Loading...
HomeMy WebLinkAboutItem 06.cSeptember 14, 2011 Proposed Action SEPTEMBER 19, 2011 CITY COUNCIL AGENDA ITEM APPROVE CHANGE ORDER NO. 1 TO BCM CONSTRUCTION, INC. 2011 Street Reconstruction City Improvement Project 11 -02 Staff recommends approval of Change Order No. 1 in the amount of $9,465.50 to BCM Construction, Inc. for the 2011 Street Reconstruction project, City Improvement Project 11 -02. Overview Attached is Change Order No. 1 to BCM Construction, Inc. with a net contract increase in the amount of $9,465.50. During construction of the storm sewer facilities along 208 Street, it was determined that the existing watermain was installed at an elevation that differed from the elevation specified on the City's record drawings, The Change Order is necessary for the additional cost incurred to lower the watermain at two storm sewer crossings. This increase results in an adjusted contract amount as follows: 1Change u Order No. 1 ld n f4ei H. Nelson City Engineer Original Contract Change Order No. 1 Primary Issues to Consider None. Supporting Information cc: BCM Construction, Inc. 61,808,150.90 $ 9,465,50 $1,817,616.40 Item No. Financial Impact: $ 9,465.50 Budgeted: Y Source: 429 Bonds Related Documents (CIP, ERP, etc.): Notes: CITY OF LAKEVILLE - 2011 STREET RECONSTRUCTION CITY PROJECT NO. 11 -02 WSB NO. 1715 -72 OWNER; CITY OF LAKEVILLE 20195 HIOLYOKE AVENUE LAKEVILLE, MN 55044 -8339 Na RD E CONTRACTOR: BCM CONSTRUCTION, INC. 15760 ACORN TRAIL FARIBAULT, MN 55021 YOU ARE DIRECTED TO MAKE THE FOLLOWING CHANGES IN THE CONTRACT DOCUMENT DESCRIPTION: "LOWERING EXISTING WATERMAIN AT TWO STORM SEWER CROSSINGS WHERE AS- BUILTS INCORRECTLY IDENTIFIED WATERMAIN DEPTHS." IT IS UNDERSTOOD THAT THIS CHANGE ORDER INCLUDES ALL ADDITIONAL COSTS AND TIME EXTENSIONS WHICH ARE IN ANY WAY, SHAPE, DR FORM ASSOCIATED WITH THE WORK ELEMENTS DESCRIBED ABOVE. CHANGE IN CONTRACT PRICE: ORIGINAL CONTRACT PRICE: PREVIOUS CHANGE ORDERS: CONTRACT PRICE PRIOR TO THIS CHANGE ORDER: NET INCREASE /DECREASE OF THIS CHANGE ORDER: CONTRACT PRICE WITH ALL APPROVED CHANGE ORDERS: RECOMMENDED BY: MONICA HEIL, PE, PROJECT MANAG APPROVED BY: 44.. „1. r WSB & ASSOCIATES, INC ENGINEER CITY ENGINEER DATE OF COUNCIL ACTION R $1,808,150.90 $0.00 $1,808,150.90 $9,465.50 $1,817,616.40 CHANGE IN CONTRACT TIME: ORIGINAL CONTRACT TIME; NET CHANGE FROM PREVIOUS CHANGE ORDERS: CONTRACT TIME PRIOR TO THIS CHANGE ORDER: NET INCREASE OF CHANGE ORDER: CONTRACT TIME WITH APPROVED CHANGE ORDERS APPROVED BCM CONSTRUCTION, INC. CONTRACTOR CITY ADMINISTRATOR IClaaigarilAdminIConstruction AdminlPay Vouchersl1715 -72 Change Order No. T 050111.x1sCO -7 September 1, 2011 10115/2011 NIA 10/15/2011 N/A 10/15/2011 CITY OF LAKEVILLE - 2011 STREET RECONSTRUCTION CITY PROJECT NO. 11 -02 WSB NO. 1715-72 ADDED ITEIVIS Item No. Description CREW TIME - LABOR, TRUCKS & EQUIPMENT WITH 110 OPERATORS 111 6" DIP VVATERMAIN 112 6" 45° MJ BEND 113 6" SLEEVE LONG MJ 114 6" MEGALUG FLANGE 115 6" MJ GASKETS 116 3/4 X 3.5 CORE BLUE BOLTS 117 4" INSULATION BOARD 6` X 4' 118 CONTRACTOR MARKUP 15% 119 MINN SALES TAX ON MATERIALS .06875 Qtv Unit Price September 1, 2011 Extended Amount 10 HOURS $675.00 $6,750.00 39 FEET $16.45 $641.55 8 EACH $86.00 $688.00 2 EACH $86.00 $172.00 20 EACH $21.50 $430.00 20 EACH $2.00 $40.00 120 EACH $1.85 $222.00 4.89 SO YD $14.40 $70.42 1 LUMP SUM $309.62 $309.62 1 LUMP SUM $141.91 $141.91 TOTAL INCREASE CHANGE ORDER NO. 1 $9,465.50 ADJUSTMENT TO ORIGINAL CONTRACT AMOUNT $9,465.50 K :541715- 721AdminiCansfrucfion Admin1Pay Vouchers11715.72 Change Order No 1 090111 xis