Street. Indirect access is also available from Ipava Avenue and Itasca Lane. No new driveway accesses are proposed with the senior housing project or the future chapel or classroom additions to the church. A separate blanket ingress /egress easement is proposed over the Hosanna 4th Addition property to allow shared access between the church parking lot and the senior housing facility. The two parties must submit an executed maintenance agreement regarding the shared access and parking prior to City Council approval of the final plat. In addition, because the shared private driveway at the main entrance to the senior care facility may serve as a fire access lane, the Fire Marshal may require "No Parking" signs to be installed. Any required signage must be installed at the expense of the developer. Sidewalks /Trails. There is an existing 8 foot wide bituminous trail along the north side of 165 Street, west side of Ipava Avenue and the south side of 162 Street (CSAH 46). A 5 foot wide concrete sidewalk exists along the south side of 163 Street. A 5 foot wide concrete sidewalk is planned to circle Lot 2 containing the senior housing facility. This sidewalk will connect to the existing church sidewalk that connects to the pedestrian trail along 165 Street. No additional public trails or sidewalks are required with the proposed preliminary and final plat. Lot Requirements. Senior assisted living or continuing care retirement communities developed under RH -1 District requirements must provide a minimum lot area of 20,000 square feet and a maximum development density of 1,500 square feet per unit. Lot 2, Block 1 exceeds the minimum lot area requirement with an area of 154,523 square feet (3.55 acres). The development density for the 93 units on the 154,523 square foot lot equals 1,662 square feet per unit, which meets the RH -1, High Density Residential District density requirements. Setbacks. The table below illustrates setbacks that would be required of the senior housing facility under the RH -1 District: 5 The proposed senior housing facility meets the RH -1 District setback requirements. A proposed connection between the senior housing facility and the church will be constructed across the property lines between the two lots. This crossing will be permitted as part of the Planned Unit Development. Landscaping. The developer has submitted a landscape plan for the subject site. Plantings are appropriate and the proposed trees are consistent with the size requirements established by the Zoning Ordinance. The design of the landscape plan is also consistent with the recommendations outlined in the Corridor & Gateway Design Study for property that abuts major corridors such as 162 Street (CSAH 46). The notes on the landscape plan indicate that in- ground irrigation will be installed as required by the Zoning Ordinance in all planting beds, sodded areas and parking lot islands planted with sod. The existing spruce and overstory deciduous trees located between 165 Street and the church parking lot will be enhanced with additional landscape screening. These new materials will include 31 new seven foot tall Black Hills Spruce trees and five new 2.5 inch caliper Red Maple trees. Additional new trees, shrubs and perennial landscaping will be incorporated into the senior housing lot and church parking lot as shown on the two landscape plan pages. In total, 105 additional trees, 501 shrubs and numerous perennial garden plants will be planted with the proposed improvements. The shrub plantings must meet the minimum size requirements of the Zoning Ordinance. The Zoning Ordinance requires raised concrete curb landscaped parking lot islands in all parking lots. The plans propose the removal of 16 landscaped parking lot islands for the construction of the senior housing facility. The plans propose to replace some of those parking lot islands with nine paved, stripe painted islands at the west end of the expanded parking lot. In addition to providing some shade and screening for the parking lot, the raised concrete islands also protect the parked vehicles from maneuvering lanes and vehicles in other parking spaces. The plans must be revised to include raised concrete curb islands with landscaping as required by the Zoning Ordinance prior to City Council consideration. Tree Preservation. The tree preservation plan identifies 102 significant trees within the area proposed to be impacted by the construction of the senior housing facility and parking, driveway and utility improvements. Of these significant trees, 49 are proposed to be saved with the proposed development. The proposed landscape 6 North East South West Buffer Yard Required 30ft. 15ft. 30ft. 15ft. 50ft. Proposed 40ft. 25ft. 42.5 ft. 42.5 ft. 196ft. The proposed senior housing facility meets the RH -1 District setback requirements. A proposed connection between the senior housing facility and the church will be constructed across the property lines between the two lots. This crossing will be permitted as part of the Planned Unit Development. Landscaping. The developer has submitted a landscape plan for the subject site. Plantings are appropriate and the proposed trees are consistent with the size requirements established by the Zoning Ordinance. The design of the landscape plan is also consistent with the recommendations outlined in the Corridor & Gateway Design Study for property that abuts major corridors such as 162 Street (CSAH 46). The notes on the landscape plan indicate that in- ground irrigation will be installed as required by the Zoning Ordinance in all planting beds, sodded areas and parking lot islands planted with sod. The existing spruce and overstory deciduous trees located between 165 Street and the church parking lot will be enhanced with additional landscape screening. These new materials will include 31 new seven foot tall Black Hills Spruce trees and five new 2.5 inch caliper Red Maple trees. Additional new trees, shrubs and perennial landscaping will be incorporated into the senior housing lot and church parking lot as shown on the two landscape plan pages. In total, 105 additional trees, 501 shrubs and numerous perennial garden plants will be planted with the proposed improvements. The shrub plantings must meet the minimum size requirements of the Zoning Ordinance. The Zoning Ordinance requires raised concrete curb landscaped parking lot islands in all parking lots. The plans propose the removal of 16 landscaped parking lot islands for the construction of the senior housing facility. The plans propose to replace some of those parking lot islands with nine paved, stripe painted islands at the west end of the expanded parking lot. In addition to providing some shade and screening for the parking lot, the raised concrete islands also protect the parked vehicles from maneuvering lanes and vehicles in other parking spaces. The plans must be revised to include raised concrete curb islands with landscaping as required by the Zoning Ordinance prior to City Council consideration. Tree Preservation. The tree preservation plan identifies 102 significant trees within the area proposed to be impacted by the construction of the senior housing facility and parking, driveway and utility improvements. Of these significant trees, 49 are proposed to be saved with the proposed development. The proposed landscape 6 plan identifies the planting of 105 new trees on the Hosanna church property and the proposed senior housing facility property. Building Floor Plans. The proposed project and PUD application includes the senior housing facility building, expanded parking lot, a new 397 seat chapel for the church, and a possible future classroom addition to the church (Exhibit 0). Building Exterior Materials. The exterior of the senior housing facility will include manufactured stone and stucco and will include an asphalt shingle roof. The building exterior has been designed to compliment the existing Hosanna Lutheran Church building exterior. Exterior details can be viewed on Exhibit P. Section 11- 61 -19.B of the Zoning Ordinance requires the exterior finish of multiple family dwelling structures to use brick, stucco, and /or natural or artificial stone for a minimum of 50 percent of the building fagade (excluding windows, doors or roof area). The proposed exterior building materials meet the Zoning Ordinance requirements. Building Height. Section 11- 17 -7.B of the Zoning Ordinance establishes a 35 foot building height for structures in the RH -1 District. The height of the building is 37 feet, nine inches measured to the mid -point of the roof as defined by the Zoning Ordinance. Because of the setback distances from 165 Street, 162 Street (CSAH 46) and the medium density residential uses to the west, the additional height would be allowed by Section 11 -17 -7E of the Zoning Ordinance. The Zoning Ordinance allows building heights in excess of 35 feet subject to the approval of a conditional use permit (or planned unit development in this case) provided that: 1. The site is capable of accommodating the increased intensity of use. 2. The increased intensity of use does not cause an increase in traffic volumes beyond the capacity of the surrounding streets. 3. Public utilities and services are adequate. 4. For each additional story over three (3) stories or for each additional ten feet (10') above thirty five feet (35'), front and side yard setback requirements shall be increased by five feet (5'). 5. The increased height is not in conflict with airport zoning regulations as provided in chapter 36 of this title. 6. The performance standards and criteria of chapter 4 (conditional use permits) of this title are considered and satisfied. The developer submitted a plan (Exhibit M) that provides a cross section view and photo simulation of the senior housing building from the homes south of 165 Street. The plan shows a drop in topographic elevation of 20 to 30 feet between the main floor elevations of the homes south of 165 street to the main floor level of the senior housing facility. 7 Unit Type Bedrooms # Independent Living 1 18 2 4 Subtotal 22 Assisted Living and Guest Suites 1 39 2 6 -- 2 Subtotal 47 Memory Care na 24 TOTAL 93 Unit Square Footage Studio 1 Bedroom 2 Bedroom Required 440sf 520sf* 600sf Proposed Memory Care Na na na Assisted Living Na 501 -927sf 823- 1,105sf Independent Living Na 644 -927sf 1,105sf The cover page of the plan submittal (Exhibit C) shows a proposed cross tower in front of the proposed future chapel and the main entrance of the senior housing facility. The applications and plans do not include written or schematic information on the location or height of the cross tower. The cross tower is permitted provided it does not exceed the maximum structure height in a residential district, which is 35 feet. All six criteria for building height in excess of 35 feet are being met according to the proposed plans. As there is no impact to surrounding properties, the 37 foot, nine inch building height may be approved as part of the PUD Development Stage Plan. Dwelling Units. The submitted plans show the following units: Section 11- 17 -13.0 of the Zoning Ordinance establishes minimum floor area requirements for independent senior dwelling units. The table below shows that the proposed memory care, assisted living and independent living units within the project conform to these requirements. The assisted living and memory care units are a more dependent care program which are not subject to the minimum floor area requirements. * Independent living units only. Off - Street Parking. Section 11 -19 -13 of the Zoning Ordinance requires housing designated for senior citizens when in a continuing care facility to provide one off - street parking stall per each two dwelling units. There will be 43 underground parking spaces dedicated to the senior housing facility. With the proposed church parking lot expansion reconfiguration there will be a total of 1,352 surface parking spaces which the senior housing facility will be sharing with the church for their employees and visitors. 8 Land Use Type Units or Church Seats Parking Ratio Spaces /Unit /Seats Spaces Required Spaces Provided Senior Housing Independent 22* 1 stall per 2 units 11 Assisted and Memory Care 69 4 spaces per 10 units 28 Employees 10 # employees on maximum shift 10 Subtotal 93 49 43 underground + 6 shared with church Church 2,500 1 stall per 2.5 seats 1,000 1,352 shared surface spaces Total 1,051 1,395 Parking for the church and the senior housing facility is as follows: * Includes two guest suites The site plan includes an expansion of the existing suface parking lot for an additional 119 parking spaces west of the existing parking lot and the senior housing facility. Hosanna Lutheran Church has indicated a desire for additional parking spaces and proposes to use the opportunity of the senior housing construction to simultaneously construct the additional parking spaces. The parking lot complies with the required setbacks of 15 feet from public rights -of- way and five feet from interior lot lines. Parking spaces and drive aisle dimensions conform to Zoning Ordinance requirements for the surface parking spaces. The underground parking spaces will include 18.5 foot deep parking spaces instead of the 20 foot stall depth required by the Zoning Ordinance. The drive aisle width will conform to the minimum 24 feet. The reduced parking space depth is acceptable to staff since the parking spaces are located under ground, there is no adjacent sidewalk, no need for snow storage adjacent to those spaces and is consistent with previous approvals for a covered public parking structure. Off- Street Loading. A loading area is provided on the south side of the proposed building accessed directly from the shared private driveway off of 165 Street. The access will require delivery and service vehicles to back up off of the private driveway into the loading area. The turning radius for this maneuver is adequate. The distance between the building and private driveway south of the loading area is 120 9 feet. The dimensions of the loading area conform to the requirements of Section 11- 20-15 of the Zoning Ordinance. Land Use Transition. Section 11 -61 -23 of the Zoning Ordinance requires a land use transition between any RH -1 District use and an abutting single family zoning district. Section 11 -61 -23 of the Zoning Ordinance exempts provisions of a residential transition as the subject site will be separated from existing single family homes by 165 Street (a major collector road) which satisfies the criteria under subsection A for providing adequate separation of the senior housing facility from existing single family residential uses. Signs. Ebenezer proposes to install a six foot tall, 28 square foot stone monument sign near the 165 Street driveway entrance and possibly a sign on the north fagade. Because of the more institutional character of the assisted living, memory care and care suite elements of the project, City staff recommends allowing signs as provided for in the O -R District as part of the PUD Development Stage Plan. Under the O -R District standards, the proposed facility would be allowed one 50 square foot wall sign and one 50 square foot freestanding sign. While the O -R District does allow the freestanding sign to be 20 feet in height, City staff is recommending the proposed monument type sign with a six foot height limit consistent with the residential character of the use senior housing facility use. The PUD will allow the freestanding sign to be located outside the senior housing lot (Lot 2) on the Hosanna Lutheran Church property adjacent to the 165 Street west driveway. A signed agreement between the church and the Ebenezer for this freestanding sign will be required prior to City Council consideration. Exterior Lighting. The developer has submitted a lighting plan illustrating the type, height, location and illumination pattern of all exterior light sources. New parking lot lights are designed to match the height, lamp and lumens of the existing parking lot lights including the hooded fixtures to restrict off -site light glare. Light cast to the property lines will not exceed one foot candle of illumination as shown on the lighting plan and in accordance with Section 11 -16 -17 of the Zoning Ordinance. Trash Enclosure. The senior housing building plans identify a trash enclosure adjacent to the loading area. The trash enclosure will consist of rock faced block and stucco to match the building exterior. Durable maintenance free screening gates are recommended. Park Dedication. Platting of the subject site requires park dedication requirements be met. The independent living units must pay the park dedication fee required for multiple family developments. The assisted living units pay a reduced rate that is 25% of the multiple family park dedication rate since residents in these units are believed to have a reduced impact to the City's planned park, trail and open space system. 10 Unit Type Number Park Dedication Per Unit 2011 Required Park Fee Independent 22 $4,153 $91,366 Assisted and Guest Suites 47 $1,038.25 $48,797.75 Memory Care 24 N/A $0 Total $140,163.75 Below is a table showing the required park dedication fees in lieu of land for the proposed development: Grading, Drainage and Utility Plans. The developer has submitted plans for grading, drainage, erosion control and utilities related to development of the subject site. The plans have been reviewed by the Engineering Department. A copy of the memorandum prepared by Zach Johnson, Assistant City Engineer and Mac Cafferty, Environmental Resources Coordinator and dated February 11, 2011 is attached. Master Site Plan. An updated master site plan has been submitted that includes a revised layout for future development on Outlot A. While the ultimate development of Outlot A is unknown at this time, the master plan shows a medium density residential layout consistent with previous master site plans prepared for that portion of the undeveloped Hosanna Lutheran Church property and the current zoning of the property. While the actual medium density residential development layout and ultimate density may be revised subject to Zoning Ordinance requirements in place at the time of development for building design, street width, building setbacks, number of street accesses and number of dwelling units, the master site plan does provide a possible development scenario. Future Church Additions. Hosanna Lutheran Church is proposing to construct the chapel addition and classrooms addition at a later date. The church is requesting that the site plan and floor plan for the chapel and classroom addition be approved with this PUD. The future building permit plans must be consistent with the site and floor plan submitted for the chapel and the site plan submitted for the classrooms addition. Easement Vacation. The preliminary and final plat shows 10 foot wide drainage and utility easements at the perimeter of the lot as required by Section 10 -4 -4 of the Subdivision Ordinance. All underlying public boundary drainage and utility easements platted with the Hosanna 3 Addition will be vacated. New boundary easements will be established with the Hosanna 4 Addition final plat. All known utility companies with a potential interest in the easement vacation were notified of the public hearing. There has been no opposition expressed by the utility companies of the proposed easement vacation. 11 Neighborhood Meeting. The developer hosted a neighborhood meeting on December 13, 2010 to provide residents and property owners surrounding the subject site an opportunity to learn about the proposed project and ask questions. The neighborhood meeting was attended by four residents from three households located south west of 165 Street. There were no particular concerns raised by the public in attendance at the neighborhood meeting. RECOMMENDATION The senior housing development proposed by Hosanna Lutheran Church and Ebenezer Management Services is an opportunity to expand life cycle housing options within the City of Lakeville consistent with the goals of the Comprehensive Plan. The proposed development is consistent with the intent of the Zoning Ordinance for use of a PUD District and complies with applicable performance standards of the Zoning Ordinance and Subdivision Ordinance. City staff recommends approval of the applications based on the findings of fact presented to the Planning Commission and subject to the following stipulations: 1. The recommendations listed in the Engineering Department memorandum dated February 11, 2011. 2. The recommendations of the Parks and Natural Resources Committee. 3. The rezoning to PUD is subject to Metropolitan Council approval of the Comprehensive Plan amendment re- guiding the property for high density residential use. 4. "No Parking" signs must be installed by and at the expense of the developer in locations required by the Fire Marshal to ensure adequate emergency fire access. 5. Interior concrete sidewalks shall be constructed as identified on the approved site plan. 6. The plans must be revised to include raised concrete curb islands with landscaping as required by the Zoning Ordinance prior to City Council consideration. 7. Landscaping shall be installed consistent with the approved landscape plan and Zoning Ordinance requirements. A security of $70,000 shall be required with the final plat to guarantee installation of the landscape improvements. 12 8. The developer shall provide a joint parking and access agreement allowing Hosanna and Ebenezer shared driveway and surface parking lot use. 9. A signed agreement between the church and Ebenezer for the freestanding monument sign adjacent to 165 Street will be required prior to City Council consideration. 10. The exterior building materials shall comply with the requirements established by Section 11- 61 -19.B of the Zoning Ordinance. 11. Park dedication requirements shall be satisfied as a cash fee in lieu of land subject to review by the Parks, Recreation and Natural Resources Committee and approval of the City Council. 12. Signs larger than two square feet shall be limited to the allowances provided for in the O -R District except that a freestanding sign is to be a monument type structure with a height not to exceed six feet, 28 square feet in area and set back not less than 15 feet from any public right -of -way. A wall sign not exceeding 50 square feet is permitted on the north face of the senior housing facility building. A sign permit is required prior to the installation of any signs. 13. Exterior lighting shall be installed according to the approved lighting plan and in compliance with the Zoning Ordinance requirements. 14. The trash enclosure shall be constructed according to the approved plans and according to the Zoning Ordinance requirements. 15. The future chapel and classroom addition to Hosanna Lutheran Church shall are allowed by the Planned Unit Development and shall be subject to the approval of a building permit and constructed according to the approved plans. Findings of Fact are attached. cc: Hosanna Lutheran Church Pope Architects HTPO Engineers Ebenezer Management Services Walker and Associates 13 Location of Proposed PUD Property w Zoning Legend RS -2, SINGLE FAMILY RESIDENTIAL DISTRICT RS -3, SINGLE FAMILY RESIDENTIAL DISTRICT RM -1, MEDIUM DENSITY RESIDENTIAL DISTRICT RM -2, MEDIUM DENSITY RESIDENTIAL DISTRICT L RH -1, MULTIPLE FAMILY RESIDENTIAL DISTRICT O -R, OFFICE /RESIDENTIAL TRANSITION DISTRICT C -1, NEIGHBORHOOD COMMERCIAL DISTRICT I PUD, PLANNED UNIT DEVELOPMENT DISTRICT 7 ,117 P /OS, PUBLIC AND OPEN SPACE DISTRICT Location Map EXHIBIT A 2030 Comprehensive Plan Amendment Land Use plArrawrilikli7 W. 4 AI Ns w I 6 8 "W m re 11111 ME * 111111 :PO roir am 1 , milli NAIL ha : soft ME I ii I s ell" IN. 41 1•1 IMMO V Mom k - idailf 41 1111111 0- . 11141' 4 i r ill is t: " r 'a aim ■ i ii Low /Medium Density Residential Medium Density Residential _ High Density Residential ® Office /Residential Transition Commercial Office Park ffsi Public and Quasi - Public Parks Restricted Development Water ili■■■■■I■■■■■■ ?p l j plopm I11u1U uIIIIIIIp •, 1. v _y� ; n tTi �1 — ; 1 I �1ihi"` 1 EXHIBIT B t c*,:Wq it ATM P Knyic* A.e •ny vn.dl so J.mNc. A. Allm CE• M .Oie z 0 N Q 0 0) m DZ O Z Z m 0) D Z 0 HOSANNA! LUTHERAN CHURCH OF LAKEVILLE HOSANNA! SENIOR HOUSING AND CHAPEL ADDITION VIOSINIMIN BIM EMUS MI 01 0096 133HS 31111 l 1 OF j PHOTOMETRIC SITE PLAN � I - - 1 _ - - - - -- -- - -.__. I SITE ELECTRICAL 1 1 ARCHITECTURAL S-1 EXISITNG CONDMONS BOUNDARY SURVEY • li • PP -1 PREUMINARY PLAT • • FP -1 ! FINAL PLAT • _. • C-1! PRELIMINARY AND FINAL GRADING AND DRAINAGE PLAN • • C-2 PRELIMINARY AND FINAL UTILITY PLAN • • C-3 PRELIMINARY AND FINAL EROSION AND SEDIMENT CONTROL PLAN • • L -1 PREUMINARY AND FINAL LANDSCAPE PLAN • • L -2 PRELIMINARY AND FINAL LANDSCAPE DETAILS • L -3 TREE PRESERVATION PLAN • • CIVIL, I A0.0 TITLE SHEET 0 tr, 4 SITE DETAILS • SENIOR HOUSING AND CHAPEL FLOOR PLANS • • • P ,Bbll FT, t c*,:Wq it ATM P Knyic* A.e •ny vn.dl so J.mNc. A. Allm CE• M .Oie z 0 N Q 0 0) m DZ O Z Z m 0) D Z 0 HOSANNA! LUTHERAN CHURCH OF LAKEVILLE HOSANNA! SENIOR HOUSING AND CHAPEL ADDITION VIOSINIMIN BIM EMUS MI 01 0096 133HS 31111 P FIE: %Z1161091150410411_.rvdp 1A131IR: 301 SCALE 50 DATUM: 10102011.1015En 0901 000 001611o1dM-1Ht;a0p sl J i 1 9 7 1 7 7 7 7 7 3: Z / 1 1 � - ,; ;, • /// /// I I I j I — — �� \ i I I i T� '<':1:1��T / / / I / I I k •A 1 1 I " � (_ /T // / �/ / I I� I� I i ���— — E I -_: \ I / J -- A 50 108.50 N0'05'09Y 108.50 c 0 0 S 0 0 0 0 05 0 z 05 0 60 E 810 763.70 0 ° O Cl) Z Q X H 7J 0 m .Z D J z Z < -< cn 0 3.1591.6^ 5 90'S90'575 11 810.74 }� T op A Z Z .1 D c z ° z° \ A l Q 0 0 11 8 rn la —J 2 _ p D � � i 0 Z Z� . Q Z= ;i t_ 0 D Z � D� . -r D F m Q _ — 500 250.9 90 1 i 1 t 42.0' 50 3811 52 17 ASCA 7RA/L ; /ij rri GJ z N f zm m o r- c 1!R y 0 a M,l0000oa*0.0 ,,. ;1 A1 ®,o NWPMIWPWHIP Ph! 0,0i0q z —z NO SCALE gg cn a 1 FAE:%A1N10011Af10.00,009 txtotrr:pod SCPL.0 DATEJRAIE: Jan 18.1011.10:120 USER. HMO XRFFlel:100SA_DESIGH.dN WWI,. 0, 1010840• 111-000_01.1( drop 101094 bop NO SCALE 0 0 " y tl y 4 8 0 • oc0 O q.0 OxOOy 0 gt UN _<m • m Z • t g g No O Z 0 cc c =m 2 1y "m g 0 WAY 8 '1 C rO 0 A 8 8 1n 8 N) L SYOS 8 1 m 1 - Z .i._,/ Lii-ii-:i/';/ 2 ,,, :7 :; I 1 \ I J AMISo /� / 8 \ p r \ i / i i , � .Fks77 �•�d / / /� / /III \ i — :— — m `FBI Y MLA IV V / l l 1 ■ ■ � �( I - - 1 7 e 3nN3nd sH�;rs$w 8 3 Rt.s 50..131V 1110.75 LOT 1 EXPANSION AREA EXIST. ZONED RN-9 PROPOSED ZONING PUO 0o m ?z 1 c z 2 O yn ydi 0 C _i 0 D • a 6 1 , Ili IJ II C U=1 III Z Z •! q 0 42 Z � >r III 32 0 DoT - 7 In z rri N rn 1 r ITASCA TRAIL Iv J JT V;- "1 I N 4 3: J 0 C: 8 0 0 J fT1 o "10 O IA 0 • r � p o ' z i m 2 40 40 I 1 � IJ 7 2 NOT 8'13'E 810.74 I 40 33 40 40 8= I 8 I 40 i S0125'09 • W 108.50 • g S gg y 33 Z TOWN A ' COUNTRY ESTATES '! r A TK/\. / N0'0058 - W 76.176 - WEST LINE OF THE SOUTHWEST QUARTER OF THE NORTHEAST QUARTER OF SECTION 6, TOWNSHIP 114, RANGE 20. - DAKOTA COUNTY ALUMINUM MONUMENT SOUTHEAST CORNER OF THE NORTHEAST QUARTER OF SECTION 6, TOWNSHIP 114, RANGE 20. DAKOTA COUNTY. T" CD i --1 4 L A v 5 0 0 c4 o t o I 3500 -- co P I 0.. N.4 `.4 N018'13 ° E 40312 7 Nb UTLTY_EASEMENT_ O S 1 r y4� 5078'13 "W 388 47 I a / ii.. I 5 Cr1L�JI I O • i g 4 '•) / _N2 " 04 'S6 ° W ___25365 p N W 1,415. 80 I 8.50 - DRAINAGE EASEMENT- , n1 0 - V NOU509 E 10 N I U L__ - 5 372_33 ° W 274 O6 \, ' 2 183 66 , I �♦ 50 "41'03 "E - 811 6 + s I - -- — 90 .c tl 3.1g. i m 507627'W 25091 225.91 D D m I � I II C , z 5 80 - 0 u 25 1" z m 0 La N 25 p ti t D0 nn DW S07329E 344.52 t4 8 TASCA T', RA L 8 c o o 0 - 1 o z A C o T m Om z O,C M 4• =0 0 1 ' 1 a CO 0 0 y J 2.25 1. s z= N m z ( O r a o z 411 a: O v 0 e 0 a v 55 FE SO t O 57 v 00 o ° . JO p °,o 30 J 4 2 z r 0 5 a 9 v 'c 0 - 9 m 8 3 . z 0 0 m a 5 H N o m 3 p m p n 5 2 0 I e p 5 J 0 n 11 d aS 0 T; %8 a 0 0 z 0 E.g ow 0 0 c > S5• z O m ; 02 0- r3 s 1> z o� om D �� 0 0 �F J (� a • a o a m 4 3 m a 0 O v D a 0. 8' 6 d A o 0 - 0 0 opp vc am D • o m ; l°°°000 0mv m oz 0 „p 52. 0 Cp i o3 °v 0 » ».°. 4 a » m m S ° J p 00 9c °v m y �o 390 g 0 0 p Oy � P 0 K 00- 5A0 :5 81.0 ° p o3 0 _�? 8-8-3! OoK� 5m z 0K p(0 1., n_ o aJp 2,925 n ' omn 3 i ° o n °c p 0 kg., a °aa 0ag3 . � r. 5. 0 .°0 0 4 a m 3 2 • 3 3 O i O 9°, 0 9- 0 0 s J N O 0 7 V O 0 'p 5 o° 1 ow 0 ' m 0 K 2 0 0 3* .8 F a SE aE t y m m m 5 0 O 0 = FP g2 J » 9 p m L a % 9 .9- 00 OK Fg °m 0 9 0 0 5 0 m T FILE'. %201000040&Drp0100MV LA0000:MO SCALE'.40 DATEI1IME In18.2011.11220sn 05050004 0EEI81. 10LIS_v5rvd0 10d40e_804.0p 100I50_OESIGI.Ep 104IM_TBLS Up 1010ST bog S N £ T z O N °. gzz ° i2m W ' O £ n 225 T W $ z 9 n 00 0 O 50 y N n 0 O 0 C 0 0 N 0 x 0 50 mN �.3 <<3. - 0 g 0 x 0 /73 0 n 2 N << 8742 r5 f p �s� 9 '3 y cw O��ti Np O z o Af ?� e 3 £000 1 - n 0 A o Z Z c q Z z- v� 0 0540 r r 6 Q0 T.r N 40 0 • 2 TJ = -J� y O C C 1 6 1 CO ~ m� CZKZ ill E4 z > D -0 I _ E -i r D ; 5m Q 0 m D z 0 o 0 Q Z z r Z 0 [T -H „.,°T • £ x T c T T FILE: P!201011.8t 10M8tU11LOp IAVOUT U11L VALE:50 MTEMME Jn15,201 .3.1 USER'. H190 %RErye1:100N wn Q.p 10-0 _OESiGNly100Ld5hdp10MM_i0LR.0.p 101054 N =8 L Z n O 0 5 0 t0 0 21 1 S 0 Q 0 ii O D � 2 y m a r51 P P 3 < D p 2 l p m 2 a p O p D z 1 (/) m D Z z = O ' 2 O Z � m Zm� M � O m r ��� J � N N ! TOP PLACFJ SILT F A � sr n sI M n L 2 1 i g /` , , pag Q n I d 2 11 I E f f i STORM SEWER EROSION CONTROL DETAILS ! nua 140-1.101=12 i '''. i 1 i { G III RESIDENTIAL DRIVEWAYS /jO COMMERCIAL & DEVELOPMENT OMR/ Pi ROCK CONSTRUCTION ENTRANCE 1 • 2010110015dDp1100151EROSOp LAYOUT:EROS SCALE' 50 DATEIRME', Jn 15, A11.103bR • ln.O >u&F01: lO015 .un Sg t00w_SR..ey 1001M_DESO4 Ep 10041A_TBL un 10dM_IAEp 1010➢q.Jp Z 1 0 F O c 0 n O 0 O) 0 2 O O 0 0 i 0 E T o m 0) � m 2 D z E O 0o0 0 Z f l2 r m D Z > > ZZ>;o Z Am N z � c z0 O CD C D cv s= gm DZKZ •! z — lig Q Z r w m Q 2 11 i i\ r W ,•l z N z m m o f D T EROSION AND SEDIMENT CONTROL NOTES wa WOW: LA SCALE 10 LATERNIE 2011. *Am 1170 RIEF(sy p1091b a➢ S 1 i Z i A 5 0 c c N 0 0 m i T ox, m r- 0 3 Z Z D � p n n� z 00 z O Ci7 z tri N z O P a m x a � ip z 4 Lip ;I Lko Oil 5 1 ; ii P ix z y gA . 5 -1 0 Y y4 4'i d A 4i i a .hi p swx1 Is. :t PI El 3 use F P 4 ¢ m D Z Z 5 n A O = Z O -0c Z r 0 1 igiAA J AM ST ' 1H PT RJ :: 24 44 g = YN g 1B 265 265 112 24 � ° 88No. a H7:, INDICATES AREA TO BE SEEDED 1117N MNDOT SEED MIX 280 INDICATES AREA TO BE SEEDED NTH MNDOT SEED MIX 325 INDICATES AREA OF 4' DEEP ROCK MULCH OVER LANDSCAPE FABRIC INDICATES AREA TO BE SODDED —STAKE ALL SOD ON 3:1 SLOPES OR GREATER n 03NT i1 CONT ,,, /1 CONT n CONT t .ta /1 CONTI n CONT n CONT CONT CONT a' /5 CONT CONT d CONT a CON' /5 CONY 1.5 @E 1.5 1.5669 2.5'B6B 2.5'066 7696 2.5'B POT OF GOLD CONEFLONER KOBOID BLAZING STAR SALNA MARCUS RUSSIAN SAGE AUGUST MOON HOSTA STRIPTEASE HOSTA AUTUMN FIRE SEDUM ARIZONA SUN GMLLARDIA ai i KEY WEST ASIILBE MflON5INF YARROW WADI CIVTIGTCO ANNABELLE HYDRANGEA DAYULLY DARKLY BUSH HCIEYSUCKLE AR71C FIRE DOGWOOD RHODODENDRON PURPLE GEM UTTLE PRINCES SPIREA BUFFALO JUNIPER RHODODENDRON PAM COMPACT REDIYWG OOGW000 TAUTON YEW THORNLESS HAWTHORN PAGODA TREE RFD JEWEL CRAB RED MAPLE SWAMP WHITE OAK BUCK HILLS SPRUCE HONEYLOCUST COMMON NAME Rudbeckb pot of gold UNtrb spkata ko)ald Salvia memaose maraca Perowkk little spire Hoslo august moon Haela atlpteoae Sedum autumn Ike •.._.•_ _, ^, Gollordlo 00.10)0 arlionla sun Ae llbe almplkifdb key *set Achilles moonshine' Hydrangea arberucane onnabelle Hemerocallle elegy supreme' Hemerocollie 'Happy Returns' Obrvlle Tankers corms..tolonifero farrow Rhododendron purple gem Spkoeo Japonica IIt0e princess Junlperue aoDina boHdo Rhododendron PJM compact Cornea serl0ea 'leant!' Taws a media tauten Crotaegue enn —golf w. Inermle Cornea altenlifolIa Mdue jewMaole Acar rubrum 'Northwood' Duero. Bicolor Picea gloms deneOto 0.411.1, triacanthos beanie 'Impcdi wa WOW: LA SCALE 10 LATERNIE 2011. *Am 1170 RIEF(sy p1091b a➢ S 1 i Z i A 5 0 c c N 0 0 m i T ox, m r- 0 3 Z Z D � p n n� z 00 z O Ci7 z tri N z O P a m x a � ip z 4 Lip ;I Lko Oil 5 1 ; ii P ix z y gA . 5 -1 0 Y y4 4'i d A 4i i a .hi p swx1 Is. :t PI El 3 use F P 4 ¢ m D Z Z 5 n A O = Z O -0c Z r 0 1 igiAA J 1 Ftt P1T1101100NALp110016LIAdp IAYgR:IAOEThL SGVE:W MXEM E'.Jn18. 2111.104m USER'. H790 MEEK 100497.7r.My 10.018, e.vp 10019I_OES ONSp I00Wp?SLNPp 10146LCi0.ep 100a0kOSSIGH9p IS10910.M.y 1 x c ‘k....elsw...10:410010.%1 - t all tralfa t011.0 107; , 71 1:51■0 001.017 nN..; ■ ►a al t► le► o a►actn � ►a►-aEeoica ■ 0 0 6) c 0 0 z m z mm w coe — H C 1j D Z D F J > l/) 0 73 m 0 3 zZ > xi 7 c z0 _ — D co C D sa 7 J C z K z egm 1 Z = q= � O a34 N Z r> gym. 2 H 0 Q m z N m 0 z 1 T FILE'. P201011001MlMW1001MLTIEE*, LAYOUT: T(EE SCALE 50 OATE/IIME .102011 .1012fn R YE911: 10015.0 50510.O48LS4.Oq lOOMA_OESION dq 1006A_TOLX 0501010Ma>w • Z 1 d� m. aE AMEEFEemMEE oEmS EHEFSIMNY E meeww ..oeHE.W & & & &R&M mom 28" ;5HRWILMANWig=M555VAMMUMBRUNFAMMMAggrOMEMIMMEEEMEMM5MFRFFFF 0 o ee..om N. me v mo" a� mmmNOO W'o moo m o N 6 N m m m, m m 0 c 0 v m (i) m z z m A ▪ m zZ cn > c ▪ z z0 0 1 O TC ) - 8 2 ! 0 D N Q _ . z > r . a am 0 _ a ) iii mi N m D Z • O O w m° z � - D O , 9 r; m m Z �C D "Z' O F I— Z Mipo y m G) egfiAIA O 8 b 0 m 0) -I m cn m v z z 1 4 J Y 1 L Y r r r III 'IIIIIIIIfI�'! L \ r -j ` -i 4 r ,I . J Iq r- L, rn tc z N to 0) m >z = 0 7E% Z 0 O Z + 'fro g 77 "; m Z 2 wn. o Z Plgom y m 0 sew r 0 z ° z$ z' ' z 0 m 0' � mm 0 co y D 0m0m Z ( 1) 0 W U A N W N W 5 E g � a _ 7C •c 0 m 0 m m d$m 0� N z L fll O) §§ 0 0 § o m 0 m v z 4, fr 1r I1 I1 I I II II € • IIII IIII I 1 l Illf Mm • III M ill �,` - , ` f/ !11.111 1111 —\\ z m N m 1 A G) 0 0 0 0 � 611 11 C 0 O c f> O El cp m 0 0 z 9�S9'Y 111161 iNYWO I /$ .347.41daiSAA t (I` A / l 1 r , 1 I 1 1 I - - - -- - L I ' - - 1 �l I �I 1j .. M.TS4:69N - 7 _ r 0011IS .• : ,2y .- �TT1 1 rte 1 co z N S31V,L53 OOOMN33119 1VI1N301531i AIINYJ 3 - -- Z-I1 :O3NOZ • —'1 I 0) m Dz p °� c�n v 0 a z k Z �CD es �� mcn _ v� = ; E. O r Z Pi 1N3 0 b m Z m r 0 00 :E1 O o z D m r0 rC Oki < mm �z x� mm Enm �Z m m z En m 0 z gSa 0 N O Z� I 73 Dm _J • 11 r0 C� < K mm xi Z En -I OM 8 O m Zz v' D F En a � Ir x V/ m z 0 r 0 - n En C m r 0 0 z • 9 9 9 SLOPE 9 rri co z N to C- 0) x m z 0 0 En C T m 0 z m r 0 I C I LI 4T En m D zOx 1 �oz D • x • zmtci�D �".7:1 O r r Z = D m G) MO 0 C O Y 3 R $ � z n y m y � �d mo A g 2 2 0 2 2 r z cn P 'vi0m 5 i O Z I ZOz0 7 U) :U O :U 0 0 z S OWL 0 b0 ' Z v - n r 0 Z t= ran = gv z N CrJ m > Z0 • X2 2 D ; Z ODO ='r<� • Zm moo O r r Z fig; a r *_- mr • 0 0 co _ v N f > 9 i o Z p N r o T IP, . D cN -0 m 1 � m e 0 • • CD tri z m DZD= °v °�c� N =o W C co m b •m D 0 m �m ' r m D O z m m - z z G1� • IIMMOOMM • IrP . IOWA 1.11 t M! MD redress a Yr �� co to z N to m O Z m 0 co 0 r O --1 co C n D" 0 oc m z N rrJ 2 i 19I11I 11MlelIjIj.IFIPJI,IIjIi.I r IPAV A qV ENUE 3 0 A X 0 � n �: 1 z : e ITASCA TRAIL HOSANNA SENIOR HOUSING PHOTMETRIC PLAN �' COLLINS ELECTRICAL CONSTRUCTION CO. >�.. 2 i 19I11I 11MlelIjIj.IFIPJI,IIjIi.I r IPAV A qV ENUE 3 0 A X 0 � n �: 1 z : e ITASCA TRAIL z 0 E 0 0 CC z Qo ' 0 1 o: `1a 2 - I = CI CD 0 C W G1 T m 1 a ■ m y O� —J 1— !LOLL AlaL.L4.005 lc e. 6 a 900 6 0 ' ' v...)V LOS O NOLLIGOV .,NV ..MCI • 7 / ..V GNV 'AUN000 Y10)I90 '0 30999 1 411 dIUS14901 '9 N0LL03S !0 431i1V110 1SV3F4J000 341 40 0394000 1SY310.003 194394094094 N0944940194 A43003 94i0009 — '00 30099 '944 d194940001 '9 NOLL03S 40 831994110 1593941908 3941 40 713109110 153941005 3141 JO 3811 1530. 1 Q / NCL.JOO. V Otiii J SELL v /0159[ ..99.00094 0. - 0 7 E V.w 27/06 ON EXHIBIT S Memorandum TO: Planning Commission FROM: Frank Dempsey, AICP, Associate Planner DATE: December 15, 2010 SUBJECT: Hosanna Senior Housing Neighborhood Meeting Notes City of Lakeville Planning Department On December 13, 2010, Hosanna Lutheran Church and Ebenezer representatives hosted a neighborhood meeting for the proposed development of a 93 unit senior housing facility on the Hosanna Lutheran Church property located at 9600 — 163 Street. Ebenezer is partnered with Fairview Health Services. The meeting was attended by the following individuals: • Pastor Bill Boline, Hosanna • Jim Hayes, Hosanna • Jeff Johnson, Hosanna • Mary Carroll, Hosanna • Janice Lindeman, Hosanna • Susan Farr, Ebenezer • Charles Howley, HTPO • Ward Issacson, Pope Architects • Kyal Klawitter, Walker • Planning Director Daryl Morey and Associate Planner Frank Dempsey • Four neighborhood residents representing three properties Pastor Boline introduced members of the development team including Susan Farr of Ebenezer. Pastor Boline gave a brief description of the proposed project. Ward Issacson described the project in more detail. He showed a three dimensional aerial animation of the proposed site improvements and stated that Hosanna is also proposing a future 350 to 400 seat chapel and a possible future education wing both to be located on the west side of the existing building. The EXHIBIT T church will be asking for approval of these future additions in conjunction with the senior housing facility project. The following questions were raised during the meeting: 1. Where will the main building entrance for the senior housing be located? 2. What will be the main access point for residents, visitors and deliveries? 3. Will the underground parking spaces be available to all residents of the facility? 4. Will the independent, assisted and memory care areas be in segregated areas of the facility? 5. What is the breakdown of units by number of bedrooms? 6. If a couple that lives in the facility requires different levels of care at a future point in time, can they both remain in the facility? 7. What are the proposed unit sizes for the independent living vs. assisted living vs. memory care? 8. Will units have decks and /or patio areas? 9. What are the rates for the different types of care? 10. Will there be doctors and nurses on staff or on call at all times? (Susan Farr responded that Health Aides are on -site 24 hours a day and a Registered Nurse will be available on -call 24 hours a day). 11. Is long term care insurance accepted at this facility? 12. Will there be guest rooms available for visitors? 13. Will there be an exercise room in the facility? The meeting adjourned at 7:30 PM January 24, 2011 City of Lakeville 20195 Holyoke Avenue Lakeville MN 55044 -9177 Re: HOSANNA 4 ADDITION Sincerely, -47. Todd B. Tollefson Secretary, Plat Commission C O U N T Y Dakota County Surveyor's Office Western Service Center • 14955 Galaxie Avenue suite # 335 • Apple Valley, MN 55124 952- 891 -7087 • Fax 952- 891 -7127 • www.dakotacounty.us The Dakota County Plat Commission met on January 18, 2011, to consider the preliminary plan of the above referenced plat. The plat is adjacent to CSAH 46, and is therefore subject to the Dakota County Contiguous Plat Ordinance. This preliminary plat is a replat that includes a 93 unit senior housing facility. The right -of -way need along CSAH 46 is 100 feet of half right -of -way. The existing right -of -way is 75 feet; therefore, an additional 25 feet of dedication is needed along CSAH 46. Restricted access should be shown along all of CSAH 46. The Plat Commission has approved the preliminary plat provided that the described conditions are met. The Ordinance requires submittal of a final plat for review by the Plat Commission before a recommendation is made to the County Board of Commissioners. No work shall commence in the County right of way until a permit is obtained from the County Transportation Department and no permit will be issued until the plat has been filed with the County Recorder's Office. The Plat Commission does not review or approve the actual engineering design of proposed accesses or other improvements to be made in the right of way. The Plat Commission highly recommends early contact with the Transportation Department to discuss the permitting process that reviews the design and may require construction of highway improvements, including, but not limited to, turn lanes, drainage features, limitations on intersecting street widths, medians, etc. Please contact Gordon McConnell regarding permitting questions at (952) 891 -7115 or Todd Tollefson regarding Plat Commission or Plat Ordinance questions at (952) 891 -7070. EXHIBIT U Memorandum To: Frank Dempsey, Associate Planner , From: Zach Johnson, Assistant City Engineer `- McKenzie Cafferty, Environmental Resources Manager Copy: Dennis Feller, Finance Director Keith Nelson, City Engineer Steve Michaud, Parks & Recreation Director David Olson, Community & Economic Development Director Gene Abbott, Building Official Date: February 11, 2011 Subject: Hosanna 4 Addition • Preliminary Plat Review • Easement Vacation • Final Plat Review • Grading Plan Review • Utility Plan Review • Site Plan Review BACKGROUND City of Lakeville Engineering Hosanna! Lutheran Church of Lakeville has submitted a preliminary and final plat named Hosanna 4 Addition. The preliminary and final plat is a re -plat of Outlot A and Lot 1, Block 1, Hosanna 3 Addition. The re -plat creates an additional lot in which the Developer is proposing to construct a senior housing building. The proposed subdivision is located north of and adjacent to 165 Street, west of and adjacent to Ipava Avenue, and south of and adjacent to 162 Street (CSAH -46) and 163 Street. The preliminary and final plat consists of two lots and one outlot on 48.04 acres. The Developer is dedicating 0.36 acres as 162 Street (CSAH -46) right -of -way. The outlot created with the preliminary and final plat has the following use: HOSANNA 4 T " ADDITION FEBRUARY 11, 2011 PAGE 2 OF 11 Outlot A: Future development; to be retained by the Developer (16.15 acres) The preliminary and final plat includes Comprehensive Plan and Zoning Map amendments and planned unit development requests which are addressed in the Planning Report. SITE CONDITIONS The eastern 2 /3 of the Hosanna 4"' Addition site contains Hosanna! Lutheran Church. The developed site includes one existing building, bituminous - surfaced area for parking and two stormwater basins. The western 1 /3 of the Hosanna 4 Addition site is vacant, undeveloped land that was previously mass graded as part of Hosanna 2 Addition improvements. EASEMENT VACATION The Hosanna 4 Addition preliminary plat identifies public drainage and utility easements previously established with the parent parcels, as depicted on the Hosanna 3 Addition plat. The existing easements will be vacated and re- platted with the Hosanna 4 Addition final plat. STREET AND SITE LAYOUT 162 Street (CSAH -46) Hosanna 4 Addition is south of and adjacent to 162 Street, a minor arterial roadway as identified in the City's Transportation Plan. Dakota County controls the right -of -way requirement and access locations for 162 Street. The current Dakota County Road Plat Review Needs Map identifies a 1 /2 right -of -way requirement of 100 feet. The plans and Dakota County 1 /2 Section Map indicate a current 1 /2 right -of- way width of 75 feet. The Developer is dedicating 25 feet of additional right -of -way, as shown on the plat, to satisfy the right -of -way requirement. The Dakota County Plat Commission approved the Hosanna 4 Addition preliminary plat at its January 18, 2011 meeting. A final plat has been submitted to the Dakota County Plat Commission for review at their February 14, 2011 meeting. 162 Street is constructed as a four -lane divided urban roadway with left and right turn lanes at the intersections and bituminous trails along both sides. The current Dakota County Road Plat Review Needs Map identifies 162 Street as a future six - lane divided roadway. Dakota County's current Transportation Capital Improvement Program does not identify improvements to 162 Street. HOSANNA 4"' ADDITION FEBRUARY 11, 2011 PAGE 3 OF 11 The parent parcels were previously assessed for the street improvements to 162 Street that were completed with City Project 91 -3. The assessment has been paid. Ipava Avenue Hosanna 4 Addition is west of and adjacent to Ipava Avenue, a minor arterial roadway as identified in the City's Transportation Plan. Ipava Avenue is constructed as an undivided urban roadway at 165 Street and transitions to a divided urban roadway at 163 Street with left and right turn lanes at the intersections. There are bituminous trails along both sides of Ipava Avenue. No additional right -of -way is required with the Hosanna 4 Addition plat. 165 Street Hosanna 4 Addition is north of and adjacent to 165 Street, a major collector roadway as identified in the City's Transportation Plan. The Developer dedicated 40 feet of right -of -way with the Hosanna Addition and Hosanna 2 Addition plats. No additional right -of -way is required with the Hosanna 4 Addition plat. 165 Street is constructed as a 44 -foot wide undivided urban roadway and striped as a three -lane section, with one through lane in each direction and center left -turn lanes between the intersections. There are bituminous trails along both sides of 165 Street. 163 Street Hosanna 4 Addition is south of and adjacent to 163 Street, a local commercial street. The Developer dedicated 80 feet of right -of -way, consistent with the right -of- way requirement for a local commercial street, with the Hosanna Addition plat. 163 Street is constructed as a 44 -foot wide undivided urban roadway with concrete sidewalks along both sides. Itasca Trail Hosanna 4 Addition is west of and adjacent to Itasca Trail, a local commercial street. The Developer dedicated 80 feet of right -of -way, consistent with the right -of -way requirement for a local commercial street, with the Hosanna 2 Addition plat. Itasca Trail is constructed as a 44 -foot wide undivided urban roadway with a concrete sidewalk along the east side. Site Plan Review The Developer proposes to partner with Ebenezer Management Services to construct a senior housing building on Lot 2. The building will contain 93 living units comprised of the following: 22 independent living; 45 assisted care; 24 memory care; and 2 guest rooms. Housing will be contained in three 3 -story wings and a first floor "town center" section that includes a bank, dining area, general store, kitchen and library as well as a direct connection to Hossana! Lutheran Church. HOSANNA 4 ADDITION FEBRUARY 11, 2011 PAGE 4 OF 11 Access to the proposed senior housing building will be primarily from either the two existing westerly driveway entrances along 163 Street or the existing westerly driveway entrance along 165 Street. Turning path movements demonstrating vehicle circulation are included on the site plan. An underground parking garage will be constructed as part of the senior housing building to provide residential and employee parking. In addition, the existing at- grade parking lot will be expanded to the west to provide joint parking facilities for both the senior housing building and Hosanna! Lutheran Church. The joint parking facilities will require that a permanent, private easement be established across Lots 1 and 2, Block 1, Hosanna 4 Addition. CONSTRUCTION ACCESS Construction traffic access and egress for grading, utility, parking lot and building construction is restricted to Itasca Trail and 163 Street via 162 Street (CSAH -46). PARKS AND TRAILS Development of Hosanna 4 Addition will not require public trail construction. The City's Parks, Trails and Open Space Plan does not designate any area within the proposed plat as future park land. The Park Dedication requirement for Lot 1 (Hosanna! Lutheran Church) was satisfied through a cash contribution paid with the Hosanna Addition plat in 1996. The Park Dedication requirement for Lot 2 has not been met and will be satisfied through a cash contribution that must be paid with the final plat. The Park Dedication fee is based on the rate in effect at the time of final plat approval and is calculated as follows: Number of Units Unit Type 22 Independent Living 2 Guest Rooms 45 Assisted Care 24 Memory Care Park Dedication Fee Rate $4,153.00 /unit $1,038.25 /unit $1,038.25 /unit $00.00 /unit Total Total $ 91,366.00 $ 2,076.50 $ 46,721.25 $ 00.00 $ 140,163.75 HOSANNA 4T" ADDITION FEBRUARY 11, 2011 PAGE 5 OF 11 UTILITIES SANITARY SEWER Hosanna 4 Addition is located within sub - districts CL -43000 and CL -44000 of the Crystal Lake sanitary sewer district as identified in the City's Comprehensive Sanitary Sewer Plan. Wastewater will be conveyed via existing public sanitary sewer to the MCES Burnsville Southwest Interceptor and continue to the Seneca Wastewater Treatment Facility. The existing City -owned downstream facilities have sufficient capacity to serve the proposed development. Development of Hosanna 4 Addition will not require public sanitary sewer construction. The existing building on Lot 1 (Hosanna! Lutheran Church) is connected to public sanitary sewer. 8 -inch sanitary sewer will be extended from public sanitary sewer located along the north property line of Lot 1 to provide service to the proposed senior housing building on Lot 2. The proposed sanitary sewer service for Lot 2 crosses through Lot 1; therefore a private utility easement must be established between the two parcel owners. Prior to City Council consideration, the Developer must submit documentation of the utility easement. The sanitary sewer service will be privately -owned and maintained by the owner of Lot 2. The Trunk Sanitary Sewer Area Charge for Lot 1 (Hosanna! Lutheran Church) was paid with the Hosanna 3 Addition plat in 2002. The Sanitary Sewer Availability Charge has not been paid on the expansion area of Lots 1 and 2 and must be paid with the building permit. The proposed area of Lots 1 and 2, Block 1, Hosanna 4 Addition is 31.54 acres. The Trunk Sanitary Sewer Area Charge was previously collected on 29.49 acres (Lot 1, Block 1, Hosanna 3 Addition), meaning 93.50% of the Sanitary Sewer Availability Charge has been satisfied. The remaining 6.50% will be applied to the Sanitary Sewer Availability Charge. The Sanitary Sewer Availability Charge is $307.00 per residential equivalent unit and shall be calculated when the M.C.E.S. Sac Units for the proposed senior housing building have been determined. WATERMAIN Development of Hosanna 4 Addition will not require public watermain construction. The existing building on Lot 1 (Hosanna! Lutheran Church) is connected to public watermain. 8 -inch watermain will be extended from public watermain located along the north property line of Lot 1 to provide service to the proposed senior housing building on Lot 2. In addition, 6 -inch watermain will connect to an existing fire protection system within Lot 1 that will be reconfigured around the perimeter of Lot 2 to provide additional fire flow availability to both Hosanna! Lutheran Church and the proposed senior housing building. HOSANNA 4 T " ADDITION FEBRUARY 11, 2011 PAGE 6 OF 11 The proposed water service for Lot 2 crosses through Lot 1 and the looped fire protection system crosses through both Lots 1 and 2; therefore a private utility easement must be established between the two parcel owners. Prior to City Council consideration, the Developer must submit documentation of the utility easement. The water service and looped fire protection system will be privately -owned and maintained by the Developer. The parent parcels were previously assessed for the watermain improvements along 162 Street that were completed with City Project 91 -3. The assessment has been paid. Final locations and sizes of all sanitary sewer and watermain facilities shall be reviewed by City staff with the final building permit plans. In association with MnOPS requirements, utility hook -ups for buildings within Hosanna 4 Addition shall not be permitted until the as -built electronic files have been submitted and approved by City staff. DRAINAGE AND GRADING Hosanna 4 Addition is located within the Crystal Lake drainage district as identified in the City's Water Resources Management Plan. The site was previously mass graded as part of Hosanna 2nd Addition improvements. The eastern 1 /2 of the parent parcel is located within sub - district CL -26A and includes the Hosanna! Lutheran Church campus as well as an existing two -cell regional stormwater basin (CL- 26 -1). Stormwater runoff generated within the Hosanna! Lutheran Church campus site is conveyed via privately -owned and maintained storm sewer to the regional stormwater basins located north and east of the existing church. The existing stormwater routing within the Hosanna! Lutheran Church campus site will generally be maintained with the exception of a small area southwest of the existing church that will be re- routed to regional stormwater basin CL -16 -1. The western 1 /2 of the parent parcel is located with sub - district CL -16 and includes the proposed senior housing campus as well as an existing regional infiltration basin (CL- 16 -1). Stormwater runoff generated within the proposed senior housing campus site is conveyed via privately -owned and maintained storm sewer to regional infiltration basin CL -16 -1. The existing stormwater routing within the proposed senior housing campus site will generally be maintained with the exception of the addition of a small area southwest of the existing church. Development of Hosanna 4 Addition will not require public stormwater or infiltration basin construction as the contributing drainage area generated within the site was incorporated into the design of the Hosanna stormwater management system. HOSANNA 4 ADDITION FEBRUARY 11, 2011 PAGE 7 OF 11 Development of Hosanna 4 Addition includes the construction of a sedimentation basin. The sedimentation basin will be located within Outlot A and provide pretreatment and skimming of a portion of the stormwater runoff generated within the proposed senior housing campus site to protect regional infiltration basin CL -16- 1 from clogging with sediment. The sedimentation basin will be privately -owned and maintained by the Developer. Prior to City Council consideration, a temporary drainage and utility easement must be established across the sedimentation basin. The temporary easement will expire when Outlot A is final platted into lots and blocks. Development of Hosanna 4 Addition also includes a modification to the existing outlet of the regional stormwater basin located north of the church. In anticipation of the future construction of the Chapel addition, the Developer will install an outlet control structure that will provide additional rate control and skimming of the stormwater runoff generated by the Chapel addition. The outlet control structure will be located within a permanent public drainage and utility easement, as shown on the plat, and maintained by the City. The grading specifications must indicate that all embankments meet FHA /HUD 79G specifications. The Developer shall certify to the City that all buildings with footings placed on fill material are appropriately constructed. Building permits shall not be issued until a building pad certification survey has been submitted and approved by City staff. A Certificate of Occupancy shall not be issued until an as -built certified grading plan has been submitted and approved by City staff. A National Pollution Discharge Elimination System General Stormwater Permit for construction activity is required by the Minnesota Pollution Control Agency for areas exceeding one acre being disturbed by grading. A copy of the Notice of Stormwater Permit Coverage must be submitted to the City upon receipt from the MPCA. RETAINING WALLS Development of Hosanna 4 Addition includes the construction of eight retaining walls. The retaining walls vary in height ranging between 3 and 10 feet. All modular block walls constructed must meet Mn /DOT requirements. All modular block walls greater than four feet in height must be designed by a registered engineer and require a separate building permit from the City's Building Inspection Department. All modular block walls requiring a separate building permit from the City's Building Inspection Department must be inspected during construction and certified by the design engineer following construction. For safety reasons, the Developer may want to consider installing fencing on top of all walls that require a separate building permit from the City's Building Inspection Department and on any wall 30- inches in height or greater that is within 5 feet of a pedestrian area. The retaining walls will be privately -owned and maintained by the Developer. HOSANNA 4 T " ADDITION FEBRUARY 11, 2011 PAGE 8 OF 11 STORM SEWER Development of Hosanna 4 Addition includes the construction of public and private storm sewer systems. The public storm sewer consists of the modification to the existing outlet of the regional stormwater basin located north of the church. The reconstructed public storm sewer will be located within a permanent public drainage and utility easement, as shown on the plat, and maintained by the City. The privately -owned and maintained storm sewer will be located within Outlot A and Lots 1 and 2 and collect and convey stormwater runoff generated from within the lots to existing private storm sewer. Any additional draintile construction, including perimeter draintile required for building footings, which is deemed necessary during construction, shall be the Developer's responsibility to install and finance. The Trunk Storm Sewer Area Charge for Lot 1 (Hosanna! Lutheran Church) was paid with the Hosanna 3 Addition plat in 2002. The Trunk Storm Sewer Area Charge has not been collected on the expansion area of Lots 1 and 2 and must be paid with the final plat. The Trunk Storm Sewer Area Charge is calculated as follows: 2,092,692 sf - 15,681 sf - 703,287 sf - 1,284,541 sf x $0.186/sf = $16,588.04 Gross area of Area of Area of Area of Area Charge Total Hosanna 4 162n R/W Outlot A, Hosanna Lot 1, Block 1, Hosanna Addition Dedication 4 Addition 3` Addition The Crystal Lake Surcharge for Lot 1 (Hosanna! Lutheran Church) was paid with the Hosanna 3 Addition plat in 2002. The Crystal Lake Surcharge has not been collected on the expansion area of Lots 1 and 2 and must be paid with the final plat. The Crystal Lake Surcharge is calculated as follows: 2,092,692 sf - 15,681 sf - 703,287 sf - 1,284,541 sf x $0.0144/sf = $1,284.24 Gross area of Area of Area of Area of Area Charge Total Hosanna 4 162 " R/W Outlot A, Hosanna Lot 1, Block 1, Hosanna Addition Dedication 4 Addition 3` Addition WETLANDS There are no existing wetlands within the Hosanna 4 Addition site. TREE PRESERVATION A tree preservation plan has been submitted and reviewed. The plan identifies a total of 102 significant trees located within the Hosanna 4 Addition site. The tree preservation plan identifies 49 significant trees for removal. HOSANNA 4 T " ADDITION FEBRUARY 11, 2011 PAGE 9 OF 11 The tree preservation plan satisfies City requirements. All "save" significant trees that are damaged or removed by site grading will require replacement at a ratio of 2:1 as per the Lakeville Subdivision Ordinance. The Landscape Plan identifies 74 new deciduous trees being planted as well as 31 evergreen trees. The Developer must post security for tree preservation on an individual lot basis for each lot containing a "save" significant tree. The security is $1,500 for each lot with a "save" significant tree and $1,000 for each outlot with a "save" significant tree and is calculated as follows: Block 1: Lots 1 and 2 2 Lots @ $1,500 each Tree Preservation Security EROSION CONTROL An erosion control plan has been submitted and includes the following: • A single rock construction entrance. • A seed and mulch specification that meets City requirements. • Inlet protection on all storm sewer structures. • Silt fence to protect offsite areas from sediment transport. • All 3:1 slopes must be seeded and stabilized with fiber blanket or sod. • The site will be re- vegetated within 48 hours of rough and final grading. • All streets shall be cleared of debris at the end of each day as identified in the erosion control notes. Street sweeping shall be done weekly or more often as needed. Additional street sweeping shall be required during the hauling process. All streets shall be maintained to provide safe driving conditions. A concrete washout area must be identified in the field and constructed per City specifications. Erosion control blankets must be installed on all stormwater /infiltration basin slopes that are disturbed during construction. The Developer shall install and maintain any additional erosion control measures deemed necessary during construction by City staff or the Dakota County Soil and Water District. SECURITIES = $ 3,000 $ 3,000 The Developer shall provide a Letter of Credit as security for the Developer - installed improvements relating to Hosanna 4 Addition. Construction costs are based upon estimates submitted by the Developer's engineer on January 21, 2011. HOSANNA 4" ADDITION FEBRUARY 11, 2011 PAGE 10 OF 11 CONSTRUCTION COSTS Sanitary Sewer Connection Watermain Connection Storm Sewer Site Grading, Erosion Control, Restoration and Grading Certification SUBTOTAL - CONSTRUCTION COSTS CASH FEES 100.00 ff x $0.214/ff /qtr x 4 qtrs = $85.60 165 Street Front Footage Streetlight Operating Rate Total $ 750.00 750.00 14,558.00 54,328.50 $ 70,386.50 OTHER COSTS Developer's Design (6.0 %) $ 4,223.19 Developer's Construction Survey (2.5 %) 1,759.66 City's Legal Expense (0.5 %) 351.93 City Construction Observation (7.0 %) 4,927.06 Developer's Record Drawing (0.5 %) 351.93 Retaining Walls 126,390.00 On -Site Private Signs and Pavement Markings 17,085.00 Tree Preservation 3,000.00 Landscaping 70,000.00 Lot Corners 300.00 SUBTOTAL - OTHER COSTS $ 228,388.77 TOTAL PROJECT SECURITIES $ 298,775.27 The Developer shall post a security to ensure the final placement of iron monuments at property corners with the final plat. The security is $100.00 per lot and outlot for a total of $300.00. The City shall hold this security until the Developer's land surveyor certifies that all irons have been placed following site grading, utility and street construction. A cash fee for one -year of streetlight operating expenses for Lot 2 shall be paid with the final plat. Consistent with City policy, the streetlight operating fee is based as a commercial development so as to provide a more comparable rate to the anticipated usage. The cash fee is calculated as follows: A cash fee for one -year of surface water management expenses for Lot 2 shall be paid with the final plat and is calculated as follows: 93 units x 0.25 REU x $7.00 /unit /qtr x 4 qtrs = $651.00 Dwelling Units Residential Surface Water Total Equivalent Utility Management Fee Factor Rate HOSANNA 4Th ADDITION FEBRUARY 11, 2011 PAGE 11 OF 11 A cash fee for the preparation of record construction drawings and for upgrading the City base map shall be paid with the final plat and is calculated as follows: 3 lots /outlots x $75.00 /lot and outlot = $225.00 Lots and Outlots City Base Map Updating Rate Total The Developer shall submit the final plat and construction drawings in an electronic format. The electronic format shall be either a .dwg file (AutoCAD) or a .dxf file. The Developer shall pay a cash fee for City Engineering Administration. The Developer has elected to provide a Letter of Credit as security for the Developer - installed improvements. The fee for City Engineering Administration shall be based on three percent (3.00 %) of the estimated construction cost, or $2,111.60. CASH REQUIREMENTS Park Dedication Fee Sanitary Sewer Availability Charge (6.50 %) Trunk Storm Sewer Area Charge Crystal Lake Surcharge Streetlight Operating Fee Surface Water Management Fee City Base Map Updating Fee City Engineering Administration (3.00 %) TOTAL CASH REQUIREMENT RECOMMENDATION $ 140,163.75 Due with Building Permit 16,588.04 1,284.24 85.60 651.00 225.00 2,111.60 $ 161,109.23 Engineering recommends approval of the preliminary plat, easement vacation, final plat, grading plan, utility plan and site plan for Hosanna 4 Addition, subject to the comments within this report and the following: Prior to City Council consideration: • The Developer shall submit documentation of a private utility easement between Lots 1 and 2 for the privately -owned and maintained sanitary sewer service, water service and fire protection system and storm sewer that will cross through both lots. • The Developer shall submit a legal description and exhibit that establish a temporary public drainage and utility easement across Outlot A, Hosanna 4 Addition, for the sedimentation basin.