HomeMy WebLinkAboutItem 07July 28, 2011 Item No. AUGUST 1, 2011 CITY COUNCIL MEETING SPIRIT OF BRANDTJEN FARM 7 ADDITION Proposed Action Staff recommends adoption of the following motion: Move to approve: a) the Spirit of Brandtjen Farm (SBF) 7 Addition preliminary plat of 59 single family Tots, b) a resolution approving the Spirit of Brandtjen Farm 7 Addition final plat of 34 single family lots, and c) a resolution designating "No Parking" on 168 Street and Diamonte Way as presented. Adoption of this motion will approve the re -plat of a portion of SBF 4 Addition consisting of a modified right -of -way dedication for Diamond Path and four additional single family Tots. Overview Tradition Development (a /k /a SBF Development Corp.) representatives are requesting approval of the Spirit of Brandtjen Farm 7 Addition preliminary plat of 59 single family Tots and final plat of 34 single family lots as the next development phase for the Spirit of Brandtjen Farm planned unit development (SBF PUD). SBF 7 Addition is a re -plat of a portion of the SBF 4 Addition preliminary plat approved in 2009. This re -plat will reduce the amount of Diamond Path right -of -way to be dedicated and defer the construction of Diamond Path to a future date. The reduced right -of -way dedication meets ordinance requirements while allowing four additional single family lots to be included in the SBF 7 Addition plat. The Planning Commission held a public hearing at their July 21, 2011 meeting and unanimously recommended approval of the SBF 7 Addition preliminary and final plat. There was no public comment. Staff recommends approval of the planning actions, which will allow continued development in the SBF PUD. Primary Issues to Consider • Are there any issues to consider regarding the modified right -of -way dedication and future construction of Diamond Path? Supporting Information • Staff analysis of issues • Resolution approving the Spirit of Brandtjen Farm 7 Addition final plat • Resolution designating "No Parking" areas on 168 Street and Diamonte Way • Signed development contract and temporary drainage and utility easement agreement • Revised preliminary and final plats • July 21, 2011 draft Planning Commission meeting minutes • July 20, 2011 draft Parks, Recreation and Natural Resources Committee meeting minutes • July 25, 2001 Dakota County Plat Commission letter July 14, 2011 planning and engineering reports (both revised July 25, 2011) Daryl M'• rey, Plan g Director Financial Impact: $ None Budgeted: Y/N Source: Related Documents (CIP, ERP, etc.): Zoning and Subdivision ordinances, SBF PUD Notes: Staff Analysis of Issues • Are there any issues to consider regarding the modified right -of -way dedication and future construction of Diamond Path? The SBF 4 th Addition preliminary plat proposed a 120 foot right -of -way dedication for Diamond Path with a 25 foot wide outlot to the east, all within the Spirit of Brandtjen Farm development and the Lakeville city boundaries. The 25 foot wide outlot was established as a buffer due to the gravel mining activities that were occurring at that time on the neighboring property in Empire Township. The 120 foot Diamond Path right -of -way dedication was based upon the Dakota County requirement at that time for this future County road (CR 33). Tradition Development representatives recently contacted City staff to request a more equitable right -of -way dedication for Diamond Path and to request deferment on the construction of Diamond Path to a future date when there is an actual need for the road. They feel that Empire Township should share in the right -of -way dedication as Diamond Path is planned to be constructed along the shared Lakeville /Empire Township border. They also don't feel that the construction of Diamond Path is warranted at this time. The initial SBF 7 th Addition preliminary and final plat submittal proposed a 75 foot right -of -way dedication for Diamond Path, which is greater than the half right -of -way requirement of 60 feet, due in large part to the existing overhead electric transmission lines located in Empire Township adjacent to the SBF development requiring that the future construction of Diamond Path be skewed to the west onto the SBF property. This reduced right -of -way dedication from 120 feet to 75 feet and the elimination of the 25 foot wide outlot, which is no longer needed because the gravel mining operation in Empire Township is no longer located directly adjacent to the SBF 7 th Addition plat, allows the addition of four single family lots in this area of the SBF development. The developer and City staff discussed Diamond Path right -of -way and construction timing issues with the Dakota County Plat Commission at their July 18, 2011 meeting. The Plat Commission agreed that the need to construct Diamond Path is not warranted at this time. They also agreed that the width of future Diamond Path could be reduced given the 2030 traffic projections for this segment of the roadway. It was agreed that an 80 foot right -of -way dedication for Diamond Path would accommodate a future three -lane street section with a trail on the west side and corresponding boulevard for snow storage. An additional 20 feet of right -of -way will be needed in Empire Township to accommodate a trail on the east side of Diamond Path and the corresponding boulevard area for snow storage. This should be accommodated without impacting the existing overhead electric transmission lines. The preliminary and final plats have been revised to show an 80 foot right -of -way dedication for Diamond Path as recommended by the Dakota County Plat Commission. 2 (Reserved for Dakota County Recording Information) CITY OF LAKEVILLE DAKOTA COUNTY, MINNESOTA RESOLUTION NO. RESOLUTION APPROVING THE FINAL PLAT OF SPIRIT OF BRANDTJEN FARM 7 ADDITION WHEREAS, the owner of the plat described as Spirit of Brandtjen Farm 7th Addition has requested final plat approval; and WHEREAS, the final plat was reviewed by the Planning Commission and the Parks, Recreation and Natural Resources Committee; and WHEREAS, the final plat is acceptable to the City. NOW, THEREFORE, BE IT RESOLVED by the Lakeville City Council: 1. The final plat of Spirit of Brandtjen Farm 7 Addition is hereby approved subject to the terms and conditions of the Spirit of Brandtjen Farm Master Planned Unit Development Stage Plan Agreement dated October 17, 2005. 2. The Mayor and City Clerk are hereby directed to sign the development contract and planned unit development agreement and the final plat mylars. 3. The City Clerk is directed to file a certified copy of this resolution with the Dakota County Recorder. APPROVED AND ADOPTED this 1 day of August, 2011. ATTEST: Charlene Friedges, City Clerk STATE OF MINNESOTA ) ( CITY OF LAKEVILLE ) CITY OF LAKEVILLE BY: Mark Bellows, Mayor I hereby certify that the foregoing Resolution No. is a true and correct copy of the resolution presented to and adopted by the City Council of the City of Lakeville at a duly authorized meeting thereof held on the 1 day of August, 2011, as shown by the minutes of said meeting in my possession. Charlene Friedges, City Clerk (SEAL) ATTEST: Charlene Friedges, City Clerk CITY OF LAKEVILLE DAKOTA COUNTY, MINNESOTA RESOLUTION NO: RESOLUTION DESIGNATING "NO PARKING" AREAS ON 168 STREET AND DIAMONTE WAY WHEREAS, the City Council for the City of Lakeville is authorized in accordance with City Code to designate parking zones within the city, and WHEREAS, the sections of 168 Street and Diamonte Way in Spirit of Brandtjen Farm 7 Addition will be constructed to allow a single traffic lane in each direction with parking on one side only, consistent with the approved street sections in the Spirit of Brandtjen Farm planned unit development, and WHEREAS, establishing "No Parking" areas on 168 Street and Diamonte Way will discourage potential on street parking, maintain sufficient access to the traffic lanes, provide increased sight lines for drivers, and reduce the interaction between vehicles and pedestrians. NOW, THEREFORE, BE IT RESOLVED, that the north side of 168 Street, the east side of the north -south Diamonte Way segment, and the outer edge of the Diamonte Way loop segment be designated "No Parking" anytime. DATED this 1 day of August, 2011. CITY OF LAKEVILLE By: Mark Bellows, Mayor 158772v2 AMP07/26/2011 (reserved for recording information) DEVELOPMENT CONTRACT AND PLANNED UNIT DEVELOPMENT AGREEMENT (Developer Installed Improvements) SPIRIT OF BRANDTJEN FARM 7 TH ADDITION AGREEMENT dated , 2011, by and between the CITY OF LAKEVILLE, a Minnesota municipal corporation ( "City "), and SBF DEVELOPMENT CORP., a Minnesota corporation (the "Developer "). 1. REQUEST FOR PLAT AND PLANNED UNIT DEVELOPMENT APPROVAL. The Developer has asked the City to approve a plat and planned unit development for SPIRIT OF BRANDTJEN FARM 7 TH ADDITION (referred to in this Contract as the "plat "). The land is situated in the City of Lakeville, County of Dakota, State of Minnesota, and is legally described as: Outlot A, SPIRIT OF BRANDTJEN FARM 3 ADDITION, according to the recorded plat thereof AND Outlot D, SPIRIT OF BRANDTJEN FARM 4 ADDITION, according to the recorded plat thereof, Dakota County, Minnesota. 1 LKVL:SPIRIT OF BRANDTJEN FARM 7TH ADD. (SBF Development Corp.) The Spirit of Brandtjen Farm 7 Addition site is zoned PUD, Planned Unit Development, and is subject to the provisions of Ordinance Number 787 approved by the Lakeville City Council on June 20, 2005, as well as the requirements listed in the Spirit of Brandtjen Farm Planned Unit Development Plan Booklet dated June 20, 2005 ( "SBF PUD Booklet "). 2. CONDITIONS OF PLAT AND PLANNED UNIT DEVELOPMENT APPROVAL. The City hereby approves the plat and planned unit development on condition that the Developer enter into this Contract, furnish the security required by it, and record the plat with the County Recorder or Registrar of Titles within 100 days after the City Council approves the final plat. 3. RIGHT TO PROCEED. Without the written permission of the City, within the plat or land to be platted, the Developer may not grade or otherwise disturb the earth, remove trees, construct sewer lines, water lines, streets, utilities, public or private improvements, or any buildings until all the following conditions have been satisfied: 1) this agreement has been fully executed by both parties and filed with the City Clerk, 2) the necessary security has been received by the City, and 3) the plat has been filed with the Dakota County Recorder's Office. 4. PHASED DEVELOPMENT. If the plat is a phase of a multi - phased preliminary plat, the City may refuse to approve final plats of subsequent phases if the Developer has breached this Contract and the breach has not been remedied. Development of subsequent phases may not proceed until Development Contracts for such phases are approved by the City. Park charges, sanitary sewer charges, and storm sewer charges referred to in this Contract are not being imposed on outlots, if any, in the plat that are designated in an approved preliminary plat for future subdivision into lots and blocks. Such charges will be calculated and imposed when the outlots are final platted into Tots and blocks. 5. PRELIMINARY PLAT STATUS. If the plat is a phase of a multi - phased preliminary plat, the preliminary plat approval for all phases not final platted shall lapse and be void unless final platted into Tots and blocks, not outlots, within three (3) years after preliminary plat approval. 6. CHANGES IN OFFICIAL CONTROLS. For fifteen (15) years from the date of the SBF PUD Stage Plan Agreement, no amendments to the City's Comprehensive Plan, except an amendment 158772v2 2 LKVL:SPIuIT OF BRANDTJEN FARM 7TH ADD. AMP07/26/2011 (SBF Development Corp.) placing the plat in the current metropolitan urban service area, or official controls shall apply to or affect the use, development density, lot size, lot layout or dedications of the approved plat unless required by state or federal law or agreed to in writing by the City and the Developer. Thereafter, notwithstanding anything in this Contract to the contrary, to the full extent permitted by state law, the City may require compliance with any amendments to the City's Comprehensive Plan, official controls, platting or dedication requirements enacted after the date of this Contract. 7. DEVELOPMENT PLANS. The plat shall be developed in accordance with the following plans. The plans shall not be attached to this Contract. With the exception of Plans A and B, the plans may be revised and finalized after the date of this Contract, subject to the City Engineer's approval. All plans must be final and approved by the City Engineer before commencement of any work in the plat. The City Engineer may approve minor amendments to Plan B without City Council approval. The erosion control plan may also be approved by the Dakota County Soil and Water Conservation District, if the City delegates its authority to the District. If the plans vary from the written terms of this Contract, the written terms shall control. The plans, which shall be on file with the City, are: 158772v2 AMP07/26/2011 Plan A - Plat Plan B - Final Grading, Drainage, and Erosion Control Plan Plan C - Plans and Specifications for Public Improvements Plan D - Street Lighting Plan Plan E - Landscape Plan 8. IMPROVEMENTS. The Developer shall install and pay for the following: A. Sanitary Sewer System B. Water System C. Storm Sewer System D. Streets E. Concrete Curb and Gutter F. Street Lights G. Site Grading, Stormwater and Erosion Control H. Underground Utilities I. Setting of Iron Monuments 3 LKVL:SPIRIT OF BRANDT.TEN FARM 7TH ADD. (SBF Development Corp.) J. Surveying and Staking K. Sidewalks The improvements shall be installed in accordance with the City subdivision ordinance; City standard specifications for utility and street construction; and any other ordinances including Section 11 -16 -7 of the City Code concerning erosion and drainage and Section 4 -1 -4 -2 prohibiting grading, construction activity, and the use of power equipment between the hours of 10 o'clock p.m. and 7 o'clock a.m. The Developer shall submit plans and specifications which have been prepared by a competent registered professional engineer to the City for approval by the City Engineer. The Developer shall instruct its engineer to provide adequate field inspection personnel to assure an acceptable level of quality control to the extent that the Developer's engineer will be able to certify that the construction work meets the approved City standards as a condition of City acceptance. In addition, the City may, at the City's discretion and at the Developer's expense, have one or more City inspectors and a soil engineer inspect the work on a full or part -time basis. The Developer, its contractors and subcontractors, shall follow all instructions received from the City's inspectors. The Developer's engineer shall provide for on -site project management. The Developer's engineer is responsible for design changes and contract administration between the Developer and the Developer's contractor. The Developer or his engineer shall schedule a pre- construction meeting at a mutually agreeable time at the City with all parties concerned, including the City staff, to review the program for the construction work. Within thirty (30) days after the completion of the improvements and before the security is released, the Developer shall supply the City with a complete set of reproducible "as constructed" plans and an electronic file of the "as constructed" plans in an AutoCAD.DWG file or a .DXF file, all prepared in accordance with City standards. In accordance with Minnesota Statutes 505.02, the final placement of iron monuments for all lot corners must be completed before the applicable security is released. The Developer's surveyor shall also submit a written notice to the City certifying that the monuments have been installed. 9. CONTRACTORS /SUBCONTRACTORS. City Council members, City employees, and City Planning Commission members, and corporations, partnerships, and other entities in which such 158772v2 4 LKVL :SPIRIT OF BRANDTJEN FARM 7TH ADD. AMP07/26/2011 (SBF Development Corp.) individuals have greater than a 25% ownership interest or in which they are an officer or director may not act as contractors or subcontractors for the public improvements identified in Paragraph 8 above. 10. PERMITS. The Developer shall obtain or require its contractors and subcontractors to obtain all necessary permits, including but not limited to: • Dakota County for County Road Access and Work in County Rights -of -Way • MnDot for State Highway Access • Minnesota Department of Health for Watermains • NPDES Permit for Stormwater Connections • MPCA for Sanitary Sewer and Hazardous Material Removal and Disposal • DNR for Dewatering • City of Lakeville for Building Permits • MCES for Sanitary Sewer Connections • City of Lakeville for Retaining Walls • NPDES General Stormwater Permit for construction activity 11. DEWATERING. Due to the variable nature of groundwater levels and stormwater flows, it will be the Developer's and the Developer's contractors and subcontractors responsibility to satisfy themselves with regard to the elevation of groundwater in the area and the level of effort needed to perform dewatering and storm flow routing operations. All dewatering shall be in accordance with all applicable county, state, and federal rules and regulations. DNR regulations regarding appropriations permits shall also be strictly followed. 12. TIME OF PERFORMANCE. The Developer shall install all required public improvements by November 30, 2011, with the exception of the final wear course of asphalt on streets. The final wear course on streets shall be installed between August 15th and October 15th the first summer after the base layer of asphalt has been in place one freeze thaw cycle. The Developer may, however, request an extension of time from the City. If an extension is granted, it shall be conditioned upon updating the security posted by the Developer to reflect cost increases and the extended completion date. Final wear course placement outside of this time frame must have the written approval of the City Engineer. 158772v2 5 LKVL:SPiRiT OF BRANDTJEN FARM 7TH ADD. AMP07/26/2011 (SBF Development Corp.) 13. LICENSE. The Developer hereby grants the City, its agents, employees, officers and contractors a license to enter the plat to perform all work and inspections deemed appropriate by the City in conjunction with plat development. 14. EROSION CONTROL. Prior to initiating site grading, the erosion control plan, Plan B, shall be implemented by the Developer and inspected and approved by the City or Dakota County Soil and Water Conservation District. The City or Dakota County Soil and Water Conservation District may impose additional erosion control requirements if they would be beneficial. All areas disturbed by the excavation and backfilling operations shall be reseeded within 48 hours after the completion of the work or in an area that is inactive for more than seven (7) days unless authorized and approved by the City Engineer. Except as otherwise provided in the erosion control plan, seed shall be in accordance with the City's current seeding specification which may include certified oat seed to provide a temporary ground cover as rapidly as possible. All seeded areas shall be fertilized, mulched, and disc anchored as necessary for seed retention. The parties recognize that time is of the essence in controlling erosion. If the Developer does not comply with the erosion control plan and schedule or supplementary instructions received from the City or the Dakota County Soil and Water Conservation District, the City may take such action as it deems appropriate to control erosion. The City will endeavor to notify the Developer in advance of any proposed action, but failure of the City to do so will not affect the Developer's and City's rights or obligations hereunder. If the Developer does not reimburse the City for any cost the City incurred for such work within ten (10) days, the City may draw down the letter of credit to pay any costs. No development, utility or street construction will be allowed and no building permits will be issued unless the plat is in full compliance with the approved erosion control plan. 15. GRADING PLAN. The plat shall be graded in accordance with the approved grading development and erosion control plan, Plan "B ". The plan shall conform to City of Lakeville specifications. Within thirty (30) days after completion of the grading and before the City approves individual building permits (except one model home permit on a lot acceptable to the Building Official), the Developer shall provide the City with an "as constructed" grading plan certified by a registered land surveyor or engineer 158772v2 AMP07/26/2011 6 LKVL:SPIRIT OF BRANDTJEN FARM 7TH ADD. (SBF Development Corp.) that all storm water treatment basins, swales, and ditches have been constructed on public easements or land owned by the City. The "as constructed" plan shall include field verified elevations of the following: a) cross sections of storm water treatment basins; b) location and elevations along all swales, wetlands, wetland mitigation areas if any, ditches, locations and dimensions of borrow areas /stockpiles, and installed "conservation area" posts; and c) lot corner elevations and house pads, and all other items listed in City Code Section 10- 3 -5.NN. The City will withhold issuance of building permits until the approved certified grading plan is on file with the City and all erosion control measures are in place as determined by the City Engineer. The Developer certifies to the City that all lots with house footings placed on fill have been monitored and constructed to meet or exceed FHA/HUD 79G specifications. 16. CLEAN UP. The Developer shall clean dirt and debris from streets that has resulted from construction work by the Developer, home builders, subcontractors, their agents or assigns. Prior to any construction in the plat, the Developer shall identify in writing a responsible party and schedule for erosion control, street cleaning, and street sweeping. 17. OWNERSHIP OF IMPROVEMENTS. Upon completion of the work and construction required by this Contract and final acceptance by the City, the improvements Tying within public easements shall become City property without further notice or action. 18. CITY ENGINEERING ADMINISTRATION AND CONSTRUCTION OBSERVATION. The Developer shall pay a fee for in -house engineering administration. City engineering administration will include monitoring of construction observation, consultation with Developer and his engineer on status or problems regarding the project, coordination for final inspection and acceptance, project monitoring during the warranty period, and processing of requests for reduction in security. Fees for this service shall be three percent (3 %) of construction costs identified in the Summary of Security Requirements if using a letter of credit, assuming normal construction and project scheduling. The Developer shall pay for construction observation performed by the City's in -house engineering staff or consulting engineer. Construction observation shall include part or full time inspection of proposed public utilities and street 158772v2 7 LKVL:SPIRIT OF BRANDTJEN FARM 7TH ADD. AMP07/26/2011 (SBF Development Corp.) construction and will be billed on hourly rates estimated to be seven percent (7 %) of the estimated construction cost. 19. STORM SEWER. Development of Spirit of Brandtjen Farm 7 Addition includes public storm sewer construction. Storm sewer will be installed within the subdivision to collect and convey stormwater runoff generated from within the public right -of -way and Tots to the existing City -owned stormwater basins located near the northwest corner of the site (Outlot C, Spirit of Brandtjen Farm 6th Addition). The trunk storm sewer area charge for the Spirit of Brandtjen Farm 7 Addition has not been collected with the parent parcel of Spirit of Brandtjen Farm 3rd and 4 Additions and must be paid with the final plat. The trunk storm sewer area charge is calculated as follows: Gross Area of Spirit of Brandtjen Farm 7 Addition 3,491,506 s.f. Less Area of Outlot B (future development) ( -) 2,942,010 s.f. Less Area of Diamond Path Right -of -Way ( -) 60,361 s.f. Total = 489,135 s.f. 489,135 s.f. (Net Area of Final Plat) x $0.167/s.f. (Area Charge) = $81,685.55 The Developer has a $240,653.19 trunk storm sewer credit carried over from Spirit of Brandtjen Farm 6 Addition. The $81,685.55 trunk storm sewer area charge for Spirit of Brandtjen Farm 7 Addition will be applied to the existing trunk storm sewer credit. The new credit balance of $158,967.64 shall be applied to future phases of the Spirit of Brandtjen Farm development. 20. SANITARY SEWER. Development of Spirit of Brandtjen Farm 7 Addition includes public sanitary sewer construction. Eight inch (8 ") and ten inch (10 ") sanitary sewer will be extended within the subdivision from an existing sanitary sewer stub to provide service to the lots. The sanitary sewer availability charge has not been collected with the parent parcels and must be paid with the final plat. The sanitary sewer availability charge is calculated as follows: 34 Units x $307.00 /dwelling unit = $10,438.00 21. WATERMAIN. Development of Spirit of Brandtjen Farm 7 Addition includes public watermain construction. Eight inch (8 ") watermain will be extended within the subdivision from an existing 158772v2 8 LKVL: SPIRIT OF BRANDTJEN FARM 7TH ADD. AMP07/26/2011 (SBF Development Corp.) watermain stub to provide service to the Tots. In association with MnOPS requirements, utility hook -ups for buildings within Spirit of Brandtjen Farm 7 Addition shall not be permitted until the as -built electronic files have been submitted and approved by City staff. 22. CONSTRUCTION ACCESS. Construction traffic access and egress for grading, public utility construction, and street construction is restricted to Diamond Path via 170 Street. 23. TRAILS AND SIDEWALKS. Development of Spirit of Brandtjen Farm 7th Addition will not require public trail construction. The City's Parks, Trails and Open Space Plan identifies a 10 -foot wide bituminous trail along the west side of Diamond Path. The trail will be built when Diamond Path is constructed. Concrete sidewalks shall be provided along both sides of interior streets (except around Outlot A). 24. PARK DEDICATION. The City's Parks, Trails and Open Space Plan does not designate any area within the proposed plat as future park land. The park dedication requirement for Spirit of Brandtjen Farm 7 Addition will be satisfied through a cash contribution that must be paid with the final plat. The park dedication fee, as described in the approve Spirit of Brandtjen Farm Planned Unit Development, is calculated as follows: 34 single family dwelling units x $2,250.00 /dwelling unit = $76,500.00 The Developer has a park dedication credit of $331,857.22 carried over from Spirit of Brandtjen Farm 6th Addition. The $76,500 park dedication requirement for Spirit of Brandtjen Farm 7 Addition will be applied to the existing park dedication credit. The new credit balance of $255,357.22 shall be applied to future phases of the Spirit of Brandtjen Farm development. 25. STREETLIGHTS AND STREETLIGHT OPERATION COSTS. The streetlight security totals $8,400.00, which consists of seven post -top streetlights at $1,200.00 each. A cash fee for one -year of streetlight operating expenses shall be paid with the final plat and is calculated as follows: 158772v2 AMP07/26/2011 34 dwelling units x $7.65/unit/qtr. x 4 qtrs. = $1,040.40 9 LKVL:SPIRIT OF BRANDTJEN FARM 7TH ADD. (SBF Development Corp.) 26. TRAFFIC CONTROL SIGNS. The Developer shall pay to the City a cash fee of $1,172.00 for traffic control signs, which consists of two street and stop signs, one stop sign and one "No Outlet" sign. If the street posts are installed in frost conditions, the Developer shall pay an additional $150.00 at each street post location. 27. SURFACE WATER MANAGEMENT UTILITY FEE. A cash fee for one -year of surface water management expenses shall be paid with the final plat and is calculated as follows: 34 dwelling units x $7.00/unit/qtr. x 4 qtrs. = $952.00 28. LANDSCAPING. Unless the lot already has two (2) trees on it, the Developer or lot purchaser shall plant sufficient trees so that there are at least two (2) trees on every lot in the plat. Suitable deciduous trees include: 158772v2 AMP07/26/2011 Birch Honeylocust Maple Ginkgo (male only) Kentucky Coffee Oak Hackberry Linden (Basswood) Suitable coniferous trees include: Fir European Larch Colorado Blue & Green Spruce Cedar Black Hills Spruce Austrian Pine Canadian Hemlock White Pine Trees which can cause a public nuisance, such as cotton producing trees, or can be a public hazard, such as bug infestation or weak bark, are prohibited. The minimum deciduous tree size shall be two and one -half (2 %) inches caliper, either bare root in season, or balled and burlapped. Evergreen trees must be at least six feet (6') tall. The required two (2) trees may not be planted in the boulevard. The Developer or lot purchaser shall sod the front yard, boulevard, and side yards to the rear of the structure on every lot. Weather permitting, the trees, sod, and seed shall be planted within sixty (60) days after a home is constructed on a lot. Before a building permit is issued, a cash escrow or letter of credit in the amount of $2,000.00 per lot shall be furnished the City to guarantee compliance with the erosion control, grading and landscaping requirements. If the final grading and landscaping is not timely completed, the City may enter the lot, perform the work, and apply the cash escrow or letter of credit toward the cost. Upon satisfactory 1 0 LKVL:SPIRIT OF BRANDTJEN FARM 7TH ADD. (SBF Development Corp.) completion of the landscaping the escrow funds, without interest, Tess any draw made by the City, shall be returned to the person who deposited the funds with the City. All trees shall be warranted to be alive, of good quality, and disease free for twelve (12) months after planting. Any replacements shall be warranted for twelve (12) months from the time of planting. 29. SPECIAL PROVISIONS. The following special provisions shall apply to plat development: A. Implementation of the recommendations listed in the July 14, 2011 Engineering report revised July 25, 2011. B. Implementation of the recommendations of the Parks, Recreation, and Natural Resources Committee. C. Buffer yard landscaping shall be installed consistent with the approved landscape plan. A $40,000 security shall be submitted by the Developer to guarantee installation of the approved buffer yard landscaping. A certified grading plan of the buffer yard berms (along both 170 Street and Diamond Path) must be submitted and approved by the City Engineer prior to installation of the buffer yard landscaping. A landscape plan for the internal boulevard streets must also be submitted and is required to be consistent with the landscape concept plan included in the Spirit of Brandtjen Farm PUD Booklet dated June 20, 2005. D. Spirit of Brandtjen Farm 7 Addition shall be developed consistent with the approved Spirit of Brandtjen Farm Master Plan, the PUD booklet dated June 20, 2005 and the PUD Development Stage Plan /Preliminary Plat. E. The Developer is responsible for the maintenance of the Diamond Path right -of -way (dust control and restoration) until the street is constructed. The Developer will provide proposed profile grades for Diamond Path to Dakota County and the City to ensure that the future grading and street construction, including trails, storm sewer and draintile, can be constructed within the right -of -way. F. Barricades are required at the end of all street stubs. 158772v2 AMP07/26/2011 11 LKVL: SPIRIT OF BRANDTJEN FARM 7TH ADD. (SBF Development Corp.) G. Documents incorporating the Spirit of Brandtjen Farm 7 Addition final plat as part of the Spirit of Brandtjen Farm Homeowners Association are required to provide for Tong -term ownership and maintenance of Outlot A and are subject to review and approval of the City Attorney. H. Before the City signs the final plat, the Developer must submit a letter from its bank stating the existing Letter of Credit submitted for the Spirit of Brandtjen Farm Development Contract shall also provide the necessary security for the Spirit of Brandtjen Farm 7 Addition Development Contract, including all of the required Developer - installed improvements. Prior to City Council approval of the final plat, the Developer shall furnish a boundary survey of the proposed property to be platted with all property corner monumentation in place and marked with lath and a flag. Any encroachments on or adjacent to the property shall be noted on the survey. The Developer shall post a $3,600.00 security for the final placement of interior subdivision iron monuments at property corners. The security was calculated as follows: 36 Tots /outlots at $100.00 per lot/outlot. The security will be held by the City until the Developer's land surveyor certifies that all irons have been set following site grading and utility and street construction. In addition, the certificate of survey must also include a certification that all irons for a specific lot have either been found or set prior to the issuance of a building permit for that lot. J. The Developer shall pay a cash fee for the preparation of record construction drawings and City base map updating. This fee is $75.00 per lot and outlot and is calculated as follows: 36 lots / outlots x $75.00 /unit = $2,700.00 K. The Developer is required to submit the final plat in electronic format. The electronic format shall be either AutoCAD.DWG file or a .DXF file. All construction record drawings (e.g., grading, utilities, streets) shall be in electronic format in accordance with standard City specifications. The Developer shall also submit one complete set of reproducible construction plans on mylar. 30. SUMMARY OF SECURITY REQUIREMENTS. To guarantee compliance with the terms of this agreement, payment of real estate taxes including interest and penalties, payment of special assessments, payment of the costs of all public improvements, and construction of all public improvements, the 158772v2 12 LKVL:SPIRIT OF BRANDTJEN FARM 7TH ADD. AMP07/26/2011 (SBF Development Corp.) Developer shall furnish the City with a letter of credit, in the form attached hereto, from a bank ( "security ") for $734,556.30, plus the cash fee calculated under Paragraph 33 of this Contract. The amount of the security was calculated as follows: CONSTRUCTION COSTS: This breakdown is for historical reference; it is not a restriction on the use of the security. The bank shall be subject to the approval of the City Administrator. The City may draw down the security, without notice, for any violation of the terms of this Contract or if the security is allowed to lapse prior to the end of the required term. If the required public improvements are not completed at least thirty (30) days prior to the expiration of the security, the City may also draw it down. If the security is drawn down, the proceeds shall be used to cure the default. Upon receipt of proof satisfactory to the City that work has been completed and financial obligations to the City have been satisfied, with City approval the security may be reduced from time to time by ninety percent (90 %) of the financial obligations that have been satisfied. Ten percent 158772v2 AMP07/26/2011 Sanitary Sewer $ 109,616.37 Watermain 128,344.49 Storm Sewer 110,805.37 Street Construction 227,010.50 Site Grading, Erosion Control, Restoration and Grading Certification 10,108.50 CONSTRUCTION SUB -TOTAL $ 585,885.23 OTHER COSTS: Developer's Design (6.0 %) $ 35,153.11 Developer's Construction Survey (2.5 %) 14,647.13 City Legal Expenses (Est. 0.5 %) 2,929.43 City Construction Observation (Est. 7.0 %) 41,011.97 Developer's Record Drawings (0.5 %) 2,929.43 Landscaping 40,000.00 Street Lights 8,400.00 Lot Corners /Iron Monuments 3,600.00 OTHER COSTS SUB -TOTAL $ 148,671.07 TOTAL PROJECT SECURITIES: $ 734,556.30 13 LKVL: SPIRIT OF BRANDTJEN FARM 7TH ADD. (SBF Development Corp.) (10 %) of the amounts certified by the Developer's engineer shall be retained as security until all improvements have been completed, all financial obligations to the City satisfied, the required "as constructed" plans have been received by the City, a warranty security is provided, and the public improvements are accepted by the City Council. The City's standard specifications for utility and street construction outline procedures for security reductions. 31. SUMMARY OF CASH REQUIREMENTS. The following is a summary of the cash requirements under this Contract which must be furnished to the City at the time of final plat approval: 158772v2 AMP07/26/2011 Sanitary Sewer Availability Charge Traffic Control Signs Street Light Operating Fee Surface Water Management Fee City Engineering Administration (3.00 %) City Base Map Updating TOTAL CASH REQUIREMENT Developer Credits: Park Dedication Credit Trunk Storm Sewer Credit Total Development Credits 14 $ 10,438.00 $ 1,172.00 $ 1,040.40 $ 952.00 $ 17, 576.56 $ 2,700.00 $ 33,878.96 $ 255, 357.22 158,967.64 $ 414,324.86* * TO BE APPLIED TO FUTURE PHASES OF THE SPIRIT OF BRANDTJEN FARM DEVELOPMENT. 32. WARRANTY. The Developer warrants all improvements required to be constructed by it pursuant to this Contract against poor material and faulty workmanship. The warranty period for streets is one year. The warranty period for underground utilities is two years and shall commence following completion and acceptance by City Council. The one year warranty period on streets shall commence after the final wear course has been installed and accepted by the City Council. The Developer shall post maintenance bonds in the amount of twenty -five percent (25 %) of final certified construction costs to secure the warranties. The City shall retain ten percent (10 %) of the security posted by the Developer until the maintenance bonds are furnished the City or until the warranty period expires, whichever first occurs. The retainage may be used to pay for warranty work. The City's standard specifications for utility and street construction identify the procedures for final acceptance of streets and utilities. LKVL:SPIRIT OF BRANDTJEN FARM 7m ADD. (SBF Development Corp.) 33. RESPONSIBILITY FOR COSTS. A. Except as otherwise specified herein, the Developer shall pay all costs incurred by it or the City in conjunction with the development of the plat, including but not limited to Soil and Water Conservation District charges, legal, planning, engineering and inspection expenses incurred in connection with approval and acceptance of the plat, the preparation of this Contract, review of construction plans and documents, and all costs and expenses incurred by the City in monitoring and inspecting development of the plat. B. The Developer shall hold the City and its officers, employees, and agents harmless from claims made by itself and third parties for damages sustained or costs incurred resulting from plat approval and development. The Developer shall indemnify the City and its officers, employees, and agents for all costs, damages, or expenses which the City may pay or incur in consequence of such claims, including attorneys' fees. C. The Developer shall reimburse the City for costs incurred in the enforcement of this Contract, including engineering and attorneys' fees. D. The Developer shall pay, or cause to be paid when due, and in any event before any penalty is attached, all special assessments referred to in this Contract. This is a personal obligation of the Developer and shall continue in full force and effect even if the Developer sells one or more lots, the entire plat, or any part of it. E. The Developer shall pay in full all bills submitted to it by the City for obligations incurred under this Contract within thirty (30) days after receipt. If the bills are not paid on time, the City may halt plat development and construction until the bills are paid in full. Bills not paid within thirty (30) days shall accrue interest at the rate of eighteen percent (18 %) per year. F. In addition to the charges and special assessments referred to herein, other charges and special assessments may be imposed such as but not limited to sewer availability charges ( "SAC "), City water connection charges, City sewer connection charges, and building permit fees. 158772v2 AMP07/26/2011 15 LKVL: SPIRIT OF BRANDTJEN FARM 7TH ADD. (SBF Development Corp.) 34. DEVELOPER'S DEFAULT. In the event of default by the Developer as to any of the work to be performed by it hereunder, the City may, at its option, perform the work and the Developer shall promptly reimburse the City for any expense incurred by the City, provided the Developer, except in an emergency as determined by the City, is first given notice of the work in default, not less than forty -eight (48) hours in advance. This Contract is a license for the City to act, and it shall not be necessary for the City to seek a Court order for permission to enter the land. When the City does any such work, the City may, in addition to its other remedies, assess the cost in whole or in part. 35. MISCELLANEOUS. A. The Developer represents to the City that the plat complies with all city, county, metropolitan, state, and federal laws and regulations, including but not limited to: subdivision ordinances, zoning ordinances, and environmental regulations. If the City determines that the plat does not comply, the City may, at its option, refuse to allow construction or development work in the plat until the Developer does comply. Upon the City's demand, the Developer shall cease work until there is compliance. B. Third parties shall have no recourse against the City under this Contract. C. Breach of the terms of this Contract by the Developer shall be grounds for denial of building permits, including lots sold to third parties. D. If any portion, section, subsection, sentence, clause, paragraph, or phrase of this Contract is for any reason held invalid, such decision shall not affect the validity of the remaining portion of this Contract. E. Grading, curbing, and one lift of asphalt shall be installed on all public and private streets prior to issuance of any building permits, except one model home on a lot acceptable to the Building Official. Approval of an administrative permit in compliance with Chapter 27 of the City's zoning ordinance is required prior to the construction of any model homes. F. If building permits are issued prior to the acceptance of public improvements, the Developer assumes all liability and costs resulting in delays in completion of public improvements and damage to public improvements caused by the City, Developer, its contractors, subcontractors, material 158772v2 AMP07/26/2011 16 LKVL:SPIRIT OF BRANDTJEN FARM 7TH ADD. (SBF Development Corp.) men, employees, agents, or third parties. No sewer and water connections or inspections may be conducted and no one may occupy a building for which a building permit is issued on either a temporary or permanent basis until the streets needed for access have been paved with a bituminous surface and the utilities are accepted by the City Engineer. G. The action or inaction of the City shall not constitute a waiver or amendment to the provisions of this Contract. To be binding, amendments or waivers shall be in writing, signed by the parties and approved by written resolution of the City Council. The City's failure to promptly take legal action to enforce this Contract shall not be a waiver or release. H. This Contract shall run with the land and may be recorded against the title to the property. The Developer covenants with the City, its successors and assigns, that the Developer is well seized in fee title of the property being final platted and /or has obtained consents to this Contract, in the form attached hereto, from all parties who have an interest in the property; that there are no unrecorded interests in the property being final platted; and that the Developer will indemnify and hold the City harmless for any breach of the foregoing covenants. I. Developer shall take out and maintain or cause to be taken out and maintained until six (6) months after the City has accepted the public improvements, public liability and property damage insurance covering personal injury, including death, and claims for property damage which may arise out of Developer's work or the work of its subcontractors or by one directly or indirectly employed by any of them. Limits for bodily injury and death shall be not Tess than $500,000 for one person and $1,000,000 for each occurrence; limits for property damage shall be not less than $200,000 for each occurrence; or a combination single limit policy of $1,000,000 or more. The City shall be named as an additional insured on the policy on a primary and noncontributory basis, and the Developer shall file with the City a certificate evidencing coverage prior to the City signing the plat. The certificate shall provide that the City must be given ten (10) days advance written notice of the cancellation of the insurance. J. Each right, power or remedy herein conferred upon the City is cumulative and in addition to every other right, power or remedy, express or implied, now or hereafter arising, available to 158772v2 AMP07/26/2011 17 LKVL:SPIRIT OF BRANDTJEN FARM 7TH ADD. (SBF Development Corp.) City, at law or in equity, or under any other agreement, and each and every right, power and remedy herein set forth or otherwise so existing may be exercised from time to time as often and in such order as may be deemed expedient by the City and shall not be a waiver of the right to exercise at any time thereafter any other right, power or remedy. K. The Developer may not assign this Contract without the written permission of the City Council. The Developer's obligation hereunder shall continue in full force and effect even if the Developer sells one or more lots, the entire plat, or any part of it. L. Retaining walls that require a building permit shall be constructed in accordance with plans and specifications prepared by a structural or geotechnical engineer licensed by the State of Minnesota. Following construction, a certification signed by the design engineer shall be filed with the City Engineer evidencing that the retaining wall was constructed in accordance with the approved plans and specifications. All retaining walls identified on the development plans or by special conditions referred to in this Contract shall be constructed before any other building permit is issued for a lot on which a retaining wall is required to be built. 36. NOTICES. Required notices to the Developer shall be in writing, and shall be either hand delivered to the Developer, its employees or agents, or mailed to the Developer by certified mail at the following address: 16972 Brandtjen Farm Drive, Lakeville, Minnesota 55044. Notices to the City shall be in writing and shall be either hand delivered to the City Administrator, or mailed to the City by certified mail in care of the City Administrator at the following address: Lakeville City Hall, 20195 Holyoke Avenue, Lakeville, Minnesota 55044. 158772v2 AMP07/26/2011 [The remainder of this page has been intentionally left blank. Signature pages follow.] 18 LKVL:SPIRIT OF BRANDTJEN FARM 7TH ADD. (SBF Development Corp.) (SEAL) STATE OF MINNESOTA ) ( ss. COUNTY OF DAKOTA ) 158772v2 AMP07/26/2011 CITY OF LAKEVILLE BY: AND Mark Bellows, Mayor Charlene Friedges, City Clerk The foregoing instrument was acknowledged before me this day of 2011, by Mark Bellows and by Charlene Friedges, the Mayor and City Clerk of the City of Lakeville, a Minnesota municipal corporation, on behalf of the corporation and pursuant to the authority granted by its City Council. NOTARY PUBLIC 19 LKVL:SPIRrr OF BRANDTJEN FARM 7TH ADD. (SBF Development Corp.) STATE OF MINNESOTA COUNTY OF DAKOTA The foregoing instrument was 2011, by - 1 - 10q b YLCOR K-- SBF Development Corp., a Minnesota • • • 158772v2 AMP07/26/2011 ( ss. Rachel Lynn Halverson .:0,,., Notary Public i ° -- Minnesota %t ; sA' v 6 ' ' My Commission Expires January 31,2014 DRAFTED BY: CAMPBELL, KNUTSON Professional Association 317 Eagandale Office Center 1380 Corporate Center Curve Eagan, MN 55121 Telephone: (651) 452 -5000 RNK:srn DEVELOPER: SBF DEVELOP BY: Its acknowledged before me this ' � day of 11A the pj'i ti— corporation, on behalf of the corporation. Iv' p N TARY PUBLIC 20 LKVL:SPIRIT OF BRANDTJEN FARM 7TH ADD. (SBF Development Corp.) of GRANT OF TEMPORARY EASEMENT SBF DEVELOPMENT CORP., a Minnesota corporation, "Grantor ", in consideration of One Dollar ($1.00) and other good and valuable consideration, the receipt and sufficiency of which is hereby acknowledged, does hereby grant unto the CITY OF LAKEVILLE, a Minnesota municipal corporation, the Grantee, hereinafter referred to as the "City ", its successors and assigns, a temporary easement for public drainage and utility purposes over, on, across, under, and through the land situated in the County of Dakota, State of Minnesota, as legally described as follows: Outlot B, SPIRIT OF BRANDTJEN FARM 7 ADDITION, according to the recorded plat thereof ( "Subject Property "). TO HAVE AND TO HOLD the same, unto the City, its contractors, agents, servants and assigns, commencing upon execution of this document and continuing until the Subject Property has been platted into lots and blocks at which time this easement will expire. The above named Grantor, for itself, its successors and assigns, does covenant with the City, its successors and assigns, that it is well seized in fee title of the above described easement premises; that it has the sole right to grant and convey the easement to the City; that there are no unrecorded interests in the easement premises; and that it will indemnify and hold the City 158801v1 1 nless for any breach of the foregoing covenants. IN TESTIMONY WHEREOF, the Grantor hereto has signed this document this alc of Su- l,/ , 2011. STATE OF MINNESOTA COUNTY OF DAKOTA ) ss. The foregoing instrument was acknowledged before me this 1 day of TV /1 2011 by '- 10k.b'2 ,fit*`- the pi'," Oki" of SBF Development Corp., a Minnesota corporation, on behalf of slaiid corporation. i, chel Lynn Halverson Notary Public Minnesota „, " my Commission Expires January 31,2014 THIS INSTRUMENT WAS DRAFTED BY: CAMPBELL KNUTSON Professional Association 317 Eagandale Office Center 1380 Corporate Center Curve Eagan, MN 55121 Telephone: 651- 452 -5000 AMP /cjh GRANTOR: SBF DEVE By: 158801v1 2 Its: e kt l 4414 /4,/,/, l I/ NOTARY PUBLIC Z I PROJECT NO. I 20662 -07 I CAD FILE I 20662- 07pp.dwg L 75.13 i II I_ ° g-...I IE �(J1l I8 q 1 L__JL__ 70.00 r 70.65 i I I_ mil IU 8_ J 1g q 1 70.00 6 8 10850 SF 1 n L — _155.00J r 76.OVI I II I gj11 U 8N1 Ig 110 L -- 70.00 x 76.55 ) 11 g_ lu g--'I 'a J 70.00 r mANI _ I -' IR.`"O L '0 I - J 73.00 I REVISIONS I 7/25/11 Areas I DATE 6/30/11 I DRAWN BY I PLM SPIRIT OF BRANDTJEN FARMS 7TH ADDITION LAKEVILLE, MINNESOTA PRELIMINARY PLAT FOR SBF DEVELOPMENT CORPORATION 6800 FRANCE AVENUE SOUTH EDINA, MINNESOTA 55435 ' -z3.ia 5 8 're-37-39 3 SF 1 167. J 0 9399 SF • Ls _159.39 j James PLANNERS / ENGINEERS 2500 W. CTY. RB. 42, Suns PHONE: (952)890 . Hill i l 1, Inc . ' / SURVEYORS 120, BURNSNLIE. MN 55337 FAX: (952)890 l - 19 12 95 5. SF ,.1 � 155.07 J � 17 . 9300 SF 1 155.00 J fO p p - 16 $ 1 �0 9300 SF 1 155.00 J L 75.13 i II I_ ° g-...I IE �(J1l I8 q 1 L__JL__ 70.00 r 70.65 i I I_ mil IU 8_ J 1g q 1 70.00 6 8 10850 SF 1 n L — _155.00J r 76.OVI I II I gj11 U 8N1 Ig 110 L -- 70.00 x 76.55 ) 11 g_ lu g--'I 'a J 70.00 r mANI _ I -' IR.`"O L '0 I - J 73.00 D 9923 SF I r— _155.00j 6.368 I 95 SF 1 rZC'o I _ 1 -U I uJJ 1 Ieq 1 ■__ _ 60.00 - - 6 10167 SF 169.75 J ' -z3.ia 5 8 're-37-39 3 SF 1 167. J 0 9399 SF • Ls _159.39 j 1-60-01 I I I '° I N^W I1 Iq 1 L_ 60.00 t' - 10.98 2 1 9704 5F I _157E1 ;,..30.00 1 170.00 12194 SF I 166.76 J 4 20662-07PRdwq - 7/27/2011 02:49PM (Tt JPII \IT DRAFT HORSE BOULEVARD 1 j vi ,C nF0,1 3F "' Cfl - •1 1 (n r � - - -1 (1) ci 326.10 N00 ° 07'38 "E g J - ; . - 1T6.T3 - 1 r6.b61 ( r 99.7T - 7 r \'/ S \ c \ \ '� mN I oN Io8NI 1 //- - , \ k: 6� °v . I o / /.. �� - - -r y e ti y 4 r \ \ q \ 3 +i "� co 1 \I. / �p IN / ' q 134.45 I - ___ AMONTE W,I '� % N �,, : r c,i _TN v' . y L/ 158.00 q JS� fi uQ I ; ;� I 1 113 W v9 / 1 , p 4 T - - - - ° c,:, LQ 13230_ J r W 32.50 J 1 a .I - E° a is8 00 L iso_os_ ?� I , L ^ { 1 26 26 G e - - -- I G V,(_,,4 .1 I- - - -� I- 'ss c / � a � I � I B PI Q Im • / L 4 / J L I IP S14 17250_ _J a 41 is g Iso.i9'A_ J 2 26 w�l m1 u m .5i (./) L .g; I, (C O NN / #8-76a1 1 N 0, \ / % ti rrl : ' (.0), 4' 58.26 162.86 n v r i I v BRA ND 1 Ui_iV j�)nnl I b o OUTLOT 0 A - OM- OM- - -! L� '`Tt - 204.00 m 1 N nIAAACENTF WAY a 26 26 r - A L)ts A 645.71 oN p _ o 0 oo' 317.00 L 139.14 1'- R '01 L 130.00 ) 265.14 26 26 1428.61 NT 9 1 TTT �I Nm 26 26 p "N P j j o 132.50_ _1 E 132 50 m 0 m D '� x7 D 07 07 167.26 S02 ° 33'0 5 ' 221.01 - 126.00 r ;00.2 6 9307 SFW a L 133.49 = 7 ,; � I° 8112 SF N If 135.76 .5 � n r - �[)n nlrlT I - nl 11 \11 \J 1 L 1\/ \I V 1 UL_IV r - n [)6 A D TI A r 1\ 1 T1 C\ 13 1 1 (71\IV1 6TH ,-\LJLJI 115)19 32 96 bI; 67 9 8 .28 1 121.15 1 it Ia4:s, ;;;;1 r TBO U I LEVARD 1 _g 1 I I xf 1 mg T'1.---25.96 1°' o " �� 1 ; 8062 SF q I m e (33.17 Cn ' 1 S!'7�1 L5 L 19-'7863 SF 0 C _ 130.00_ 9 MN -I r 75.6; L ro s - 1 I rr - 4s21 r66ar 11 _ 1 1 ° 1 E r CD o aJ g 1 1 g I Iu ; I IAO 0 81 4a Nrn11 - �(J1 1N N�11i; m 1 !Ni R 9081 SF um^-'I ,, 0 • 6>J L6 Q'QCJ L?Q .4 0 1y IA 1 f,..:1 ' 1 5L7.il Lfl4'9LJ I.Z.W ' m WY _ 8 69'091 rBe 313 Ol Z `S al. �I N I Imm - `l I 0 NC 00 CO 1 99991 r9 '061 rgfr -0-I I I I - I I_ z INNco Ip U 1$ U Iqq 1 ( 011 >.0 I I 11 1 , 1 II Loso J LZ@S3J L 77 ° 11 J _A zz 23 0 (1) � m CD F.10p2AD .'[ ZZ0000 -P1 {11('5 m 0 r 0 >DZ 00 l7 0 1.-. (7 ; 0 (n D (n DIAMOND PATH 0 Ill my Z 1) O 3 m M m A D Z D -1 Z 0m D Z 0 D Ln A r C o° z U) Z - 4 D r O U1 Uf O C O 1 0 (, O 0 0 OZ 0 (n t0 0c -- 2566.72 N00 ° 07'38 "E -- 0 D r N C c c C O 0 N 2 o o 0 . N zm za u o � D 0 N NI (" (C CN 15 i C w o g ' O.(4 O CP S CP C P N N N m CJI,03 w • \\ I \ ,// \ 1 \ \ \ 1 , L I, 2 4� m � A 45 45 5 0 0 G O R 0 O a� ad w'0 N 0 N '7 07 _ 0 9 0 U1" x 0 y�y 2 70 .4 X dx 0 ■ P 0 O z N 0 a 2 0 x 0 76 0. 01, -50 FOOT NIWAMS BROTHERS PIPE LINE if COMPANY EASEMENT PER °OC. N0. 43307 00 i 1093.11 2 O a 0 G a "- a? 33 (13 e , ro r. � 0' 1 CD . 03 0 CJ z 0 G •=1 2 V .0 0 p C7 0 a w 00 O z N 0 0 0 a 0 0 x (0 D m co 2 ✓ r z n 50 ( i 0 c= i v =i 0 ) 50 50 55 5 50 / \\ sDRA,' / 1 5 , i n I pp J 03 73 c ri Z _J Uo co I p II rn p TI Z7;o r; :C W'0 r7 - - U 7c0 +�° G = o A '(:)), �' �. *0 fl w� wJ "k 73 N - - 1 ° \ \ / A P 1. / \ 06 2 - 6EI a \ .' 7 N0 / *N3 ? 'I. rl I \ . rv J ., �\ (, � \ \ L- \ y LP S, ? ° 0,? 9 4 6 9 Jr p.� w ( J\ * so 0,, L.9 c,0£ �� - > O � • - ,cn - ,(r) ;�J => o o w � J ' j 0 v ? rrl - \r (<i LAG N SC° \ � -n < v N o0 , C7 <j -d C) z ' 1 \ ' \\ \\ 33 D> _ ) 'I 1> X1.1 W (...1 4 - \1 1 \ \ 'b12 , 1, - -� W C7 >> C7 �> (I' ' - \.° '4 ct, ? \ , V6S 6 7 CJ - C C7 �° o V \N � c3,„:, 6 ssojw C7 .. 1 No n , \ \ M. 6 / M mcn l I \ � i \ � - f 4 \ ' 5 — �\ c.:1 Ac.,,,, . :LOVER" L � ^ \\ V— ,' .JE . w \ w rn C . @R �53 1 @ o ., N00 ° 07'38 "E 0 - 326.10 O, 2 CA, �� 0 N O OUrLOr DIAMONTE WAY N N W co co DIAM,pFD PATH rr i N ni (Do ▪ A "_r0) c rn m - � N (J� N 0) N -4 N 00 600'0238'6 >66.67 ' N89 \V 52.00 583'34'08`W 2566.72 NO0 °07'38 "E z 00IA 00Z mDO0J �xm�mo mocro 01 >O > >0 -1> � AO ;9::5 O f Dz m �� � x Om CINJ O� m mzmm m _v� � �l om f p D T O X yZ N VI��?O (A OJ mZ�O-Di0 mz > miw oo `m N C1 ~ D D O z Z • Fr; x O A < D A D Z C A A OZ�2> '0m D o 1021=210 O 0mm zz z 0 0 1 0 CCI z z z rn Cv C O (31 (n 1, - a'° J o rn coC";p 0 sr 130° 0°N. � 0'��+ U�� rnv of 70 O, -S S ! y� I\ I 1 I \ 15 \ \I \ C <1'-'-^ \ S o,- \\ 1 1 5 @p ls 30j \ \ \ \\I I 093, W \ i 1812.11 G yp ,t-^a CZ a' n n -50 FOOT WILLIAMS BROTHERS PIPE LINE -. -- COMPANY EASEMENT PER OOC. N0. 43307`: 9 4 711 -H 0 D m En 2 r r z n z CD CD N t0 ■ 58.26 rn N \ \t t2 35 N l ts3 1,+ 35 L 600'15'31'W - 15 0.1 9 \s� 46.5 p 150.05 - - 1 I J I; 46.5 )00 ° 15'31 "W - J 25.4 8- 19'10'42 162.66 L7 106.33 ,o \ r 0 178.00 26 8 DIAMONTE WAY - 500°07'38'W 158.00 326.10 N00 "E ° 63.31 204.00 °u.uu I I I I 60.00 60.6 N09 ° 2 014 1-30.00 • 60.00 Bit. ". 32S S �° p 754.61 N00 ° 07'38 "E - N 00'07'38' 6 / / \ \ /2 o \ 41 �/ /F 0 - 110 1 }1.55 34.6 / O6,/ I L. $1 8=03'28'56" /t W °J 1 ' 9 • I N 4 :02X2 -, 4. \y. V / N L 500 '07'38 "W cc t c0 IE 4 ` 9 0JT. � ` u ; `�,° \:_ I 0 26 1 2 6 • 99.77 26 26 /0.00 1 I I 1 N 1 IN 4 " NI L_ J_ 70.02 - N01'0 ''01 "W +40.00 '7D R A I N A G E ]n !In "1r'l 150 150 NSA -Ic3 V2,01. ; Z 027, A \ 0 15 02 -^ f„, 0 1.3> I Z -0 rn 15 I0 m='Am -< =0 7 Z AU1 o m Z AU12 D 1 ,` � P F) O 001 . T>P1N 0 7 31.1 Ri 7' NO A> OZZ A r O 1> 0 O AP • 2 A " < oz2z� >wr5 > m rn 0 C O m m z m z2 -1 32.50 � I co I L _ - N00 '07'38'E f 32.5a SIC 132.50 I I I N I f2 `J1 UI Im °I .L 70.01 J I NO1°06'01•W 7n 00 317.00 645.71 N00°07'38 "E DIAMONTE WAY /U. UU L ,1 NO2 °35'54 "W U T I L I T Y 0 00 J 0 D z 0, 265.14 N00 °07'38 "E • 8 DRAFT HORSE BOULEVARD a 265.14 N00°07'38"E 139.14 �`c� 113.14 701 Y L � - - - - �Ia - 500'07'38 "W 1 130.00 q -nsa s0.7' ww _ A T I - 134.45 �1 r l 4 '1 , OL 500 . 07'38"W 1 n r 132.50 1 I 01 I 'L 00007'36 "W J i r 132.50 I aL 1 132.50 70.00 r I I N IU J N I 1 ° I L - 7D.oe - NO2'35'54 "W ?E A S E M E N T 711 ❑0 A 6 \ 70.00 26 Iq l: 9 \::;: 2 �1 16 °1.1 : -I 26 1 26 26 8 T- -' -50 FOOT WILLIAMS BROTHERS PIPE LINE COMPANY EASEMENT PER DOC. NO. 43307 ; T DIAMOND PATH 2 70.00 I I 1 N 5 E 1 i ra 70.08 J ,. , NO2'35'54•Y 8 126.00 8=11°21'40" o X 16 R= 200.00 100.00 , 578a30'421* ly -D ,4 lu \\ of N J I ,>66.67 5 / N89 °52'22 "W L N00'07'38 "E J 10 26 N CN N 0 0 N 03 60 0 N N N N I$ a I L ^ N00•07 . 38 "E 135.00 I1 ''V.-25.96 131.51 a =02'52•21 ` ' 4.63 CA I' ' " 4=03 °28'56" L N00'07'38 "E 98.71 8=06 124.71 " 124.71 R =300.00 - 118.06 N00 ° 07'38 "E �1 °I 1 Q - 733.1.1 7 - 7 15 !.1N 1 N00'07'38 "E I - 130.00 sl 1 L - N00'0738 "E- J 130.00 I °I ' z ( J m 0 z 08 cn V I I T u a� I c O' c1 N \_ 0 00 z 0 L rn T z II D 2 D 0 0 H 0 z CITY OF LAKEVILLE PLANNING COMMISSION MEETING MINUTES JULY 21, 2011 e July 21, 2011 Planning Commission meeting was called to order by Chair Davis City Hall Council Chambers at 6:00 p.m. The Pled of Allegiance to the Flag was given. Roll call of me ' bers: Present: hair Davis Vi - Chair Lillehei Co issioner Boers Commi ioner Drotning Secretary A ale Commissions Commissi M ti Ex- offi Fitzhenryl Daryl Morey, Plannir Com pany; and Judi Ha Absent: Staff Present EM 3. APPROVAL OF MEETING MINUTES. The 'July 7, 2011 Planning Commission meeting lutes were approved as presented: ITEM 4. ANNOUNCEMENTS: 1. Draft of the July 20, 2011 Parks, Recreation and Natural Resources •lion for the Spirit of Brandtjen Farm 7th Addition preliminary and final plat. 2. Plan revision showing an 80 foot right of way width for Diamond Path as part of the Spirit of Brandtjcn Farm 7th Addition. ITEM 5. SPIRIT OF BRANDTJEN FARM 7TH ADDITION Director; Daniel Licht, The Planning s, Recording Secretary. Mr. Morey stated that the following items were distributed to e Planning Commission at tonight's meeting: Chair Davis opened the Public Hearing to consider the application of SBF Development Corporation for the preliminary plat and development stage Planned Unit Development of 59 single family residential lots to be known as Spirit of Brandtjen Farm 7th Addition, located north of 170th Street and east of Eagleview Drive, and to consider the final plat of 34 single family lots to be known as Spirit of Brandtjen Farm 7th Addition. The Recording Secretary attested that the legal notice has been duly published in accordance with State Statutes and City Code. Jacob Fick representing Tradition Development presented a brief overview of the changes that have been madepsince the original preliminary plat (Spirit of Brandtjen Farm 4th Addition) was revue wed by the Planning Commission in 2009. The major change is the shift in the ri.bt -of -way for Diamond Path. Tradition Development is requesting that the Diamond ,'ath right -o =` , ay be shifted 70 feet to the east, which h would allow the addition of f o u r lots to 1 S iri: of Brandtjen Farm 7th Addition ilf plat. Diamond Path will be bu t a future i ecause the need for this street is not yet warranted by Dakota Count At that time additional property could be dedicated by Empire Township for the g rig �t -of -wa y required by Dakota County. Chair Davis opened the hearing to the public for comment. Consultant Daniel Licht of The =: "" ''' g Company presented the planning report on the • plication of SBF Devekgiment eplat 8 cres in the southeast corner of ent. This pormn of the projecad originally been approved in 2009 as Spirit of "ratjen F : 4th Addition. SB bringing this plat forward for the purpose of makut;g dju - , ents to the,..location of the right -of -way for the future Diamond Path. Witf�`he original SBF %'_ preliminary plat the developer proposed to dedicate feet within the City of Lakeville plus an k. nadditional 25 -foot wide outlot so that the entire roadway and right -of -way would ha in'" been entirely with he City of Lakeville. The developer has discussed with Lake Mlle and Dakota Count staff the possible shifting of the right -of -way 70 feet to the eauch that the 120 feet of right -of -way required by Dakota County would overlay theadjoining boun caries of Lakeville and Empire Township to make the location of the: oadway more balanced. The Spirit of Brandtjen Farm 7th Addition plans propose sliigle family ttage lots consistent with the Spirit of Brandtjen Farm 4th Addition prel' ry p plans. Planning Commission Meeting July 21, 2011 Page 2 Mr. Licht stated that th 4 reliminary and final plat were reviewed and discussed at the July 18, 2011 Dakota County Plat Commission meeting and an 80 foot right -of- way width for Diamond Path was agreed to by the developer, City staff and the Plat Commission. The 80 foot right -of -way width will accommodate a future three lane street section and an eight foot trail on the west side of Diamond Path. Additional right -of -way would be required in Empire Township for a trail on the east side and boulevard snow storage. Planning Department staff recommends approval of the revised preliminary plat with the 80 -foot right -of -way dedication for Diamond Path and the Spirit of Brandtjen Farm 7th Addition final plat of 34 single family lots and two outlots subject to the seven stipulations listed in the July 14, 2011 planning report. There were no comments from the audience. Planning Commission Meeting July 21, 2011 Page 3 11.43 Motion was made and seconded to close the public hearing at 6:11 p.m. Ayes: Lillehei, Davis, Boerschel, Drotning. Chair Davis asked for comp Tents from the Planning Commission. • Commission member Boerschel asked, whether Diamond Path is a City or County road and asked many issues created by the road being split between two jurisdictions. Planning Doctor Morey stated it is identified as a future County road. The roadway_urface ill be entirely within the City of Lakeville and a possible trail onlhe east side wi �. bAbe n Empire Township. • Chair Davis asked about iteed for lamond Pali being constructed at this time The developer .stated that adequate internal accesses exist for this d current traff exotnts d o varran construction of the road at this • Commissionember , illehei asked about the surface of the driveway within the Diamond Path righ -way an if residents would be driving on it. Mr. Fick stated that drivIvay will be a graded gravel surface but it will be available for emergency vehAcles only and not intended for local traffic. La Screening will be 'installed at the rear lot lines of the homes abutting iamond Path, andlthe future roadway will be disclosed to prospective b ° ors. Commissioner Lillehei asked if the trail would be built at this time Mr. k stated that the trail would be built in conjunction with construction of th e way. 11.44 Motion was made 4 4i,ld seconded to recommend to City Council approval of the Spirit of Brandtjen Farm, Addition preliminary plat of 59 single family residential lots and the final plat 61 34 single family lots, to be known as Spirit of Brandtjen Farm 7th Addition, located north of 170th Street and east of Eagleview Drive, subject to the following seven stipulations: 1. The developer shall provide for year - around maintenance of the secondary access road to 170th Street for emergency vehicle access. 2. The developer has a $331,857.22 park dedication credit carried over from the SBF 6th Addition final plat. The park dedication requirement for the SBF 7th Addition final plat is $76,500.00 (34 lots x $2,250.00/lot). A park dedication credit of $255,357.22 will be carried over to future phases of the SBF PUD. 3. A temporary drainage and utility easement must be provided over Outlot B of the SBF 7th Addition final plat as recommended by the City Engineer. 4. Buffer yard landscaping shall be installed consistent with the approved landscape plan. A certified grading plan of the buffer yard berms must be submitted and appro d by the City Engineer prior to installation of the buffer yard landscaping. 5. The grading and utilifk are st ibject to approval by the City Engineer. 6. SBF 7th Addition shall tbbe developed, c atilstent with the approved SBF Master Plan, the PUD booklet dated 20. aae 2005 and the PUD Development Stage Plan/ Preliminary Plat. 7. Documents incorporating the SB, Addition al Plat as part of the SBF Master Homeowners Association arep requiredrovide for long -term ownership and maintena c Outlot and are subject to review and approval of the City Attor ey. „t `1r' 'EM 6. '1 BUSINESS. There was no ne •usiness. ATTEST: cil at their Augtlt, 201 eeting. erschel, Din ring, Lillehei. ITEM 7. S'1 NOTICES. The next meeting g qf the Planni4 ommission is scheduled for August 4, 2011. ITEM 8. ADJOURN. There being no further business, the meeting w. adjourned at 6:18 p.m. Respectfully submitted, Judi Hawkins, Recording Secretary 8/4/11 Planning Commission Meeting July 21, 2011 Page 4 o be considered by City M 1 Call to order Mee , was called to order at 6:01 p.m. ITEM 2 • • II call of members Present: Ma ° r nsiage, Tom Goodwin, Judy Hayes, Scott Kelly, Howard Lovelace, Jeanne Peterson, Bob Swan Absent: Jerry Zell Staff Present: Parks & Recreation irector Steve Michaud, Recording Secretary Patty Ruedy ITEM 3 Approval of the June 15;2011 meeting minutes The Parks, Recreation & Natural Resources Cothmittee meeting minutes were approved as presented. ITEM 4 Citizen comments There were no citizens present. ITEM 5 Staff Report \� Staff referred to the report in the committee packet. Per City ordinance, La Marion was required to be a no -wake zone because of heavy rain last week. Stoneborough Park flooded over the weekend as well. Road to archery range was washed out and some downed trees t •ughout town. Pan -O -Prog went extremely smooth this year. Hayes arrived at 6;07 p.m. CITY OF LAKEVILLE PARKS, RECREATION & NATURAL RESOURCES COMMITTEE Meeting Minutes for July 20, 2011 DRAFT ITEM 6 SBF 7 Addition preliminary and final plat Staff reviewed the plat. The proposed SBF 7 Addition preliminary and final plat consists of 34 lots located in the southeast corner of the Spirit of Brandtjen Farms plat. Goodwin inquired if there were changes from the original plan. Staff replied that there are no major changes from the original plan. (11.14) Motion made by Peterson, seconded by Goodwin to recommend City Council consider approval of Spirit of Brandtjen Farms 7 Addition preliminary and final plat. The developer will be required to install sidewalks on both sides of all residential streets. A proper right -of -way on Diamond Path to accommodate a future 10' trail is being dedicated. Due to credits remaining with the original SBF plat, there are no park dedication fees required for the 7 Addition. Credits are noted in the Engineering Department report. Finally, the developer is required to follow other recommendations outlined in the Planning and Engineering reports as they pertain to this plat. The developer is also required to follow the natural resources requirement detailed in the Planning and Engineering reports associated with tree preservation, grading, drainage, and erosion control and further recommendations by the Dakota County Soil and Water Conservation District, if applicable. Ayes -7 Nays -0 fi Rished- e: Committees have been formed to work on the Senior Center project. Staff ilable and status of the project. Staff will be presenting the plan • Senior Cen discussed a summary of u at the July 25 Council work session. • Canoe rack discussion has been pushed to the August Council wo July 25, 2011 City of Lakeville 20195 Holyoke Avenue Lakeville, MN 55044 Dakota County Surveyor's Office Western Service Center • 14955 Galaxie Avenue suite # 335 • Apple Valley, MN 55124 952 - 891 -7087 • Fax 952- 891 -7127 • www.dakotacounty.us Re: SPIRIT OF BRANDTJEN FARM 7 ADDITION The Dakota County Plat Commission met on July 18, 2011, to consider the final plan of the above referenced plat. The plat is adjacent to future CSAH 33, and is therefore subject to the Dakota County Contiguous Plat Ordinance. The plat was revised to reflect changes to the future Diamond Path (CSAH 33) right -of -way width. The right -of -way needs for this future County roadway is 120 feet or 60 feet of half right -of -way. The revised plat shows 75 feet of dedication for future CSAH 33 due to unique challenges including a pipeline easement and power line easement running along the eastern portion of the plat. There are many unknowns regarding the existing pipelines and transmission lines that will not be addressed as part of this plat since the roadway does not need to be constructed at this time. Based on the current Empire Township Comprehensive Plan, the property directly east of this plat is expected to remain rural. Based on all of these considerations, the developer, City and County agreed that 80 feet would accommodate most of what would be needed for a future 3 -lane roadway while minimizing the potential for future right -of -way acquisition on the lots created by this plat. When the time comes to construct Diamond Path, discussions with the City, the property owner to the east, the pipeline owner, and power line owner will be needed to explore all alignment and design options. The Plat Commission received a revised plan prior to this letter being sent out, which shows the dedication of 80 feet. Restricted access should be shown along all of future CSAH 33. A quit claim deed to Dakota County for restricted access should accompany the plat mylars. The Plat Commission has approved the preliminary and final plat, provided that the described conditions are met, and will recommend approval to the County Board of Commissioners when the plat is submitted in signed mylar form. Mylars should be submitted to the County Board within one year of the Plat Commission's final approval. Residential developments along County highways commonly result in noise complaints. In order for noise levels from the highway to meet acceptable levels for adjacent residential units, substantial building setbacks, buffer areas, and other noise mitigation elements should be incorporated into this development. No work shall commence in the County right of way until a permit is obtained from the County Transportation Department and no permit will be issued until the plat has been filed with the County Recorder's Office. The Plat Commission does not review or approve the actual engineering design of proposed accesses or other improvements to be made in the right of way. The Plat Commission highly recommends early contact with the Transportation Department to discuss the permitting process that reviews the design and may require construction of highway improvements, including, but not limited to, turn lanes, drainage features, limitations on intersecting street widths, medians, etc. Please contact Gordon McConnell regarding permitting questions at (952) 891 -7115 or Todd Tollefson regarding Plat Commission or Plat Ordinance questions at (952) 891 -7070. Sincerely, -47• Todd B. Tollefson Secretary, Plat Commission cc: Jacob Fick; Tradition Development Jake Enebek; Tradition Development TPC MEMORANDUM TO: FROM: DATE: RE: NAC FILE: BACKGROUND Exhibits: A. B. C. D. E. F. G. H. I. Location Map SBF 7 Addition SBF 7 Addition SBF 7 Addition SBF 7 Addition SBF 7 Addition SBF 7 Addition SBF 4 Addition SBF 7 Addition 3601 Thurston Avenue N, Suite 100 Anoka, MN 55303 Phone: 763.231.5840 Facsimile: 763.427.0520 TPC a@PlanningCo.corn Daryl Morey Daniel Licht, AICP 14 July 2011 (Revised 25 July 2011) Lakeville — SBF 7 Addition 135.02 — 11.01 SBF Development Corporation (aka Tradition Development) has submitted plans for Spirit of Brandtjen Farm 7 Addition. This application involves re- platting portions of SBF 3 Addition and SBF 4 Addition necessitating consideration of PUD Development Stage Plan, Preliminary Plat and Final Plat applications. The proposed SBF 7th addition preliminary plat includes 59 single family lots and two outlots located on 80.15 acres at the southeast corner of the Spirit of Brandtjen Farm PUD. A request for final plat approval of 34 single family lots and two outlots is also being requested concurrent with the preliminary plat application. The subject site is zoned PUD, Planned Unit Development District as approved by the City Council on 20 June 2005. Title Sheet Preliminary Plat Preliminary Grading & Drainage Plan (2 sheets) Preliminary Grading & Storm Plan (2 sheets) Preliminary Erosion & Sediment Control Plan Preliminary Utility Plan Preliminary Landscape Plan (2 sheets) Final Plat (2 sheets) Direction Land Use Plan Zoning Existing Use North Medium Density (SBF) PUD Undeveloped East Agricultural (Empire Twp) - - Agriculture South Low Density Residential RAO /RS -3 Agriculture West LD Residential (SBF) PUD Single Family ANALYSIS SBF 4th Addition. The developer previously received approval for a preliminary plat in the same area as the proposed 7 Addition. The developer is proposing to reduce the right -of -way dedication for future Diamond Path from 120 feet and a 25 foot wide outlot east of the right -of -way to 75 feet and no outlot. This shifts the alignment of future Diamond Path to the east with more than half of the required right -of -way within the City of Lakeville and the remainder within Empire Township. Dakota County will be required to obtain the additional right -of -way for Diamond Path within Empire Township in the future. The right -of -way dedication for future Diamond Path is subject to review and approval of the Dakota County Plat Commission at their July 18, 2011 meeting. Four additional sing family lots have been added to the 68 single family lots approved as part of SBF 4t Addition preliminary plat on September 8, 2009. The SBF 4 Addition final plat of 12 single family lots was approved simultaneously with the preliminary plat. Comprehensive Plan. The 2008 Comprehensive Land Use Plan guides the subject site for medium density residential uses at four to seven dwelling units per acre. The net density of the SBF 7 Addition preliminary plat is 3.0 dwelling units per acre consistent with the densities approved in this area with the SBF 4 Addition. The additional four single family lots is within the 2,109 dwelling units planned for SBF and will not have a negative impact to City service capacities. The proposed SBF 7 Addition is also consistent with the City's goal of maintaining an average net density of three dwelling units per acre for housing within the MUSA. MUSA. The subject site is within the current MUSA and sanitary sewer and water utilities are available to the property to accommodate the proposed preliminary plat. Zoning. The subject site is zoned PUD, Planned Unit Development District subject to the provisions of Ordinance Number 787 approved by the City Council on 20 June 2005. Surrounding Land Use. The subject site is surrounded by the following land uses. The proposed single family lots will be compatible with existing and planned uses in the area. Lots. There is no minimum lot area required by the SBF PUD District. Rather, lots are regulated based on minimum width requirements, setbacks and design standards established by the SBF PUD Booklet dated 20 June 2005. The Tots within SBF 7th Addition are proposed with a minimum 60 foot width and otherwise subject to cottage lot standards as set forth in Section 7 of the SBF PUD Booklet. Designation of all lots as the more compact cottage lots within the preliminary plat is consistent with the lot 2 Setbacks Front Side Rear House Garage Door Garage Interior Corner House Garage Door Garage House Garage 170`" St./ Diamond Path 20ft. 25ft. 20ft. 7ft. 15ft 25ft 15ft 20ft. 10ft. 50ft. requirements for the previously approved SBF 4 Addition based on proposed housing designs previously submitted by the developer that are appropriate in scale relative to the lot area and maintain a high standard of architectural character intended for SBF. Setbacks. All of the proposed single family lots are subject to and are consistent with the setback requirements established for "cottage" lots: Access. Access to the subject site will be provided via Draft Horse Boulevard from 170 Street. The developer had previously agreed as part of the original SBF approvals and those for the SBF 4 Addition final plat to construct Diamond Path with this phase of the project. The developer is requesting consideration to defer construction of Diamond Path to a future date as they do not believe construction of Diamond Path is needed for the development of SBF 7 Addition with two planned connections to Draft Horse Boulevard as shown on the preliminary plat and a proposed secondary connection to an existing access road that is utilized for the gravel processing and asphalt production areas on the north side of the SBF PUD that could be utilized by emergency service vehicles until Diamond Path is constructed in the future. Streets. The general layout of the streets is unchanged from the approved SBF 4th Addition preliminary plat. Streets within SBF 7 Addition have been designed to utilize the street sections approved as part of the PUD Booklet dated 20 June 2005. Proposed streets have been reviewed by Assistant City Engineer Zach Johnson and his comments are contained in his July 14, 2011 memo. All streets are subject to approval of the City Engineer. Sidewalks/Trails. Concrete sidewalks are provided along both sides of interior streets (except around Outlot A). A 10 foot wide bituminous Multi- Purpose Trailway will be constructed along the west side of Diamond Path with the future construction of the street consistent with the City's Parks, Trails and Open Space Plan. Landscape Plan. Buffer yard landscaping is already in place along 170 Street. Buffer yard landscaping along Diamond Path is required to provide a 10 foot screening height. The proposed berming and landscaping meets Zoning Ordinance requirements and the design is consistent with the buffer yard plantings along 170 Street. A certified grading plan of the buffer yard berms must be submitted and approved by the City Engineer prior to installation of the buffer yard landscaping. A landscape plan for the internal boulevard streets must also be submitted and is required to be consistent with the landscape concept plan included in the SBF PUD Booklet dated 20 June 2005. 3 Purpose Outlots Publicly accessible /privately maintained open space A Future phases B Park Dedication. No public park land will be dedicated to the City as part of SBF 4th Addition. Park dedication requirements are calculated and paid at the time of final plat approval based on the formula established by the SBF Master PUD Development Agreement, minus any outstanding credits due from previously final platted additions. The park dedication requirement for the SBF 7 Addition final plat is $76,500.00 (34 lots x $2,250.00/lot). There is a $331,857.22 park dedication credit carried over from the SBF 6 Addition final plat. The new SBF park dedication credit balance will be $255,357.22 ($331,857.22 - $76,500.00). Outlots. The PUD Development Stage Plan /preliminary plat includes two outlots: Easements. The preliminary plat and final plat illustrate drainage and utility easements at the perimeter of the single family lots as required by Section 10 -4 -4 of the Subdivision Ordinance. The drainage and utility easements at the rear of the lots within Block 1 have additional depth to include the buffer yard berm and landscaping along 170 Street and Diamond Path. A temporary drainage and utility easement is also required to be provided over Outlot B of the SBF 7 Addition final plat as identified in the engineering report. Grading Plan. The applicant has submitted a preliminary grading plan for the subject site. All grading and drainage issues are subject to review and approval of the City Engineer. Utility Plan. A preliminary utility plan has been submitted to illustrate extension of sanitary sewer and water services to the subject site from the existing final plat of SBF. All utility issues are subject to review and approval of the City Engineer. Final Plat. The developer has submitted a final plat of 34 single family lots and two outlots as the first phase of this preliminary plat. Homeowners Association. Documents including SBF 7 Addition as part of the SBF Master Homeowners Association are required to provide for long -term ownership and maintenance of Outlot A. These documents are subject to review and approval by the City Attorney. Development Contract. The proposed final plat requires execution of a development contract. The development contract must be executed, including posting of all securities and payment of all fees, prior to the City signing the final plat mylars. The development contract will be prepared by the City Attorney. 4 CONCLUSION The Spirit of Brandtjen Farm 7 Addition PUD Development Stage Plan, Preliminary Plat and Final Plat are consistent with the requirements of the Comprehensive Plan, Zoning Ordinance, Subdivision Ordinance and the approved SBF PUD. Our office recommends approval subject to the conditions outlined below: 1. The developer shall provide for year around maintenance of the secondary access road to 170 Street for emergency vehicle access. 2. The developer has a $331,857.22 park dedication credit carried over from the SBF 6 Addition final plat. The park dedication requirement for the SBF 7th Addition final plat is $76,500.00 (34 lots x $2,250.00 /lot). A park dedication credit of $255,357.22 will be carried over to future phases of the SBF PUD. 3. A temporary drainage and utility easement must be provided over Outlot B of the SBF 7 Addition final plat as recommended by the City Engineer. 4. Buffer yard landscaping shall be installed consistent with the approved landscape plan. A certified grading plan of the buffer yard berms must be submitted and approved by the City Engineer prior to installation of the buffer yard landscaping. 5. The grading and utility plans are subject to approval by the City Engineer. 6. SBF 7 Addition shall be developed consistent with the approved SBF Master Plan, the PUD booklet dated 20 June 2005 and the PUD Development Stage Plan /Preliminary Plat. 7. Documents incorporating the SBF 7 Addition final plat as part of the SBF Master Homeowners Association are required to provide for long -term ownership and maintenance of Outlot A and are subject to review and approval of the City Attorney. c. Steven Mielke, City Administrator Keith Nelson, City Engineer David Olson, Community and Economic Development Director Steve Michaud, Parks and Recreation Director Roger Knutson, City Attorney Jacob Fick, Tradition Development 5 I i ' mr eAK ) I 1 N III Ma 1 l i pi uuumu=��= *UUmH mmmmm . I /AIM 1 II City of Apple Valley N 170th Street c a) 0 w Location Map City of Lakeville Spirit of Brandtjen Farm 7th Addition Preliminary Plat Exhibit A 9909-069(096) '%VJ 9909-069(006) 3NO69 00000 991 1.9999 .001 090 09 99 All ,6 0000 S210A3Atlf1S / SeJ33NION3 / SN)NNtlld ` II!H 9a sewer I 1 I I ! r 96199 9105399/1 '99103 '91009 30N39V 33NVNJ 0099 NOLLV2IOd2I03 3HS LaaH s J 37SLL 010939911/ 37993NV1 HOLLIQOV ELL MU Harmon 30 11 ffidS ..3r133 ::0J i fi EXHIBIT B *$09 000(LS6) %Vd 9909-069(096) 'NJNd 01000 NN 3..98118 b0l 36110 09'01 Ala AI 0090 S2101,3A8f1S / SN33NION3 / SM3NNVld •� ul `II!H •H sawed S0*SS Y9OS3NNIN 'YN13 01005 3110YY 33NYN1 0099 NOLLV2IOd O3 LMariciCrIZAZU 39S 603 ZV Id A2IVNI nrad 910039081 30113001 NOLLIaaV H.LL SJVIV13 M r,LaNVIs �O ,i1�uaS O l l V ' 1'' I ^V \/111VV H 1M l�vJ VJIIIVIV Y(_ i, JV 11_10.: EXHIBIT C tin m nos-maw 3/4014d MSS NA �msNra 1:21 MS 71 Al u AI aaz S2lOA3Aaf1S / Stl33NION3 / S213NMIld • #ui ` •a O IIIfl' — wort.. aor sass r1U53NNM VNwa •runs 3fIN3SV 3.1V114 dEIS NOUN Od2IO0 LN3➢Qdo1 A3Q /OA Wad 3JVNIVII 1 ONIQVN9 AaVNIYN'1 Id �.o N 3TN3NVl • M !Ww /P//» " � . : , ;a NOLU(EIY }W. 1(W N3e.LQNVNH 30 .0 lIdS EXHIBIT D AVM 31NONIVIO` - 9+09-069(006) '%V! 1+09-069(006) 3$64 00000 611 311909 VI 3696 7/ 96 a l l 9 0052 SNOA3ANf1S / S2133NION3 / Sb3NNV1d ' 3U1 ` II!H 'H saver fU a s 5 5 0 SCYSS 01053NNIN VN103 111005 30931V 30NV113 0099 NOLLV2I0cM00 ZN3ndoTaA3a ABS 603 NV'Id 39VNIVtIa ' ONIamN9 x21V?WW1I Id 010539919 '3TlN36V1 NOLLIaav FLU RM mama ao ,L1 IdS (3Z 1% m 0 we a Ii1Vd ONOINVIO 37 6 31NONIV IO —"` 90060 90 1102/61/0 - 009 000 -09900 II39 1y! WS-OMOW BANd ff59 Y1053NN1/1 'YNI03 'N11105 311N3r3Y 30NY714 009 cros xn 3.s one WI 101S 'z1. 99 u w aosz /P/�� HOLLV2IOd2I00 .LHJdOTaM CI 3EIS aoe S8OA3A f1S / Sa33NION3 / 913NNVld ..,....:=PIT HVTd moos OH[Qtl2i9 ]C2NHDaT32id •11u1 `11!11 .LI sewer ..0 ...n w y uw .fix Ho Y1093NNp1 '3TN3NY waaV H.L . R2iV3 mamma 40 fl IdS HIVd ONOWVIO EXHIBIT E _ MSS till ^ ) / \ � , B»73Zs � , mAw OU N settler ` ` N Jan dkTaa\ a 2 Ha W! x& & 3 awe AEI NMVaO I II/OE/90 I 31VO I SNO5N3a I I CAD FILE 20662 -07G I PROJECT NO. I 20662 -07 1 VZ£ 1 2 / A » . &� x ( F § _| ) §Z «! " {' \ ( / i ft HIVd a_` OZ9-069(M) ?'/J 9/09-06940) Wild Mc NM 1 'OZl .S 7t 99 u3 M 0092 SHOA3Aaf1S / SN33NION3 / Si13NNYld •3u1 `111H •a sawed SfKS V10S3Mnn V1103 'HMn0S 30x1 V 30nV J OOI x0 � o�03 �d��aQ a0J Old 101111103 annals $ N AII9ImMEd ROIflaUV }WW, ie N3LI .O MndS I arv� AD NMVaO I l l /0090 I 31VO ' SNOISIA321 I I CAD FILE I 20662 -07ECP I PROJECT NO 20662 -07 1 VC " tor./90 ^'• r3Wwi 3 I , '°' "= �. W - " '° �q n v� ler, Niwa Rwwv mat 90 IIOO /91 /Z - ono d3310 -Z990t EXHIBIT F NZ9 1Y1 1109 - 099(259) 3A09 9I NN 39v5XM9 OZl 'a M 9052 SdIDA3ANRS / S2J33NION3 / SS3NNY1d •3U1 `11111 . H saucer 00495 9105394M 94103 '01905 3493AV 309991 0098 NOLLV2IOd2IO3 .LNANdOTaAMQ ARS 904 NV'Id LLPILLfl ANVNDOTNtId 910539141 '31903401 NOLLIOQV ELL II1Y NElatinla dO 118IdS Y.1!!+ik4fdRd499911m hhZ9 (Z96) ILI nog (ZS6) 3ANd VMS V :53NNIN 'VNN13 'winos 3ON31V 30NY444 COBB PRO.ECT NO. 20662 -07 WO L[[SS NM - 1 ,,,, ..13 'On x 1 G 'Zh'9N K1 M 0092 NOLLVIIOd?I03 SN37[dO TA3Q SNDAMS% / Sd33NION3 / S83NNVld `II!H Old 3dV3SQNV'I ) 1Vl d jro NMV1 of /9i iV0 5l1? AD F )662- l m .3u .11 Sealer l NOLLIQQV HIL " I I21 V3 ° Ii � P Z QNV2IH .�0 1LRIIdS ■ � ` C OQ •• �'we �.y "r`T'�. Wed. = e ..��I " �� ` c o • 1 ° - -- X46„ - - � 1 == f = = = It ". ` e.oera � j 0 m 0 02:1VA311108 3S8OH 13V210 HLVd ONOWVIO HLVd GNOMIC AVM 31NOWVIO CJ <C c� <C r J� C) LO <C (.1) - 13NV7 A83/r00STO . / m e , I JIN V 1 / \(,_J, / Y V (. / I c y In " V IlI V V V InV I'nnIii \I- -� JI V v C�`l - (i ) Ld (1) () n \l -, VC2 In I vc] v in ,I v it n , ;I :: n \(1.JA _1 "I(1/,'l - ' \ InLJ IV \lrl V C v, \_J 1 , LJ v ( W cn cn 0 1, z O NV9a SO 1462 /a, /L - 4T95LO EXHIBIT H /509-060006) 0141 1Y09 392,14d L0099 NI 1 ....8 001 3u5 'Z1 Rl M 0000 SriSS 01053NN91 'VN103 '141009 30x340 3001461 00 xou,r ocraoo ma dolansa ass 004 1 Z 'S ' S80A3A816 / S2133NION3 / Sa3NNVld ` IIIH NV'Id adV3SQNV'I DIVNDITI3Nd 'AWh CM! LVC :N9 4D F 662- UEC 1662 .311I 'H Sealer Nolstam HLL . 1 " mamma AO JStuaS YOU t- o 5- w 00 r En T n N 0 0) co N N N N AVM 31NOWVIO GLIVA311108 3SaOH 1JV21O CO 0 4- 0 0 co _ •, ___ aA _ a� V __ •mow L�OOO10 -= ^ =0' c-- y _O ' 9 � r: y -`d CC ' CCe''s'1 %�000e0 'i ' • e o e o • eur"•∎, Oeeoe''w` e z CO rn 0 N 00 O8VA31(10e 3SHOH 1dVNO HIVd ONONVIO AVM 31NC 40 40 M I 0'J 00 M 00C, 0 0 1400/04/0 - 0 ^1'100 -29900 EXHIBIT I QaVA31f108 3S OH 13tl n - < YM I ul Is L____J Memorandum To: Daryl Morey, Planning Director From: Zach Johnson, Assistant City Engineer McKenzie Cafferty, Environmental Resources Manager Copy: Dennis Feller, Finance Director Gene Abbott, Building Official Date: July 14, 2011 * *REVISED ** July 25, 2011 Subject: Spirit of Brandtjen Farm 7 Addition • Preliminary Plat Review • Final Plat Review • Grading Plan Review • Utility Plan Review BACKGROUND City of Lakeville Engineering SBF Development Corporation has submitted a preliminary and final plat named Spirit of Brandtjen Farm 7 Addition. The parent parcels consist of Outlot A, Spirit of Brandtjen Farm 3 Addition and Outlot D, Spirit of Brandtjen Farm 4 Addition and are zoned PUD, Planned Unit Development District. The residential subdivision is located north of and adjacent to 170 Street, west of and adjacent to the future extension of Diamond Path (CSAH -33) and east of the farmstead preservation area. The preliminary plat consists of fifty -nine (59) single - family lots and two (2) outlots on 80.15 acres. The outlots created with the preliminary plat will have the following uses: Outlot A: H.O.A. common area; to be retained by the Developer (0.70 acres) Outlot B: Future residential development; to be retained by the Developer (57.65 acres) SPIRIT OF BRANDT3EN FARM 7 T " ADDITION JULY 14,2011 * *REVISED ** ,7uLY 25, 2011 PAGE 2OF11 The final plat consists of thirty -four (34) single - family Tots and two (2) outlots on 80.15 acres. The Developer is dedicating 1.39 acres as Diamond Path (CSAH -33) right -of -way. The outlots created with the final plat will have the following uses: Outlot A: H.O.A. common area; to be retained by the Developer (0.70 acres) Outlot B: Future residential development; to be retained by the Developer (67.54 acres) SITE CONDITIONS The Spirit of Brandtjen Farm 7th Addition site consists of vacant, undeveloped land that was previously mass graded with the first phase of the Spirit of Brandtjen Farm improvements. STREET AND SITE LAYOUT 170 Street Spirit of Brandtjen Farm 7 Addition is north of and adjacent to 170 Street, a major collector roadway as identified in the City's Transportation Plan. The Developer previously dedicated 55 feet of right -of -way, consistent with the 1 /2 right -of -way requirement for a major collector, with the Spirit of Brandtjen Farm plat. 170 Street is constructed as a two -lane undivided roadway. The north half of the road is an urban section with concrete curb and gutter while the south half is a rural section. Designated left and right -turn lanes exist at the Draft Horse Boulevard intersection. The ultimate roadway section for 170 Street will likely consist of a 52- foot wide undivided urban roadway with shoulders and striped as a three -lane section, with one through -lane in each direction and a center continuous left -turn lane with exclusive turn lanes at the intersections. The City's current Capital Improvement Plan does not include improvements to 170 Street. Diamond Path Spirit of Brandtjen Farm 7 Addition is west of and adjacent to Diamond Path, a future major collector roadway as identified in the City's Transportation Plan. The current Dakota County Road Plat Review Needs Map identifies Diamond Path as a future four -lane undivided County State Aid Highway with a 1 /2 right -of -way requirement of 60 feet. The Developer is dedicating 80 feet of right -of -way, as shown on the plat, to satisfy the 1 /2 right -of -way requirement for Diamond Path. The Dakota County Plat Commission approved the Spirit of Brandtjen Farm 7 Addition preliminary and final plat at its July 18, 2011 meeting and will recommend approval to the Dakota County Board of Commissioners. SPIRIT OF BRANDTJEN FARM 7 Th ADDITION JULY 14, 2011 * *REVISED ** JuLY 25, 2011 PAGE 3 OF 11 The Developer will dedicate right -of -way for Diamond Path, as shown on the preliminary plat, when Outlot B, Spirit of Brandtjen Farm 7 Addition develops. The Diamond Path right -of -way currently consists of a flat, rough - graded dirt surface. The intersection of 170 Street and Diamond Path is barricaded with a locked gate — there is no vehicular traffic. The Developer is responsible for maintenance of the Diamond Path right -of -way (dust control and restoration) until the street is constructed. The right -of -way dedication overlaps an existing 50 -foot wide easement in favor of Williams Companies, Inc. The future design and construction of Diamond Path must be consistent with Dakota County standard specifications, including access spacing and storm sewer requirements, as well as any requirements set forth by Williams Companies, Inc. in relation to the potential relocation of the existing gas pipeline. Prior to City Council consideration, proposed profile grades for Diamond Path must be submitted and reviewed by Dakota County and the City to ensure that the future grading and street construction, including trails, storm sewer and draintile, can be constructed within the right -of -way. The County's current Capital Improvement Plan does not include the construction of Diamond Path. Diamond Path will be constructed in the future when the need for the street is warranted. Draft Horse Boulevard Development of Spirit of Brandtjen Farm 7th Addition includes the construction of Draft Horse Boulevard, a local street. Draft Horse Boulevard will be extended north from the existing stub. Draft Horse Boulevard is designed as a 28 -foot wide urban street with 5 -foot wide concrete sidewalks along both sides. The Developer is dedicating 60 feet of right -of -way, as shown on the final plat, to satisfy the right -of -way requirement for Draft Horse Boulevard. The street and landscaped boulevard design is consistent with the approved Spirit of Brandtjen Farm Planned Unit Development Plan. Draft Horse Boulevard will also be extended north in the future when Outlot B, Spirit of Brandtjen Farm 7 Addition develops. 167 Street 167 Street is designed as a two -lane divided parkway urban street with 5 -foot wide concrete sidewalks along both sides and provides connections to Diamond Path, Draft Horse Boulevard and Diamonte Way. The Developer will dedicate 90 feet of right -of -way, as shown on the preliminary plat, to satisfy the right -of -way requirement for 167 Street. The street and landscaped boulevard design is consistent with the approved Spirit of Brandtjen Farm Planned Unit Development Plan. The Developer will dedicate right -of -way and construct 167 Street when Outlot B, Spirit of Brandtjen Farm 7 Addition develops. SPIRIT OF BRANDDEN FARM 7"' ADDITION 3ULY14,2011 * *REVISED ** JULY 25, 2011 PAGE 4OF11 168 Street Development of Spirit of Brandtjen Farm 7 Addition includes the construction of 168 Street, a local street. 168 Street is designed as a 28 -foot wide urban street with 5- foot wide concrete sidewalks along both sides and provides connections to Draft Horse Boulevard and Diamonte Way. The Developer is dedicating 52 feet of right - of -way, as shown on the final plat, to satisfy the right -of -way requirement for 168 Street. The street and landscaped boulevard design is consistent with the approved Spirit of Brandtjen Farm Planned Unit Development. Diamonte Way Development of Spirit of Brandtjen Farm 7 Addition includes the construction of Diamonte Way, a local street. Diamonte Way is designed as a 28 -foot wide urban street with 5 -foot wide concrete sidewalks along both sides and provides connections to 167 Street and 168 Street. The southern end of Diamonte Way transitions into a loop with a 5 -foot wide concrete sidewalk along one side. The Developer is dedicating 52 feet of right -of -way, as shown on the final plat, to satisfy the right -of -way requirement for Diamonte Way. The street and landscaped boulevard design is consistent with the approved Spirit of Brandtjen Farm Planned Unit Development Plan. Diamonte Way will also be extended north in the future when Outlot B, Spirit of Brandtjen Farm 7th Addition develops. The City reserves the right to increase the street sections at the time of construction based upon site conditions. Barricades and future street connections signs are required at the end of all street stubs. Building permits, except one model home permit, for Spirit of Brandtjen Farm 7 Addition shall not be issued until the concrete curb and gutter and bituminous base pavement have been installed. CONSTRUCTION ACCESS Construction traffic access and egress for grading, utility and street construction is restricted to Diamond Path via 170 Street. PARKS AND TRAILS Development of Spirit of Brandtjen Farm 7 Addition will not require public trail construction. The City's Parks, Trails and Open Space Plan does not designate any area within the proposed plat as future park land. The City's Parks, Trails and Open Space Plan identifies a 10 -foot wide bituminous trail along the west side of Diamond Path. The trail will be built when Diamond Path is constructed. SPIRIT OF BRANDT3EN FARM 7 T " ADDITION ]ULY 14, 2011 * *REVISED ** 7ULY 25, 2011 PAGE 5 OF 11 The Park Dedication requirement will be satisfied through a cash contribution that must be paid with the final plat. The Park Dedication fee, as described in the approved Spirit of Brandtjen Farm Planned Unit Development, is calculated as follows: 34 units x $2,250.00 /unit = $76,500.00 Single - Family Dwelling Units Park Dedication Fee Rate Total The Developer has a $331,857.22 Park Dedication credit carried over from Spirit of Brandtjen Farm 6 Addition. The $76,500 Park Dedication requirement for Sprit of Brandtjen Farm 7 Addition will be applied to the existing Park Dedication credit. A new balance of $255,357.22 shall be applied to future phases of the Spirit of Brandtjen Farm development. The Park Dedication requirement has not been collected on Outlot B, Spirit of Brandtjen Farm 7 Addition and shall be paid (or credited) when the outlot develops. UTILITIES SANITARY SEWER Spirit of Brandtjen Farm 7 Addition is located within subdistrict NC -20070 of the North Creek sanitary sewer district as identified in the City's Comprehensive Sewer Plan. Wastewater will be conveyed via existing public sanitary sewer to the MCES Lakeville Interceptor and continue to the Empire Wastewater Treatment Facility. The existing City -owned downstream facilities have sufficient capacity to serve the residential development. Development of Spirit of Brandtjen Farm 7 Addition includes public sanitary sewer construction. 8 -inch and 10- sanitary sewer will be extended within the subdivision from an existing sanitary sewer stub to provide service to the lots. The Sanitary Sewer Availability Charge has not been collected on the parent parcels and must be paid with the final plat. The Sanitary Sewer Availability Charge is calculated as follows: 34 units x $307.00 /dwelling unit = $10,438.00 Single - Family Dwelling Units Sanitary Sewer Availability Charge Rate Total The Sanitary Sewer Availability Charge has not been collected on Outlot B, Spirit of Brandtjen Farm 7 Addition, and shall be paid at the time the outlot develops. SPIRIT OF BRAND FARM 7"' ADDITION JULY 14, 2011 * *REVISED ** 7uLY 25, 2011 PAGE6OF11 WATERMAIN Development of Spirit of Brandtjen Farm 7 Addition includes public watermain construction. 8 -inch watermain will be extended within the subdivision from an existing watermain stub to provide service to the lots. Final locations and sizes of all sanitary sewer and watermain facilities shall be reviewed by City staff with the final construction plans. In association with MnOPS requirements, utility hook -ups for buildings within Spirit of Brandtjen Farm 7 Addition shall not be permitted until the as -built electronic files have been submitted and approved by City staff. OVERHEAD LINES An existing overhead electric transmission line extends north of 170 Street, outside (east of) the parent parcel boundary. The overhead transmission line is not subject to Title 7 of the City Code and the City's Right -of -Way Management Policy and will not be buried with the development of Spirit of Brandtjen Farm 7 Addition. DRAINAGE AND GRADING Spirit of Brandtjen Farm 7 Addition is located within subdistrict NC -12 of the North Creek drainage district as identified in the City's Water Resources Management Plan. The site was mass graded with Spirit of Brandtjen Farm improvements. Development of Spirit of Brandtjen Farm 7 Addition will not require public stormwater or infiltration basin construction as the contributing drainage area generated within the site was incorporated into the design of the Spirit of Brandtjen stormwater management system. Stormwater runoff generated from within the site will be conveyed via public storm sewer to an existing public stormwater basin located near the northwest corner of the site before eventually discharging into the existing regional infiltration basin located within Outlot C, Spirit of Brandtjen Farm 6 Addition. Prior to City Council consideration, the Developer must submit legal descriptions that establish a temporary public drainage and utility easement across Outlot B, Spirit of Brandtjen Farm 7 Addition for the conveyance of the stormwater runoff. The final grading plan must identify all fill lots in which the building footings will be placed on fill material. The grading specifications must indicate that all embankments meet FHA /HUD 79G specifications. The Developer shall certify to the City that all lots with building footings placed on fill material are appropriately constructed. Building permits shall not be issued until an as -built certified grading plan has been submitted and approved by City staff. SPIRIT OF BRANDT3EN FARM 7"' ADDITION 7uLr 14, 2011 * *REVISED ** 3ULY 25, 2011 PAGE 7 OF 11 A National Pollution Discharge Elimination System General Stormwater Permit for construction activity is required from the Minnesota Pollution Control Agency for areas exceeding one acre being disturbed by grading. A copy of the Notice of Stormwater Permit Coverage must be submitted to the City upon receipt from the MPCA. RESIDENTIAL BUFFER YARD REQUIREMENTS A buffer yard berm and landscaping screen was provided adjacent to 170 Street with previous Spirit of Brandtjen Farm improvements. A certified as -built grading plan of the buffer yard berm must be submitted and approved by City staff. A buffer yard berm and landscaping screen with a combined height of 10 feet will be provided adjacent to Diamond Path, as shown on the landscape plan. A certified as- built grading plan of the buffer yard berm must be submitted and approved by City staff prior to the installation of any buffer yard plantings. STORM SEWER Development of Spirit of Brandtjen Farm 7 Addition includes public storm sewer construction. Storm sewer will be installed within the subdivision to collect and convey stormwater runoff generated from within the public right -of -way and lots to an existing public stormwater basin located near the northwest corner of the site (Outlot C, Spirit of Brandtjen Farm 6 Addition). Draintile construction is required in areas of non - granular soils within Spirit of Brandtjen Farm 7 Addition for the street sub -cuts and lots. Any additional draintile construction, including perimeter draintile required for building footings, which is deemed necessary during construction, shall be the Developer's responsibility to install and finance. The Trunk Storm Sewer Area Charge has not been collected on the parent parcels and must be paid with the final plat. The Trunk Storm Sewer Area Charge is calculated as follows: Gross Area of Spirit of Brandtjen Farm 7 Addition Less Area of Outlot B (Future Development) Less Area of Diamond Path Right -of -Way Total 489,135 s.f. Net Area of Spirit of Brandtjen Farm 7 Addition 3,491,506 s.f. ( -) 2,942,010 s.f. ( -) 60,361 s.f. = 489,135 s.f. x $0.167/s.f. = $81,685.55 Area Charge Total SPIRIT OF BRANDT3EN FARM 7 T " ADDITION JULY 14, 2011 * *REVISED ** JULY 25, 2011 PAGE 8 OF 11 The Developer has a $240,653.19 Trunk Storm Sewer credit carried over from Spirit of Brandtjen Farm 6th Addition. The $81,685.55 Trunk Storm Sewer Area Charge for Sprit of Brandtjen Farm 7 Addition will be applied to the existing Trunk Storm Sewer credit. A new balance of $158,967.64 shall be applied to future phases of the Spirit of Brandtjen Farm development. The Trunk Storm Sewer Area Charge has not been collected on Outlot B, Spirit of Brandtjen Farm 7 Addition and shall be paid (or credited) at the time the outlot develops. WETLANDS There are no existing wetlands within the Sprit of Brandtjen Farm 7 Addition site. TREE PRESERVATION There are no significant trees within the Sprit of Brandtjen Farm 7 Addition site. EROSION CONTROL An erosion control plan has been submitted and includes the following: • A single rock construction entrance. • A seed and mulch specification that meets City requirements. • Inlet protection on all storm sewer structures. • Silt fence to protect offsite areas from sediment transport. • All 3:1 slopes will be seeded and stabilized with fiber blanket or sod. • The site will be re- vegetated within 48 hours of rough and final grading. • Temporary sediment basins are shown on the grading plan. • All streets shall be cleared of debris at the end of each day and maintained to provide safe driving conditions. Street sweeping shall be done weekly or more often as needed. A concrete washout area must be identified in the field and constructed per City specifications. Erosion control blankets must be installed on all stormwater basin slopes that are disturbed during construction. Silt fence or sod (36" minimum width) must be installed behind the curb following the installation of the private utilities. Additional erosion control measures may be required during construction as deemed necessary by City staff or the Dakota County Soil and Water District. All additional measures shall be installed and maintained by the Developer. SPIRIT OF BRANDT3EN FARM 7"' ADDrrION JULY 14,2011 * *REVISED ** 3uLY 25, 2011 PAGE 9 OF 11 SECURITIES The Developer shall provide a Letter of Credit as security for the Developer - installed improvements relating to Sprit of Brandtjen Farm 7 Addition. Construction costs are based upon estimates submitted by the Developer on July 14, 2011. CONSTRUCTION COSTS Sanitary Sewer $ 109,616.37 Watermain 128,344.49 Storm Sewer 110,805.37 Street Construction 227,010.50 Site Grading, Erosion Control, Restoration and Grading 10,108.50 Certification SUBTOTAL - CONSTRUCTION COSTS $ 585,885.23 OTHER COSTS Developer's Design (6.0 %) $ 35,153.11 Developer's Construction Survey (2.5 %) 14,647.13 City's Legal Expense (0.5 %) 2,929.43 City Construction Observation (7.0 %) 41,011.97 Developer's Record Drawing (0.5 %) 2,929.43 Landscaping 40,000.00 Street Lights 8,400.00 Lot Corners /Iron Monuments 3,600.00 SUBTOTAL - OTHER COSTS $ 148,671.07 TOTAL PROJECT SECURITY $ 734,556.30 The streetlight security totals $8,400.00, which consists of seven post -top streetlights at $1,200.00 each. The Developer shall post a security to ensure the final placement of iron monuments at property corners with the final plat. The security is $100.00 per lot and outlot for a total of $3,600.00. The City shall hold this security until the Developer's land surveyor certifies that all irons have been placed following site grading, utility and street construction. SPIRIT OF BRANDT3EN FARM 7 T " ADDITION JULY 14, 2011 * *REVISED ** JULY 25, 2011 PAGE 10 OF 11 CASH FEES The cash fee for traffic control signs is $1,172.00, which consists of two street and stop signs, one stop sign and one "No Outlet" sign. If the street posts are installed in frost conditions, the Developer shall pay an additional $150.00 at each street post location. A cash fee for one -year of street light operating expenses shall be paid with the final plat and is calculated as follows: 34 units x $7.65 /unit /qtr. x 4 qtrs. = $1,040.40 Dwelling Units Street Light Operating Fee Total A cash fee for one -year of surface water management expenses shall be paid with the final plat and is calculated as follows: x 4 qtrs. = $952.00 34 units x $7.00 /unit /qtr. Dwelling Units Surface Water Management Fee Total A cash fee for the preparation of record construction drawings and for upgrading the City base map shall be paid with the final plat and is calculated as follows: 36 lots and outlots x $75.00 /unit = $2,700.00 Lots and Outlots City Base Map Updating Fee Total The Developer shall submit the final plat and construction drawings in an electronic format. The electronic format shall be either a .dwg file (AutoCAD) or a .dxf file. The Developer shall also pay a cash fee for City Engineering Administration. The fee for City Engineering Administration will be based on three percent (3.00 %) of the estimated construction cost, or $17,576.56. CASH REQUIREMENTS Sanitary Sewer Availability Charge Traffic Control Signs Street Light Operating Fee Surface Water Management Fee City Base Map Updating Fee City Engineering Administration (3.00 %) TOTAL CASH REQUIREMENT $ 10,438.00 1,172.00 1,040.40 952.00 2,700.00 17,576.56 $ 33,878.96 SPIRIT OF BRANDTIEN FARM 7"' ADDITION 3ULY 14,2011 * *REVISED ** 7uLY 25, 2011 PAGE 11 OF 11 NEW BALANCE OF DEVELOPER CREDITS Park Dedication Credit Trunk Storm Sewer Credit TOTAL DEVELOPER CREDITS * *TO BE APPLIED TO FUTURE PHASES ** RECOMMENDATION $ 255,357.22 158,967.64 $ 414,324.86 Engineering recommends approval of the preliminary plat, final plat, grading plan and utility plan for Sprit of Brandtjen Farm 7 Addition, subject to the comments within this report and the following: Prior to City Council consideration: • The Developer must submit proposed profile grades for Diamond Path to Dakota County and the City to ensure that the future grading and street construction, including trails, storm sewer and draintile, can be constructed within Diamond Path right -of -way. • The Developer must submit legal descriptions that establish a temporary public drainage and utility easement across Outlot B, Spirit of Brandtjen Farm 7 Addition for the conveyance of the stormwater runoff.