HomeMy WebLinkAboutItem 06.dSeptember 14, 2011
Proposed Action
Staff recommends approval of Change Order No. 1 in the amount of $8,108.40 and Pay
Estimate No. 1 in the amount of $132,461.83 to Barber Construction, Inc. for the Safe
Routes to School project, City Improvement Project 08 -09.
Overview
Attached is Change Order No. 1 to Barber Construction, Inc. with a net contract increase
in the amount of s8,108.40. The Change Order is necessary due to minor design changes
and minor extra work needed due to conditions different than those shown on the plans
that were encountered during construction. This increase results in an adjusted contract
amount as follows:
Primary' Issues to Consider
None.
Supporting Information
Change Order No. 1
Pay Estimate No. 1
Keith H. Nelson
City Engineer
Original Contract
Change Order No. 1
cc: Barber Construction, Inc.
Financial Impact: $ 0 Budgeted:
Related Documents (CIP, ERP, etc.):
Notes:
Item No.
SEPTEMBER 19, 2011 CITY COUNCIL AGENDA ITEM
APPROVE CHANGE ORDER NO. 1 AND PAY ESTIMATE NO. 1
TO BARBER CONSTRUCTION, INC.
Safe Routes to School
City Improvement Project 08 -09
$178,279.50
1 8,108.40
$186,387.90
Source: MnDOT
Owner: City of Lakeville By:
Date: By:
-Nature of the Changes,:
1, Adjust Frame & Ring Castings
2, 18" RC Pipe
3, Transformer and Service .Egulp ent
4, Hygroseeding
CHANGE ORDER NO. 1
Owner, Cite of Lakeville Project No,: 08-09
roject: City of Lakeville Sate Routes to School
Contractor% Barber Construction, Inc.
Contract
D.ate; Original Contract Amount $178,27930
To: Barber Construction, inc. (Contractor), you are hereby directed to make the changes
noted below in the subject Contract:
These changes result in the following adjustment of Contract Price:
Oriairial Contract Price $ 178,27950
Change - Order No. 1 $ 8,108,40
Current Contract Price, Including this Change Order $ 186,387.90
Tne above changes are approved: City of Lakeville_
The above changes are accepted:
By:
Date:
By:
Date:
Mark Beliows, Mayor
Charlene Friegges, City Clerk
Keith H., Nelson., City Engineer
Barber Cosntruction,
CHANGE ORDER 1
City of Lakevilie Safe Routes to School
City of Lakevilie Improvement Project No. 0S-09
Item 'No, Item Unit Unit Price Quantity Amount
2506.522 ADJUSi FRAME RING & CASTING Each $ 1,600.00 1 $ 1,600.00
2506.522 ADJUST FRAME RING & CASTING Each $ (800.00) 1
_,. 5
(800.00)
2104.501 REMOVE SEWER PIPE (STORM) LF $ (50.00) 10 $
(500.00)
2502.521 18" RC PIPE DRAIN CLASS V LF 5 80.00 30 S 2400.00
2502.521 12" RC PIPE DRAIN CLASS v LF $ (64.00) 25 (1.600.00)
2565.602 TRANSFORMER & SERVICE EQUIPMENT Each $ 4,558.40 1 = - . 4,550.40
2575.623 HYDROSEEDING SY $ 3.50 700 $ 2.450.00
CHANGE ORDER NO. I TOTAL ..$ E.,10S-40
PROJECT: City of Lakeville Safe Routes to School
SP 188 - 591 -002 Minn Proj 1910(164)
City Improvement Project 08 -09
DATE:
ESTIMATE NO
OWNER:
CONTRACTOR:
ORIGINAL CONTRACT AMOUNT:
CHANGE ORDER NO. 1
TOTAL CONTRACT AMOUNT
REMARKS:
RECOMMENDATION FOR PAYMENT
September 9, 2011
1
City of Lakeville, Minnesota
Barber Construction, Inc.
4350 Main Street
St. Bonifacious, MN 55375
WORK COMPLETED TO DATE:
MATERIALS ON HAND:
SUBTOTAL:
LESS AMOUNT RETAINED: 5%
LESS PREVIOUS PAYMENTS:
AMOUNT DUE THIS PAYMENT:
SUMMARY
REQUEST THIS ESTIMATE
$178,279.50
$ 8,108.40
$186,387.90
139,433.50
139,433.50
6,971.67
132,461.83
This is to certify to the best of my knowledge, information and belief, the quantities and values of
work certified herein are fair approximate estimates for the period covered by this voucher_
Name of Contractor:
BARBER CONSTRUCTION, INC.
This is to certify that the work shown in the Statement of Work certified herein has been actually
furnished for the above- mentioned project in accordance with the plans and specifications
heretofore approved and that the total work is 75% completed as of September 9, 2011. I
hereby recommend payment of this voucher.
SIGNED:
DATE:
Mark DuChene
SIGNED:
TITLE:
DATE:
RECOMMENDED FOR PAYMENT BY THE CITY OF LAKEVILLE, MINNESOTA.
SIGNED: SIGNED:
City Engineer Finance Director
DATE: DATE:
Item No.
CITY 09 LAKEVILLE SAFE ROUTES TO SCHOOL
PROJECT: CITY OF LAKEVILLE PROJECT NO. 08 -09
S.P. NO. 188 -591 -002
MINNESOTA PROJECT N0. SRTS1910(164)
OWNER: CITY OF LAKEVILLE
CONTRACTOR BARBER CONSTRUCTION, INC
PAY ESTIMATE NO: 6. Sep -11
Item Quantity Unit
2104.501 REMOVE SEWER PIPE (STORM; 16 LF S 50.05 $ 500500
2104.501 REMOVE CURB AND GUTTER 117 LF 5 17.00: $ 1,989,00
2104.503 REMOVE CONCRETE WALK 245 SF 9 G_00 2 1,47000
2104.505 REMOVE BITUMINOUS PAVEMENT 78 SY : $ 9.00 6' 024.00
2104.505 REMOVE PIPE APRON EACH I $ 1,000700 i 5 1,000.00
2104.509 REMOVE DRAINAGE STRUCTURE EACH $ 2,000,00 18 2,000.00
2104.523 SALVAGE SIGN TYPE 0 2 EACH i 5 400700 9 800.00
2105.501 COMMON EXCAVATION 18) 720 CY 3 19,00 1 9 13,860..00
2105,522 SELECT GRANULAR BORROW )CV) 105 CY S 20.00 Si 2,100.00
2211 501 AGGREGATE, EASE CLASS 5 745 TON : 5 1 0.00 9 14,155,00
2502.521 12" RC PIPE CRAIN CLASS V 25 LF 9 64.00 9 1500.00
2502.602 005500770 EXISTING STORM SEVER 1 EACH. 0 2.000.00 I 5 2.000,00
2506.502 CONST DRAINAGE STRUCTURE DESIGN SPECIAL 1 EACH r 9 7.900.00 $ 7900.00
2505.522 ADJUST FRAME & 91140 CASTING 1 EACH i 9 800.00: 5 806.00
252 .501 4" CONCR =T= WALK 8,165 5F 15 4.00 :, $ 32,660.00
2521.511 2.5" BITUMINOUS WALK 15.815 SF I S 1.00 5 30,048.50
2531.501 CONCRETE CURB &GUTTER DESIGN 8615 117 LF i 5 27.00 5 3,155.00
2531.602 PEDESTRIAN CURB RAMP - TRUNCATED DOME SYS 8 EACH 0 400.00 5 3.200.00
2540.602 6109000 RACK 3 EACH 1,200.00 I $ 3,600.00
2545.523 2" NON-METALLIC CONDUIT 225 L9 $ 5.000 1 5 1,125.00
2545.523 2" NON - METALLIC COND (D1RECT1ONAL BORE} 200 LF ', 9 22.00 ! 9 4,400.00
2545 553 HANDHOLE 7 EACH 1 $ 930.00 S 5 , 3 00.00
2563.601 TRAFFIC CONTROL 1 L5 2,000.00 5 2,900.00
2564.537 €NSTALL SIGN TYPE C 11 EACH 1 € 300.00 ` 55 3,300.00
2565.616 FLASHING BEACON SYSTEM SYS $ 24,000.00 I $ 24,000.00 I
2573.502 SILT FENCE. TYPE PREASSEMBLED 1.573 LF i 5 2.00 i $ 3,140.01
2573.530 STORM CRAIN INLET PROTECTION 2 EACH $ 100.00 5 2000.00
2575.505 SOGD!NG TYPE LAWN 700 SY ".9 7.00 9 4.9600.00
2575.555 TURF ESTA30SHMENT LS 15 3.000.00 I 0 3,000.00
2582.502 2 4" 50=_15 LINE WHETS -PAINT 58 59 i 5 7.00 406.00
2582.503 CROSSWALK MARKING - PAINT 378 SF a 3.50 $ 1.323.000
TOTAL: 5 17 8,279.50
Current
Contract Contract Pay Est. Current Pay Est. 06861110
Price Extension Quantity Extension to Date Extension to Date
CHANGE ORDER 1
Minor Extra Work Order 1
2506.522 ADJUST FRAME RING & CASTING EACH 5 1,600.00 3 1,60000 I 1,600.00 r 1.00 0 1,600.06
2506.522 ADJUST FRAME RING & CASTING -1 EACH 5 800.00 `= 5 (800 00)
$
800.00 $ 1,600.00 $ 1,600,00
Minor Extra Work Order 2
2502.521 18" RC PIPE DRAIN CLASS V 3D LF 980.00 i $ 2.400,00 30 0 2,403.00 ! 30 9 2,400.00
2104.501 REMOVE SEWER PIPE (STORM) -10 LF 950,00) $ (500.00)
2502.521 12" RC PIPE 0991N CLASS V -25 99 004.00 5 (1.600.00)
$ 300.00 $ 2,400.00 $ 2,400.00
0 9 0 a -
127 9 2.159,00 127 9 2. 159.00
207 9 1 1.002,00 267 5 1,502.00
78 S 024.00 78 5 3 0000
6 1.000 1 5 ":,000000'
5 2.000.00 1 5 2,000.00
2 5 800.00 2 $ 800.00
720 $ 13,0080.00 7200 9 13.580.00
139 S 2,780.00 139 5 2,780.61-
725 5 13_ 725 a ':3,775.000
0 $ - 0 9 -
1 1 2,000.00 1 0 2.000130
1 5 7,900.00 �, 7,90000
G 9 - 0 -
7,780 5 31,120.00 7,780 5 31,120 00
45.615 S 30,548 50 15,61E 5 30,048.50
127 $ 3,429 000 127 9 3 .429 00
8 9 3,200.00 8 5 3.200.00
8 c
2,900.00 1 5 2.500.00
11 5 3305.00 11 9 3,3^-0.00
9 9
083 9 1.376.00 688 $ 1,376.00
2 0 203.00 2 5 200.00
0 5 - 9 -
9 3,000.00 1 3000.00
60 5 420.00 60 5' 420.00
342 E 1,197.00 342 a 1,197.00
$ 128,510,50 $ 128,51 0.50
Minor Extra Work Order 3
2565.602 TRANSFORMER & SERVICE EQUIPMENT 1 Each 9 4,558.40 3 5 2,558. [ 0 5 0
$ 4,558.40
Minor Extra Work Order 4
2575.623 HYDROSEEDING 700 SY $ 3.50 S 2.450:00 1,976 5 6,923.00 [ 1978.00 0 6,923.00
$ 2,450.00 $ 6,923.00 $ 6,923.00
GRAND TOTAL:
9186,387.90 9130.433.50
Measured Quantitiy was 7836 sf, Failing concrete tests for 818!11 pour resulted in payment of 985 for 34.5 yards poured that day (56 sf deduct).
5 539,433.50 75°l