HomeMy WebLinkAboutItem 06.hJuly 5, 2011 APPROVE CHANGE ORDER NO, 1 WITH FRIEDGES LANDSCAPING, INC. FOR CONSTRUCTION OF STONEBOROUGH PARK — CITY IMPROVEMENT PROJECT #11 -05 Proposed Action Staff recommends adoption of the following motion: Move to authorize Mayor and City Clerk to execute Change Order No. 1 with Friedges Landscaping, Inc. for construction of Stoneborough Park. Overview On May 2, 2011 the Mayor and City Clerk executed an Agreement with Friedges Landscaping, Inc. for the construction of Stoneborough Park at a cost of $188,857.50. Over the past seven weeks, Friedges Landscaping, Inc. has made significant progress in the construction of the park, including installation of the trail, curb for playground area, concrete pad for shelter, landscaping, ballfleld and backstop along with the majority of the grading on -site and seeding along the trail. At this time staff is recommending approval of Change Order No. 1 equaling $6,606.33. Significant items included in Change Order No. 1 include the elimination of electrical component encompassing a Tight fixture and outlet in the shelter at a deduct cost of $13,400.00. Add items include installation of sod along the entrance of the park and around the playground /shelter areas at a cost of $6,006.00, and importing common borrow material to the site at a cost of $12,687.50. The new contract price is as follows: Contract price prior to Change Order Net increase resulting from Change Order No. 1 Current contract price including Change Order No. 1 Primary Issues to Consider a Is the cost of Change Order No. 1 fair and reasonable? Supporting Information o Change Order No. 1 n Hennen rk Maintenance & Operations Mgr Item No. $188,857.50 6,606.33 $195.463.83 Financial Impact: $195,463.83 Budgeted: YIN Y Source: Park Ded Fund Related Documents (CIP, ERP, etc.): Notes: Change Or Contract Change Order for: Stoneborough Park Development City of Lakeville, MN 20195 Holyoke Avenue Lakeville, MN 55044 To (Contractor): Friedges Landscaping, Inc. 9380 - 202nd Street West Lakeville, MN 55044 Distribution To: ❑ Owner ❑ Consultant ❑ Contractor Initiation Date: 17- Jun -11 Consultants Project: #11 -02 CHANGES TO THE CONTRACT (The contractor shall make the following changes to the contract) Page 1 of 2 ❑ Field ❑ Other DESCRIPTION ADD DEDUCT 1 Seeding Deduct: Reduction in area to be seeded and hydromulched. The unit price listed is the base bid price of $4 per acre with the deduction of $1,800 per acre for the hydromulch alternate: .35 acres cr $2,445.00 = $855.75 855.75 f 2 Electrical Deduct: Elimination of Alternate A6 (all but cost fo electrical conduit beneath shelter structure pad = $475.00) 13,400.00 3 Topsoil Deduct: Reduction of imported topsoil: 1,500 cy $0.01/cy = $15.00 15.00 4 Import Common Borrow: Addition of Alternate A5 for common borrow: 1450 cy common borrow @ $8.75/cy = $12,687.50 12,687.50 5 Concrete Curb & Gutter: Additional cost for removal and replacement of 16 If of curb & gutter 950.00 6 Sod: Additional cost for furnishing and installing sod. 1820 sy @ $3.30 = $6,006.00 6,006.00 7 Soils corrections: Additional cost for furnishing and placement of 3" minus material beneath trails. 24.59 tons @ $21.75 = 534.83 534.83 8 Soils corrections: Additional cost for furnishing and placement of geotextile fabric beneath trails. 25 sy @ $1.55 = 38.75 38.75 9 Additional work - additional trip for the surveyors to mark property oper corners. 360.00 y 10 Additional work - removal of existing tree along creek trail 300.00 TOTAL CHANGE ORDER ADDS AND DEDUCTS: 20,877.08 14,270/5 1 NET CHANGE ORDER TOTAL: $6,606.33 Change Or Contract Change Order for: Stoneborough Park Development City of Lakeville, MN 20195 Holyoke Avenue Lakeville, MN 55044 To (Contractor): Friedges Landscaping, Inc. 9380 - 202nd Street West Lakeville, MN 55044 Distribution To: ❑ Owner ❑ Consultant ❑ Contractor Initiation Date: 17- Jun -11 Consultants Project: #11 -02 CHANGES TO THE CONTRACT (The contractor shall make the following changes to the contract) Page 1 of 2 ❑ Field ❑ Other Contract Summary to Date Original Contract Sum: 188,857.50 Net Change by Previously Authorized Change Orders: - - Net Change of this Change Order: 6,606.33 Total Contract Sum (including all Change Orders to Date): $195,463.83 Consultant: Brauer & Associates, Ltd. 10417 Excelsior Blvd. - Suite One Hopkins, MN 55343 Contractor: Friedges Landscaping, Inc. 9380 - 202nd Street West Lakeville, MN 55044 Owner: City of Lakeville, MN 20195 Holyoke Avenue Lakeville, MN 55044 Signature Date Z"A Signature Date Mayor Signature Date City Clerk Date